Household Kinrara Residence - Link Houses

views
     
TSndykh
post May 19 2011, 02:33 PM, updated 13y ago

Getting Started
**
Junior Member
66 posts

Joined: May 2011


hello there,

any update on the S&P & signning on the new layout?


Added on May 19, 2011, 2:43 pmi heard almost all of the "upgrade" owner are not going to sign anything

for your info, the status of the house now almost 70% to 80% completion

This post has been edited by ndykh: May 19 2011, 02:43 PM
krgia10
post May 19 2011, 06:14 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
How about you, opt for upgrade?


TSndykh
post May 19 2011, 07:40 PM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


ya... i opt for the ugrade... didnt agree with it.. so didnt sign..



This post has been edited by ndykh: May 19 2011, 07:41 PM
krgia10
post May 19 2011, 08:39 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
Then what the lawyer said?

For 2 1/2 storey, it should be follow the revised plan, of course the DMC is sided to the developer.
mrkenjiro
post May 19 2011, 09:19 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


The lawyer, Mr Ng has not call me yet. Anyone signed?
TSndykh
post May 20 2011, 08:42 AM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


he didnt call me neither

i got to know that Mr. Ng will be at 2 1/2 Mahajaya sample house every Sunday

u try to call the lawyer firm and look for his assistant (Ms. Choo)

tell her that u wan to make appointment with Mr. Ng


Added on May 20, 2011, 8:50 am
QUOTE(krgia10 @ May 19 2011, 08:39 PM)
Then what the lawyer said?

For 2 1/2 storey, it should be follow the revised plan, of course the DMC is sided to the developer.
*
For 2 storey, the lawyer said that MS fail to obtain approval for the new layout. (without the corridor & with the additional built up)

Therefore, MS have to revise again and put back the corridor. He claimed that the outlook now is similar to 3 storey superlink by MS

Secondly, we have to pay the RM100 (guard) + RM50 (clubhouse) upon getting the key but the old S&P said that its free.
I think this is applied to 2 1/2 storey as well.

From what I know, alot upgrade owner do not agree to sign it

This post has been edited by ndykh: May 20 2011, 08:50 AM
krgia10
post May 20 2011, 09:00 AM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
Ya, supposedly it should come with 2 years free Security fee.

For 2 storey, you mean they will put back the balcony? Or corridor? So what is the latest built up size?
mrkenjiro
post May 20 2011, 09:00 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Hmm...
Honestly I have a few thing I am unhappy with

1. Lawyer - Our lawyer 'Mr Ng' is a;ways keeping us in dark. I met up with him 1 month ago where he told me to prepare to sign the SPA+MOT but until today no sound. Also because of the delay for the signing of SPA + Loan Agreement, my bank is pulling back the loan because no disbursement in 1 year which is okay as it was already writte in the earlier LO but this lawyer should step in and talk to them. Bloody hell, now I have to convince the bank to extend the facility
One word - This fella's a crap but we are stuck with him.

2. New Layout - If MS failed to obtain approval for the new layout, it's fine but remember we actually failed 28k for that upgrade so the new revision by MS must be at least equal to what was promised earlier or if he is not revising the build up, please give us some goodies such as auto-gate, air con, water heater, etc to compensate

3. 2 years free maintenance - Now this pissed me off the most. How can they reversed whatever that were agreed earlier. THis is crap la. I'll defiitely not sign the DMC for this until an agreement is reached. And I heard from some owner that it will be more than 150 bucks a month

I have not sign or see the SPA therefore I couldn't comment about my dissatisfaction but Mr Ng know I am hard to dealt with, maybe that's why he hasn't get me to sign the thing because I already communicated earlier to him that I'll only sign if everything is as per the earlier SPA with MH. Therefore for those that has already signed, kindly bring this case to MS via the lawyer. I can't because technically I have not sign and I am only writing this based on what I heard from other owner
krgia10
post May 20 2011, 09:08 AM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
Totally agree with you, if not much changes from MH design, why should you pay 28K to them?

The lawyer is the biggest failure for this deal!
mrkenjiro
post May 20 2011, 09:15 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Fyi, the lawyer knows about this forum but I am not sure if he actually reads what we said. So Mr. Ng, if you are reading this, kindly disseminate more information to all your 80 plus clients. You can just drop by this forum and let us know what's the current status is as and when needed

It's bloody hard to get you...
krgia10
post May 20 2011, 09:22 AM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
Wa... luckily did not mention which unit that I own... tongue.gif

We are severely behind schedule for S&P, Loan Agreement and MOT... buck up Mr. Lawyer !
mrkenjiro
post May 20 2011, 11:14 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


LOL

Don't worry about Mr Lawyet jeopardizing everything and taking personal 'revenge' over our comment here. From how I look at it, he's doing a good job dealing with MS, just a bad one dealing with us.
TSndykh
post May 20 2011, 11:30 AM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


ya.. agreed with you...

our situation is 1st in M'sia, so the lawyer also dunno what to do sometimes biggrin.gif

but I know he is doing his very best communicate with MS & fight for us

i remember asking him at least to update us..

but he said he know we all didnt satisfied with the changes so no point calling us
krgia10
post May 20 2011, 11:42 AM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
But keeping us in dark will make the situation worse.

I am expecting at least some update from time to time.


mrkenjiro
post May 23 2011, 09:33 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Guys,

I went to the site on Saturday for a look.
I have to say that the progress is very good as some units even have the roof done. I was trying to see the fascade and it is definitely different compare to the MH's one but I cannot identify how it will look like as they are still building it. The way I look at it, we are about 40-50% done... that's quick but hopefully MS do not sacrifice the quality
krgia10
post May 23 2011, 02:27 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
2 storey should look like this?

user posted image



ozak
post May 23 2011, 03:24 PM

10k Club
********
All Stars
17,021 posts

Joined: Jan 2005


Is this the mah sing develop kinrara resident? I when there yesterday. The salesgirl said maintenance fee is rm310?
mrkenjiro
post May 23 2011, 09:20 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


QUOTE(krgia10 @ May 23 2011, 02:27 PM)
2 storey should look like this?

user posted image
*
Hmm... if this is the one then it is not the same as the one I signed earlier as I remember there's no balcony... The one I got from MS was this
user posted image

Uploaded with ImageShack.us

One question I want to ask. Will those that purchase with MH and opt for upgrade has similar fascade as the one sold by MS?


Added on May 23, 2011, 9:21 pm
QUOTE(ozak @ May 23 2011, 03:24 PM)
Is this the mah sing develop kinrara resident? I when there yesterday. The salesgirl said maintenance fee is rm310?
*
RM310 for which type? 2 storey? 2 1/2 storey? 3 storey?

This post has been edited by mrkenjiro: May 23 2011, 09:32 PM
krgia10
post May 23 2011, 10:40 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
QUOTE(mrkenjiro @ May 23 2011, 09:20 PM)
Hmm... if this is the one then it is not the same as the one I signed earlier as I remember there's no balcony... The one I got from MS was this
user posted image

Uploaded with ImageShack.us

One question I want to ask. Will those that purchase with MH and opt for upgrade has similar fascade as the one sold by MS?


Added on May 23, 2011, 9:21 pm

RM310 for which type? 2 storey? 2 1/2 storey? 3 storey?
*
The facede should be same for both MS & MH purchaser. Which design u prefer?
alfredfx
post May 24 2011, 12:20 AM

Enthusiast
*****
Senior Member
715 posts

Joined: Jan 2003
From: Cheras
it has a gate or no ?
mrkenjiro
post May 24 2011, 09:01 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


krgia10,
I've seen the balcony in the 3storey/semi D and it is too small to fit anything so I don't see a point of having a balcony. If it is not taken care well, it'll just gather dust and dirt. I would prefer without balcony and the space that the balcony occupied to be part of the masterbedroom, easily get additional 30-40 sq feets...

I think we need to know what is the status right now. The way I understand it right now the layout is not approved by the local council...

alfredx,
Yes. There's gate. It's not open concept
krgia10
post May 24 2011, 09:17 AM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
QUOTE(mrkenjiro @ May 24 2011, 09:01 AM)
krgia10,
I've seen the balcony in the 3storey/semi D and it is too small to fit anything so I don't see a point of having a balcony. If it is not taken care well, it'll just gather dust and dirt. I would prefer without balcony and the space that the balcony occupied to be part of the masterbedroom, easily get additional 30-40 sq feets...

I think we need to know what is the status right now. The way I understand it right now the layout is not approved by the local council...

alfredx,
Yes. There's gate. It's not open concept
*
IINM the design without balcony was rejected by local council, that's why the came out with this design.

You will only know the finalized design when you sign your S&P. Get Mr. Lawyar. sweat.gif
endieyap
post May 24 2011, 07:16 PM

New Member
*
Junior Member
22 posts

Joined: Oct 2010


QUOTE(mrkenjiro @ May 23 2011, 09:33 AM)
Guys,

I went to the site on Saturday for a look.
I have to say that the progress is very good as some units even have the roof done. I was trying to see the fascade and it is definitely different compare to the MH's one but I cannot identify how it will look like as they are still building it. The way I look at it, we are about 40-50% done... that's quick but hopefully MS do not sacrifice the quality
*
in fact i think its should be 70% completion
ya, confirmed that they cant get the previous layout & now they will use the facade that have balcony with the outside layout similar to 3 story link hse

i got to know that someone actually "sneak" into the construction side and have a look of the unit that have the roof done.
they said that they saw the "roof(top)" of each room is empty on the 1st floor.
last time MH confirmed that the roof top of each room will be cemented.

which mean will they covered the roof of each room with only wood or how?
what i mean is by right they should covered with cement 1st then only they put up the roof outside rite?

i'm not engineer nor have good knowledge in construction but this is just my common sense.
mrkenjiro
post May 24 2011, 11:36 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


QUOTE(endieyap @ May 24 2011, 07:16 PM)
in fact i think its should be 70% completion
ya, confirmed that they cant get the previous layout & now they will use the facade that have balcony with the outside layout similar to 3 story link hse

i got to know that someone actually "sneak" into the construction side and have a look of the unit that have the roof done.
they said that they saw the "roof(top)" of each room is empty on the 1st floor.
last time MH confirmed that the roof top of each room will be cemented.

which mean will they covered the roof of each room with only wood or how?
what i mean is by right they should covered with cement 1st then only they put up the roof outside rite?

i'm not engineer nor have good knowledge in construction but this is just my common sense.
*
This kinds of thing very hard to judge as it is not mentioned in the SPA. I guess the best person to answer is the project manager for our phase. They will have everything layout but not sure if they can reveal it to us or not
pcteck19
post May 25 2011, 09:15 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
supposingly last sunday going to sign the upgrade plan as the Ms Choo called. however, mana tau last minuts (saturday) she sms and said cancelled, till further notice.

Anyone happen the same thing? i guess cancelled due to upgrade statement was not clear enough for purchaser who choose to upgrade
TSndykh
post May 25 2011, 11:59 AM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(pcteck19 @ May 25 2011, 09:15 AM)
supposingly last sunday going to sign the upgrade plan as the Ms Choo called. however, mana tau last minuts (saturday) she sms and said cancelled, till further notice.

Anyone happen the same thing? i guess cancelled due to upgrade statement was not clear enough for purchaser who choose to upgrade
*
i went there few weeks back. the lawyer knows that we(opt for upgrade) will not agree with the new arrangement.
so he just explain to me what are the changes & ask us to take back & consider.
he said he will "update" us wor.

WAIT lor..
pcteck19
post May 25 2011, 02:23 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(ndykh @ May 25 2011, 11:59 AM)
i went there few weeks back. the lawyer knows that we(opt for upgrade) will not agree with the new arrangement.
so he just explain to me what are the changes & ask us to take back & consider.
he said he will "update" us wor.

WAIT lor..
*
what i worry is about the bank loan, just like mrkenjiro, the bank pull back the agreement since not active for year.

damn, the lawyer said will update, but for weeks never get his call
SUSUFO-ET
post May 25 2011, 05:10 PM

Look at all my stars!!
*******
Senior Member
6,747 posts

Joined: Sep 2010


Be proactive, drop by Mah Sing office to solve the problems, I foresee the longer the issue being dragged, the insecure of your interest, TMS is not easy to deal with...
Try to think the consequences if you dun sign the incomplete DMC at all...it could turn worst, give and take a bit
my 2 bakuli
mrkenjiro
post May 26 2011, 08:54 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


I think UFO is correct. I think we should bring our concern to TMS with or without the lawyer.

Can we meet up and discuss this with TMS say this Sat (is their office open on Saturday?)
pcteck19
post May 26 2011, 10:13 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ May 26 2011, 08:54 AM)
I think UFO is correct. I think we should bring our concern to TMS with or without the lawyer.

Can we meet up and discuss this with TMS say this Sat (is their office open on Saturday?)
*
can we do it on sunday? as i'm not available on saturday
mrkenjiro
post May 26 2011, 12:49 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Tell you guys what. Maybe I'll drop by first since I am staying quite to close to the place this weekend and talk to TMS.
But I need you guys to help me to list down the question to be posted to them.

I'll start the ball rolling

1. Why is the delay in the signing of SPA?
2. What will be the monthly maintenance fees?
3. Will there be a 2 years free maintenance fees after vacant?


pcteck19
post May 26 2011, 02:17 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
4. since no extra built-up area, what are the changes of upgrade plan statement? going to sign new upgrade plan statement?

5. new floor layout

TSndykh
post May 26 2011, 02:44 PM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


the lawyer had given me the new floor layout, everything is the same except the corridor and some changes to lighting point, a/c point, etc

remember to inform & remind them that our bank will withdraw the loan if it continued to delay

i got 1 silly question but u no need to ask : can MS remove & relocate the Surau & Dewan to somewhere near Clubhouse? tongue.gif
pcteck19
post May 26 2011, 04:59 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
MS reduce the lighting & a/c points?
TSndykh
post May 26 2011, 06:59 PM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(pcteck19 @ May 26 2011, 04:59 PM)
MS reduce the lighting & a/c points?
*
let me sum up (referring to Intermediate Lot) :-

Old: New
light point 39: 28
power point 20: 20
telephone 2: 2
ceiling fan 4: 6
MATV 3: 3
Water heater 3: 3
gate light 1: 1
door bell 1: 1
air-cond point 4: 5

This post has been edited by ndykh: May 26 2011, 07:22 PM


Attached thumbnail(s)
Attached Image Attached Image Attached Image Attached Image
mykidzshop
post May 26 2011, 09:43 PM

New Member
*
Newbie
1 posts

Joined: Jan 2011
1. Why is the delay in the signing of SPA?
2. What will be the monthly maintenance fees?
3. Will there be a 2 years free maintenance fees after vacant?
4. since no extra built-up area, what are the changes of upgrade plan statement? going to sign new upgrade plan statement?
5. new floor layout
6. can MS remove & relocate the Surau & Dewan to somewhere near Clubhouse?
mrkenjiro
post May 30 2011, 12:29 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Did not manage to go last weekend. Busy with stuff and all. Will try to go again this weekend


Added on June 6, 2011, 11:21 pmThe lawyer called me today. Will sign the SPA this Sat. Anyone got a call from him as well?

This post has been edited by mrkenjiro: Jun 6 2011, 11:21 PM
pcteck19
post Jun 7 2011, 09:17 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ May 30 2011, 12:29 PM)
Did not manage to go last weekend. Busy with stuff and all. Will try to go again this weekend


Added on June 6, 2011, 11:21 pmThe lawyer called me today. Will sign the SPA this Sat. Anyone got a call from him as well?
*
yes, the lawyer called me yesterday, ask me to sign the SPA on this coming Saturday 2pm.
what he said is we can compare the SPA and decide to sign or not.

TSndykh
post Jun 7 2011, 05:25 PM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(pcteck19 @ Jun 7 2011, 09:17 AM)
yes, the lawyer called me yesterday, ask me to sign the SPA on this coming Saturday 2pm.
what he said is we can compare the SPA and decide to sign or not.
*
yeap...u will get the same thing that i posted early..the new plan & the new specs
so, u can decide wan to sign or not with the changes..
i dunno whether he got any updated news for u all anot...
if got, pls share here ya smile.gif
pcteck19
post Jun 8 2011, 10:42 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(ndykh @ Jun 7 2011, 05:25 PM)
yeap...u will get the same thing that i posted early..the new plan & the new specs
so, u can decide wan to sign or not with the changes..
i dunno whether he got any updated news for u all anot...
if got, pls share here ya  smile.gif
*
so did you sign?
TSndykh
post Jun 8 2011, 11:24 AM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(pcteck19 @ Jun 8 2011, 10:42 AM)
so did you sign?
*
of coz no..

plenty of owners opt not to sign..

if all signed, then i sign lor
pcteck19
post Jun 8 2011, 12:00 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(ndykh @ Jun 8 2011, 11:24 AM)
of coz no..

plenty of owners opt not to sign..

if all signed, then i sign lor
*
beside the layout and the lighting points, what else the diff in the new SPA?
if only these, not much diff with the original SPA.

1. security fee + club house maintenance fee still 100 + 50?
2. do we entitled for 2 years FOC for security fee + club house maintenance fee?

if these 2 are remove from the SPA, definitely i wont sign.


recently i discussed with my fren who is the Civil Engineer, talk about the balcony in master bedroom.
when we get the key, actually we can change the balcony into indoor area of master bedroom, the things is pay ourself.
haha
TSndykh
post Jun 8 2011, 05:45 PM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(pcteck19 @ Jun 8 2011, 12:00 PM)
beside the layout and the lighting points, what else the diff in the new SPA?
if only these, not much diff with the original SPA.

1. security fee + club house maintenance fee still 100 + 50?
2. do we entitled for 2 years FOC for security fee + club house maintenance fee?

if these 2 are remove from the SPA, definitely i wont sign.
recently i discussed with my fren who is the Civil Engineer, talk about the balcony in master bedroom.
when we get the key,  actually we can change the balcony into indoor area of master bedroom, the things is pay ourself.
haha
*
1. security fees + club house should maintain at 150
2. no. they removed this clause. u have to start paying once u got the key

yea, i agreed that we can move the balcony door out and become part of the master bedroom.
but as u said, we have to pay ourself.
so, whats the point we pay the ugrade?
MS should compensate us with others like what Mr. Kenjiro said earlier

mrkenjiro
post Jun 10 2011, 09:03 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Hi pcteck19,
I'll probably be seeing you then around 2pm tomorrow.

Hi ndykh,
Can I know how many agreement are there?
SPA? DMC?

If the changes on the SPA is minimal then I'll probably sign it as I don't think the security fee and club house part of SPA. It should be part of DMC.

Therefore I might sign SPA only but I need to ask about the layout and what is the implication if we do not sign it?! Does MS has the right to void our earlier agreement and kick us out. This I need to ask our dear Mr Ng.
pcteck19
post Jun 10 2011, 09:45 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ Jun 10 2011, 09:03 AM)
Hi pcteck19,
I'll probably be seeing you then around 2pm tomorrow.

Hi ndykh,
Can I know how many agreement are there?
SPA? DMC?

If the changes on the SPA is minimal then I'll probably sign it as I don't think the security fee and club house part of SPA. It should be part of DMC.

Therefore I might sign SPA only but I need to ask about the layout and what is the implication if we do not sign it?! Does MS has the right to void our earlier agreement and kick us out. This I need to ask our dear Mr Ng.
*
Remember March or April we received the letter from MS, talk about they accept the SPA signed before, and will delivery the house on June 2012.

i think we can fight on this, since MS already accepted this, why should we to re-sign the new SPA? if cruel abit, we can complain/sue MS regarding this.

BTW, if the SPA just about the lighting point and the balcony issue, i might sign on that since it's not big issue. Let say MS really want us to pay the RM150 immediately when they pass the key, i wont sign for that, really pissed me off.
mrkenjiro
post Jun 10 2011, 09:57 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Hi pcteck19,

My view and yours are exactly the same!
Let's meet up this Sat 2pm at the MH's showhouse.
pcteck19
post Jun 10 2011, 03:34 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ Jun 10 2011, 09:57 AM)
Hi pcteck19,

My view and yours are exactly the same!
Let's meet up this Sat 2pm at the MH's showhouse.
*
yea, can fight with our dear mr. Ng, it's great if MS ppl also there.

but i cant stay long in there, coz i gotta catch the flight in the evening time.

gosh......
mrkenjiro
post Jun 13 2011, 09:45 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Well guys,

I've signed the SPA and MOT last Saturday. I couldn't wait as my loan will be withdrawn by my bank end of this month
Like what was mentioned earlier by a forummer, the changes to the SPA are
1. Layout - Extension to masterbedroom change to balcony
2. Lighting point, etc

But I didn't sign the DMC as I mentioned to the lawyer that the agreement should be changed to include the free 2 years waive for the Security Fees (and hopefully the club house as well).
He will bring it up to MS. I have also spoken to Samantha (sales girl from MS) about this as well and she was surprised why we didn't have that so she said she'll bring it up to MS. Hopefully will get good news.




TSndykh
post Jun 13 2011, 02:42 PM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(mrkenjiro @ Jun 13 2011, 09:45 AM)
Well guys,

I've signed the SPA and MOT last Saturday. I couldn't wait as my loan will be withdrawn by my bank end of this month
Like what was mentioned earlier by a forummer, the changes to the SPA are
1. Layout - Extension to masterbedroom change to balcony
2. Lighting point, etc

But I didn't sign the DMC as I mentioned to the lawyer that the agreement should be changed to include the free 2 years waive for the Security Fees (and hopefully the club house as well).
He will bring it up to MS. I have also spoken to Samantha (sales girl from MS) about this as well and she was surprised why we didn't have that so she said she'll bring it up to MS. Hopefully will get good news.
*
Noted & Thanks.

By the way, we seem dont have much choices & have to accept the SPA with no extention.
I wonder is it still worth RM28k for the upgrade?
mrkenjiro
post Jun 13 2011, 04:53 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Honestly if I have the $$ and time, I'll probably fight this one but sad to say, I don't have the luxury. The only 'loss' I would say is the lost of the extended 'covered' area in master bedroom. And to be frank, I think we actually do not really have a case as MS is actually giving us the same total sq feet as before.

I did asked the same question about the upgrade whether we can pull back or not but was informed to contact MS directly.

pcteck19
post Jun 13 2011, 10:30 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
got DMC paper to sign? i thought is the MPSJ form being signed, with the SPA
mrkenjiro
post Jun 14 2011, 09:20 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Yes, only SPA and MOT

I have a copy of the DMC but I have yet to sign it. The lawyer said he'll amend it to include the free 2 years waivers.
TSndykh
post Jun 16 2011, 09:23 AM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


there are about 20 owners who choose not to sign the SPA.

MS came out with a "warning letter" and ask them to sign before 17th June in order to avoid the ownership being taken back.


mrkenjiro
post Jun 16 2011, 09:27 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Yes, and I got that letter.
And I AM f***ING FURIOUS


Added on June 16, 2011, 9:32 amThose of you that already signed please call to MS and show your anger. This is pissing me off.
We waited for the SPA for god know how long and now they just send us a letter dated 8th June (pos stamped 14th June) and request me to sign the damn thing (which I did on the 11th June). Someone in MS will be getting a good f*** from me soon...

This post has been edited by mrkenjiro: Jun 16 2011, 09:32 AM
pcteck19
post Jun 16 2011, 03:10 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
well, since already signed the SPA, just dun care & fcuk up with them
mrkenjiro
post Jun 29 2011, 09:45 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Received a letter from MS for the remaining RM2800 so I went and passed the cheque to MS last Sat. Took the opportunity to talk to Vivian (she's something like a marketing manager for MS) and she confirmed that we (buyer from MS) have the same entitlement as the Semi D for the 2 years waiver even though it was not mentioned in the DMC (apparently it was not mentioned in DMC for other direct purchasers as well)
pcteck19
post Jun 29 2011, 02:00 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ Jun 29 2011, 09:45 AM)
Received a letter from MS for the remaining RM2800 so I went and passed the cheque to MS last Sat. Took the opportunity to talk to Vivian (she's something like a marketing manager for MS) and she confirmed  that we (buyer from MS) have the same entitlement as the Semi D for the 2 years waiver even though it was not mentioned in the DMC (apparently it was not mentioned in DMC for other direct purchasers as well)
*
the MS sales office is that club house? i'm out of malaysia, yesterday only i know abt the letter. will ask my bro to go today.

mrkenjiro
post Jun 29 2011, 03:21 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Yes. You can pay them there either via cheque or bankdraft.
TSndykh
post Jul 4 2011, 10:05 AM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


finally got my stamped S&P

and received the progressing billing...25%
mrkenjiro
post Jul 4 2011, 02:32 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Woah?! You got the progressing billing already?
That was fast!!

Assuming your bank are paying, have you got a stamped copy of the loan agreement?
pcteck19
post Jul 4 2011, 03:53 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
have you guys finance in the upgrade amount into the loan?
i didn't receive any letter from the bank regarding the finance-in issue

This post has been edited by pcteck19: Jul 4 2011, 03:55 PM
mrkenjiro
post Jul 4 2011, 04:42 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


I did. You need to call your bank to tell them if you want to increase else your loan will be based on the previous loan amount.
pcteck19
post Jul 4 2011, 04:54 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ Jul 4 2011, 04:42 PM)
I did. You need to call your bank to tell them if you want to increase else your loan will be based on the previous loan amount.
*
just call to the bank center? or call to the bank officer which did our case before?
TSndykh
post Jul 4 2011, 05:00 PM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


they should ask for at least 50% progressing billing..

most of the double storey houses are with roof now smile.gif

i didnt get any news regarding the loan agreement wor..

should we check with our bank regarding the billing?
mrkenjiro
post Jul 5 2011, 09:03 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Hmm... as long as the loan agreement with the bank is intact and executed, it should be fine.
pcteck19
post Jul 6 2011, 02:12 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ Jul 5 2011, 09:03 AM)
Hmm... as long as the loan agreement with the bank is intact and executed, it should be fine.
*
i think we should check with our banker, the due date of the billing is 25/7, i dont wish to see the MS going to charge interest due to late payment.

just called banker, telling that our dearly lawyer mr. ng didn't inform her about the finance in the upgrade amount into loan (as mr. ng promised help to contact bankker, and my loan doc also settle by him). So the bank is ready the loan without the upgrade plan figure, if finance in now, it takes time to proceed the new loan doc, definitely over the due date 25/7.


Added on July 6, 2011, 11:06 pmany one has Mr. Ng contact number? office number is ok. i kena ask him who going to bear this penalty charge.

This post has been edited by pcteck19: Jul 6 2011, 11:22 PM
mrkenjiro
post Jul 7 2011, 09:32 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


pcteck,

Try calling this number 6016-3383707 or 6012-3323715. By the way I am dealing directly with the bank and I was required to sign a sub LO for the increase in loan amount. Call your bank to hold on the execution of the loan cause once the money is transferred to Mah Sing then I think it'll be very chaotic to change the loan amount.

I have also received the progressing billing yesterday. Due date 1 Aug 2011. They have completed 55% contruction already.


pcteck19
post Jul 7 2011, 02:57 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ Jul 7 2011, 09:32 AM)
pcteck,

Try calling this number 6016-3383707 or 6012-3323715. By the way I am dealing directly with the bank and I was required to sign a sub LO for the increase in loan amount. Call your bank to hold on the execution of the loan cause once the money is transferred to Mah Sing then I think it'll be very chaotic to change the loan amount.

I have also received the progressing billing yesterday. Due date 1 Aug 2011. They have completed 55% contruction already.
*
So u dial to bank's call center? When you call?

and the progressing billing, MS claims 55%?


Added on July 7, 2011, 4:09 pmjust call to the banker, she said if i wish to finance in the upgrade plan amount into loan, then i need to resubmit the income docs as per previous loan application. the process need to re-do again, and previous Letter of Offer will be cancelled accordingly once we superseded the case.

is not like you just sign a sub LO then finish.

damn...

This post has been edited by pcteck19: Jul 7 2011, 04:09 PM
TSndykh
post Jul 7 2011, 08:30 PM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(pcteck19 @ Jul 7 2011, 02:57 PM)
So u dial to bank's call center? When you call?

and the progressing billing, MS claims 55%?


Added on July 7, 2011, 4:09 pmjust call to the banker, she said if i wish to finance in the upgrade plan amount into loan, then i need to resubmit the income docs as per previous loan application. the process need to re-do again, and previous Letter of Offer will be cancelled accordingly once we superseded the case.

is not like you just sign a sub LO then finish.

damn...
*
which bank u using?
pcteck19
post Jul 7 2011, 08:34 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(ndykh @ Jul 7 2011, 08:30 PM)
which bank u using?
*
OCBC
mrkenjiro
post Jul 8 2011, 09:18 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


I am with Hong Leong bank and I liase with the loan officer directly. He's helpful in getting the Sub LO done. This project brought many difficulties to us and the banker so I am quite thankful to him for the hassle.
pcteck19
post Jul 8 2011, 02:03 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ Jul 8 2011, 09:18 AM)
I am with Hong Leong bank and I liase with the loan officer directly. He's helpful in getting the Sub LO done. This project brought many difficulties to us and the banker so I am quite thankful to him for the hassle.
*
thanks for the info, will try to contact loan division directly when i back to malaysia next tuesday
TSndykh
post Jul 18 2011, 10:28 AM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


anyone have any idea when the bank will release the progressive payment to MS?

i called the bank and they said they have to wait for our lawyer instruction 1st

worried that MS will charged us late interest payment
Immortal
post Jul 18 2011, 10:48 AM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


i'm eyeing on the 2 1/2 storey, but too bad there's only around 20units left, anyone 2 1/2 owner here?? I was thinking to get a unit in the row facing 3storey link....but it's quite near to the guard house, worried about the noise and traffic..... anyone cares to share?

there's another unit facing 2 storey link, but too near to the allocated masjid.....sigh i'm now in dilemma between these 2.....
noswear
post Jul 18 2011, 11:19 AM

Regular
******
Senior Member
1,050 posts

Joined: Jan 2011
QUOTE(Immortal @ Jul 18 2011, 10:48 AM)
i'm eyeing on the 2 1/2 storey, but too bad there's only around 20units left, anyone 2 1/2 owner here?? I was thinking to get a unit in the row facing 3storey link....but it's quite near to the guard house, worried about the noise and traffic..... anyone cares to share?

there's another unit facing 2 storey link, but too near to the allocated masjid.....sigh i'm now in dilemma between these 2.....
*
eh still got 2 1/2 sty left??

bumi lot izzit??
TSndykh
post Jul 18 2011, 11:31 AM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(noswear @ Jul 18 2011, 11:19 AM)
eh still got 2 1/2 sty left??

bumi lot izzit??
*
my fren went to the sales office last sat.

there are few end-lot available for 2 storey (RM888k) & 2 1/2 storey available (RM988k)

i think MS just "converted" it recenlty from bumi lot
noswear
post Jul 18 2011, 11:40 AM

Regular
******
Senior Member
1,050 posts

Joined: Jan 2011
QUOTE(ndykh @ Jul 18 2011, 11:31 AM)
my fren went to the sales office last sat.

there are few end-lot available for 2 storey (RM888k) & 2 1/2 storey available (RM988k)

i think MS just "converted" it recenlty from bumi lot
*
ok...let me go their sales office c look c look...



Immortal
post Jul 18 2011, 12:34 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


2 1/2 is RM888k, end lot is RM988k
tishaban
post Jul 18 2011, 01:33 PM

Look at all my stars!!
*******
Senior Member
3,615 posts

Joined: Feb 2007
Was there several times last week. I love the 3-storey ones but can't get myself to pay 1.068m for an intermediate house. I think this isn't one of Mah Sing's better projects IMO.

noswear
post Jul 18 2011, 02:37 PM

Regular
******
Senior Member
1,050 posts

Joined: Jan 2011
QUOTE(Immortal @ Jul 18 2011, 12:34 PM)
2 1/2 is RM888k, end lot is RM988k
*
so is 2 1/2 RM888K or 2 sty RM888K...


tats a big difference...lol./...
Immortal
post Jul 18 2011, 02:42 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


2-storey is RM788k, 2 1/2 is RM888k, I went to the office just yesterday.
2-storey only left end-lot which facing road.
pcteck19
post Jul 25 2011, 09:59 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
yesterday i was able to "sneak" into the project area, and get looking within my house.

roof covered, wall has been coated, ground floor bathroom & kitchen tiles until ceiling heights, current progress is plaster ceiling works at 1st floor (ground floor completed).

1 thing a bit disappointed me is about the tiles at kitchen, although using Kimgres tiles as written in the upgrade plan letter, but its size just only 1X1 (MHJY show unit is 1X2), tiles color is something white color (MHJY show unit is something beige color kind), looks not so classy for me.

This post has been edited by pcteck19: Jul 25 2011, 10:16 AM
mrkenjiro
post Jul 25 2011, 12:35 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Hmm... yours 2 storey or 2 and 1/2?
You are referring to the wall tiles or floor tiles?
pcteck19
post Jul 25 2011, 12:41 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ Jul 25 2011, 12:35 PM)
Hmm... yours 2 storey or 2 and 1/2?
You are referring to the wall tiles or floor tiles?
*
mine is 2 storey, it's wall tiles i mentioned, floor tiles not that soon to be done yet. smile.gif

2.5 storey progress is slower than 2 storey


Added on July 25, 2011, 3:23 pmhave you guys' bank already execute the amount for progressing billing?

This post has been edited by pcteck19: Jul 25 2011, 03:23 PM
mrkenjiro
post Jul 25 2011, 03:50 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Ohh F**K, I just called my bank (Hong Leong) and they told me that they have 'discontinue' using Swan & Partners as the lawyer due to their 'bad history'.

And now TMS is asking for money. F**K. This is very bad! The lawyer did not even call me to inform me.

pcteck19
post Jul 25 2011, 03:56 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ Jul 25 2011, 03:50 PM)
Ohh F**K, I just called my bank (Hong Leong) and they told me that they have 'discontinue' using Swan & Partners as the lawyer due to their 'bad history'.

And now TMS is asking for money. F**K. This is very bad! The lawyer did not even call me to inform me.
*
i just called TMS Vivien Chor, she said my bank ocbc still not yet execute the amount, due to my portion not settle yet.

so i gonna pay the upgrade plan myself, or resubmit the loan application (but this take longer time and i worry abt the late payment charge).

facing the cross now, dunno way to go.
mrkenjiro
post Jul 25 2011, 04:04 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


I have already settled mine 2 weeks ago.
Problem is bank is not disbursing because
1. Expiry of the loan offer
2. Upgrade package plan who want to finance partly the upgrade without sub LO
3. Bank just doesn't want to work with Swan & Partner because the bank was never briefed by the lawyer of what's happening ---> this is my case!!


Added on July 25, 2011, 4:15 pmOK. I just called the lawyer and Mah Sing to get a clear picture of what's happening.

Brian from MS updated me that currently there are some documentation issue between MS and the bank so if there's delay in disbursing the money due to that then MS will waive the interest. I just hope Swan & Partner do their work diligently. I have a feeling they are sitting on the issue and did not really 'chase' on behalf of us.

This post has been edited by mrkenjiro: Jul 25 2011, 04:15 PM
tiger_gogogo
post Jul 25 2011, 04:25 PM

New Member
*
Junior Member
12 posts

Joined: Oct 2010
QUOTE(pcteck19 @ Jul 25 2011, 09:59 AM)
yesterday i was able to "sneak" into the project area, and get looking within my house.

roof covered, wall has been coated, ground floor bathroom & kitchen tiles until ceiling heights, current progress is plaster ceiling works at 1st floor (ground floor completed).

1 thing a bit disappointed me is about the tiles at kitchen, although using Kimgres tiles as written in the upgrade plan letter, but its size just only 1X1 (MHJY show unit is 1X2), tiles color is something white color (MHJY show unit is something beige color kind), looks not so classy for me.
*
Thanks for the sharing man notworthy.gif Do you able to look into the master bedroom and see is there a balcony there? Or as in advertise in the liftlet that the balcony is converted and become part of the master bedroom?

Any photo that can share?
pcteck19
post Jul 25 2011, 04:40 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(tiger_gogogo @ Jul 25 2011, 04:25 PM)
Thanks for the sharing man  notworthy.gif Do you able to look into the master bedroom and see is there a balcony there? Or as in advertise in the liftlet that the balcony is converted and become part of the master bedroom?

Any photo that can share?
*
yea, i walk into master bedroom too, it's a balcony.

latest floor plan is the balcony, not longer part of the master bedroom (as the design was rejected by the authorities.)

u can go club house/sales office to get the latest liftlet, the layout becomes balcony.

user posted image
tiger_gogogo
post Jul 26 2011, 02:54 PM

New Member
*
Junior Member
12 posts

Joined: Oct 2010
QUOTE(pcteck19 @ Jul 25 2011, 04:40 PM)
yea, i walk into master bedroom too, it's a balcony.

latest floor plan is the balcony, not longer part of the master bedroom (as the design was rejected by the authorities.)

u can go club house/sales office to get the latest liftlet, the layout becomes balcony.

user posted image
*
Ok bro, suddenly the house less few square feet... blink.gif
pcteck19
post Jul 26 2011, 03:13 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(tiger_gogogo @ Jul 26 2011, 02:54 PM)
Ok bro, suddenly the house less few square feet...  blink.gif
*
built up area as TMS claimed is the same, no matter inside bedroom or balcony, still consider as area they bring to you

mad.gif mad.gif mad.gif


Added on August 1, 2011, 3:19 pmtoday lawyer firm staff just called me, talk about the disbursement for the loan legal fees. it's RM4200 !!!

so exp!!!

This post has been edited by pcteck19: Aug 2 2011, 10:48 AM
TSndykh
post Aug 1 2011, 09:32 PM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(pcteck19 @ Jul 26 2011, 03:13 PM)
built up area as TMS claimed is the same, no matter inside bedroom or balcony, still consider as area they bring to you

mad.gif  mad.gif  mad.gif


Added on August 1, 2011, 3:19 pmtoday lawyer firm staff just called me, talk about the reimbursement for the loan legal fees. it's RM4200 !!!

so exp!!!
*
i thought we just paid the stamp duty fees and etc...this is another bill ah?
SUSUFO-ET
post Aug 1 2011, 10:35 PM

Look at all my stars!!
*******
Senior Member
6,747 posts

Joined: Sep 2010


QUOTE(pcteck19 @ Jul 26 2011, 03:13 PM)
built up area as TMS claimed is the same, no matter inside bedroom or balcony, still consider as area they bring to you

mad.gif  mad.gif  mad.gif


Added on August 1, 2011, 3:19 pmtoday lawyer firm staff just called me, talk about the reimbursement for the loan legal fees. it's RM4200 !!!

so exp!!!
*
Reasonable, includes loan agreement stamping fees ma.. 0.5%
Lowyat
post Aug 2 2011, 08:31 AM

myLowyat
******
Senior Member
1,676 posts

Joined: Jan 2003
From: Lowyat....KL

QUOTE(noswear @ Jul 18 2011, 02:37 PM)
so is 2 1/2 RM888K or 2 sty RM888K...
tats a big difference...lol./...
*
No matter which price...to spend 800K for a leasehold houses is ridiculous!!!!

What happen to Malaysia property nowadays?? I am better start saving money now and wait the house price burst!!! vmad.gif
mrkenjiro
post Aug 2 2011, 08:56 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Hmm... I thought we only pay stamp duty.
SUSUFO-ET
post Aug 2 2011, 08:57 AM

Look at all my stars!!
*******
Senior Member
6,747 posts

Joined: Sep 2010


QUOTE(Lowyat @ Aug 2 2011, 08:31 AM)
No matter which price...to spend 800K for a leasehold houses is ridiculous!!!!

What happen to Malaysia property nowadays?? I am better start saving money now and wait the house price burst!!! vmad.gif
*
ya agree, it's ridiculous...
the same thing I said on MK condo bout 20 years back, the mkt proves me wrong & wrong again.. cool.gif
mrkenjiro
post Aug 2 2011, 09:03 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Hmm... Can we tabulate here what else we need to pay

Here's my understanding for 2 storey
1. S&P Stamping (MOT) ~ 10k
2. Loan Stamping ~ 2.7k

What else?
SUSUFO-ET
post Aug 2 2011, 09:11 AM

Look at all my stars!!
*******
Senior Member
6,747 posts

Joined: Sep 2010


QUOTE(mrkenjiro @ Aug 2 2011, 08:56 AM)
Hmm... I thought we only pay stamp duty.
*
When purchasing a new property fr developer, basically there are 6 fees incur


1. S&P legal professional fees
2. S&P disbursement
3. Stamp Duty MOT
4. Loan Agreement legal professional fees
5. Loan Agreement disbursement
6. Loan Agreement stamping fees (0.5% of loan amount)


When developer says "free lawyer fees", it could means..

1. Free S&P legal professional fees only OR
2. Free S&P legal professional fees + S&P disbursement OR
3. Free S&P legal professional fees + S&P disbursement + Loan Agreement legal professional fees + Loan Agreement disbursement OR
4. Free S&P legal professional fees + Loan Agreement legal professional fees



When developer says free Stamping fees, it could means...
1.Free Loan Agreement stamping fees (0.5% of loan amount) OR
2. free Stamp Duty MOT

The answer is in bold normally, be careful and dun be mislead by SA icon_idea.gif

This post has been edited by UFO-ET: Aug 2 2011, 09:12 AM
Lowyat
post Aug 2 2011, 09:20 AM

myLowyat
******
Senior Member
1,676 posts

Joined: Jan 2003
From: Lowyat....KL

QUOTE(UFO-ET @ Aug 2 2011, 08:57 AM)
ya agree, it's ridiculous...
the same thing I said on MK condo bout 20 years back, the mkt proves me wrong & wrong again.. cool.gif
*
Just give the market another 2-3 years time...mkt proves us wrong also because we are spending too much for the houses...
mrkenjiro
post Aug 2 2011, 09:25 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


So in the case of KR, it's only this
1. Free S&P legal professional fees only?

SUSUFO-ET
post Aug 2 2011, 09:30 AM

Look at all my stars!!
*******
Senior Member
6,747 posts

Joined: Sep 2010


QUOTE(mrkenjiro @ Aug 2 2011, 09:25 AM)
So in the case of KR, it's only this
1. Free S&P legal professional fees only?
*
I Remember is

4. Free S&P legal professional fees + Loan Agreement legal professional fees

Both disbursements have to be borne bu purchaser

This post has been edited by UFO-ET: Aug 2 2011, 09:30 AM
pcteck19
post Aug 2 2011, 10:44 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(UFO-ET @ Aug 2 2011, 09:30 AM)
I Remember is

4. Free S&P legal professional fees + Loan Agreement legal professional fees

Both disbursements have to be borne bu purchaser
*
yes, we got foc for legal fee on both S&P and loan agreement, disbursements are excluded.

last year i already paid the disbursement for the S&P, RM750. mad.gif mad.gif

now the load agreement disbursement, largest amount is "stamp duty on facilities agreement" cost me RM2.2k, add up other misc, total 4.2k

This post has been edited by pcteck19: Aug 2 2011, 10:47 AM
mrkenjiro
post Aug 2 2011, 11:45 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Ahh... yes.
I paid about 700++ as well for the S&P disbursement.

So right now we are looking at
1. S&P legal professional fees - foc
2. S&P disbursement - RM750
3. Stamp Duty MOT - RM10k
4. Loan Agreement legal professional fees - foc
5. Loan Agreement disbursement
6. Loan Agreement stamping fees (0.5% of loan amount)

Pcteck, your loan agreement disbursement includes item no 6 or just item no 5 only?


Added on August 2, 2011, 11:52 amBtw, I got this from the main forum

Differences between MH and MS.
1. FACADE : MHJ - Remain as sample house , MS - with door and banister, toilet with aluminium powder coated louvres.
2. TILES : MHJ - Remain same , MS- Kimgress, modern style. Feruni tiles used for 2 x 2 . Use nosing tiles at staircase while MHJ use PVC cove
3. TOILET : MHJ - no concrete kerb between shower , MS - with kerb and granite counter top.
4. LAYOUT : MHJ - Remain as sample house , MS : No wall between kitchen and hall. Directly see kitchen
5. CEILING : MHJ - With plaster ceiling and L box , MS : No L box , flat

Why ours no plaster ceiling?

This post has been edited by mrkenjiro: Aug 2 2011, 11:52 AM
SUSUFO-ET
post Aug 2 2011, 12:10 PM

Look at all my stars!!
*******
Senior Member
6,747 posts

Joined: Sep 2010


QUOTE(pcteck19 @ Aug 2 2011, 10:44 AM)
yes, we got foc for legal fee on both S&P and loan agreement, disbursements are excluded.

last year i already paid the disbursement for the S&P, RM750. mad.gif  mad.gif

now the load agreement disbursement, largest amount is "stamp duty on facilities agreement" cost me RM2.2k, add up other misc, total 4.2k
*
RM750 is fair.
Good enough the package by TMS with DIBS.
mrkenjiro
post Aug 2 2011, 12:13 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


UFO-ET, I think ours do not come with DIBS
pcteck19
post Aug 2 2011, 12:56 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ Aug 2 2011, 11:45 AM)
Ahh... yes.
I paid about 700++ as well for the S&P disbursement.

So right now we are looking at
1. S&P legal professional fees - foc
2. S&P disbursement - RM750
3. Stamp Duty MOT - RM10k
4. Loan Agreement legal professional fees - foc
5. Loan Agreement disbursement
6. Loan Agreement stamping fees (0.5% of loan amount)

Pcteck, your loan agreement disbursement includes item no 6 or just item no 5 only?
item 5 & 6
the details are following:
user posted image

QUOTE(mrkenjiro @ Aug 2 2011, 11:45 AM)
Ahh... yes.

Added on August 2, 2011, 11:52 amBtw, I got this from the main forum

Differences between MH and MS.
1. FACADE : MHJ - Remain as sample house , MS - with door and banister, toilet with aluminium powder coated louvres.
2. TILES : MHJ - Remain same , MS- Kimgress, modern style. Feruni tiles used for 2 x 2 . Use nosing tiles at staircase while MHJ use PVC cove
3. TOILET : MHJ - no concrete kerb between shower , MS - with kerb and granite counter top.
4. LAYOUT : MHJ - Remain as sample house , MS : No wall between kitchen and hall. Directly see kitchen
5. CEILING : MHJ - With plaster ceiling and L box , MS : No L box , flat

Why ours no plaster ceiling?
*
actually upgrade plan house does has the plaster ceiling, i saw it but only flat plaster ceiling, L box only apply on the entrance there.

This post has been edited by pcteck19: Aug 2 2011, 01:06 PM
SUSUFO-ET
post Aug 2 2011, 01:09 PM

Look at all my stars!!
*******
Senior Member
6,747 posts

Joined: Sep 2010


QUOTE(mrkenjiro @ Aug 2 2011, 12:13 PM)
UFO-ET, I think ours do not come with DIBS
*
Ya true. Only for direct purchaser only
pcteck19
post Aug 3 2011, 11:25 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
i decided not to finance in the upgrade plan into loan amount, last friday just submit the cheque to the sales office.

the staff told me that phase 2B complete on July-August 2012
TSndykh
post Aug 3 2011, 05:19 PM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(pcteck19 @ Aug 3 2011, 11:25 AM)
i decided not to finance in the upgrade plan into loan amount, last friday just submit the cheque to the sales office.

the staff told me that phase 2B complete on July-August 2012
*
hur??

complete on july to aug 2012??

r u sure? phase 2B is refering to 2 story link houses rite?
mrkenjiro
post Aug 4 2011, 09:00 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


I got an official letter saying it's on the June 2012
pcteck19
post Aug 4 2011, 10:28 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(ndykh @ Aug 3 2011, 05:19 PM)
hur??

complete on july to aug 2012??

r u sure? phase 2B is refering to 2 story link houses rite?
*
phase 2B is 2sty and 2.5 sty houses.

Well, maybe the staff also dont know the actual situation, last thing he said, "everything follow the S&P"


Added on August 4, 2011, 10:29 am
QUOTE(mrkenjiro @ Aug 4 2011, 09:00 AM)
I got an official letter saying it's on the June 2012
*
yes, i do received that letter.

hopefully we can get the key on June 2012.

This post has been edited by pcteck19: Aug 4 2011, 10:29 AM
TSndykh
post Aug 4 2011, 10:39 AM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(mrkenjiro @ Aug 4 2011, 09:00 AM)
I got an official letter saying it's on the June 2012
*
When u got this official letter?

i got mine few months back and stated mid May'12 wor..

initially we should get it in April as per MHJ
pcteck19
post Aug 4 2011, 11:00 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(ndykh @ Aug 4 2011, 10:39 AM)
When u got this official letter?

i got mine few months back and stated mid May'12 wor..

initially we should get it in April as per MHJ
*
mine stated 24 months from 3-june 2010
mrkenjiro
post Aug 4 2011, 02:16 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


bro pcteck19,

Are you going to stay there or ?
pcteck19
post Aug 4 2011, 02:32 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ Aug 4 2011, 02:16 PM)
bro pcteck19,

Are you going to stay there or ?
*
yes, i bought it for own stay.

well, frankly to say, if the price is high enough for selling (eg 1m), may consider lo. tongue.gif tongue.gif drool.gif drool.gif

as i bought at the price 526k, i earn 480k. later i buy another house like 500k to 600k, my house loan burden will much more lighter compare to now icon_rolleyes.gif icon_rolleyes.gif


mrkenjiro
post Aug 4 2011, 04:18 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


1 mil might be too far fetched. What about RM800-850k. Would you sell?
pcteck19
post Aug 4 2011, 04:24 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ Aug 4 2011, 04:18 PM)
1 mil might be too far fetched. What about RM800-850k. Would you sell?
*
it depends, bro, must get another suitable house only i consider to sell.

what worry me is when 2012 comes, the price for other property also gone crazy, pointless to sell then get another crazy price house
TSndykh
post Aug 4 2011, 08:02 PM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(pcteck19 @ Aug 4 2011, 11:00 AM)
mine stated 24 months from 3-june 2010
*
found the letter....confirm is 10/05/2012 smile.gif
pcteck19
post Aug 5 2011, 01:25 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
anyone's bank already execute the 25% for the progressing bill?
mrkenjiro
post Aug 8 2011, 11:55 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Mine not yet. Sucks
pcteck19
post Aug 8 2011, 03:59 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ Aug 8 2011, 11:55 AM)
Mine not yet. Sucks
*
did you receive the letter from lawyer regarding the MOT?

i got it, stamp duty of MOT plus misc, cost me RM10k.

and the letter says, unless we clear this, otherwise they wont advise the bank to execute the progress billing

mad.gif mad.gif mad.gif
mrkenjiro
post Aug 8 2011, 05:53 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


I have not receive any billing from the lawyer yet. Called my banker and he told me the law firm just sent the document over (presumely the signed loan agreement) to the bank. So I guess they will start using letter asking for money very soon.

Now that we are technically 'behind' in term of the progressive payment, who's gonna bear the interest?
pcteck19
post Aug 9 2011, 01:45 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
i called lawyer again, actually the bank already execute the progress billing, just hold in lawyer there, unless we clear the stamp duty of MOT, else they wont pass it to developer.
mrkenjiro
post Aug 9 2011, 05:18 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Just got a called from the law firm and they are asking payment. I answered," I did not receive any bill from you, how to pay?!"

They seriously lack PR skill man...
pcteck19
post Aug 11 2011, 05:46 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
just paid the stamp duty of MOT, and disbursement.

no more excuses to hold the money!
mrkenjiro
post Aug 16 2011, 11:37 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


pcteck,

How many % you loan?
I just got the loan disbursement billing and there's an amount under legal fees - RM690+6% GST. Do you have the same thing applicable?
pcteck19
post Aug 16 2011, 02:31 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ Aug 16 2011, 11:37 AM)
pcteck,

How many % you loan?
I just got the loan disbursement billing and there's an amount under legal fees - RM690+6% GST. Do you have the same thing applicable?
*
i loan 449k (90% of older price, upgrade plan amount i paid by cash)

the loan disbursement billing i posted before, 4.2k

user posted image
mrkenjiro
post Aug 16 2011, 04:35 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Funny cause my loan is lower but yet I am paying abt the same.
pcteck19
post Aug 16 2011, 05:26 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ Aug 16 2011, 04:35 PM)
Funny cause my loan is lower but yet I am paying abt the same.
*
how much u loan?
mrkenjiro
post Aug 16 2011, 05:31 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


422k and I have this amount under Legal - RM690+6% GST. Do you have this?
pcteck19
post Aug 16 2011, 07:40 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ Aug 16 2011, 05:31 PM)
422k and I have this amount under Legal - RM690+6% GST. Do you have this?
*
no, i just paid what i posted above there.

TSndykh
post Sep 5 2011, 04:55 PM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


hi guys,

i went to the site last weekend but unable to go in.
from outside, it look like its already 80-90% completion (minus the finishing & road)

any update from the lawyer?

what is the status on your side regarding the releasing of the loan?
vevex
post Sep 6 2011, 12:18 AM

Getting Started
**
Junior Member
79 posts

Joined: Sep 2011


QUOTE(ndykh @ Sep 5 2011, 04:55 PM)
hi guys,

i went to the site last weekend but unable to go in.
from outside, it look like its already 80-90% completion (minus the finishing & road)

any update from the lawyer?

what is the status on your side regarding the releasing of the loan?
*
I went in last Sunday. As I observed, overall progress is less than 60%. However, few units are considered 70%, from them, mostly 2 storeys (workers stayed there, with wall and ground flooring done, not higher levels, not stair case). Most other units are less than 40%. Pls refer attachments.

Attached Image
main road separating phase 2b (2, 2.5 storey - left) and 2c (3 storey - right). Sand brick sad.gif vs Clay smile.gif

Attached Image
one of 2.5 storey ground floor face

Attached Image
side of 2 corner units (3 storey)

Attached Image
looking down from 1st floor stair (2.5)

Attached Image
view from 1st floor master bedroom (2.5)

Attached Image
neighbouring unit - wall not up yet (2.5)

Attached Image
another view looking at the 2 stairs - going upstair and dining area respectively (2.5)

Attached Image
a "more progressed" 2 storey units (workers occupied)

Attached Image
kitchen area of an end-lot with ceiling height tiling - high layout 27' width (2 storey)

Attached Image
bathroom full height tiling as well smile.gif (2 storey)

Attached Image
stacked of good quality floor tiles (Feroni) 2' x 2' smile.gif (2 storey)

Attached Image
partial layed floor tiles (2 storey)

Attached Image
another 2 storey - close up, pretty

Attached Image
rear view of a 2.5 row - notice standard MS facade mixed with MHJ facade hmm.gif

Attached Image
front view of the same 2.5 row - double standard facade... rclxub.gif

Attached Image
2.5 again - MS (left) , MHJ (right)... hopefully MS touches can help the 2 to blend with each other sweat.gif
I noticed 2 previous phase units of MHJ facing main road (in white), it's facade seems a lot better than the rest just because of it's colour... So I believe if MS don't use the yellow coating like the MHJ corner show unit, plus with MS finishing touch, things would work fine.
Attached Image
2 storey - MS (left) , MHJ (right) ... edges finishing can be seen much better and refined than previous phase of MHJ

Attached Image
went into a 3 storey - close up on clay brick (the brick glow, seems pretty good quality)

Attached Image
the wall in front of entrance (3 storey) - Neat and Refined....

Attached Image
2.5 storey - sand brick lay

I can see very clearly the stair case of the 3 storey comparing the 2s and 2.5; big difference visibly. the 3s seemed very slick and sturdy while the 2ss were rough and bulky. After googled some info, I find the problem is not developer paying less attention to phase 2B. Rather it's a technical issue:
Sand brick are not good when come to heat resistence, so require thick cement coating to prevent crack / prolong lifespan while clay by its nature is very adaptive to change of temperature, so coating are merely finishing touch. That explain the bulky wall and staircase in the phase 2B which all uses sand brick. Another thing is when thick layer of cement needs to be laid, the requirement for better workmanship, experience and skill (even to mention patience) are crucial. Clay brick also provide better sound proof, so care for the neighbour - light on the woofer and "night indoor exercises". blush.gif
TSndykh
post Sep 6 2011, 10:48 AM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


good job Vevex thumbup.gif
krgia10
post Sep 6 2011, 12:32 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
Vevex,

Thanks for the great photos. Have you decided to go with 2.5S or 3S after seeing the different in material quality?

From the unfinished build, what is your opinion on the workmanship?
vevex
post Sep 6 2011, 07:49 PM

Getting Started
**
Junior Member
79 posts

Joined: Sep 2011


QUOTE(krgia10 @ Sep 6 2011, 12:32 PM)
Vevex,

Thanks for the great photos. Have you decided to go with 2.5S or 3S after seeing the different in material quality?

From the unfinished build, what is your opinion on the workmanship?
*
Hi, thanks for the concern. I found something new today... I have already booked the 2.5 last week. By the way, it's not just the bricks and workmanship, as stated in the latest brochure, only 3 storey comes with solar, acond refrigrant piping, water booster, water filter and intercom to guard house. After my findings of course, I'm eager to switch... Found out switching is not allowed. The only thing to do is cancel booking with penalty (RM2k). Getting the 3 storey is considered as new transaction altogether - and refund of initial booking fee RM28k (after minus penalty) takes about 3mths doh.gif

The SA stand firm to say it's a company policy, while I thought it's only a matter of paper work. Finally, I found out from MahSing HQ: Phase 2B and 2C are under 2 different developers though project owner is the same (MahSing). So there are rules stated in their agreement with developer to enforce the policy to protect mutual interests.
So, I think I will stick to 2.5 (still pending loan approval tongue.gif )... besides exceeding 1Mil is really out of my measure now. Side note: during first launch, 3storey is priced at exactly current price for 2.5.

To comfort myself, at least I can see clearly the workmanship of some "progressed" 2storeys are good (not losing out even to their show unit facing sales gallery).

On this thought to compare option. I also looked IOI (16Sierra) soon to launch 2storey link house at 838k+;

KR vs 16 Sierra next launch
-total built-up: 3038sf over 2688sf
-landsize: 22x75 lose to 22x80
-avg built-up per level: 1000+sf lose to 1344sf
-GatednGuarded: KR more like Fenced n Guarded lose to Real GnG in 16S
-completion: Next year vs 2yrs from launching
-landtitle: both leasehold
-location: this is subjective depending on owner needs (KR nearer to KL while 16S nearer to Cyber, putrajaya / KLIA)
-nearby shops: few for KR (though nearer to Giant) - 16S has more Giant, Jusco, soon Tesco also, all in Putra Permai (a lot more food court also in Equine and very near to Seri Kembangan when come to Chinese food)
-clubhouse: yes (but rather small) vs none
-facade: modern vs plain (not outdated) ... personally, I think KR 2.5s is prettier than 3s from outside

For me, I would always go for KR... confession: always the look first. And then it's Big. Also I want to get puchong address for my boy (school registration). Otherwise, 16 sierra may be a good option. For 16S project, IOI acquired a huge piece of land and trying to build a townshape trying to replicate Desa Park City. MS Garden Residence in Cyberjaya is trying the same thing, but remaining developments are mostly top-end properties (SemiD/Bangalow).
Antzfield
post Sep 6 2011, 09:05 PM

Casual
***
Junior Member
496 posts

Joined: Aug 2011
wow, great work (and photos) Vevex!! how you manage to sneak in? Overall, you think the build quality is good and up to mark? (vs the price you paid for?)

The road fronting the houses looks really wide and that is impressive.

What roofing tiles are they using? clay or concrete sand?
Maverick2011
post Sep 6 2011, 09:11 PM

Getting Started
**
Junior Member
83 posts

Joined: Jul 2011
QUOTE(vevex @ Sep 6 2011, 07:49 PM)
Hi, thanks for the concern. I found something new today... I have already booked the 2.5 last week. By the way, it's not just the bricks and workmanship, as stated in the latest brochure, only 3 storey comes with solar, acond refrigrant piping, water booster, water filter and intercom to guard house. After my findings of course, I'm eager to switch... Found out switching is not allowed. The only thing to do is cancel booking with penalty (RM2k). Getting the 3 storey is considered as new transaction altogether - and refund of initial booking fee RM28k (after minus penalty) takes about 3mths doh.gif

The SA stand firm to say it's a company policy, while I thought it's only a matter of paper work. Finally, I found out from MahSing HQ: Phase 2B and 2C are under 2 different developers though project owner is the same (MahSing). So there are rules stated in their agreement with developer to enforce the policy to protect mutual interests.
So, I think I will stick to 2.5 (still pending loan approval tongue.gif )... besides exceeding 1Mil is really out of my measure now. Side note: during  first launch, 3storey is priced at exactly current price for 2.5.

To comfort myself, at least I can see clearly the workmanship of some "progressed" 2storeys are good (not losing out even to their show unit facing sales gallery).

On this thought to compare option. I also looked IOI (16Sierra) soon to launch 2storey link house at 838k+;

KR vs 16 Sierra next launch
-total built-up: 3038sf over 2688sf
-landsize: 22x75 lose to 22x80
-avg built-up per level: 1000+sf lose to 1344sf
-GatednGuarded: KR more like Fenced n Guarded lose to Real GnG in 16S
-completion: Next year vs 2yrs from launching
-landtitle: both leasehold
-location: this is subjective depending on owner needs (KR nearer to KL while 16S nearer to Cyber, putrajaya / KLIA)
-nearby shops: few for KR (though nearer to Giant) - 16S has more Giant, Jusco, soon Tesco also, all in Putra Permai (a lot more food court also in Equine and very near to Seri Kembangan when come to Chinese food)
-clubhouse: yes (but rather small) vs none
-facade: modern vs plain (not outdated) ... personally, I think KR 2.5s is prettier than 3s from outside

For me, I would always go for KR... confession: always the look first. And then it's Big. Also I want to get puchong address for my boy (school registration). Otherwise, 16 sierra may be a good option. For 16S project, IOI acquired a huge piece of land and trying to build a townshape trying to replicate Desa Park City. MS Garden Residence in Cyberjaya is trying the same thing, but remaining developments are mostly top-end properties (SemiD/Bangalow).
*
16 Sierra is not full gated and guarded lah.
twins9
post Sep 7 2011, 06:33 AM

Regular
******
Senior Member
1,371 posts

Joined: Sep 2011
I was interested in 16S too last year but that phase I wanted was fully sold with only bumi lots left. The whole of 16S is not a g&g, it comes with concrete perimeter fencing and a guard house. The RA will have to hire their own guards. There is no maintenance fee for 16S as the RA will have to do the calculations and collections. Problem with this type of development is that if you are a investor, it is great, no fees at all, you enjoy all the perks of the investments.

If you are buying for home stay, you will be the sitting ducks if you are the first batch to move in. Guards will be very expensive if most of the buyers are investors and less than 50% are staying there.

My 2nd option was Garden Residence which I loved but missed out on launch prices as we were too hesitance. It is almost completed now and looks lovely with mostly semi-ds and bungalows. Very classy when you drive pass the putrajaya highway.


macho dog
post Sep 7 2011, 07:27 AM

Enthusiast
*****
Senior Member
792 posts

Joined: Jun 2011
QUOTE(twins9 @ Sep 7 2011, 06:33 AM)
I was interested in 16S too last year but that phase I wanted was fully sold with only bumi lots left.  The whole of 16S is not a g&g, it comes with concrete perimeter fencing and a guard house.  The RA will have to hire their own guards.  There is no maintenance fee for 16S as the RA will have to do the calculations and collections.  Problem with this type of development is that if you are a investor, it is great, no fees at all, you enjoy all the perks of the investments.

If you are buying for home stay, you will be the sitting ducks if you are the first batch to move in.  Guards will be very expensive if most of the buyers are investors and less than 50% are staying there.

My 2nd option was Garden Residence which I loved but missed out on launch prices as we were too hesitance.  It is almost completed now and looks lovely with mostly semi-ds and bungalows.  Very classy when you drive pass the putrajaya highway.
*
Worth to consider sub-sale for GR? Notice a number of units offered in iprop. Price abt 1.2m for 2s smd.



vevex
post Sep 7 2011, 09:41 AM

Getting Started
**
Junior Member
79 posts

Joined: Sep 2011


QUOTE(twins9 @ Sep 7 2011, 06:33 AM)
I was interested in 16S too last year but that phase I wanted was fully sold with only bumi lots left.  The whole of 16S is not a g&g, it comes with concrete perimeter fencing and a guard house.  The RA will have to hire their own guards.  There is no maintenance fee for 16S as the RA will have to do the calculations and collections.  Problem with this type of development is that if you are a investor, it is great, no fees at all, you enjoy all the perks of the investments.

If you are buying for home stay, you will be the sitting ducks if you are the first batch to move in.  Guards will be very expensive if most of the buyers are investors and less than 50% are staying there.

My 2nd option was Garden Residence which I loved but missed out on launch prices as we were too hesitance.  It is almost completed now and looks lovely with mostly semi-ds and bungalows.  Very classy when you drive pass the putrajaya highway.
*
I see. It's same with KR as well then. I previously thought it was G n G because of the concrete perimeter. Thanks smile.gif
SUSUFO-ET
post Sep 7 2011, 10:21 AM

Look at all my stars!!
*******
Senior Member
6,747 posts

Joined: Sep 2010


QUOTE(vevex @ Sep 7 2011, 09:41 AM)
I see. It's same with KR as well then. I previously thought it was G n G because of the concrete perimeter. Thanks smile.gif
*
When you see fence like this, it's not Gated & Guarded (although it comes with proper guard post and booms gate - access cardAttached Image Attached Image
Attached Image Attached Image )


vevex
post Sep 7 2011, 06:10 PM

Getting Started
**
Junior Member
79 posts

Joined: Sep 2011


QUOTE(UFO-ET @ Sep 7 2011, 10:21 AM)
When you see fence like this, it's not Gated & Guarded (although it comes with proper guard post and booms gate - access card
So, how can one tell if it's the real thing (G n G) ? I am now staying in a real G n G apartment (strata title)... the perimeter is worse than KR phase 2B and 2C ... shocking.gif
chgan98
post Sep 7 2011, 06:43 PM

Getting Started
**
Junior Member
70 posts

Joined: May 2011
@vevex - for a landed G&G environment, believed there's something like a separate deed of mutual covenant to be signed when executing the S&P...
SUSUFO-ET
post Sep 7 2011, 07:21 PM

Look at all my stars!!
*******
Senior Member
6,747 posts

Joined: Sep 2010


QUOTE(chgan98 @ Sep 7 2011, 06:43 PM)
@vevex - for a landed G&G environment, believed there's something like a separate deed of mutual covenant to be signed when executing the S&P...
*
There are a few types :-
1. G+G - DMC (Deed of Mutual Covenants) - Strata title / fence full brick wall kenot see through
2. F+G - DMC (Deed of Mutual Covenants) - Individual title / fence 1/2 brick wall 1/2 steel or full anti-climb galvanised steel - can see through
3. F+G - Individual title / fence 1/2 brick wall 1/2 steel or full anti-climb galvanised steel - can see through
vevex
post Sep 7 2011, 09:22 PM

Getting Started
**
Junior Member
79 posts

Joined: Sep 2011


QUOTE(UFO-ET @ Sep 7 2011, 07:21 PM)
There are a few types :-
1. G+G - DMC (Deed of Mutual Covenants) - Strata title / fence full brick wall kenot see through
2. F+G - DMC (Deed of Mutual Covenants) - Individual title / fence 1/2 brick wall 1/2 steel or full anti-climb galvanised steel - can see through
3. F+G - Individual title / fence 1/2 brick wall 1/2 steel or full anti-climb galvanised steel - can see through
*
I do have the DMC for my apartment stating things like must pay maintenance fee and sinking fund; and compliance to building policy, strictly no hacking (no even for conceal wiring), exterior uniformed colour, grill, acond compressor location, car park and other rules regarding noise, etc

What are the DMC for individual title?

I think there are no "enforced rules" when it comes to gate / fencing in terms of height, material used or whether can see thru or not, it depends on developer deliveries (mine not stated clearly in DMC, just something about gated compound with guard house and 24-hrs security). I remember in another G n G (if anyone heard of Brem Park between Happy Garden and Kuchai - old hang out, close friend place), perimeter were all brick wall (about 6-7 feet) except back side of the compound which were initially fenced (fence shared by the tennis court). I think the court is shared by 2 part of Brem Park. They have 2 guard houses... to cross between the 2 parts, one have to get out from 1 guard house and go in thru the other; or alternative go thru the tennis court (the guard house and court are located at 2 distinct end of compound).

Then again, about GnG or FnG, even though the known governing rules are GnG compound are strata and everything within it are private property (to be maintained privately) while for FnG, the roads and common facilities are for public (maintained by state gov); one would term a private strata compound with non-brick perimeter as FnG.
Maverick2011
post Sep 7 2011, 09:41 PM

Getting Started
**
Junior Member
83 posts

Joined: Jul 2011
QUOTE(vevex @ Sep 7 2011, 09:22 PM)
I do have the DMC for my apartment stating things like must pay maintenance fee and sinking fund; and compliance to building policy, strictly no hacking (no even for conceal wiring), exterior uniformed colour, grill, acond compressor location, car park and other rules regarding noise, etc

What are the DMC for individual title?

I think there are no "enforced rules" when it comes to gate / fencing in terms of height, material used or whether can see thru or not, it depends on developer deliveries (mine not stated clearly in DMC, just something about gated compound with guard house and 24-hrs security). I remember in another G n G (if anyone heard of Brem Park between Happy Garden and Kuchai - old hang out, close friend place), perimeter were all brick wall (about 6-7 feet) except back side of the compound which were initially fenced (fence shared by the tennis court). I think the court is shared by 2 part of Brem Park. They have 2 guard houses... to cross between the 2 parts, one have to get out from 1 guard house and go in thru the other; or alternative go thru the tennis court (the guard house and court are located at 2 distinct end of compound).

Then again, about GnG or FnG, even though the known governing rules are GnG compound are strata and everything within it are private property (to be maintained privately) while for FnG, the roads and common facilities are for public (maintained by state gov); one would term a private strata compound with non-brick perimeter as FnG.
*
This is not true lah. landed with Strata title and DMC is the only real G+G, and this is irrespective of the type of fencing! The important part is the legality. Brick fencing no matter how high or low or with CCTV or infrared or what not is still not G+G without STRATA title because the road inside the development is public road! That is why all condos are also gated and guarded but HIGHRISE. All roads in condos are private road.(if got road la). Even Desa Park city, some landed development are G+G and some are not because they are INDIVIDUAL title.
vevex
post Sep 8 2011, 09:46 AM

Getting Started
**
Junior Member
79 posts

Joined: Sep 2011


QUOTE(Maverick2011 @ Sep 7 2011, 09:41 PM)
This is not true lah. landed with Strata title and DMC is the only real G+G, and this is irrespective of the type of fencing! The important part is the legality. Brick fencing no matter how high or low or with CCTV or infrared or what not is still not G+G without STRATA title because the road inside the development is public road! That is why all condos are also gated and guarded but HIGHRISE. All roads in condos are private road.(if got road la). Even Desa Park city, some landed development are G+G and some are not because they are INDIVIDUAL title.
*
Exactly what I meant and I 100% agree with you smile.gif ... but I have friends always argued with me otherwise yawn.gif
mrkenjiro
post Sep 9 2011, 12:06 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


QUOTE(vevex @ Sep 8 2011, 09:46 AM)
Exactly what I meant and I 100% agree with you  smile.gif ... but I have friends always argued with me otherwise  yawn.gif
*
Yes, you are right but try going into a housing area with boom gate and argue with the guard. Haha. I mean legally yes it's public road and anyone can do in but in reality the guard will not let you in.

This post has been edited by mrkenjiro: Sep 9 2011, 12:07 PM
pcteck19
post Sep 12 2011, 09:24 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
called lawyer firm, saying that MS yet to sign the MOT, so the lawyer firm still didnt advice the bank to release the loan.
mrkenjiro
post Sep 12 2011, 02:54 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Well... MS informed me that they will waived the 'interest fees' caused by their delay
Antzfield
post Sep 12 2011, 06:36 PM

Casual
***
Junior Member
496 posts

Joined: Aug 2011
QUOTE(pcteck19 @ Sep 12 2011, 09:24 AM)
called lawyer firm, saying that MS yet to sign the MOT, so the lawyer firm still didnt advice the bank to release the loan.
*
any idea why reason for the delay?
shinjun
post Sep 14 2011, 03:43 PM

Look at all my stars!!
*******
Senior Member
2,247 posts

Joined: Jan 2007


Any1 know what's the price like for their link house over there?

Interested to buy 1 but currently looking around. hmm.gif
mrkenjiro
post Sep 22 2011, 09:33 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


If i am not mistaken, a few bumi lots open for sales for RM788k. You should go to the showhouse to check
slackinux
post Sep 22 2011, 09:59 AM

Casual
***
Junior Member
407 posts

Joined: Dec 2008
QUOTE(mrkenjiro @ Sep 9 2011, 12:06 PM)
Yes, you are right but try going into a housing area with boom gate and argue with the guard. Haha. I mean legally yes it's public road and anyone can do in but in reality the guard will not let you in.
*
i am a tax payer and the road is a public access road. i don't see why can't i access the road eventhough it is guarded. They have no right to block anybody to access that road according to law.
pcteck19
post Sep 28 2011, 07:49 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(slackinux @ Sep 22 2011, 09:59 AM)
i am a tax payer and the road is a public access road. i don't see why can't i access the road eventhough it is guarded. They have no right to block anybody to access that road according to law.
*
yes, by law u can access all the public road. but in reality, how do u know that is a public or private road? the guard wont show to you, unless u find the evidence to prove that is the public road for you to access.
slackinux
post Sep 28 2011, 11:19 PM

Casual
***
Junior Member
407 posts

Joined: Dec 2008
if it is a private road, i am sure there will be sign board in front to remind stranger to stay away from the entrance. Normally Individual tittle house won't have private road.
mrkenjiro
post Oct 3 2011, 10:03 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Guys,

Any of your loan disbursed yet?
krgia10
post Oct 3 2011, 10:55 AM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
Loan from OCBC - Not yet.

Last update got from Swan (few weeks ago) was pending MS Director signoff for a docs.
mrkenjiro
post Oct 3 2011, 01:53 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Thanks man. As long as I know the delay is not because of us
krgia10
post Oct 9 2011, 12:10 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
Anyone got the stamped copy of Loan Agreement?
Karas Otoha
post Oct 9 2011, 02:17 PM

New Member
*
Junior Member
45 posts

Joined: Jul 2008
QUOTE(krgia10 @ Oct 9 2011, 12:10 PM)
Anyone got the stamped copy of Loan Agreement?
*
NO..not yet.. i jz signed last week. Guess it will take 2- 3 weeks to get signed and stamped.
TSndykh
post Oct 28 2011, 09:40 AM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


guys,

any update from your side?


mrkenjiro
post Oct 31 2011, 10:39 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Nothing much from my side except I received a letter from MS informing construction is now at 65% and they are collecting payment from bank.
pcteck19
post Oct 31 2011, 02:22 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
i called Swan & Partners last friday, Asiah who in-charged the loan told me that MS not yet sign the MOT, so lawyer firm not yet advice the bank to release the loan.
mrkenjiro
post Nov 1 2011, 12:04 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


In this case why MS keep asking the bank to release the payment since the delay is on their side?!!!
pcteck19
post Nov 1 2011, 02:58 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ Oct 31 2011, 10:39 AM)
Nothing much from my side except I received a letter from MS informing construction is now at 65% and they are collecting payment from bank.
*
which row your house is? mine just 35% as quite some time didn't receive letter from MS
mrkenjiro
post Nov 2 2011, 09:20 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Mine 2nd row. I think a lot of owners for other units also went into my unit and checked as it one of those almost complete
pcteck19
post Nov 2 2011, 11:22 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ Nov 2 2011, 09:20 AM)
Mine 2nd row. I think a lot of owners for other units also went into my unit and checked as it one of those almost complete
*
Jalan DU 4/2? mine on this street.
mrkenjiro
post Nov 2 2011, 05:59 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Yes. I think so.

So... hi neighbour!
TSndykh
post Nov 3 2011, 02:01 PM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(mrkenjiro @ Nov 2 2011, 05:59 PM)
Yes. I think so.

So... hi neighbour!
*
2nd row mean behind is 2 1/2 storey & also facing the 2 1/2 storey??

that is the only row like tat... DU 4/2


mrkenjiro
post Nov 3 2011, 02:22 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


I think there are 2 rows where you are facing 2 1/2 and also behind 2 1/2 no?
pcteck19
post Nov 3 2011, 10:15 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ Nov 3 2011, 02:22 PM)
I think there are 2 rows where you are facing 2 1/2 and also behind 2 1/2 no?
*
only 1 street Jalan DU 4/2 is facing 2.5 sty and behind also 2.5 sty


Jalan DU 4/4 is facing 2 sty, then behind is 2.5 sty
mrkenjiro
post Nov 4 2011, 09:17 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


I thought the current 2 storey showhouse also face 2 1/2?

Btw what's your unit number?

This post has been edited by mrkenjiro: Nov 4 2011, 09:29 AM
pcteck19
post Nov 4 2011, 11:21 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ Nov 4 2011, 09:17 AM)
I thought the current 2 storey showhouse also face 2 1/2?

Btw what's your unit number?
*
current 2 sty showhouse is located on DU 4/2 tongue.gif tongue.gif

unit no just pm u
mrkenjiro
post Nov 4 2011, 02:21 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Ahh...my bad. Mine is facing 2 storeys not 2 1/2 as what I thought.
alfredfx
post Nov 5 2011, 01:42 PM

Enthusiast
*****
Senior Member
715 posts

Joined: Jan 2003
From: Cheras
2sty here. Bank has released my loan. Now MS asking for another 15% which is around 70%


Added on November 5, 2011, 2:06 pmhow to distinguish 2sty MS and MHJ ?

This post has been edited by alfredfx: Nov 5 2011, 02:06 PM
Immortal
post Nov 8 2011, 08:43 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


Anyone gets 'impressed' by the mild steel railing? hmm.gif I personally not sad.gif .... a half a mil house by other developer gives better railing like glass.....

user posted image
Antzfield
post Nov 8 2011, 09:14 PM

Casual
***
Junior Member
496 posts

Joined: Aug 2011
QUOTE(Immortal @ Nov 8 2011, 08:43 PM)
Anyone gets 'impressed' by the mild steel railing? hmm.gif  I personally not sad.gif .... a half a mil house by other developer gives better railing like glass.....

user posted image
*
you managed to sneak in again? nod.gif ya, i agree with you, not really "impressed" with that, hopefully, looks better when completed later.

how is the finishing of the floor tiles? is the gap between tiles reasonable? I noticed the new bungalow show house unit's floor tiles gap look awful. (TMS, hear this???)
Immortal
post Nov 8 2011, 09:36 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


QUOTE(Antzfield @ Nov 8 2011, 09:14 PM)
you managed to sneak in again?  nod.gif ya, i agree with you, not really "impressed" with that, hopefully, looks better when completed later.

how is the finishing of the floor tiles? is the gap between tiles reasonable? I noticed the new bungalow show house unit's floor tiles gap look awful. (TMS, hear this???)
*
Wasn't checking about the floor tiles much as the floor is covering by plastic sheet. But you can always judge it by yourself looking at the wall tiles in toilets below. Hey......I walked in.. brows.gif

user posted image
user posted image

mrkenjiro
post Nov 9 2011, 09:20 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


QUOTE(Immortal @ Nov 8 2011, 08:43 PM)
Anyone gets 'impressed' by the mild steel railing? hmm.gif  I personally not sad.gif .... a half a mil house by other developer gives better railing like glass.....

user posted image
*
I totally agree with the steel railing thingy but it's something TMS inherited from MH so...
pcteck19
post Nov 9 2011, 10:40 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
just received the letter from MS about the progress is up to 65%
Immortal
post Nov 9 2011, 12:02 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


QUOTE(mrkenjiro @ Nov 9 2011, 09:20 AM)
I totally agree with the steel railing thingy but it's something TMS inherited from MH so...
*
but we're not paying peanuts and we should not get monkey.....so the railing really look cheap... wondering who's the ID consultant for this project
Antzfield
post Nov 9 2011, 02:13 PM

Casual
***
Junior Member
496 posts

Joined: Aug 2011
QUOTE(Immortal @ Nov 8 2011, 09:36 PM)
Wasn't checking about the floor tiles much as the floor is covering by plastic sheet. But you can always judge it by yourself looking at the wall tiles in toilets below. Hey......I walked in.. brows.gif

user posted image
user posted image
*
next time when you are planning to sneak in again, see if can get rombongan n walk in rolleyes.gif melawat sambil belajar. no one is stopping you? notworthy.gif

from the pic, it looks really decent, and 1 of the pic of bathroom is testing water proof of the floor. not bad
Karas Otoha
post Nov 9 2011, 04:00 PM

New Member
*
Junior Member
45 posts

Joined: Jul 2008
QUOTE(mrkenjiro @ Nov 9 2011, 09:20 AM)
I totally agree with the steel railing thingy but it's something TMS inherited from MH so...
*
What the lousy job they do???? at least give us the glass railing la.. can't be so cheap right???
Anyone go and complaint this? Please do it.. don't wait untill they install..
Immortal
post Nov 9 2011, 06:40 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


QUOTE(Karas Otoha @ Nov 9 2011, 04:00 PM)
What the lousy job they do???? at least give us the glass railing la.. can't be so cheap right???
Anyone go and complaint this? Please do it.. don't wait untill they install..
*
They will install another timber handrail on top of the mild steel. But, it still look cheap like those 70s house... Really OMG.
krgia10
post Nov 9 2011, 06:48 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
I remember MH show unit at least came with stainless steel handrail.

Wonder how to voice this out in order for MS to offer us another complimentary upgrade. hmm.gif
Immortal
post Nov 9 2011, 06:57 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


QUOTE(krgia10 @ Nov 9 2011, 06:48 PM)
I remember MH show unit at least came with stainless steel handrail.

Wonder how to voice this out in order for MS to offer us another complimentary upgrade.  hmm.gif
*
Haha... Let them hear our voice...
Just a lil bit more salt on the wound, the 2nd floor balcony railing is mild steel too instead of glass railing like at 1st floor balcony...sigh why....even the opposite Damai link house c/w glass rail at balcony
Karas Otoha
post Nov 9 2011, 09:19 PM

New Member
*
Junior Member
45 posts

Joined: Jul 2008
QUOTE(Immortal @ Nov 9 2011, 06:57 PM)
Haha... Let them hear our voice...
Just a lil bit more salt on the wound, the 2nd floor balcony railing is mild steel too instead of glass railing like at 1st floor balcony...sigh why....even the opposite Damai link house c/w glass rail at balcony
*
We need to voice out all this to MS. How to make a complaint? Just go to club house? or....
Now is the best time to voice out all this issues...


Added on November 9, 2011, 9:37 pm
QUOTE(Antzfield @ Nov 9 2011, 02:13 PM)
next time when you are planning to sneak in again, see if can get rombongan n walk in  rolleyes.gif melawat sambil belajar. no one is stopping you?  notworthy.gif

from the pic, it looks really decent, and 1 of the pic of bathroom is testing water proof of the floor. not bad
*
I'm ON, let me know when is the next sneak preview again... im sure be there...
Any MS staff here, you're also welcome.. smile.gif

This post has been edited by Karas Otoha: Nov 9 2011, 09:37 PM
vevex
post Nov 10 2011, 12:18 PM

Getting Started
**
Junior Member
79 posts

Joined: Sep 2011


QUOTE(Karas Otoha @ Nov 9 2011, 09:19 PM)
We need to voice out all this to MS. How to make a complaint? Just go to club house? or....
Now is the best time to voice out all this issues...


Added on November 9, 2011, 9:37 pm

I'm ON, let me know when is the next sneak preview again... im sure be there...
Any MS staff here, you're also welcome.. smile.gif
*
I don't think it's a good idea to go in group(s) (not like we are permitted to go in). I went in few times (alone and sometime with a partner). Workers / contractors will look at you as you past by... Imagine if you're in a group of 4, chatting / sighting / seeing like tourists... not good
Immortal
post Nov 10 2011, 07:56 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


Antz, you seem very particular on the gap between tiles, so I've got this picture specially for you.
Ground floor tile...

user posted image
krgia10
post Nov 10 2011, 08:10 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
Is this kind of workmanship consider acceptable?
Karas Otoha
post Nov 10 2011, 08:23 PM

New Member
*
Junior Member
45 posts

Joined: Jul 2008
QUOTE(Karas Otoha @ Nov 9 2011, 04:00 PM)
What the lousy job they do???? at least give us the glass railing la.. can't be so cheap right???
Anyone go and complaint this? Please do it.. don't wait untill they install..
*
Anyone going to complaint this?
Immortal
post Nov 10 2011, 08:32 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


QUOTE(krgia10 @ Nov 10 2011, 08:10 PM)
Is this kind of workmanship consider acceptable?
*
Well, it's very subjective. To me, it's acceptable.
Met a contractor, he told be 2.5 storey is inspected by CONQUAS quality (65/100) minimum.
krgia10
post Nov 10 2011, 09:07 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
QUOTE(Immortal @ Nov 10 2011, 08:32 PM)
Well, it's very subjective. To me, it's acceptable.
Met a contractor, he told be 2.5 storey is inspected by CONQUAS quality (65/100) minimum.
*
This is consider a better news to us. In fact, I never expect they will comply to CONQUAS standard.
Immortal
post Nov 10 2011, 09:13 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


QUOTE(krgia10 @ Nov 10 2011, 09:07 PM)
This is consider a better news to us. In fact, I never expect they will comply to CONQUAS standard.
*
I actually thought only 3storey c/w CONQUAS, but the contractor told me 2 & 2.5 storey are complying to CONQUAS as well, but they're checking on selected units only, not all.

Notice that most of the rooms are c/w aircond drain pipe only...you have to lay the copper pipe yourself. As for tile, pretty same as the 3storey show unit, but upper floors are using 500x500 tile....mostly KIMGRES
krgia10
post Nov 10 2011, 09:18 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
QUOTE(Immortal @ Nov 10 2011, 09:13 PM)
I actually thought only 3storey c/w CONQUAS, but the contractor told me 2 & 2.5 storey are complying to CONQUAS as well, but they're checking on selected units only, not all.

Notice that most of the rooms are c/w aircond drain pipe only...you have to lay the copper pipe yourself. As for tile, pretty same as the 3storey show unit, but upper floors are using 500x500 tile....mostly KIMGRES
*
Normally copper pipe is not included. Standard A/C installation should include at least 10 feet copper pipe.

500 x 500mm same as 1.5 x 1.5 ft? I thought it will be 1 x 1.
Immortal
post Nov 10 2011, 09:28 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


QUOTE(krgia10 @ Nov 10 2011, 09:18 PM)
Normally copper pipe is not included. Standard A/C installation should include at least 10 feet copper pipe.

500 x 500mm same as 1.5 x 1.5 ft? I thought it will be 1 x 1.
*
Yah, I thought the same too, I was surprised when I saw those boxed tiles placed on the 1st floor was 500x500....only the rooms at ground floor are using 1x1...

another info from the contractor...for 2.5storey, the proposed staircase going up to the back aisle is now omitted, the retaining wall is constructed toward the backyard of 2storey.
krgia10
post Nov 10 2011, 09:40 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
QUOTE(Immortal @ Nov 10 2011, 09:28 PM)
Yah, I thought the same too, I was surprised when I saw those boxed tiles placed on the 1st floor was 500x500....only the rooms at ground floor are using 1x1...

another info from the contractor...for 2.5storey, the proposed staircase going up to the back aisle is now omitted, the retaining wall is constructed toward the backyard of 2storey.
*
Sorry, don't quite get you. How is it going to benefit us if the staircase is remove?

Now the eyesore is the staircase railing + balcony railing.

MS, do something about this !

Immortal
post Nov 10 2011, 09:49 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


if you look at the layout plan, you will see a staircase at your backyard. for 2.5storey only. which means, if you want to go to the back-lane you will have to climb up, coz the level is higher than your backyard. but for the latest design, backlane and backyard are same level.
krgia10
post Nov 10 2011, 09:52 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
Ok, got it.

Anyway, just received the 45% progress billing today. I think my unit is the slowest among all the 2.5 storey.
mrkenjiro
post Nov 10 2011, 11:26 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Just received another billing. 70% now which is the sewer, so this means my unit should already been completed.
FlyingJoy
post Nov 11 2011, 01:33 AM

Getting Started
**
Junior Member
74 posts

Joined: Sep 2011
QUOTE(Karas Otoha @ Nov 10 2011, 08:23 PM)
Anyone going to complaint this?
*
Count me in too... actually i prefer the glass railing too...
mrkenjiro
post Nov 11 2011, 01:54 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


FlyingJoy, you brought up a good question in the other thread - the entrance for the link house. We need to know whether it's current one or we have alternative to go in via the KR big gate
Immortal
post Nov 11 2011, 01:58 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


I thought there is two entrance to phase 2B, one located at the Mahajaya show unit, another one at jalan DU4/7, the road separate 2.5 and 3 storey.
mrkenjiro
post Nov 11 2011, 02:11 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


If this is the case then we can actually use the big KR gate to go home
Immortal
post Nov 11 2011, 02:19 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


QUOTE(mrkenjiro @ Nov 11 2011, 02:11 PM)
If this is the case then we can actually use the big KR gate to go home
*
Couldn't agree with you more, nicer road with trees. Rather than passing by damai link houses.

The entrance for phase 2B is pretty much fixed, a small guard house has been built at both entrance, but SA told me there could be a possibility they're going to upgrade to a bigger one which can fit CCTV system... Very much depend on the consultant.

pcteck19
post Nov 11 2011, 04:35 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ Nov 11 2011, 02:11 PM)
If this is the case then we can actually use the big KR gate to go home
*
i wish too, but dont think can make it.

1st, the KR main gate near the club house is for the Semi-D where there are Strata Title properties. 2sty, 2.5sty and 3sty are individual title, that's the different between us. Their maintenance fee is calculate by sq ft (G&G concept), we are lump sum 100 + 50 (guarded community only).

i remember the SA told me before, Semi-D has it's own security system (separate with link-houses), people with the pass only can enter.


2nd, there is a big "longkang" between the link-houses and club house. dont think MS is going to make the damn big road on top of the longkang.

how do we link-houses go to club house? MS is going to built bridge on the longkang, so we link-houses just walking to enter club house.
Immortal
post Nov 11 2011, 05:24 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


I think I misunderstood the KR gate. You're talking about the main guard house next to the pool near 3SS show unit?
Karas Otoha
post Nov 11 2011, 06:17 PM

New Member
*
Junior Member
45 posts

Joined: Jul 2008
QUOTE(pcteck19 @ Nov 11 2011, 04:35 PM)
i wish too, but dont think can make it.

1st, the KR main gate near the club house is for the Semi-D where there are Strata Title properties. 2sty, 2.5sty and 3sty are individual title, that's the different between us. Their maintenance fee is calculate by sq ft (G&G concept), we are lump sum 100 + 50 (guarded community only).

i remember the SA told me before, Semi-D has it's own security system (separate with link-houses), people with the pass only can enter.
2nd, there is a big "longkang" between the link-houses and club house. dont think MS is going to make  the damn big road on top of the longkang.

how do we link-houses go to club house? MS is going to built bridge on the longkang, so we link-houses just walking to enter club house.
*
Ya..my SA told me there is a bridge on the longkang, but i'm not so sure how big/nice is it.. may be papan somemore ..tongue.gif
For 3 sty also got buit in security system right ? Only 2.5 and 2 sty no security system..
Of course i hope the guarded house will be nicer and bigger.. because we not only paid for the house.. we paid for the concept also.. and it's not cheap!
Immortal
post Nov 11 2011, 06:27 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


QUOTE(Karas Otoha @ Nov 11 2011, 06:17 PM)
Ya..my SA told me there is a bridge on the longkang, but i'm not so sure how big/nice is it.. may be papan somemore ..tongue.gif
For 3 sty also got buit in security system right ? Only 2.5 and 2 sty no security system..
Of course i hope the guarded house will be nicer and bigger.. because we not only paid for the house.. we paid for the concept also.. and it's not cheap!
*
3SS c/w smart security system, touch screen. 2.5 & 2 sty c/w normal security system.

Antzfield
post Nov 11 2011, 08:55 PM

Casual
***
Junior Member
496 posts

Joined: Aug 2011
QUOTE(Immortal @ Nov 10 2011, 07:56 PM)
Antz, you seem very particular on the gap between tiles, so I've got this picture specially for you.
Ground floor tile...

user posted image
*
you da man!!!

it looks decent and happy with it. The show house somehow not that good.
pcteck19
post Nov 12 2011, 12:11 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(Immortal @ Nov 11 2011, 05:24 PM)
I think I misunderstood the KR gate. You're talking about the main guard house next to the pool near 3SS show unit?
*
then which gate u are referring?

link-houses got 2 gates like u said, 1 located on the current 2.5sty show unit there, another gate located on Jalan 4/7 where 2.5sty and sty meet each other.

i think gate on 4/7 will be the main gate for link-houses.
Karas Otoha
post Nov 12 2011, 03:58 PM

New Member
*
Junior Member
45 posts

Joined: Jul 2008
QUOTE(Immortal @ Nov 11 2011, 06:27 PM)
3SS c/w smart security system, touch screen. 2.5 & 2 sty c/w normal security system.
*
Hmmm... why not synchronize all the security system?? I tot this is the selling point.. tongue.gif
krgia10
post Nov 12 2011, 04:51 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
QUOTE(pcteck19 @ Nov 12 2011, 12:11 PM)
then which gate u are referring?

link-houses got 2 gates like u said, 1 located on the current 2.5sty show unit there, another gate located on Jalan 4/7 where 2.5sty and sty meet each other.

i think gate on 4/7 will be the main gate for link-houses.
*
With 2 entrance, it will be good if they implement single flow system ie. 1 in & 1 out as the road for 2 & 2.5 storey is not wide enough to cater for 2 cars simultaneously.

Currently DU3 already implemented the manual bomb gate system. This may affect the access to the entrance near the JALAN DU 4/7.

Anyone sneak in to the site this weekend? Can share some photo here notworthy.gif
pcteck19
post Nov 12 2011, 05:21 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(Karas Otoha @ Nov 12 2011, 03:58 PM)
Hmmm... why not synchronize all the security system?? I tot this is the selling point.. tongue.gif
*
depends how much we pay to MS.

i think up to 65% of 2sty & 2.5sty owners are from MHJY, the price get from MHJY is 150k cheaper than MS (after upgrade plan).

that's why MS didn't treat important for 2sty & 2.5sty


Added on November 12, 2011, 5:25 pm
QUOTE(krgia10 @ Nov 12 2011, 04:51 PM)
With 2 entrance, it will be good if they implement single flow system ie. 1 in & 1 out as the road for 2 & 2.5 storey is not wide enough to cater for 2 cars simultaneously.

Currently DU3 already implemented the manual bomb gate system. This may affect the access to the entrance near the JALAN DU 4/7.

Anyone sneak in to the site this weekend? Can share some photo here  notworthy.gif
*
if guarded community, let say a visitor wan to enter this area, shall they give any ID to the guard house? if so, then your idea is not working already.

if visitor pass the ID on the gate 4/7 when they enter, if they leave on gate DU 4/1, how they get back their ID? dont think the guard will manually pass the ID to another gate sweat.gif sweat.gif

This post has been edited by pcteck19: Nov 12 2011, 05:25 PM
twins9
post Nov 12 2011, 06:30 PM

Regular
******
Senior Member
1,371 posts

Joined: Sep 2011
The semid residents may not be happy with link houses residents passing their area.


krgia10
post Nov 12 2011, 06:41 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
It's still do-able as nowadays technology should be able to cater for this kind of scenario.

Let say the security guard scan the visitor ID and pass a visitor tag to visitor, when the visitor need to leave, they just return the visitor tag to the guard at the exit.

Hehe... Just some weekend senseless idea.
mrkenjiro
post Nov 14 2011, 09:37 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


I would like to our house's main entrance to be via DU 4/7 (TMS, please make it a double volumne proper entrance) rather than the existing showhouse.

I want to position my house as part of KR and NOT part of Damai Utama(MH's old development project) as this will impact valuation.
Immortal
post Nov 14 2011, 03:19 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


QUOTE(mrkenjiro @ Nov 14 2011, 09:37 AM)
I would like to our house's main entrance to be via DU 4/7 (TMS, please make it a double volumne proper entrance) rather than the existing showhouse.

I want to position my house as part of KR and NOT part of Damai Utama(MH's old development project) as this will impact valuation.
*
Even though if my house was at the same row with MH units, I'd still use the main road with the KR signboard to get to my house.....like what you said, don't wanna be part of Damai Utama.....
pcteck19
post Nov 15 2011, 12:19 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
just called lawyer firmed, confirmed that MS already sign the MOT, and lawyer firm already advised Bank to release the loan.

Now gotta chase the Bank to release, otherwise MS going to charge the late payment.
mrkenjiro
post Nov 15 2011, 12:27 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


I just got a call and an email from Swan & Partner to sign some documents - Statutory Declaration (SD), SD - non bankrupt, LETTER OF UNDERTAKING AND INDEMNITY and ACKNOWLEDGMENT OF LEGAL REPRESENTATION

The last letter (ACKNOWLEDGMENT OF LEGAL REPRESENTATION) is quite fishy as it was stated in that document:

2. I/We am/are fully aware, and hereby acknowledge, that [Messrs. Swan & Partners of Pusat Dagangan Phileo Damansara 1, Block E 3A-10, No. 9, Jalan 16/11, Off Jalan Damansara, 46350 Petaling Jaya, Selangor Darul Ehsan] (“the said Solicitors”) are solicitors acting only for the abovenamed Financier in the above loan documentation, and that the said Solicitors are NOT representing me/us in the matter; notwithstanding that they witness or attest my/our execution of the relevant documents, or that I/we have agreed to bear their fees on behalf of the Financier, or that they may be acting (or have acted) for me/us in any other related or unrelated matter.

3. I/We have been advised, and am/are fully aware, that I/we am/are at liberty to engage separate and independent legal representation in the matter. However, I/we have chosen not to do so, while being fully aware that, should situations arise where the Financier’s interest is in conflict with my/our interest, the said Solicitors’ duty would be owed to the Financier and not to me/us.

4. The contents of this acknowledgement have been explained to me/us and I/we fully understand the same.


krgia10
post Nov 16 2011, 10:34 AM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
QUOTE(mrkenjiro @ Nov 15 2011, 12:27 PM)
I just got a call and an email from Swan & Partner to sign some documents - Statutory Declaration (SD), SD - non bankrupt, LETTER OF UNDERTAKING AND INDEMNITY and ACKNOWLEDGMENT OF LEGAL REPRESENTATION

The last letter (ACKNOWLEDGMENT OF LEGAL REPRESENTATION) is quite fishy as it was stated in that document:

2. I/We am/are fully aware, and hereby acknowledge, that [Messrs. Swan & Partners of Pusat Dagangan Phileo Damansara 1, Block E 3A-10, No. 9, Jalan 16/11, Off Jalan Damansara, 46350 Petaling Jaya, Selangor Darul Ehsan] (“the said Solicitors”) are solicitors acting only for the abovenamed Financier in the above loan documentation, and that the said Solicitors are NOT representing me/us in the matter; notwithstanding that they witness or attest my/our execution of the relevant documents, or that I/we have agreed to bear their fees on behalf of the Financier, or that they may be acting (or have acted) for me/us in any other related or unrelated matter.

3. I/We have been advised, and am/are fully aware, that I/we am/are at liberty to engage separate and independent legal representation in the matter. However, I/we have chosen not to do so, while being fully aware that, should situations arise where the Financier’s interest is in conflict with my/our interest, the said Solicitors’ duty would be owed to the Financier and not to me/us.

4. The contents of this acknowledgement have been explained to me/us and I/we fully understand the same.
*
Any possibility that this is requested by your end financier? So far I don't receive any call from Swan & Partners - Loan from OCBC.
mrkenjiro
post Nov 16 2011, 12:07 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Could be
luvimp
post Nov 18 2011, 10:27 AM

Casual
***
Junior Member
375 posts

Joined: Jul 2008


QUOTE(pcteck19 @ Nov 15 2011, 12:19 PM)
just called lawyer firmed, confirmed that MS already sign the MOT, and lawyer firm already advised Bank to release the loan.

Now gotta chase the Bank to release, otherwise MS going to charge the late payment.
*
I thought this should be done by your lawyer?
If the lawyer unable to get the Bank to release or lack of any docs then they will inform you.
No worry. rclxms.gif
Karas Otoha
post Nov 18 2011, 04:38 PM

New Member
*
Junior Member
45 posts

Joined: Jul 2008
Hey guys, I've created a Facebook Group to discuss all the issues we facing in Kinrara Residence. Here is the URL link:-

http://www.facebook.com/groups/kinrararesidence

See you there..
pcteck19
post Nov 19 2011, 10:54 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
just received the letter from bank. already released 264k to developer, now kena start to do the payment, ass pain
krgia10
post Nov 19 2011, 02:05 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
QUOTE(pcteck19 @ Nov 19 2011, 10:54 AM)
just received the letter from bank. already released 264k to developer, now kena start to do the payment, ass pain
*
OCBC very efficient in chasing for payment. Call like nobody business just because of few ringgit of interest.
mrkenjiro
post Nov 21 2011, 09:14 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


This is the beginning of a long hardship period. Have to tighten belt already
twins9
post Nov 23 2011, 07:14 PM

Regular
******
Senior Member
1,371 posts

Joined: Sep 2011
When do you start paying maintenance fees? Upon VP ?
mrkenjiro
post Nov 24 2011, 10:17 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


First 2 years maintenance is free. But need to pay 50 bucks for those that opt for clubhouse
Immortal
post Nov 24 2011, 10:32 AM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


QUOTE(mrkenjiro @ Nov 24 2011, 10:17 AM)
First 2 years maintenance is free. But need to pay 50 bucks for those that opt for clubhouse
*
I thought clubhouse fee is free too? Because I was told it's free for first 2yrs, thereafter would be optional.
mrkenjiro
post Nov 24 2011, 11:33 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


QUOTE(Immortal @ Nov 24 2011, 10:32 AM)
I thought clubhouse fee is free too? Because I was told it's free for first 2yrs, thereafter would be optional.
*
I think that's only applicable for those that purchase from MS
pcteck19
post Nov 24 2011, 03:27 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
heard from lawyer too, those who bought from MHJY only entitle to get free maintenance RM100 for 1st 2 years, gotta pay for clubhouse RM50 since we get the house key
mrkenjiro
post Nov 29 2011, 09:50 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


The fella over at the other thread are finalizing the memorandum for KR. I think we should also 'try' to raise something for the 2 and 2 1/2 owners. Since most of our units are already 60% completed thus we couldn't do much about structure/layout of the house but we could ask for

1. Autogate
2. Security System like the those in Semi D and Bungalow (since we are also paying maintenance fees)
3. Decision on our main entrance (should be the same one as 3 storeys)
4. Anything else...

They are submitting the memorandum tomorrow so we need to decide today.
Immortal
post Nov 29 2011, 09:54 AM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


QUOTE(mrkenjiro @ Nov 29 2011, 09:50 AM)
The fella over at the other thread are finalizing the memorandum for KR. I think we should also 'try' to raise something for the 2 and 2 1/2 owners. Since most of our units are already 60% completed thus we couldn't do much about structure/layout of the house but we could ask for

1. Autogate
2. Security System like the those in Semi D and Bungalow (since we are also paying maintenance fees)
3. Decision on our main entrance (should be the same one as 3 storeys)
4. Anything else...

They are submitting the memorandum tomorrow so we need to decide today.
*
agreed to you. especially Item. 1....it's a must.
mrkenjiro
post Nov 29 2011, 11:13 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


I am meeting the lawyer (Swan & Partner) to sign the new DMC. This DMC will outline the free 2 years for maintenance fee.


Added on November 29, 2011, 3:33 pmI have just vetted through the memorandum. It is very well detailed. I encouraged everyone here to join and endorse the memorandum as more people joining= more power to push. Please join http://www.facebook.com/groups/kinrararesidence.


This post has been edited by mrkenjiro: Nov 29 2011, 03:33 PM
pcteck19
post Dec 4 2011, 03:10 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
today received a letter from MS, about the TNB & Syabas (water) application.

fill in the form and pay RM940 for that. But there is a difficulty, which is the unit no. in mailing address, where our Phase 2B unit no. is not applicable for that.

and i realized my row Jalan DU 4/2 is the weirdest street for Phase 2B. coz we got a MHJY ori show house, non-upgraded unit, and MS/upgraded unit in the same row. sleep.gif

This post has been edited by pcteck19: Dec 4 2011, 03:10 AM
Immortal
post Dec 4 2011, 09:41 AM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


I've got mine too...I thought the deposit for utilities are to be paid during VP....sigh....
krgia10
post Dec 4 2011, 10:35 AM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
QUOTE(pcteck19 @ Dec 4 2011, 03:10 AM)
today received a letter from MS, about the TNB & Syabas (water) application.

fill in the form and pay RM940 for that. But there is a difficulty, which is the unit no. in mailing address, where our Phase 2B unit no. is not applicable for that.

and i realized my row Jalan DU 4/2 is the weirdest street for Phase 2B. coz we got a MHJY ori show house, non-upgraded unit, and MS/upgraded unit in the same row. sleep.gif
*
The external colour code also different between MS & MHJY. Never expect this from MS.
mrkenjiro
post Dec 5 2011, 08:44 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


QUOTE(pcteck19 @ Dec 4 2011, 03:10 AM)
today received a letter from MS, about the TNB & Syabas (water) application.

fill in the form and pay RM940 for that. But there is a difficulty, which is the unit no. in mailing address, where our Phase 2B unit no. is not applicable for that.

and i realized my row Jalan DU 4/2 is the weirdest street for Phase 2B. coz we got a MHJY ori show house, non-upgraded unit, and MS/upgraded unit in the same row. sleep.gif
*
Got the letter as well. If you read the letter from MS, I don't think we need to fill in everything.
TSndykh
post Dec 5 2011, 03:35 PM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(mrkenjiro @ Dec 5 2011, 08:44 AM)
Got the letter as well. If you read the letter from MS, I don't think we need to fill in everything.
*
ya.. just fill in where they put a "X" on it. the rest they will fill in for you.
I returned back the form together with cheque to MS office last Sat.

someone is correct, it look very weird on the diff design & color on the same row.
very dissapointed on MS. they seem didnt care much about 2 & 2 1/2 stories.

they only focus on their "own" projects and not on the whole KR under their care. sad.gif


mrkenjiro
post Dec 6 2011, 02:49 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Bank just disbursed 260k. This means construction has now reached 70%. Yay!
pcteck19
post Dec 12 2011, 12:14 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
just visited the site today.

my row, 2 storey
1) plaster ceiling works all done, spotted few places got water leak! sleep.gif
2) windows glass installed
3) alarm cable for all windows installed
4) most of the doors installed, bad quality, only main door is solid wood, but plain designed
5) gate's wall work done, all 2 sty units still attached to MHJY old design, unlike the lawyer said before, "wider gate for car entrance" only 1 pillar tiang
MHJY design: 2 pillar tiang, narrower gate. what worse is, the sampah area, you cant throw the sampah from the car porch (there is small door for the sampah area), gotta get out from the gate, throw sampah from outside, damn very stupid design!

This post has been edited by pcteck19: Dec 12 2011, 12:24 AM
mrkenjiro
post Dec 12 2011, 10:50 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


QUOTE(pcteck19 @ Dec 12 2011, 12:14 AM)
just visited the site today.

my row, 2 storey
1) plaster ceiling works all done, spotted few places got water leak! sleep.gif
2) windows glass installed
3) alarm cable for all windows installed
4) most of the doors installed, bad quality, only main door is solid wood, but plain designed
5) gate's wall work done, all 2 sty units still attached to MHJY old design, unlike the lawyer said before, "wider gate for car entrance" only 1 pillar tiang
MHJY design: 2 pillar tiang, narrower gate. what worse is, the sampah area, you cant throw the sampah from the car porch (there is small door for the sampah area), gotta get out from the gate, throw sampah from outside, damn very stupid design!
*
I remembered the lawyer mentioned about wider gate entrance but nothing mentioned about the pillar supporting the roof. Maybe I should sneak in again this weekend.

krgia10
post Dec 12 2011, 11:31 AM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
QUOTE(pcteck19 @ Dec 12 2011, 12:14 AM)
just visited the site today.

my row, 2 storey
1) plaster ceiling works all done, spotted few places got water leak! sleep.gif
2) windows glass installed
3) alarm cable for all windows installed
4) most of the doors installed, bad quality, only main door is solid wood, but plain designed
5) gate's wall work done, all 2 sty units still attached to MHJY old design, unlike the lawyer said before, "wider gate for car entrance" only 1 pillar tiang
MHJY design: 2 pillar tiang, narrower gate. what worse is, the sampah area, you cant throw the sampah from the car porch (there is small door for the sampah area), gotta get out from the gate, throw sampah from outside, damn very stupid design!
*
Any photo to share? Overall workmanship disappointed? Mind to tell which entrance to sneak in?
mrkenjiro
post Dec 12 2011, 12:48 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


QUOTE(krgia10 @ Dec 12 2011, 11:31 AM)
Any photo to share? Overall workmanship disappointed? Mind to tell which entrance to sneak in?
*
You can use the entrance to 3 storeys to sneak in. That's what I did last time. You will walk pass the kongsi built by the foreign labor. They will stare at you! If you want to check out the place, let me know. Maybe we can do together this weekend.

pcteck19
post Dec 12 2011, 02:45 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ Dec 12 2011, 10:50 AM)
I remembered the lawyer mentioned about wider gate entrance but nothing mentioned about the pillar supporting the roof. Maybe I should sneak in again this weekend.
*
not the pillar supports the roof.

user posted image
you can see the image above, get from show room and broucher, the pillar i mean is pillar attached the main gate for mailbox and sampah area.
only 1 on right/left.

user posted image
design from MHJY got 2 pillars, narrower gate, stupid design to throw sampah from outside


Added on December 12, 2011, 2:50 pm
QUOTE(krgia10 @ Dec 12 2011, 11:31 AM)
Any photo to share? Overall workmanship disappointed? Mind to tell which entrance to sneak in?
*
u may enter from end of the DU 4/7, drive all the way to your unit tongue.gif



This post has been edited by pcteck19: Dec 12 2011, 02:50 PM
krgia10
post Dec 12 2011, 03:44 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
QUOTE(mrkenjiro @ Dec 12 2011, 12:48 PM)
You can use the entrance to 3 storeys to sneak in. That's what I did last time. You will walk pass the kongsi built by the foreign labor. They will stare at you! If you want to check out the place, let me know. Maybe we can do together this weekend.
*
OK, will let you know... Which day you prefer to go?
mrkenjiro
post Dec 13 2011, 09:27 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


I am fine with Sat morning
pcteck19
post Dec 13 2011, 09:49 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
usually i sneak in on sunday 6pm, lesser ppl on site
Immortal
post Dec 14 2011, 10:35 AM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


Wait until you see the tile finish for 1st & 2nd floor...500 x 500 matt surface tile finish...
mrkenjiro
post Dec 14 2011, 04:32 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


QUOTE(Immortal @ Dec 14 2011, 10:35 AM)
Wait until you see the tile finish for 1st & 2nd floor...500 x 500 matt surface tile finish...
*
What do you mean? Quality no good?
Immortal
post Dec 14 2011, 06:08 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


QUOTE(mrkenjiro @ Dec 14 2011, 04:32 PM)
What do you mean? Quality no good?
*
user posted image

Judge it yourself,Kenji. To me, I don't quite like it...pinkish with matt surface...weird.
Look more like kitchen tiles......sigh, normally is gloss finish.

TSndykh
post Dec 14 2011, 06:29 PM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(Immortal @ Dec 14 2011, 06:08 PM)
user posted image

Judge it yourself,Kenji. To me, I don't quite like it...pinkish with matt surface...weird.
Look more like kitchen tiles......sigh, normally is gloss finish.
*
ohnnoo... its look sucks!!!

tis is upgraded tiles???
mrPOTATO
post Dec 14 2011, 06:33 PM

Look at all my stars!!
*******
Senior Member
2,113 posts

Joined: Dec 2008


Matt can b same price or cheaper than gloss ones .. Tiles shld look better after washing cos even gloss tiles r terrible when dusty.
krgia10
post Dec 14 2011, 07:05 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
2 storey & 2.5 storey using the same tiles?
Immortal
post Dec 14 2011, 07:25 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


QUOTE(mrPOTATO @ Dec 14 2011, 06:33 PM)
Matt can b same price or cheaper than gloss ones  .. Tiles shld look better after washing cos even gloss tiles r terrible when dusty.
*
I had the same thought as you when I first saw it, then I checked those in the box... As sux.
mrPOTATO
post Dec 14 2011, 10:28 PM

Look at all my stars!!
*******
Senior Member
2,113 posts

Joined: Dec 2008


QUOTE(Immortal @ Dec 14 2011, 07:25 PM)
I had the same thought as you when I first saw it, then I checked those in the box... As sux.
*
Managed to c wat brand is it ?
Immortal
post Dec 14 2011, 10:33 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


Kimgres... I thought this kinda Matt finish tile normally lay at wet kitchen.
pcteck19
post Dec 14 2011, 11:15 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(Immortal @ Dec 14 2011, 06:08 PM)
user posted image

Judge it yourself,Kenji. To me, I don't quite like it...pinkish with matt surface...weird.
Look more like kitchen tiles......sigh, normally is gloss finish.
*
this is flooring tiles of room on upstair?
mrkenjiro
post Dec 15 2011, 01:24 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Let's find out this weekend.

Who want to meet up this Saturday? Say around 10am?
krgia10
post Dec 15 2011, 03:16 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
@mrkenjiro,

I am in... will PM you my contact no. later
pcteck19
post Dec 15 2011, 10:40 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
cant make it as in bangkok till sunday
twins9
post Dec 16 2011, 04:35 PM

Regular
******
Senior Member
1,371 posts

Joined: Sep 2011
Looks like maid's room or kitchen tiles. My developer gave me similar matt off white tiles for my kitchen. I dint bother to change mine. But for bedrooms, it looks cold. Would cost a fortune to redo. Better buy some carpets.


Added on December 16, 2011, 4:39 pmOne good thing about tiles is easy maintenance. Wood is hard to keep scratch free.


This post has been edited by twins9: Dec 16 2011, 04:39 PM
alfredfx
post Dec 16 2011, 09:38 PM

Enthusiast
*****
Senior Member
715 posts

Joined: Jan 2003
From: Cheras
i dont see free maintenance for the first 2 years in my DMC

i thought it should be standardized from MS ?

How should i request then.
mrkenjiro
post Dec 16 2011, 10:23 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


QUOTE(alfredfx @ Dec 16 2011, 09:38 PM)
i dont see free maintenance for the first 2 years in my DMC

i thought it should be standardized from MS ?

How should i request then.
*
I have this in my new DMC that I just signed 2 weeks ago. I requested the lawyer to add this in. Maybe you need up speak to your lawyer.
alfredfx
post Dec 16 2011, 10:28 PM

Enthusiast
*****
Senior Member
715 posts

Joined: Jan 2003
From: Cheras
but i thought this should be standardized across all buyer, no ?

i have this

service charge; 100 for guarded neighbourhood; 50 for community area and facility

for the first 2 years only commencing on the date of delivery of vacant possession of th said lot and thereafter to be determined by the developer at their sole discretion fro mtime to time.

i wonder, how would the lawyer agree to let me sign a new DMC consider mine is stamped unless MS agree upon ?

do you mind send me a scan copy of the schedule ?
Immortal
post Dec 19 2011, 11:14 AM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


Guys, any comments after the site visit on last Saturday?

mrkenjiro
post Dec 19 2011, 11:46 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


QUOTE(Immortal @ Dec 19 2011, 11:14 AM)
Guys, any comments after the site visit on last Saturday?
*
Sorry I couldn't make it so no photo for now. Will try to make it next week.
jintakahashi
post Dec 26 2011, 01:57 AM

New Member
*
Junior Member
6 posts

Joined: Dec 2011
Hi all,

I'm a 2.5 stories(TMS) buyer, just dropped by to some 2.5 stories and 3 stories link houses.

very disappointing with the first impression on the product. The car porch area is so darn short and can just nicely fit a sedan car from head to tail, doubt there's any space left for movement. And the entrance(gate size) to each house is very narrow as well, blocked by stupid bulky trash/mail box pillar and electric meter pillar on both sides of the gate area.(Totally off from the brochure and advertisement) I really doubt can drive in 2 cars into car porch area.

Material used looks really cheap and lousy from such established developer and with such high premium price.

Bad Security guard house, bad planning on the whole linked-house residential area, bad mixture of outlook design(spoil the image).

Really regret and feel fooled by "The Premier Lifestyle Experience" from TMS.

This post has been edited by jintakahashi: Dec 26 2011, 02:01 AM
pcteck19
post Dec 28 2011, 12:24 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
anyone has clear the cheque for TNB and SYABAS? i was submit the form and cheque before 9th Dec, but until now the cheques still not clear yet.
TSndykh
post Dec 29 2011, 11:23 AM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(pcteck19 @ Dec 28 2011, 12:24 PM)
anyone has clear the cheque for TNB and SYABAS? i was submit the form and cheque before 9th Dec, but until now the cheques still not clear yet.
*
Mine not clear.
As usual, have to wait
pcteck19
post Dec 31 2011, 08:34 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
site visit today, 1st think to visit my unit, however, the workers still doing something on the road. so i just visit other unit on another road

main gate, pillar to pillar 149inches, 12.5ft
user posted image

back yard
user posted image

master bedroom's toilet
user posted image

user posted image


Added on December 31, 2011, 8:46 pmu can compare the photos below

MHJY original show unit, back yard, brick wall
user posted image

TMS actual unit, back yard, pillar with mild steel design, disappointed!
user posted image

This post has been edited by pcteck19: Dec 31 2011, 08:47 PM
krgia10
post Dec 31 2011, 08:58 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
Wow, really cut cost to the maximum!

Do you notice any auto gate power point?
pcteck19
post Dec 31 2011, 09:41 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(krgia10 @ Dec 31 2011, 08:58 PM)
Wow, really cut cost to the maximum!

Do you notice any auto gate power point?
*
there is, can look at the picture

wire at the bottom of pillar, i think should be auto gate power point
user posted image

This post has been edited by pcteck19: Dec 31 2011, 09:55 PM
krgia10
post Dec 31 2011, 09:56 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
Overall workmanship ok or not?

This post has been edited by krgia10: Dec 31 2011, 09:57 PM
pcteck19
post Dec 31 2011, 11:08 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(krgia10 @ Dec 31 2011, 09:56 PM)
Overall workmanship ok or not?
*
not ok, indon worker, can't expect too much.

i can easily point out the uneven concrete beam on car porch
spydermind
post Jan 1 2012, 10:46 PM

Regular
******
Senior Member
1,166 posts

Joined: Dec 2010
QUOTE(pcteck19 @ Dec 31 2011, 11:08 PM)
not ok, indon worker, can't expect too much.

i can easily point out the uneven concrete beam on car porch
*
Every project is using indonesian, the responsibility shall fall on the developers to consistently requesting better finishing from their sub-con. There ought to be issue during construction, then the developer should be paying more attention to ensure those issues are rectified and if not, then dont sign off.....

The mat finish tiles is only for kitchen right? I thought they are giving procelain tile for all living and dining area?

By the way, try not to supervise the progress of your own unit, give them chance to finish the work...i can understand the eagerness and frustration, but sometimes, it will just frustrate the contractor. IT is the developer responsibility to ensure the house quality is maintained. In addition, sometimes, it might look damn ugly, but, after they finish and clean it up, it should look much better.

Of course, it is always good to give pressure to developer otherwise, they will try to commit known crime.......

This post has been edited by spydermind: Jan 2 2012, 12:09 AM
SUSUFO-ET
post Jan 1 2012, 11:29 PM

Look at all my stars!!
*******
Senior Member
6,747 posts

Joined: Sep 2010


QUOTE(spydermind @ Jan 1 2012, 10:46 PM)
Every project is using indonesian, the responsibility shall fall on the developers to consistently requesting better finishing from their sub-con. The odd to be issue during construction, then the developer should be paying more attention to ensure those issues are rectified and if not, then dont sign off.....

The mat finish tiles is only for kitchen right? I thought they are giving procelain tile for all living and dining area?

By the way, try not to supervise the progress of your own unit, give them chance to finish the work...i can understand the eagerness and frustration, but sometimes, it will just frustrate the contractor. IT is the developer responsibility to ensure the house quality is maintained. In addition, sometimes, it might look damn ugly, but, after they finish and clean it up, it should look much better.

Of course, it is always good to give pressure to developer otherwise, they will try to commit known crime.......
*
Well said rclxms.gif
twins9
post Jan 2 2012, 02:54 PM

Regular
******
Senior Member
1,371 posts

Joined: Sep 2011
The backlane looks narrow....10 ft or less?


Immortal
post Jan 2 2012, 04:29 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


10ft, no more no less.
mrkenjiro
post Jan 3 2012, 10:50 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


QUOTE(pcteck19 @ Dec 31 2011, 08:34 PM)
site visit today, 1st think to visit my unit, however, the workers still doing something on the road. so i just visit other unit on another road

main gate, pillar to pillar 149inches, 12.5ft
user posted image

back yard
user posted image

master bedroom's toilet
user posted image

user posted image


Added on December 31, 2011, 8:46 pmu can compare the photos below

MHJY original show unit, back yard, brick wall
user posted image

TMS actual unit, back yard, pillar with mild steel design, disappointed!
user posted image
*
One question - Do we have a case here to fight? The entrance and the backyard brick wall if we bring it to TMS during handover?
pcteck19
post Jan 3 2012, 10:57 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ Jan 3 2012, 10:50 PM)
One question - Do we have a case here to fight? The entrance and the backyard brick wall if we bring it to TMS during handover?
*
unfortunately no sad.gif

i checked the snp, the fencing stated brick with mild steel, so no argument for this sad.gif

the entrance gate didn't state in snp at all, u may check your snp, the floor plan didn't include the entrance layout
mrkenjiro
post Jan 4 2012, 08:44 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


QUOTE(pcteck19 @ Jan 3 2012, 10:57 PM)
unfortunately no sad.gif

i checked the snp, the fencing stated brick with mild steel, so no argument for this sad.gif

the entrance gate didn't state in snp at all, u may check your snp, the floor plan didn't include the entrance layout
*
Crap! We had our balls hold by them then! This is ridiculous. I don't mind the entrance but I am pissed off with the backyard area.

pcteck19
post Jan 5 2012, 02:20 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
my cheque for TNB & SYABAS RM940 has been cleared on 4 Jan
twins9
post Jan 12 2012, 05:00 AM

Regular
******
Senior Member
1,371 posts

Joined: Sep 2011
is the Mah Sing Rm750k unit better than the Mahajaya RM500k unit in terms of material used, built quality and size?

Where does the Rm250k goes?
pcteck19
post Jan 12 2012, 09:19 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(twins9 @ Jan 12 2012, 05:00 AM)
is the Mah Sing Rm750k unit better than the Mahajaya RM500k unit in terms of material used, built quality and size?

Where does the Rm250k goes?
*
what TMS said are:

- club house
- guarded area
- extra built-up area
- practical layout
- modern facade
- free alarm system
- better tiles for floor and wall

and....

TMS = Premier Lifestyle; MHJY = low end


marketing strategy from dearly TMS



twins9
post Jan 12 2012, 09:41 AM

Regular
******
Senior Member
1,371 posts

Joined: Sep 2011
So, the cost of clubhouse comes from residents after all. Then still have to pay Rm50 monthly. But those lucky ones who bought before also enjoy the clubhouse, guarded area, except free alarm system, "better materials" and practical layout.

Anyone has MH and TMS houses side by side?

mrkenjiro
post Jan 12 2012, 12:16 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


QUOTE(twins9 @ Jan 12 2012, 09:41 AM)
So, the cost of clubhouse comes from residents after all.  Then still have to pay Rm50 monthly.  But those lucky ones who bought before also enjoy the clubhouse, guarded area, except free alarm system, "better materials" and practical layout.

Anyone has MH and TMS houses side by side?
*
Those so called lucky one pay additional premium ranged from Rm28K to Rm50K to enjoy those so called additional benefits
pcteck19
post Jan 12 2012, 01:24 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(twins9 @ Jan 12 2012, 09:41 AM)
So, the cost of clubhouse comes from residents after all.  Then still have to pay Rm50 monthly.  But those lucky ones who bought before also enjoy the clubhouse, guarded area, except free alarm system, "better materials" and practical layout.

Anyone has MH and TMS houses side by side?
*
the unit left beside mine, ngam ngam is the unit who choose not to upgrade. so the layout still stick with MHJY design.
doh.gif doh.gif

BTW, the units choose to upgrade, also get the free alarm system too biggrin.gif
krgia10
post Jan 12 2012, 02:36 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
Just curious, has anyone inspect the unit with MHJY design? If the material used for MS designed is bad, what do you think for those MHJY one?
vevex
post Jan 12 2012, 03:05 PM

Getting Started
**
Junior Member
79 posts

Joined: Sep 2011


QUOTE(mrkenjiro @ Jan 12 2012, 12:16 PM)
Those so called lucky one pay additional premium ranged from Rm28K to Rm50K to enjoy those so called additional benefits
*
Wah, they only paid 28k to 50k and getting the same thing as those paying additional 250k to 330k. How can you call that lucky. They must have did something really good in their past lives.
mrkenjiro
post Jan 12 2012, 04:42 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


QUOTE(vevex @ Jan 12 2012, 03:05 PM)
Wah, they only paid 28k to 50k and getting the same thing as those paying additional 250k to 330k. How can you call that lucky. They must have did something really good in their past lives.
*
Yes, lucky bugger!
Immortal
post Jan 12 2012, 05:09 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


Comment this!


user posted image
user posted image


fixed!

This post has been edited by Immortal: Jan 12 2012, 05:23 PM
twins9
post Jan 12 2012, 05:12 PM

Regular
******
Senior Member
1,371 posts

Joined: Sep 2011
no photo??

Immortal
post Jan 12 2012, 05:26 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


fixed!
The crack starts from bottom to top, the gap was much smaller when I first noticed. It's not anywhere near to the joint between column/beam to wall, if you see closely, the skirting tile was cracked too.

Sad to say...this is my unit, 3rd floor.
twins9
post Jan 12 2012, 06:35 PM

Regular
******
Senior Member
1,371 posts

Joined: Sep 2011
You have one or two years warranty? I am sure they can fix that cracks... most house would have hairline cracks. ...small ones ok.


Added on January 12, 2012, 6:44 pmAny more pics? One crack only? Windows and doors alignment ok?



This post has been edited by twins9: Jan 12 2012, 06:44 PM
pcteck19
post Jan 12 2012, 09:30 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
my unit has crack too, the wall on small living room of upstair
Immortal
post Jan 13 2012, 10:13 AM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


QUOTE(twins9 @ Jan 12 2012, 06:35 PM)
You have one or two years warranty?  I am sure they can fix that cracks... most house would have hairline cracks.  ...small ones ok.


Added on January 12, 2012, 6:44 pmAny more pics?  One crack only?  Windows and doors alignment ok?
*
Yes, defect liabilities period for 2 years.

But, to me, that's not hairline crack. Hairline crack happens due to bad plastering workmanship and the material used, and sometime due to shrinkage. This is no biggy, just hack off can patch up will solve the problem.

I guess, this crack is caused by the movement on the wall itself. The unit next to mine got the same crack almost at the same area.
vevex
post Jan 13 2012, 12:18 PM

Getting Started
**
Junior Member
79 posts

Joined: Sep 2011


QUOTE(Immortal @ Jan 13 2012, 10:13 AM)
Yes, defect liabilities period for 2 years.

But, to me, that's not hairline crack. Hairline crack happens due to bad plastering workmanship and the material used, and sometime due to shrinkage. This is no biggy, just hack off can patch up will solve the problem.

I guess, this crack is caused by the movement on the wall itself. The unit next to mine got the same crack almost at the same area.
*
Yea, that's what it seems to be - like the wall split from inside... wonder what could cause this. Think this could be serious. If root problem is not rectified, this may be troublesome in the years to come.
SUSUFO-ET
post Jan 13 2012, 01:14 PM

Look at all my stars!!
*******
Senior Member
6,747 posts

Joined: Sep 2010


QUOTE(Immortal @ Jan 13 2012, 10:13 AM)
Yes, defect liabilities period for 2 years.

But, to me, that's not hairline crack. Hairline crack happens due to bad plastering workmanship and the material used, and sometime due to shrinkage. This is no biggy, just hack off can patch up will solve the problem.

I guess, this crack is caused by the movement on the wall itself. The unit next to mine got the same crack almost at the same area.
*
Correct, hair line crack is not a big deal. In my past 10 yrs inspecting so many landed hses, I hvn't found any without crack line, m referring to those basic unit without reno (not show house). I use to advise my client to add "milk / susu" into the paint, it will mend / cure the crack line.
Of course structural crack, separation or settlement crack is to do with load bearing or soil problem already.

This post has been edited by UFO-ET: Jan 13 2012, 01:16 PM
twins9
post Jan 13 2012, 04:28 PM

Regular
******
Senior Member
1,371 posts

Joined: Sep 2011
so fast got movement?
mrkenjiro
post Jan 13 2012, 04:42 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


QUOTE(Immortal @ Jan 13 2012, 10:13 AM)
Yes, defect liabilities period for 2 years.

But, to me, that's not hairline crack. Hairline crack happens due to bad plastering workmanship and the material used, and sometime due to shrinkage. This is no biggy, just hack off can patch up will solve the problem.

I guess, this crack is caused by the movement on the wall itself. The unit next to mine got the same crack almost at the same area.
*
Which unit is yours?
twins9
post Jan 16 2012, 09:59 PM

Regular
******
Senior Member
1,371 posts

Joined: Sep 2011
Since not VP yet, MS still have time to plaster them up again.


Immortal
post Jan 17 2012, 11:10 AM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


QUOTE(mrkenjiro @ Jan 13 2012, 04:42 PM)
Which unit is yours?
*
my unit is located at row DU 4/7...

My concern is that touching up with new plastering doesn't cure the root problem of the crack. It will happen again in time
twins9
post Jan 18 2012, 08:55 AM

Regular
******
Senior Member
1,371 posts

Joined: Sep 2011
What they did to mine was (not MS house) actually widen the crack, then plaster it up....!

spydermind
post Jan 18 2012, 09:03 AM

Regular
******
Senior Member
1,166 posts

Joined: Dec 2010
That is a standard process if the crack line is getting slightly big
pcteck19
post Jan 29 2012, 07:26 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
user posted image

what a "nice" gate that TMS provided to us!
the gate appears on TMS unit and MHJY unit.

saw other diff between TMS and MHJY:
there is a shower screen intalled on MHJY unit's master bedroom toilet (non-upgrade unit)

This post has been edited by pcteck19: Jan 30 2012, 10:25 AM
Apscen
post Jan 29 2012, 07:49 PM

On my way
****
Senior Member
684 posts

Joined: Oct 2010


very weired looking gate, is like purpose make it easy for people climb in rclxub.gif
SUSUFO-ET
post Jan 29 2012, 08:01 PM

Look at all my stars!!
*******
Senior Member
6,747 posts

Joined: Sep 2010


QUOTE(pcteck19 @ Jan 29 2012, 07:26 PM)
user posted image

what a "nice" gate that TMS provided to us!
the gate appears on TMS unit and MHJY unit.

saw other diff between TMS and MHJY:
there is a shower screen intalled on MHJY unit's master bedroom
*
Ya the gate is nice! But dun installed even nicer biggrin.gif
1282009
post Jan 29 2012, 08:06 PM

Look at all my stars!!
*******
Senior Member
4,230 posts

Joined: Jan 2009
I like the front porch. Can easily park 2 cars side by side smile.gif


krgia10
post Jan 29 2012, 11:14 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
QUOTE(pcteck19 @ Jan 29 2012, 07:26 PM)
user posted image

what a "nice" gate that TMS provided to us!
the gate appears on TMS unit and MHJY unit.

saw other diff between TMS and MHJY:
there is a shower screen intalled on MHJY unit's master bedroom
*
mad.gif Oh, wtf!! TMS give us this kind of gate? doh.gif
mrkenjiro
post Jan 30 2012, 11:41 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


QUOTE(pcteck19 @ Jan 29 2012, 07:26 PM)
user posted image

what a "nice" gate that TMS provided to us!
the gate appears on TMS unit and MHJY unit.

saw other diff between TMS and MHJY:
there is a shower screen intalled on MHJY unit's master bedroom toilet (non-upgrade unit)
*
Any other pictures?
Can I know which row you took this pix from?
spydermind
post Jan 30 2012, 01:01 PM

Regular
******
Senior Member
1,166 posts

Joined: Dec 2010
well, a lot of developments now are giving simple gate design. This one perhasp is a bit thin...they will paint the gate later on.
pcteck19
post Jan 30 2012, 03:47 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ Jan 30 2012, 11:41 AM)
Any other pictures?
Can I know which row you took this pix from?
*
no other picture as not mny progress updated, only staircase handle installed (stainless steel)
maybe will go for site visit again after my biz trip in shanghai.

this photo was took on Jalan DU 4/3
mrkenjiro
post Jan 30 2012, 04:50 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


QUOTE(pcteck19 @ Jan 30 2012, 03:47 PM)
no other picture as not mny progress updated, only staircase handle installed (stainless steel)
maybe will go for site visit again after my biz trip in shanghai.

this photo was took on Jalan DU 4/3
*
Hmm... I think the house on the left in your photo is my house. biggrin.gif
pcteck19
post Jan 30 2012, 06:35 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ Jan 30 2012, 04:50 PM)
Hmm... I think the house on the left in your photo is my house.  biggrin.gif
*
nope, this sample was took in row which unit no. between 101 - 111, and yours is 8x tongue.gif


Added on January 30, 2012, 6:40 pm
QUOTE(spydermind @ Jan 30 2012, 01:01 PM)
well, a lot of developments now are giving simple gate design. This one perhasp is a bit thin...they will paint the gate later on.
*
is not abt the thin or paint color, but design!

i dun mind TMS gives us mild steel gate, but a better looking one la, please....

i showed this photo to my wife last night, she said the old MHJY show unit gate is much nicer than TMS!

This post has been edited by pcteck19: Jan 30 2012, 06:41 PM
mrkenjiro
post Jan 31 2012, 09:17 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Ahh... okay.

Obviously TMS is trying to cut corner. Hopefully it's only on these visible thing not underneath the structure.

What's your disbursement status? Mine still at 70-75%
twins9
post Jan 31 2012, 09:55 AM

Regular
******
Senior Member
1,371 posts

Joined: Sep 2011
I just found out from my bil that the non-guarded Amansari Semid opposite the guarded area was selling around Rm850k last year (same time as KR launch). At first nobody wants that 4 semid...then all sold out because terrace houses are more expensive! Those are really lucky buyers....sorry to be off topic.


pcteck19
post Jan 31 2012, 10:16 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ Jan 31 2012, 09:17 AM)
Ahh... okay.

Obviously TMS is trying to cut corner. Hopefully it's only on these visible thing not underneath the structure.

What's your disbursement status? Mine still at 70-75%
*
mine 70%
Immortal
post Feb 4 2012, 04:19 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


You guys will be amazed if you see how many cracklines in te unit I'm in now. Every floor, 80% of the wall corner, almost every wall in the house got cracklines. Haha... Speechless! And, no vanity top for 3rd floor bathroom for 2 1/2 story.
Antzfield
post Feb 4 2012, 05:08 PM

Casual
***
Junior Member
496 posts

Joined: Aug 2011
QUOTE(Immortal @ Feb 4 2012, 04:19 PM)
You guys will be amazed if you see how many cracklines in te unit I'm in now. Every floor, 80% of the wall corner, almost every wall in the house got cracklines. Haha... Speechless! And, no vanity top for 3rd floor bathroom for 2 1/2 story.
*
This is serious and we are not expecting this quality from such a developer. if from Talam, ok lah.

anyway, can any sifu here familiar with constructions, why is there cracklines appear? is it bad workmanship? material quality problem?
Immortal
post Feb 4 2012, 05:15 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


I was inspecting a few units along DU4/7. Units closer to the guardhouse has more cracklines. Will post up some pics later when I get home.

I can see some of the cracklines are at the joining point between wall and column/beam, this happene to my current 20yrs old house.


Added on February 4, 2012, 5:58 pmHere's the pics

user posted image
user posted image
user posted image
user posted image
user posted image
user posted image
user posted image


Added on February 4, 2012, 6:09 pmOps...too bad no vanity top for you... sad.gif

user posted image

This post has been edited by Immortal: Feb 4 2012, 06:09 PM
1282009
post Feb 4 2012, 10:54 PM

Look at all my stars!!
*******
Senior Member
4,230 posts

Joined: Jan 2009
Scary.. rclxub.gif


krgia10
post Feb 4 2012, 11:37 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
No eye see!
pcteck19
post Feb 4 2012, 11:50 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
plan to withdraw EPF 2nd acc for reno

do i need some doc from TMS or lawyer?
krgia10
post Feb 4 2012, 11:53 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
QUOTE(pcteck19 @ Feb 4 2012, 11:50 PM)
plan to withdraw EPF 2nd acc for reno

do i need some doc from TMS or lawyer?
*
I think you need S&P + Loan Agreement.
pcteck19
post Feb 4 2012, 11:55 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(krgia10 @ Feb 4 2012, 11:53 PM)
I think you need S&P + Loan Agreement.
*
since we are leased hold, do we need extra doc?

eg. consent?
Antzfield
post Feb 5 2012, 01:10 AM

Casual
***
Junior Member
496 posts

Joined: Aug 2011
aiyo, it looks terrible. Really, is it the quality of the materials or poor workmanship?

I do hope after this remedial work, it will be alright. is it all the units do having such "horrendous" look?
Chris Chew
post Feb 5 2012, 01:17 AM

10k Club
********
Senior Member
10,387 posts

Joined: Dec 2011


wahhh. That's very horrible and scary.
Apscen
post Feb 5 2012, 02:20 AM

On my way
****
Senior Member
684 posts

Joined: Oct 2010


Macam kena earthquake.... sweat.gif

mrPOTATO
post Feb 5 2012, 10:39 AM

Look at all my stars!!
*******
Senior Member
2,113 posts

Joined: Dec 2008


ttttttms ... they are concentrating too much on marketing & profits.
krgia10
post Feb 5 2012, 12:24 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
Potential buyer to TMS products should beware of this. You want to be the next?
1282009
post Feb 5 2012, 12:31 PM

Look at all my stars!!
*******
Senior Member
4,230 posts

Joined: Jan 2009
QUOTE(krgia10 @ Feb 5 2012, 12:24 PM)
Potential buyer to TMS products should beware of this. You want to be the next?
*
At least the prop appreciates quite a lot right? I thot the developer is MSG. What's TMS?


SUSUFO-ET
post Feb 5 2012, 12:36 PM

Look at all my stars!!
*******
Senior Member
6,747 posts

Joined: Sep 2010


The handrail is terrible!!
The developer is LEGEND GRAND DEVELOPMENT SDN. BHD.
TMS = Mah Sing
1282009
post Feb 5 2012, 12:38 PM

Look at all my stars!!
*******
Senior Member
4,230 posts

Joined: Jan 2009
QUOTE(UFO-ET @ Feb 5 2012, 12:36 PM)
The handrail is terrible!!
The developer is LEGEND GRAND DEVELOPMENT SDN. BHD.
TMS = Mah Sing
*
Thanks for the info.


yoki
post Feb 5 2012, 12:44 PM

Regular
******
Senior Member
1,313 posts

Joined: Jan 2003
From: klang Valley
This is really horrible....
Wish The buyers good luck
Hope nothing bad happen dlp

The material used is really dem cheap
Need to add min 80k to make the house stayable n reduce eyesore
pcteck19
post Feb 5 2012, 01:57 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
for phase 2B buyers, have you guys get the loan agreement?

i cant find it and i don rmb that i received before or not.
AVFAN
post Feb 5 2012, 02:11 PM

20k VIP Club
*********
All Stars
24,456 posts

Joined: Nov 2010
QUOTE(Immortal @ Feb 4 2012, 05:15 PM)
Here's the pics

i have seen many with short thin cracks but this one is very bad...
doesn't look like all are surface carcks - a chance of joints not cast properly?
at vp, should check very thoroughly again and again.

This post has been edited by AVFAN: Feb 5 2012, 02:11 PM
krgia10
post Feb 5 2012, 02:14 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
QUOTE(pcteck19 @ Feb 5 2012, 01:57 PM)
for phase 2B buyers, have you guys get the loan agreement?

i cant find it and i don rmb that i received before or not.
*
Not yet, last check with Swan & Partner still pending for land office stamping. Dunno how true is it.

Immortal
post Feb 5 2012, 02:15 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


QUOTE(pcteck19 @ Feb 5 2012, 01:57 PM)
for phase 2B buyers, have you guys get the loan agreement?

i cant find it and i don rmb that i received before or not.
*
I received it just before CNY.
pcteck19
post Feb 5 2012, 05:11 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(Immortal @ Feb 4 2012, 05:15 PM)
I was inspecting a few units along DU4/7. Units closer to the guardhouse has more cracklines. Will post up some pics later when I get home.

I can see some of the cracklines are at the joining point between wall and column/beam, this happene to my current 20yrs old house.


Added on February 4, 2012, 5:58 pmHere's the pics

user posted image


Added on February 4, 2012, 6:09 pmOps...too bad no vanity top for you... sad.gif

*
QUOTE(UFO-ET @ Feb 5 2012, 12:36 PM)
The handrail is terrible!!
The developer is LEGEND GRAND DEVELOPMENT SDN. BHD.
TMS = Mah Sing
*
handrail really sux, how come 2sty can get stainless steel for handrail?


Added on February 5, 2012, 5:12 pm
QUOTE(Immortal @ Feb 5 2012, 02:15 PM)
I received it just before CNY.
*
really? gotta call our dearly Mr. Ong or Sia from Swan & partners already...

This post has been edited by pcteck19: Feb 5 2012, 05:12 PM
mrkenjiro
post Feb 8 2012, 10:58 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


TMS really s*cks.

Did you guys manage to check the 3 storeys workmanship as well as I believe TMS is using a different sub con for 3 storeys/Semi D and Bungalow.
pcteck19
post Feb 9 2012, 01:53 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ Feb 8 2012, 10:58 AM)
TMS really s*cks.

Did you guys manage to check the 3 storeys workmanship as well as I believe TMS is using a different sub con for 3 storeys/Semi D and Bungalow.
*
3sty has CONQUAS certified, its QC definitely better than 2sty and 2.5sty

*
The Construction Quality Assessment System (CONQUAS â), introduced in Singapore since 1989, serves as a standard assessment system on the quality of building projects. A defacto national yardstick for the industry, CONQUAS â has been periodically fine-tuned to keep pace with changes in technology and quality demands of a more sophisticated population. In 1998, BCA introduced a number of new features to CONQUAS â resulting in the launch of CONQUAS â 21. Such refinements make CONQUAS â scoring more comprehensive and customer oriented.

By using CONQUAS â as a standardized method of quality assessment, developers are able to use the CONQUAS â score to set targets for contractors to achieve and also assess the quality of the finished building.

Today, CONQUAS â is widely recognised and also accepted internationally as a benchmarking tool for quality. Indeed, countries like UK and Hong Kong have successfully adapted CONQUAS â to their construction industries. CONQUAS â is now a registered trademark in Singapore, Malaysia, China, Hong Kong SAR, United Kingdom, Australia, South Africa and India.
*

CONQUAS


Added on February 20, 2012, 5:31 pmwent for site visit yesterday, saw some indon workers "moved" in to my unit, so cant really visit my own unit.

very sienz.........

This post has been edited by pcteck19: Feb 20 2012, 05:31 PM
mrkenjiro
post Feb 27 2012, 09:37 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Was there on Saturday. Almost all the units 7788 done. Spoke to the SA and he told me it should be ready by May 2012. The facade for upgraded is really very nice
SUSUFO-ET
post Feb 27 2012, 09:49 AM

Look at all my stars!!
*******
Senior Member
6,747 posts

Joined: Sep 2010


QUOTE(mrkenjiro @ Feb 27 2012, 09:37 AM)
Was there on Saturday. Almost all the units 7788 done. Spoke to the SA and he told me it should be ready by May 2012. The facade for upgraded is really very nice
*
Is it the original (Mahajaya) and the new facade design (Mah Sing) different so much? The SA said so...
Immortal
post Feb 27 2012, 09:50 AM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


Morning Kenjin, I was there on Sunday. Most of the 2 & 2 1/2 storey are 7788, but the 3 storey is just 5566, hopefully it can be done in three months time.

Yeah, the aluminum facade is very nice indeed.
mrkenjiro
post Feb 27 2012, 09:55 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


QUOTE(UFO-ET @ Feb 27 2012, 09:49 AM)
Is it the original (Mahajaya) and the new facade design (Mah Sing) different so much? The SA said so...
*
Well... I can only say the non upgrade unit will regret not taking the option to upgrade.

Of course there will be complaint about the alcheapo front gate and the backyard railing (MH getting brick while MS getting steel rail), I don't think that will be a big issue as normally people tend to change the original gate to others. Anyway I am really looking forward to my new house!


pcteck19
post Feb 28 2012, 10:36 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
did you guys take any photo?

This post has been edited by pcteck19: Feb 28 2012, 10:36 AM
Immortal
post Feb 28 2012, 11:36 AM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


QUOTE(pcteck19 @ Feb 28 2012, 10:36 AM)
did you guys take any photo?
*
This? Taken 2 weeks ago...now is completed with facade painting.
user posted image
matthewctj
post Feb 28 2012, 12:23 PM

Regular
******
Senior Member
1,304 posts

Joined: May 2007


QUOTE(Antzfield @ Feb 4 2012, 05:08 PM)
This is serious and we are not expecting this quality from such a developer. if from Talam, ok lah.

anyway, can any sifu here familiar with constructions, why is there cracklines appear? is it bad workmanship? material quality problem?
*
In my opinion, the crack that I've seen recently posted are architectural cracks and not structural cracks. Possible reasons ...

1. If cement bricks were used - possible insufficient curing time at the factory or at site before being used for bricklaying works. If due to that, the bricks has not fully dried, thus absorbing moisture/water from the plastering works. This causes shrinkage, hence the cracks. It is common in the past to spray water on the wall 1-2 days before plastering works commence, but I hardly see that these days, even at sites I inspect for my developer.

2. Cement/sand ratio for wall plastering works. Plasterers use lime to add to the mix. Lime helps to let the plaster stick to the wall. It eases the worker's job. Too much lime will not give the plaster strength.

3. Dowel bars or stiffiners should be provided at all 4 1/2 inch walls, where the bricks meets the column. It helps to reduce movement. If none were provided, it may be a contributing factor as well.

All in all, it's a combination of material and workmanship lacking. Feel free to add on those who have experience as well.
vevex
post Feb 28 2012, 04:06 PM

Getting Started
**
Junior Member
79 posts

Joined: Sep 2011


QUOTE(matthewctj @ Feb 28 2012, 12:23 PM)
In my opinion, the crack that I've seen recently posted are architectural cracks and not structural cracks. Possible reasons ...

1. If cement bricks were used - possible insufficient curing time at the factory or at site before being used for bricklaying works. If due to that, the bricks has not fully dried, thus absorbing moisture/water from the plastering works. This causes shrinkage, hence the cracks. It is common in the past to spray water on the wall 1-2 days before plastering works commence, but I hardly see that these days, even at sites I inspect for my developer.

2. Cement/sand ratio for wall plastering works. Plasterers use lime to add to the mix. Lime helps to let the plaster stick to the wall. It eases the worker's job. Too much lime will not give the plaster strength.

3. Dowel bars or stiffiners should be provided at all 4 1/2 inch walls, where the bricks meets the column. It helps to reduce movement. If none were provided, it may be a contributing factor as well.

All in all, it's a combination of material and workmanship lacking. Feel free to add on those who have experience as well.
*
Hi matthewctj,

Thanks for your knowledgeable inputs. A question: Can you pls explain architectural cracks and structural cracks.

Sorry, just edit to ask more.... What's the risk (short / long term) involve for the two scenarios? Any remedies or preventive measures for owners?

This post has been edited by vevex: Feb 28 2012, 04:09 PM
TSndykh
post Feb 29 2012, 02:35 PM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


wow...there are few owner selling 2 story unit at 950k to 990k now

just found the letter given by MS, we shall get the key by 10th May 2012

do you think we can get our house earlier than that date? brows.gif



http://www.iproperty.com.my/propertylistin...k_House_ForSale

This post has been edited by ndykh: Mar 1 2012, 08:53 AM
spydermind
post Feb 29 2012, 02:42 PM

Regular
******
Senior Member
1,166 posts

Joined: Dec 2010
2S is 750k++ right, i remember mid of last year the price was around RM790k. Looks like the price is stablizing. 20-30% increase is about the same prior to 2008 for completed property (newly VP).
twins9
post Feb 29 2012, 04:36 PM

Regular
******
Senior Member
1,371 posts

Joined: Sep 2011
what was the launch price? 550k for 2 storeys?

vevex
post Mar 1 2012, 10:17 AM

Getting Started
**
Junior Member
79 posts

Joined: Sep 2011


QUOTE(ndykh @ Feb 29 2012, 02:35 PM)
wow...there are few owner selling 2 story unit at 950k to 990k now

just found the letter given by MS, we shall get the key by 10th May 2012

do you think we can get our house earlier than that date?  brows.gif
http://www.iproperty.com.my/propertylistin...k_House_ForSale
*
The iprop link could just be a post by estate agent (not owner). I have a relative agent also do that. When interested buyer call, they can contact owner and tell with ready buyer.


The last selling price for 2SS by Mahsing when bumi lot release (back in Jul/Aug 2011) was RM 788,800 for intermediate (22x75) and RM 9xxK for end lot (26 x 75)
mrkenjiro
post Mar 5 2012, 03:29 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Honestly will anyone willing to fork up 1 mil for a double storey?
spydermind
post Mar 5 2012, 04:21 PM

Regular
******
Senior Member
1,166 posts

Joined: Dec 2010
yes and no.....yes, there are plenty of million dollar 2S link house. No, not many can afford, but still quite a number of them

Also, you have to understand that 2S link house nowadays might not be the same as those previously built. Some of the latest 2S comes with big land area (e.g. 24/26 x 80), some comes with club house wihtin a G&G, some are nicely buildup, etc.

Even those old 2S link house in certain area like TTDI, Bangsar, Taman Desa, Seputeh , many already have a price tag of more than 1 mil. at DPC, normal 22x75 (Safa), already commanding about RM1.4 mil.


pcteck19
post Mar 5 2012, 10:01 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
just visit the site this evening

1. all roads are done, base layer of coz, they gonna lay another layer

2. shower screen installed on master bedroom's toilet

3. installed electrical switch brand is Schneider, Vivace series. although Vivace is the cheapest in Schneider (Vivace < Pieno < Zen celo < Neo), at least not cheapo brand lo....

4. unifi fiber patch cord installed, located at tv panel, where beside tv port and RJ11 port

This post has been edited by pcteck19: Mar 5 2012, 10:01 PM
TSndykh
post Mar 6 2012, 08:44 AM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(pcteck19 @ Mar 5 2012, 10:01 PM)
just visit the site this evening

1. all roads are done, base layer of coz, they gonna lay another layer

2. shower screen installed on master bedroom's toilet

3. installed electrical switch brand is Schneider, Vivace series. although Vivace is the cheapest in Schneider (Vivace < Pieno < Zen celo < Neo), at least not cheapo brand lo....

4. unifi fiber patch cord installed, located at tv panel, where beside tv port and RJ11 port
*
Thanks for the updates!!

Good!! never know that they will installed unifi fiber for us
Neo|ofGeo
post Mar 6 2012, 08:48 AM

Stop Complaining and Read
Group Icon
Elite
3,142 posts

Joined: Nov 2010


QUOTE(ndykh @ Mar 6 2012, 08:44 AM)
Thanks for the updates!!

Good!! never know that they will installed unifi fiber for us
*
Mostly they would do this nowdays
since it last longer then copper technology
actually most of Bandar Kinrara should have optic cable already set up
but since there are complication
there are delayed until this year



btw,
have anyone see the Kinrara Club House nearby Taman Damai Utama?
just saw it a few weeks ago
never knew about it

pcteck19
post Mar 6 2012, 10:11 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(Neo|ofGeo @ Mar 6 2012, 08:48 AM)
have anyone see the Kinrara Club House nearby Taman Damai Utama?
just saw it a few weeks ago
never knew about it
*
that is private club house for Kinrara Residence
Neo|ofGeo
post Mar 6 2012, 10:28 AM

Stop Complaining and Read
Group Icon
Elite
3,142 posts

Joined: Nov 2010


QUOTE(pcteck19 @ Mar 6 2012, 10:11 AM)
that is private club house for Kinrara Residence
*
quite impressive,
IINM,2million house behind the club house?
3 storey
might be a good place if the lakes nearby become more clear

Immortal
post Mar 6 2012, 10:45 AM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


That's a rain water catchment pond....not possible to get clearer water, as the water get cloudy like 'teh'o ' every time it rains....

That's 2 & 3 storey semi-d behind the club house....IINM, priced below 2mil...

This post has been edited by Immortal: Mar 6 2012, 10:48 AM
krgia10
post Mar 9 2012, 09:08 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
Finally got the copy of Loan Agreement.
pcteck19
post Mar 10 2012, 03:50 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(krgia10 @ Mar 9 2012, 09:08 PM)
Finally got the copy of Loan Agreement.
*
swan & partners sent it to you? or you request from them?

does the loan doc come with the title (gelan)?
krgia10
post Mar 10 2012, 04:40 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
QUOTE(pcteck19 @ Mar 10 2012, 03:50 PM)
swan & partners sent it to you? or you request from them?

does the loan doc come with the title (gelan)?
*
Yes, lawyer firm courier it over. Photocopy of Title also come together.
pcteck19
post Mar 10 2012, 07:42 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(krgia10 @ Mar 10 2012, 04:40 PM)
Yes, lawyer firm courier it over. Photocopy of Title also come together.
*
do we pay for MOT before? i cant recall it already
krgia10
post Mar 10 2012, 07:44 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
Paid already, a few thousand damage!
twins9
post Mar 10 2012, 08:09 PM

Regular
******
Senior Member
1,371 posts

Joined: Sep 2011
Went to look at the kinrara clubhouse again. The pool looks good, surrounded by a pond. The is a small kiddy pool too. But no showers, lots of nice recliners though. Ladies change room wash basin area looks nice. Only 10 simple lockers, 2 shower/change rooms and 1 toilet! LOL.

On first floor, the gym is really small and cramp for 600?? residents. The lounge and mph are reasonably sized. Top floor - one meeting room.

No other facilities like spa, jacuzzi, sauna, badminton or basketball courts. Rm50 per family is reasonable, I think, for such sparse facilities.


mrkenjiro
post Mar 12 2012, 08:46 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


QUOTE(krgia10 @ Mar 10 2012, 07:44 PM)
Paid already, a few thousand damage!
*
Almost 10k man for MOT. Btw I have also received the courier copies.
pcteck19
post Mar 12 2012, 10:15 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ Mar 12 2012, 08:46 PM)
Almost 10k man for MOT. Btw I have also received the courier copies.
*
now i remember, i paid 10k for MOT before as well

btw, i yet to receive the copies, as now i got business trip in JB
mrkenjiro
post Mar 13 2012, 08:26 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


I was informed that the bank just disbursed another 10% for road and drain.
The next milestone is delivery of key (after electricity and water supplied)
krgia10
post Mar 13 2012, 09:06 AM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
Me too... just received the letter yesterday. Can't wait for the VP.
pcteck19
post Mar 13 2012, 10:32 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ Mar 13 2012, 08:26 AM)
I was informed that the bank just disbursed another 10% for road and drain.
The next milestone is delivery of key (after electricity and water supplied)
*
just check my loan account, bank yet to withdraw this 10% for road and drain


Added on March 15, 2012, 12:14 pmtoday only the bank withdraw the 10% for drain & road


Added on March 20, 2012, 8:41 pmvisit the site this evening, meet 1 supervisor who wearing a MS tag, he said phase 2B will be ready on mid/end of April.

as i guess, VP time will be around mid of May

This post has been edited by pcteck19: Mar 20 2012, 08:41 PM
mrkenjiro
post Mar 21 2012, 09:17 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


QUOTE(pcteck19 @ Mar 13 2012, 10:32 AM)
just check my loan account, bank yet to withdraw this 10% for road and drain


Added on March 15, 2012, 12:14 pmtoday only the bank withdraw the 10% for drain & road


Added on March 20, 2012, 8:41 pmvisit the site this evening, meet 1 supervisor who wearing a MS tag, he said phase 2B will be ready on mid/end of April.

as i guess, VP time will be around mid of May
*
Happy to hear that.
My only concern is the workmanship since MS rushed to complete the house within the pre-agreed SPA (with MH). MS only took around 1 year to complete what should have been 2.
SKfolk
post Mar 21 2012, 11:07 AM

Enthusiast
*****
Senior Member
928 posts

Joined: Mar 2012
QUOTE(Immortal @ Mar 6 2012, 10:45 AM)
That's a rain water catchment pond....not possible to get clearer water, as the water get cloudy like 'teh'o ' every time it rains....

That's 2 & 3 storey semi-d behind the club house....IINM, priced below 2mil...
*
Good, that means there will be no flood because the developer provide the retention pond.
TSndykh
post Apr 19 2012, 04:13 PM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


has anyone signed and returned back the Letter of consent in relation to Guaraded Neighbourhood Scheme, Kinrara Residence‏?

if you not aware, please call your lawyer & ask them to email u this letter.

thanks.
luvimp
post Apr 19 2012, 05:51 PM

Casual
***
Junior Member
375 posts

Joined: Jul 2008


QUOTE(ndykh @ Apr 19 2012, 04:13 PM)
has anyone signed and returned back the Letter of consent in relation to Guaraded Neighbourhood Scheme, Kinrara Residence‏?

if you not aware, please call your lawyer & ask them to email u this letter.

thanks.
*
Signed the TNB and Syabas application letter and paid the amount for the application.
Returned to Mah Sing.
pcteck19
post Apr 20 2012, 09:45 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(luvimp @ Apr 19 2012, 05:51 PM)
Signed the TNB and Syabas application letter and paid the amount for the application.
Returned to Mah Sing.
*
that is TNB and syabas application form.

what ndykh talk about is Letter of consent in relation to Guaraded Neighbourhood Scheme

well, i yet to receive that, later call lawyer firm and see what happend
mrkenjiro
post Apr 20 2012, 12:05 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


I have received it but they have resend another form today.
Immortal
post Apr 20 2012, 12:41 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


I thought I signed the Letter of Consent prior to the signing of DMC, no?

I can't really remember and I have not receive any letter yet.
mrkenjiro
post Apr 20 2012, 01:46 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


The law firm need to call you and send it to you via email
pcteck19
post Apr 20 2012, 02:05 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ Apr 20 2012, 01:46 PM)
The law firm need to call you and send it to you via email
*
i didn't receive any call yet
TSndykh
post Apr 24 2012, 10:22 AM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(pcteck19 @ Apr 20 2012, 02:05 PM)
i didn't receive any call yet
*
please call the lawyer and ask them to email to u

have to make it fast..end of April already
pcteck19
post Apr 24 2012, 11:55 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(ndykh @ Apr 24 2012, 10:22 AM)
please call the lawyer and ask them to email to u

have to make it fast..end of April already
*
done yesterday, call him and then sent me email

i fax immediately after sign off, then this morning sent a scanned copy to them again.

Lawyer said he is chasing TMS for VP and key collection, while TMS chasing him for this Letter of Consent.

So we gotta settle this Letter of Consent by end on April, so we can get the key according to the S&P

This post has been edited by pcteck19: Apr 24 2012, 01:57 PM
mrkenjiro
post Apr 26 2012, 09:22 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


QUOTE(pcteck19 @ Apr 24 2012, 11:55 AM)
done yesterday, call him and then sent me email

i fax immediately after sign off, then this morning sent a scanned copy to them again.

Lawyer said he is chasing TMS for VP and key collection, while TMS chasing him for this Letter of Consent.

So we gotta settle this Letter of Consent by end on April, so we can get the key according to the S&P
*
Honestly I think the reason given by TMS is bullsh*t. If they really this need letter of consent, they should get us to sign it earlier. Now they are buying time by giving this excuse. Come on la
krgia10
post Apr 26 2012, 10:41 AM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
QUOTE(mrkenjiro @ Apr 26 2012, 09:22 AM)
Honestly I think the reason given by TMS is bullsh*t. If they really this need letter of consent, they should get us to sign it earlier. Now they are buying time by giving this excuse. Come on la
*
Agree, if this letter of consent is so important, by right TMS should ask us to sign together with S&P or DMC. Why wait until last minutes. hmm.gif


Immortal
post Apr 26 2012, 10:50 AM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


QUOTE(krgia10 @ Apr 26 2012, 10:41 AM)
Agree, if this letter of consent is so important, by right TMS should ask us to sign together with S&P or DMC. Why wait until last minutes.  hmm.gif
*
Couldn't agree with you more.

I actually thought I signed the LoC together with the DMC. sweat.gif
twins9
post Apr 26 2012, 08:33 PM

Regular
******
Senior Member
1,371 posts

Joined: Sep 2011
Is the LOC required for g&g or else majlis wont allow them to block?

Or is it required as a consent for you to pay the maintenance fees monthly?


mrkenjiro
post Apr 27 2012, 08:52 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Tuan Yang DiPertua
Majlis Perbandaran Subang Jaya
Persiaran Perpaduan USJ 5
47610 Subang Jaya
Selangor Darul Ehsan

Dear Sir,

Re:Letter of Consent and Authorization Pertaining to the Establishment of a Guarded Neighbourhood Scheme for Phase 2B and 2C, Kinrara Residence
Project : Kinrara Residence, Puchong
Property : Lot/Unit No. , Type: 2B-
____________________________________________________________
I/We refer to the above matter.

I/We, as the owner(s) of the above Property, hereby unconditionally and irrevocably agree to participate and support the establishment of a Guarded Neighbourhood Scheme for the above Project as and when it is deemed fit to be implemented.

In this connection, I/We further consent for all such necessary acts or things to be taken or done by the Developer or the Resident Association in relation to the said Guarded Neighbourhood Scheme, including but not limited to the construction of a guarded house, boom gate and any other fitting, fixtures and structures necessary for the control and restriction of traffic and access in and out of the said Project as well as the effective operation of the Guarded Neighbourhood Scheme.

I/We further agree to procure my/our successors in title to issue you a similar letter of consent to participate in the scheme prior to the transfer of the above Property to them.

This post has been edited by mrkenjiro: Apr 27 2012, 08:52 AM
intostyle
post May 2 2012, 09:15 PM

New Member
*
Junior Member
17 posts

Joined: Feb 2010
Anyone received letter from Mahsing? Vacant possession will be on 16 May 2012
TSndykh
post May 2 2012, 09:37 PM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(intostyle @ May 2 2012, 09:15 PM)
Anyone received letter from Mahsing? Vacant possession will be on 16 May 2012
*
Good..but i thought our S&P is dated 10 May 2012?


Antzfield
post May 3 2012, 02:08 AM

Casual
***
Junior Member
496 posts

Joined: Aug 2011
QUOTE(ndykh @ May 2 2012, 09:37 PM)
Good..but i thought our S&P is dated 10 May 2012?
*
Wah, not bad. 6 days after signing of SPA, can get VP brows.gif so the loan released almost full immediately? MS surely save on DIBS.

Anyone has checked the workmanship?


mrkenjiro
post May 3 2012, 08:50 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Hmm... I have yet to receive mine.
pcteck19
post May 3 2012, 08:53 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(Antzfield @ May 3 2012, 02:08 AM)
Wah, not bad. 6 days after signing of SPA, can get VP  brows.gif so the loan released almost full immediately? MS surely save on DIBS.

Anyone has checked the workmanship?
*
VP for 2st and 2.5sty only, which signed the SPA 2 years ago (who bought from MHJY)


Added on May 3, 2012, 8:58 amsecurity fee will be RM100 per month per unit (waived 2 years)

Phase 2B is 180 units, while Phase 2C is 230+ units
(2st, 2.5sty and 3sty sharing the same guarded community)

410 X RM100 = RM41k per month gathered, wondering how the community invest the RM41k on our residence.....

This post has been edited by pcteck19: May 3 2012, 08:58 AM
TSndykh
post May 3 2012, 10:27 AM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(pcteck19 @ May 3 2012, 08:53 AM)
VP for 2st and 2.5sty only, which signed the SPA 2 years ago (who bought from MHJY)


Added on May 3, 2012, 8:58 amsecurity fee will be RM100 per month per unit (waived 2 years)

Phase 2B is 180 units, while Phase 2C is 230+ units
(2st, 2.5sty and 3sty sharing the same guarded community)

410 X RM100 = RM41k per month gathered, wondering how the community invest the RM41k on our residence.....
*
good question..
i hope is they upgrade the guard house.. it is so much difference from the palmeria entrance
pcteck19
post May 3 2012, 10:39 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(ndykh @ May 3 2012, 10:27 AM)
good question..
i hope is they upgrade the guard house.. it is so much difference from the palmeria entrance
*
Palmeria is strate title (G&G concept), link-houses only guarded community (individual title), Palmeria pays the maintenance fee according to their land size or build-up area, which much more expensive than link-houses.

MS already re-furnished the guard house of 1st entry, did some landscaping.
user posted image

Besides, they removed the guard house of 2nd entry
user posted image

This post has been edited by pcteck19: May 3 2012, 11:39 AM
mrkenjiro
post May 3 2012, 04:26 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


QUOTE(pcteck19 @ May 3 2012, 08:53 AM)
VP for 2st and 2.5sty only, which signed the SPA 2 years ago (who bought from MHJY)


Added on May 3, 2012, 8:58 amsecurity fee will be RM100 per month per unit (waived 2 years)

Phase 2B is 180 units, while Phase 2C is 230+ units
(2st, 2.5sty and 3sty sharing the same guarded community)

410 X RM100 = RM41k per month gathered, wondering how the community invest the RM41k on our residence.....
*
You received your VP letter?
pcteck19
post May 3 2012, 09:25 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ May 3 2012, 04:26 PM)
You received your VP letter?
*
nope, i think will receive on June, as i remember MS did sent us an email regarding they will follow the SPA we signed with MHJY dated June 2010.

So, i think i will get my VP during that time, perhaps can be sooner.

TSndykh
post May 8 2012, 03:19 PM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(intostyle @ May 2 2012, 09:15 PM)
Anyone received letter from Mahsing? Vacant possession will be on 16 May 2012
*
anyone else received the letter of VP? r u sure is 16th?
intostyle
post May 8 2012, 03:40 PM

New Member
*
Junior Member
17 posts

Joined: Feb 2010
I received the letter consist of :-

1. Delivery of vacant possession (VC) - In that letter MS informed that CCC has been issued. I wish to make correction , LAM via Atelier ADT Architect issued on 24 April 2012

2. Billing for Assessment & Quit Rent from 31/12/11 - 30/6/2012
(mine amounting RM204.95)

3. Late Payment Interest - Charging on outstanding of progress payment. This really make me pissed off. MS claimed interest about RM5k++. I called Swan N Partner but they not aware this matter. A lady asked me to fax the letter to them which i supposed they already have the c.c. I really demand explanation from Swan & Partner.

4. 6 months ahead Maintenance Charge from 26 APRIL 2014 - 25 OCT 2014.


Mind to share ur opinion? Thanks


krgia10
post May 8 2012, 03:52 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
QUOTE(intostyle @ May 8 2012, 03:40 PM)
I received the letter consist of :-

1. Delivery of vacant possession (VC) -  In that letter MS informed that CCC has been issued. I wish to make correction , LAM via Atelier ADT Architect issued on 24 April 2012

2.  Billing for Assessment & Quit Rent from 31/12/11 - 30/6/2012
    (mine amounting RM204.95)

3.  Late Payment Interest - Charging on outstanding of progress payment. This really make me pissed off. MS claimed interest about RM5k++. I called Swan N Partner but they not aware this matter. A lady asked me to fax the letter to them which i supposed they already have the c.c. I really demand explanation from Swan & Partner.

4. 6 months ahead Maintenance Charge from 26 APRIL 2014 - 25 OCT 2014.
Mind to share ur opinion? Thanks
*
Yours is 2 or 2.5 storey? Purchased from MHJY or MS? Upgrade or Non-upgrade?

I don't think we should pay the Late Payment Interest, it's either the lawyer or bank to settle this with MS.
intostyle
post May 8 2012, 03:56 PM

New Member
*
Junior Member
17 posts

Joined: Feb 2010
mine 2storey , non upgrade.

Yes, i really demand explanation from Swan. Really really
krgia10
post May 8 2012, 04:07 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
So far you are the first here to receive VP.

Let's wait for the remaining and see how much we kena the late payment charge. My S&P signed somewhere in May 2010.
dc_rf_pch
post May 8 2012, 10:13 PM

New Member
*
Junior Member
10 posts

Joined: May 2012
Prospective buyer looking at property around this area, please call 016-2197411 if you have a unit for sale.
tonytyk
post May 8 2012, 11:04 PM

Look at all my stars!!
******
Senior Member
1,962 posts

Joined: Nov 2011
How much offer for 3 storey superlink intermediate / end lot?
TSndykh
post May 9 2012, 01:05 PM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(intostyle @ May 8 2012, 03:40 PM)
I received the letter consist of :-

1. Delivery of vacant possession (VC) -  In that letter MS informed that CCC has been issued. I wish to make correction , LAM via Atelier ADT Architect issued on 24 April 2012

2.  Billing for Assessment & Quit Rent from 31/12/11 - 30/6/2012
    (mine amounting RM204.95)

3.  Late Payment Interest - Charging on outstanding of progress payment. This really make me pissed off. MS claimed interest about RM5k++. I called Swan N Partner but they not aware this matter. A lady asked me to fax the letter to them which i supposed they already have the c.c. I really demand explanation from Swan & Partner.

4. 6 months ahead Maintenance Charge from 26 APRIL 2014 - 25 OCT 2014.
Mind to share ur opinion? Thanks
*
the interest is really not acceptable.. we are not purposely wan to delay the progress payment.
its between the lawyer, banker & MS who "delay" the stamping on the loan agreement.

we did paid the progresive payment interest accordingly every month after the bank release the money...
it reallly not fair to us...

lets wait and see wats the lawyer goin to explain about this mad.gif
pcteck19
post May 9 2012, 05:38 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
i received the letter of VP too

1. the late payment charge from construction stage 2a to 2e, cost me RM6779 mad.gif mad.gif
ridiculous, why charge me? i did called to mah sing when their 1st claim, due to loan doc stamping issue, should not charge the late payment to purchaser. now they sent this letter to us again, should ask the lawyer to gau dim this

2. advanced payment of 6months maintenance fee RM900

3. assessment and quit rent billing RM151

4. hasil tanah RM50 (per year)

5. cukai pintu RM153 (yearly 306)


We should pay all these within 14days, then can arrange the key collection (3 working days); otherwise the 24months warranty period will start counting after this 14days although we didn't take vacant possession.

This post has been edited by pcteck19: May 9 2012, 06:19 PM
TSndykh
post May 9 2012, 06:36 PM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(pcteck19 @ May 9 2012, 05:38 PM)
i received the letter of VP too

1. the late payment charge from construction stage 2a to 2e, cost me RM6779  mad.gif  mad.gif
ridiculous, why charge me? i did called to mah sing when their 1st claim, due to loan doc stamping issue, should not charge the late payment to purchaser. now they sent this letter to us again, should ask the lawyer to gau dim this

2. advanced payment of 6months maintenance fee RM900

3. assessment and quit rent billing RM151

4. hasil tanah RM50 (per year)

5. cukai pintu RM153 (yearly 306)
We should pay all these within 14days, then can arrange the key collection (3 working days); otherwise the 24months warranty period will start counting after this 14days although we didn't take vacant possession.
*
i received the VP too.. what should we do with it now?
all make complain to the lawyer?
krgia10
post May 9 2012, 06:55 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
As usual, unable to contact Mr.Lawyar.

Our address is Taman Damai Utama and not Kinrara Residence.
twins9
post May 9 2012, 08:36 PM

Regular
******
Senior Member
1,371 posts

Joined: Sep 2011
No free maintenance fee the first year? Rm8k to collect keys is quite a princely sum.


FlyingJoy
post May 9 2012, 09:29 PM

Getting Started
**
Junior Member
74 posts

Joined: Sep 2011
QUOTE(krgia10 @ May 9 2012, 06:55 PM)
As usual, unable to contact Mr.Lawyar.

Our address is Taman Damai Utama and not Kinrara Residence.
*
Really? The address name is far from KR?.....
intostyle
post May 9 2012, 10:29 PM

New Member
*
Junior Member
17 posts

Joined: Feb 2010
Yes.. Our address name still TAMAN DAMAI UTAMA.. Pity us.. MS double standard us.. Better remove KINRARA RESIDENCE signboard in front of the guard house.

Called Swan today, still no answer. Mr Ng on MC today. He also pening..


Added on May 9, 2012, 10:33 pm
QUOTE(twins9 @ May 9 2012, 08:36 PM)
No free maintenance fee the first year? Rm8k to collect keys is quite a princely sum.
*
Free maintenance for 2 year.. fee imposed for April 2014 - OCT 2014

This post has been edited by intostyle: May 9 2012, 10:35 PM
twins9
post May 9 2012, 10:39 PM

Regular
******
Senior Member
1,371 posts

Joined: Sep 2011
Free for 2 years, also have to collect for 2014? First time I heard of this...thanks.


krgia10
post May 9 2012, 10:43 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
QUOTE(intostyle @ May 9 2012, 10:29 PM)
Yes.. Our address name still TAMAN DAMAI UTAMA.. Pity us.. MS double standard us.. Better remove KINRARA RESIDENCE signboard in front of the guard house.

Called Swan today, still no answer. Mr Ng on MC today. He also pening..


Added on May 9, 2012, 10:33 pm
Free maintenance for 2 year.. fee imposed for April 2014 - OCT 2014
*
That lawyer is hiding from us la. Don't dare to face us!
twins9
post May 9 2012, 10:52 PM

Regular
******
Senior Member
1,371 posts

Joined: Sep 2011
You can write your address as Kinrara Residence, Taman Damai Utama, Puchong, xxxxx. ......

??
krgia10
post May 9 2012, 11:00 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
Nope, it's 1, Jalan DU 4/x, Taman Damai Utama, 47180 Puchong. Sad!
pcteck19
post May 9 2012, 11:10 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
the late payment charged on period before the loan doc stamping, after that, my bank ocbc never late to drawdown the money la

gotta call MS and see what's going there

besides, the hasil tanah & cukai pintu paid by MS, and we just pay to MS? the attachment looks paid already

sadly to say yes, our address still TDU

eg.
1, Jalan DU4/1,
Taman Damai Utama,
47180 Puchong,
Selangor D. E.


i think 3sty will share the same address, since their road also 4/x

maybe only semi-d and bungalow use the real KR name in address

This post has been edited by pcteck19: May 9 2012, 11:16 PM
FlyingJoy
post May 10 2012, 04:05 AM

Getting Started
**
Junior Member
74 posts

Joined: Sep 2011
QUOTE(pcteck19 @ May 9 2012, 11:10 PM)
the late payment charged on period before the loan doc stamping, after that, my bank ocbc never late to drawdown the money la

gotta call MS and see what's going there

besides, the hasil tanah & cukai pintu paid by MS, and we just pay to MS? the attachment looks paid already

sadly to say yes, our address still TDU

eg.
1, Jalan DU4/1,
Taman Damai Utama,
47180 Puchong,
Selangor D. E.
i think 3sty will share the same address, since their road also 4/x

maybe only semi-d and bungalow use the real KR name in address
*
Wow,,,,so it will be confusing la cause 2 KR gate entrance......
And taman damai utama is at the front....
mrkenjiro
post May 10 2012, 09:09 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


QUOTE(pcteck19 @ May 9 2012, 05:38 PM)
i received the letter of VP too

1. the late payment charge from construction stage 2a to 2e, cost me RM6779  mad.gif  mad.gif
ridiculous, why charge me? i did called to mah sing when their 1st claim, due to loan doc stamping issue, should not charge the late payment to purchaser. now they sent this letter to us again, should ask the lawyer to gau dim this

2. advanced payment of 6months maintenance fee RM900

3. assessment and quit rent billing RM151

4. hasil tanah RM50 (per year)

5. cukai pintu RM153 (yearly 306)
We should pay all these within 14days, then can arrange the key collection (3 working days); otherwise the 24months warranty period will start counting after this 14days although we didn't take vacant possession.
*
The late payment is ridiculous!
And what the f*ck with the advance payment for the maintenance fee?! That's in 2 years time!

I think we should not pay them first until we sort out all these issue. If we are united then we can have a say else MS will just goreng us

This post has been edited by mrkenjiro: May 10 2012, 09:12 AM
jason_chee
post May 10 2012, 10:22 AM

Regular
******
Senior Member
1,559 posts

Joined: Oct 2004


i'm not sure whether you can skip the 6 months advance. but, as long as you sign the DMC, you can't runaway cos you agreed to the terms during purchasing. legally, you have to pay as well. but 1 thing, u can try to get official receipt on your payment as a proof for future reference. smile.gif
TSndykh
post May 10 2012, 10:27 AM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(mrkenjiro @ May 10 2012, 09:09 AM)
The late payment is ridiculous!
And what the f*ck with the advance payment for the maintenance fee?! That's in 2 years time!

I think we should not pay them first until we sort out all these issue. If we are united then we can have a say else MS will just goreng us
*
how much is your late payment?
look like everyone have different amount.
tat is really ridiculous
pcteck19
post May 10 2012, 10:28 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(jason_chee @ May 10 2012, 10:22 AM)
i'm not sure whether you can skip the 6 months advance. but, as long as you sign the DMC, you can't runaway cos you agreed to the terms during purchasing. legally, you have to pay as well. but 1 thing, u can try to get official receipt on your payment as a proof for future reference. smile.gif
*
will get the official receipt after they receive the payment. the company who runs the management/maintenance called Metika Kenangan Sdn Bhd, still a subsidiary of TMS rclxub.gif rclxub.gif


Added on May 10, 2012, 10:33 am
QUOTE(ndykh @ May 10 2012, 10:27 AM)
how much is your late payment?
look like everyone have different amount.
tat is really ridiculous
*
different amount because of 2:

1. 2sty 2.5sty selling price diff, so construction stage claim also diff

2. the date of drawdown from bank, diff purchaser got diff bank, depends when the bank drawdown the money to ms


most late payment charged was 2a-2e, before loan doc stamping, i think we can ask for waiver for this.


This post has been edited by pcteck19: May 10 2012, 10:33 AM
TSndykh
post May 10 2012, 10:47 AM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(pcteck19 @ May 10 2012, 10:28 AM)
will get the official receipt after they receive the payment. the company who runs the management/maintenance called Metika Kenangan Sdn Bhd, still a subsidiary of TMS rclxub.gif  rclxub.gif


Added on May 10, 2012, 10:33 am
different amount because of 2:

1. 2sty 2.5sty selling price diff, so construction stage claim also diff

2. the date of drawdown from bank, diff purchaser got diff bank, depends when the bank drawdown the money to ms
most late payment charged was 2a-2e, before loan doc stamping, i think we can ask for waiver for this.
*
mine is 2sty-upgraded, bank is ocbc
total late payment charges is 7.5k mad.gif
pcteck19
post May 10 2012, 11:22 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(ndykh @ May 10 2012, 10:47 AM)
mine is 2sty-upgraded, bank is ocbc
total late payment charges is 7.5k    mad.gif
*
hmm

mine also 2sty-upgraded, ocbc bank
TSndykh
post May 10 2012, 11:27 AM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(pcteck19 @ May 10 2012, 11:22 AM)
hmm

mine also 2sty-upgraded, ocbc bank
*
but yours is 500 cheaper than mine..
i really wan to audit their working

krgia10
post May 10 2012, 11:43 AM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
Guys,

Look for Li Ping from MS, write in to request to waive the late payment interest.
TSndykh
post May 10 2012, 11:52 AM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(krgia10 @ May 10 2012, 11:43 AM)
Guys,

Look for Li Ping from MS, write in to request to waive the late payment interest.
*
do you a sample letter to share here?
krgia10
post May 10 2012, 04:21 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
Just give her a call, then follow up with a simple email stating your unit no. That's all.
mrkenjiro
post May 11 2012, 09:02 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


As for mine, the late payment charge from construction stage 2a to 2h, cost me RM6400. My financer is HLB. Will call Li Ping today to understand and sort out this issue.

pcteck19
post May 11 2012, 09:46 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
just call Mei, just told to send her an email with simple write of waive for late payment charge, without any reason is ok.

they will review that, maybe not waive all, we might to pay few hundred if the late caused by purchaser/bank, not the loan doc stamping issue

hasil tanah and cukai pintu already paid by MS, so we just pay to MS is ok.

and she told not rush to pay, after the clarify the late payment charge amount then only we pay once. but gotta issue 2 diff cheque, as maintenance/management fee is pay to Mestika Kenangan Sdn Bhd.
mrkenjiro
post May 11 2012, 10:02 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


QUOTE(pcteck19 @ May 11 2012, 09:46 AM)
just call Mei, just told to send her an email with simple write of waive for late payment charge, without any reason is ok.

they will review that, maybe not waive all, we might to pay few hundred if the late caused by purchaser/bank, not the loan doc stamping issue

hasil tanah and cukai pintu already paid by MS, so we just pay to MS is ok.

and she told not rush to pay, after the clarify the late payment charge amount then only we pay once. but gotta issue 2 diff cheque, as maintenance/management fee is pay to Mestika Kenangan Sdn Bhd.
*
I called Li Ping just now as well. What she told me is consistent to what you mentioned. Like what you said, high chances to get waiver but maybe not 100%. I wonder if we can claim from the bank for the delay caused by them.
TSndykh
post May 11 2012, 11:35 AM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(mrkenjiro @ May 11 2012, 10:02 AM)
I called Li Ping just now as well. What she told me is consistent to what you mentioned. Like what you said, high chances to get waiver but maybe not 100%. I wonder if we can claim from the bank for the delay caused by them.
*
i already emailed to MS yesterday. i hope they can sort it out fast.
meanwhile, they asked us to pay the misc charges 1st. we can send the cheque to KR office
pcteck19
post May 11 2012, 11:47 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(ndykh @ May 11 2012, 11:35 AM)
i already emailed to MS yesterday. i hope they can sort it out fast.
meanwhile, they asked us to pay the misc charges 1st. we can send the cheque to KR office
*
Mei said pay at once, so nonit to go there many times
rclxms.gif rclxms.gif

mrkenjiro
post May 11 2012, 12:24 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


The sequence is like this

Bank to disburse the remaining -> we pay everything -> take key
TSndykh
post May 11 2012, 12:31 PM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(mrkenjiro @ May 11 2012, 12:24 PM)
The sequence is like this

Bank to disburse the remaining -> we pay everything -> take key
*
i dont think bank will agree on tat and this might lead to some delays..

i hope MS give us the key 1st after we paid the misc charges (pending the interest)
pcteck19
post May 11 2012, 12:36 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(ndykh @ May 11 2012, 12:31 PM)
i dont think bank will agree on tat and this might lead to some delays..

i hope MS give us the key 1st after we paid the misc charges (pending the interest)
*
what mrkenjiro means was bank going to pay the last 20% of construction stage 15% + 5%

then we pay the rest, after waive of some amount
mrkenjiro
post May 11 2012, 01:45 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


QUOTE(pcteck19 @ May 11 2012, 12:36 PM)
what mrkenjiro means was bank going to pay the last 20% of construction stage 15% + 5%

then we pay the rest, after waive of some amount
*
Correct! Thanks for explaining on behalf
pcteck19
post May 14 2012, 02:01 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
anyone got the copy of DMC?
TSndykh
post May 15 2012, 10:39 AM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(pcteck19 @ May 14 2012, 02:01 PM)
anyone got the copy of DMC?
*
got new copy?
pcteck19
post May 15 2012, 11:15 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(ndykh @ May 15 2012, 10:39 AM)
got new copy?
*
looks like i don't have the copy
krgia10
post May 15 2012, 11:15 AM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
Any of you manage to contact Mr.Lawyar from Swan to find out the late payment interest?

It's difficult for us to swallow if there is no waiver from MS. It's not our fault ! doh.gif
pcteck19
post May 15 2012, 11:40 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(krgia10 @ May 15 2012, 11:15 AM)
Any of you manage to contact Mr.Lawyar from Swan to find out the late payment interest?

It's difficult for us to swallow if there is no waiver from MS. It's not our fault !  doh.gif
*
Beside waiting the lawyer, we can prepare some evident, eg. bank statement of loan drawdown date.

Will prove that bank issue the amount on time, so no way MS is charging us.

if late payment charge before the loan doc stamping, can ask for waive off because not our fault.


TSndykh
post May 18 2012, 03:37 PM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(pcteck19 @ May 15 2012, 11:40 AM)
Beside waiting the lawyer, we can prepare some evident, eg. bank statement of loan drawdown date.

Will prove that bank issue the amount on time, so no way MS is charging us.

if late payment charge before the loan doc stamping, can ask for waive off because not our fault.
*
any updates?
lawyer no sound no gas
mrkenjiro
post May 22 2012, 06:26 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Just called Mah Sing and was informed that some owners get 100% waiver but some did not. And the reason why they did not is because of the delay from the law firm (that's according to the person I spoke to). I was wondering if we can claim back from the law firm (if yes, how?)
Also I will only know the outcome of my appeal this Thursday
pcteck19
post May 22 2012, 09:16 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ May 22 2012, 06:26 PM)
Just called Mah Sing and was informed that some owners get 100% waiver but some did not. And the reason why they did not is because of the delay from the law firm (that's according to the person I spoke to). I was wondering if we can claim back from the law firm (if yes, how?)
Also I will only know the outcome of my appeal this Thursday
*
hmm.....

our lawyer from Swan & Partners always late....


TSndykh
post May 24 2012, 04:13 PM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


got email from MS, they agreed to waive most of the interest, but not 100%.


mrkenjiro
post May 24 2012, 06:30 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Me too. Apparently the interest not waived are those incurred in Nov 2011. I need to pay 600++ late interest. Try to get in touch with Swan & Partner but couldn't get on hold with them. Anyone has any their active contact number?
pcteck19
post May 24 2012, 06:42 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
hmm

i yet to receive email from MS


Added on May 25, 2012, 2:16 pmgot the email already, late interest = 300+

plus the quit rent and asmt 150, total less than 500

This post has been edited by pcteck19: May 25 2012, 02:16 PM
TSndykh
post May 25 2012, 04:44 PM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(pcteck19 @ May 24 2012, 06:42 PM)
hmm

i yet to receive email from MS


Added on May 25, 2012, 2:16 pmgot the email already, late interest = 300+

plus the quit rent and asmt 150, total less than 500
*
i think i need to call mr. lawyer & ask y mine is much more expensive

This post has been edited by ndykh: May 25 2012, 04:52 PM
mrkenjiro
post May 25 2012, 07:44 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


QUOTE(ndykh @ May 25 2012, 04:44 PM)
i think i need to call mr. lawyer & ask y mine is much more expensive
*
How's much is yours?
TSndykh
post May 27 2012, 09:32 PM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(mrkenjiro @ May 25 2012, 07:44 PM)
How's much is yours?
*
mine is 1.2k sad.gif
mrkenjiro
post May 28 2012, 12:06 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


I've called the lawyer and informed him to look into my case. Will check again with him tomorrow or Tuesday.


Added on May 30, 2012, 11:43 amJust contacted the person in charge from the law firm and he informed me that the law firm will not pay for all these 'so-called late payment' and we (the owner) has to bear it ourselves.
Pisses me off to the max $%&#$^%&!!!


This post has been edited by mrkenjiro: May 30 2012, 11:43 AM
TSndykh
post May 30 2012, 12:20 PM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(mrkenjiro @ May 28 2012, 12:06 AM)
I've called the lawyer and informed him to look into my case. Will check again with him tomorrow or Tuesday.


Added on May 30, 2012, 11:43 amJust contacted the person in charge from the law firm and he informed me that the law firm will not pay for all these 'so-called late payment' and we (the owner) has to bear it ourselves.
Pisses me off to the max $%&#$^%&!!!
*
i called them too few days ago. they said will look into it.

i'm still waiting for their answer on this
mrkenjiro
post May 30 2012, 12:43 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


QUOTE(ndykh @ May 30 2012, 12:20 PM)
i called them too few days ago. they said will look into it.

i'm still waiting for their answer on this
*
I can confirm that they are not paying anything. I'll pm you the detail
tonytyk
post May 30 2012, 07:11 PM

Look at all my stars!!
******
Senior Member
1,962 posts

Joined: Nov 2011
QUOTE(pcteck19 @ May 15 2012, 11:40 AM)
Beside waiting the lawyer, we can prepare some evident, eg. bank statement of loan drawdown date.

Will prove that bank issue the amount on time, so no way MS is charging us.

if late payment charge before the loan doc stamping, can ask for waive off because not our fault.
*
Can also bring it to the attention of Housing Tribunal. http://www.kpkt.gov.my/kpkt_en/main.php

pcteck19
post Jun 1 2012, 07:14 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
I paid the amount, and collect key on Thursday
mrkenjiro
post Jun 2 2012, 12:10 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


How was your house? Any defect?
pcteck19
post Jun 2 2012, 08:47 AM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ Jun 2 2012, 12:10 AM)
How was your house? Any defect?
*
sorry, i didn't write properly.

collect key on next thursday, as now i'm in singapore smile.gif
luvimp
post Jun 4 2012, 02:19 PM

Casual
***
Junior Member
375 posts

Joined: Jul 2008


Went to KR and tried to go inside to have a look but failed.
Stopped by the guards. sad.gif
TSndykh
post Jun 5 2012, 02:28 PM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(luvimp @ Jun 4 2012, 02:19 PM)
Went to KR and tried to go inside to have a look but failed.
Stopped by the guards. sad.gif
*
saw some washing their unit

some start renovating their unit

smile.gif
irenechong85
post Jun 5 2012, 02:37 PM

Getting Started
**
Junior Member
125 posts

Joined: Nov 2007
From: Subang Jaya
Hi owners/investor,

Does any friend of you looking a unit there? I have few unit is looking buyer on 2 1/2 story superlink house and 2 storey superlink house in Kinrara, asking price RM 1.2 million n end lot letting go at 1.45mil...do drop me a pm for more info..


luvimp
post Jun 5 2012, 03:18 PM

Casual
***
Junior Member
375 posts

Joined: Jul 2008


QUOTE(ndykh @ Jun 5 2012, 02:28 PM)
saw some washing their unit

some start renovating their unit

smile.gif
*
Yes, they allow you to enter if you have the key.
But i wanted to sneak in to look at my 3-sty superlink so they stopped me. cry.gif


Added on June 5, 2012, 3:19 pm
QUOTE(irenechong85 @ Jun 5 2012, 02:37 PM)
Hi owners/investor,

Does any friend of you looking a unit there? I have few unit is looking buyer on 2 1/2 story superlink house and 2 storey superlink house in Kinrara, asking price RM 1.2 million n end lot letting go at 1.45mil...do drop me a pm for more info..
*
Wow?!
So expensive now?
3-sty superlink how much?

This post has been edited by luvimp: Jun 5 2012, 03:19 PM
Immortal
post Jun 5 2012, 03:45 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


where is my keyyyy..........??? sad.gif sad.gif

I was wondering why no one make noise about the second entrance since there's no guardhouse for whatsoever, just a few drums blocking the road.
Maybe it's just me...because my unit is in that row... blush.gif
luvimp
post Jun 5 2012, 04:41 PM

Casual
***
Junior Member
375 posts

Joined: Jul 2008


QUOTE(Immortal @ Jun 5 2012, 03:45 PM)
where is my keyyyy..........??? sad.gif  sad.gif

I was wondering why no one make noise about the second entrance since there's no guardhouse for whatsoever, just a few drums blocking the road.
Maybe it's just me...because my unit is in that row... blush.gif
*
Where is the 2nd entrance?
No guard is good cause i want to sneak in to see my unit le.
Do you have any photo?
Immortal
post Jun 5 2012, 04:48 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


QUOTE(luvimp @ Jun 5 2012, 04:41 PM)
Where is the 2nd entrance?
No guard is good cause i want to sneak in to see my unit le.
Do you have any photo?
*
The road between 2B and 2C. That will be the second entrance, but currently the road from entrance 1 to entrance 2 was blocked by the guard of Damai residents, so you will have to come from the clubhouse direction. 'Safer' if you sneak in thru the TNB substation next to clubhouse.
luvimp
post Jun 5 2012, 04:53 PM

Casual
***
Junior Member
375 posts

Joined: Jul 2008


QUOTE(Immortal @ Jun 5 2012, 04:48 PM)
The road between 2B and 2C. That will be the second entrance, but currently the road from entrance 1 to entrance 2 was blocked by the guard of Damai residents,  so you will have to come from the clubhouse direction. 'Safer' if you sneak in thru the TNB substation next to clubhouse.
*
Is it the road after the clubhouse.
I mean you need to turn right to go into clubhouse but we just continue straight?
I think that road blocked by metal.
So i stop my car from there and walk?
Immortal
post Jun 5 2012, 04:55 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


QUOTE(luvimp @ Jun 5 2012, 04:53 PM)
Is it the road after the clubhouse.
I mean you need to turn right to go into clubhouse but we just continue straight?
I think that road blocked by metal.
So i stop my car from there and walk?
*
Yes, but sometime there will be 2 patrol guards sitting there too. If you just want to check out the 3sty, why not get in thru the TNB, easier.
luvimp
post Jun 5 2012, 05:42 PM

Casual
***
Junior Member
375 posts

Joined: Jul 2008


I am so sorry but i do not know where is the TNB?
SUSUFO-ET
post Jun 5 2012, 06:19 PM

Look at all my stars!!
*******
Senior Member
6,747 posts

Joined: Sep 2010


QUOTE(luvimp @ Jun 5 2012, 05:42 PM)
I am so sorry but i do not know where is the TNB?
*
Near to club house
pcteck19
post Jun 5 2012, 11:04 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(Immortal @ Jun 5 2012, 03:45 PM)
where is my keyyyy..........??? sad.gif  sad.gif

I was wondering why no one make noise about the second entrance since there's no guardhouse for whatsoever, just a few drums blocking the road.
Maybe it's just me...because my unit is in that row... blush.gif
*
i think the guard house of 2nd entrance will be completed with phase 2C together

just my own prediction
biggrin.gif biggrin.gif
mrkenjiro
post Jun 6 2012, 09:28 AM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


Anyone here already received the key and checked the house? How was the quality?
krgia10
post Jun 6 2012, 10:21 AM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
I got my key already.... quite a lot of defect in my unit.

Not happy with the overall quality!
mrkenjiro
post Jun 6 2012, 01:34 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


QUOTE(krgia10 @ Jun 6 2012, 10:21 AM)
I got my key already.... quite a lot of defect in my unit.

Not happy with the overall quality!
*
Generally what kinds of defect and how long will they take to fix it.
krgia10
post Jun 6 2012, 01:55 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
You name it, they have it:

- hairline crack
- rough and uneven surface on wall
- gap between tiles too wide
- rusty grille
- water mark on plaster ceiling
- chip and cracked floor tiles
- windows frame dented
- tiles colour not matching
- and many many more...

Just wait for your turn, be prepared to spend 1 full day to check the defect.

They need 30 days to rectify the defect.
Donald Trump
post Jun 6 2012, 02:10 PM

Regular
******
Senior Member
1,686 posts

Joined: Aug 2011
QUOTE(krgia10 @ Jun 6 2012, 01:55 PM)
You name it, they have it:

- hairline crack
- rough and uneven surface on wall
- gap between tiles too wide
- rusty grille
- water mark on plaster ceiling
- chip and cracked floor tiles
- windows frame dented
- tiles colour not matching
- and many many more...

Just wait for your turn, be prepared to spend 1 full day to check the defect.

They need 30 days to rectify the defect.
*
sorry to say your 2 storey unit if bought from MJ is an unwanted child of MS for this project...worse still if u never chose the upgrade package...these unit the roof structure is actually made of wood instead of steel rclxub.gif

cant blame them with that kind of entry price and high building cost...there is the only way out
krgia10
post Jun 6 2012, 02:22 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
True, nothing much I can do apart from hoping them to repair or touch up the defect for me.
luvimp
post Jun 6 2012, 03:12 PM

Casual
***
Junior Member
375 posts

Joined: Jul 2008


QUOTE(krgia10 @ Jun 6 2012, 02:22 PM)
True, nothing much I can do apart from hoping them to repair or touch up the defect for me.
*
Please update us on MS response time and service time (if they accept to fix the issues).
I really want to know how is 5 stars MS is different from other.
irenechong85
post Jun 6 2012, 03:23 PM

Getting Started
**
Junior Member
125 posts

Joined: Nov 2007
From: Subang Jaya
Hi luvimp,

the price for 3 strorey super link is 1.2million, for 2 storey price is RM900k...
both price still able nego dy...
mrkenjiro
post Jun 6 2012, 04:42 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


QUOTE(krgia10 @ Jun 6 2012, 01:55 PM)
You name it, they have it:

- hairline crack
- rough and uneven surface on wall
- gap between tiles too wide
- rusty grille
- water mark on plaster ceiling
- chip and cracked floor tiles
- windows frame dented
- tiles colour not matching
- and many many more...

Just wait for your turn, be prepared to spend 1 full day to check the defect.

They need 30 days to rectify the defect.
*
I am not so worry about 'surface' defect, it's the structural defect that I am worried about.
Immortal
post Jun 6 2012, 04:45 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


QUOTE(Donald Trump @ Jun 6 2012, 02:10 PM)
sorry to say your 2 storey unit if bought from MJ is an unwanted child of MS for this project...worse still if u never chose the upgrade package...these unit the roof structure is actually made of wood instead of steel rclxub.gif

cant blame them with that kind of entry price and high building cost...there is the only way out
*
FYI, both Phase2B and 2C are using timber roof truss...

The hairline crack isn't something new, they had patched up previously but this kinda problem will happen again...
mrkenjiro
post Jun 6 2012, 04:48 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


QUOTE(Immortal @ Jun 6 2012, 04:45 PM)
FYI, both Phase2B and 2C are using timber roof truss...

The hairline crack isn't something new, they had patched up previously but this kinda problem will happen again...
*
Isn't hairline crack caused by paint quality or the mixture of paint, water not done well?
Immortal
post Jun 6 2012, 04:58 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


QUOTE(mrkenjiro @ Jun 6 2012, 04:48 PM)
Isn't hairline crack caused by paint quality or the mixture of paint, water not done well?
*
Based on my limited knowledge, it probably caused by the plastering material (mixture), and also absence of the netting at joint between structure and wall.

Nothing to do with the paint.
pcteck19
post Jun 6 2012, 05:22 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(Donald Trump @ Jun 6 2012, 02:10 PM)
sorry to say your 2 storey unit if bought from MJ is an unwanted child of MS for this project...worse still if u never chose the upgrade package...these unit the roof structure is actually made of wood instead of steel rclxub.gif

cant blame them with that kind of entry price and high building cost...there is the only way out
*
if not mistaken, upgraded MHJY units also get the wood roof structure

correct me if i'm wrong

PS. i'm going to collect the key by tomorrow
krgia10
post Jun 6 2012, 05:38 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
I believe the entire Phase 2B is using wood roof.

@pcteck19, you may not be able to perform water leakage test as all the tap are still not install yet. My unit don't even have the TNB meter. Wonder if this is proper for a developer to handover to buyer as electricity and water also not ready.

Good luck!
pcteck19
post Jun 6 2012, 05:49 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(krgia10 @ Jun 6 2012, 05:38 PM)
I believe the entire Phase 2B is using wood roof.

@pcteck19, you may not be able to perform water leakage test as all the tap are still not install yet. My unit don't even have the TNB meter. Wonder if this is proper for a developer to handover to buyer as electricity and water also not ready.

Good luck!
*
really? a common key collection should water & power ready, and we can test all the sockets whether function or not.

if like what u said, i only can check on tiles, walls, and window frame?

sigh....
Immortal
post Jun 6 2012, 06:52 PM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


QUOTE(pcteck19 @ Jun 6 2012, 05:49 PM)
really? a common key collection should water & power ready, and we can test all the sockets whether function or not.

if like what u said, i only can check on tiles, walls, and window frame?

sigh....
*
The house is solar powered and come with Rain water harvest system *grin*
TSndykh
post Jun 6 2012, 10:04 PM

Getting Started
**
Junior Member
66 posts

Joined: May 2011


QUOTE(pcteck19 @ Jun 6 2012, 05:49 PM)
really? a common key collection should water & power ready, and we can test all the sockets whether function or not.

if like what u said, i only can check on tiles, walls, and window frame?

sigh....
*
yes, only check the tiles, wall, door, locks (please test properly, some not working good) & window frame

they will install the taps & mainhole covers once u have no comment on defects

if u have any, then they will install it together with the defects
platinum39
post Jun 6 2012, 10:09 PM

Getting Started
**
Junior Member
132 posts

Joined: May 2011
QUOTE(irenechong85 @ Jun 6 2012, 03:23 PM)
Hi luvimp,

the price for 3 strorey super link is 1.2million, for 2 storey price is RM900k...
both price still able nego dy...
*
Is this sub-sale price? I-property show much higher prices
Immortal
post Jun 7 2012, 12:37 AM

Getting Started
**
Junior Member
221 posts

Joined: Sep 2005


QUOTE(ndykh @ Jun 6 2012, 10:04 PM)
yes, only check the tiles, wall, door, locks (please test properly, some not working good) & window frame

they will install the taps & mainhole covers once u have no comment on defects

if u have any, then they will install it together with the defects
*
How can you check leakage problem without water supply? Especially bathrooms at upper floor as well as balcony.
luvimp
post Jun 7 2012, 10:54 AM

Casual
***
Junior Member
375 posts

Joined: Jul 2008


QUOTE(Immortal @ Jun 6 2012, 06:52 PM)
The house is solar powered and come with Rain water harvest system *grin*
*
Rain harvest system only for bungalow.
Solar power only for heater and i am not sure whether 2 & 2 1/2 storey also enjoy that offer.
But i am sure that 3 storey superlink have solar powered heater (not for whole house)
pcteck19
post Jun 7 2012, 01:13 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(Immortal @ Jun 7 2012, 12:37 AM)
How can you check leakage problem without water supply? Especially bathrooms at upper floor as well as balcony.
*
i got my keys just now, water supply is ready, indoor taps are installed.

only 2 taps not yet install, which car porch and back yard for washing machine, they worry if installed now and will lost it where nobody at home tongue.gif
they gave the taps to me, install it when needed.

tested water in 3 toilets, frankly, the water pressure is damn low, maybe the water in tangki is low, will test it on sunday again. perhaps my guess is correct.

electricity cant test now, as TNB not ready, maybe can get the power supply within 2 weeks.


as krgia10 said, quite a lot of defects spotted in short time just now.

1. hairline crack on plaster ceiling, but didn't spot any on wall
2. rough and uneven plaster ceiling shocking.gif
3. suspect 2 water leakage, 1 caused by roof, 1 caused by toilet from master bedroom
4. rust door lock handle
5. door frame dented
6. stair case stainless steel handrail get "painted"

overall is quite dirty, like paint leaks on window/window frame, dust on track of window frames, toilet dirty and etc.

PS. Keypad panel and motion sensor (alarm system) install later with or after the defects repairing.

This post has been edited by pcteck19: Jun 7 2012, 01:15 PM
krgia10
post Jun 7 2012, 01:52 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
QUOTE(pcteck19 @ Jun 7 2012, 01:13 PM)
i got my keys just now, water supply is ready, indoor taps are installed.

only 2 taps not yet install, which car porch and back yard for washing machine, they worry if installed now and will lost it where nobody at home tongue.gif
they gave the taps to me, install it when needed.

tested water in 3 toilets, frankly, the water pressure is damn low, maybe the water in tangki is low, will test it on sunday again. perhaps my guess is correct.

electricity cant test now, as TNB not ready, maybe can get the power supply within 2 weeks.
as krgia10 said, quite a lot of defects spotted in short time just now.

1. hairline crack on plaster ceiling, but didn't spot any on wall
2. rough and uneven plaster ceiling shocking.gif
3. suspect 2 water leakage, 1 caused by roof, 1 caused by toilet from master bedroom
4. rust door lock handle
5. door frame dented
6. stair case stainless steel handrail get "painted"

overall is quite dirty, like paint leaks on window/window frame, dust on track of window frames, toilet dirty and etc.

PS. Keypad panel and motion sensor (alarm system) install later with or after the defects repairing.
*
Ha... no surprise then... more or less the same.

Got spider in the house? wink.gif
pcteck19
post Jun 7 2012, 01:58 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(krgia10 @ Jun 7 2012, 01:52 PM)
Ha... no surprise then... more or less the same.

Got spider in the house? wink.gif
*
yes yes, i saw few spiders in living room
sweat.gif sweat.gif
mrkenjiro
post Jun 7 2012, 04:46 PM

Casual
***
Junior Member
396 posts

Joined: Jan 2003


QUOTE(pcteck19 @ Jun 7 2012, 01:13 PM)
i got my keys just now, water supply is ready, indoor taps are installed.

only 2 taps not yet install, which car porch and back yard for washing machine, they worry if installed now and will lost it where nobody at home tongue.gif
they gave the taps to me, install it when needed.

tested water in 3 toilets, frankly, the water pressure is damn low, maybe the water in tangki is low, will test it on sunday again. perhaps my guess is correct.

electricity cant test now, as TNB not ready, maybe can get the power supply within 2 weeks.
as krgia10 said, quite a lot of defects spotted in short time just now.

1. hairline crack on plaster ceiling, but didn't spot any on wall
2. rough and uneven plaster ceiling shocking.gif
3. suspect 2 water leakage, 1 caused by roof, 1 caused by toilet from master bedroom
4. rust door lock handle
5. door frame dented
6. stair case stainless steel handrail get "painted"

overall is quite dirty, like paint leaks on window/window frame, dust on track of window frames, toilet dirty and etc.

PS. Keypad panel and motion sensor (alarm system) install later with or after the defects repairing.
*
I will only get my key on the 19th but getting very excited at it. Will you be around at the site this weekend? Thinking of dropping by your house to look see look see
luvimp
post Jun 7 2012, 05:20 PM

Casual
***
Junior Member
375 posts

Joined: Jul 2008


QUOTE(pcteck19 @ Jun 7 2012, 01:13 PM)
i got my keys just now, water supply is ready, indoor taps are installed.

only 2 taps not yet install, which car porch and back yard for washing machine, they worry if installed now and will lost it where nobody at home tongue.gif
they gave the taps to me, install it when needed.

tested water in 3 toilets, frankly, the water pressure is damn low, maybe the water in tangki is low, will test it on sunday again. perhaps my guess is correct.

electricity cant test now, as TNB not ready, maybe can get the power supply within 2 weeks.
as krgia10 said, quite a lot of defects spotted in short time just now.

1. hairline crack on plaster ceiling, but didn't spot any on wall
2. rough and uneven plaster ceiling shocking.gif
3. suspect 2 water leakage, 1 caused by roof, 1 caused by toilet from master bedroom
4. rust door lock handle
5. door frame dented
6. stair case stainless steel handrail get "painted"

overall is quite dirty, like paint leaks on window/window frame, dust on track of window frames, toilet dirty and etc.

PS. Keypad panel and motion sensor (alarm system) install later with or after the defects repairing.
*
Do 2 and 2 1/2 storey get the free water booster?
It is best to try out the shower head at 2nd floor bathroom and you will know how strong is the water pressure.
If it is only slightly more powerful than your pee then definitely there is some problem.
To confirm, maybe you should call the developer to confirm which tap is using direct water and not from tank.
Try that tap and you will know too.
pcteck19
post Jun 7 2012, 05:57 PM

Getting Started
**
Junior Member
237 posts

Joined: Aug 2006
QUOTE(mrkenjiro @ Jun 7 2012, 04:46 PM)
I will only get my key on the 19th but getting very excited at it. Will you be around at the site this weekend? Thinking of dropping by your house to look see look see
*
i'm now at outstation, maybe sunday evening can arrive KL


Added on June 7, 2012, 6:00 pm
QUOTE(luvimp @ Jun 7 2012, 05:20 PM)
Do 2 and 2 1/2 storey get the free water booster?
It is best to try out the shower head at 2nd floor bathroom and you will know how strong is the water pressure.
If it is only slightly more powerful than your pee then definitely there is some problem.
To confirm, maybe you should call the developer to confirm which tap is using direct water and not from tank.
Try that tap and you will know too.
*
no, only 3sty get the water booster.

i think i will get the grunfos water pump, i tried master bedroom toilet, it's weak; tried on another toilet on upstair, weaker.

plan to get the rain show in master bedroom, definitely will get the water booster.


This post has been edited by pcteck19: Jun 7 2012, 06:00 PM
krgia10
post Jun 7 2012, 06:14 PM

Getting Started
**
Junior Member
183 posts

Joined: Oct 2010
From: 1 Malaysia 2 System 3 Voices
QUOTE(pcteck19 @ Jun 7 2012, 05:57 PM)
i'm now at outstation, maybe sunday evening can arrive KL


Added on June 7, 2012, 6:00 pm

no, only 3sty get the water booster.

i think i will get the grunfos water pump, i tried master bedroom toilet, it's weak; tried on another toilet on upstair, weaker.

plan to get the rain show in master bedroom, definitely will get the water booster.
*
Do group purchase can? if yours is weak, i think mine will be worst. You finished doing defect checking?