Household Kinrara Residence - Link Houses
|
Immortal
|
Jul 18 2011, 10:48 AM
|
Getting Started

|
i'm eyeing on the 2 1/2 storey, but too bad there's only around 20units left, anyone 2 1/2 owner here?? I was thinking to get a unit in the row facing 3storey link....but it's quite near to the guard house, worried about the noise and traffic..... anyone cares to share?
there's another unit facing 2 storey link, but too near to the allocated masjid.....sigh i'm now in dilemma between these 2.....
|
|
|
|
|
|
Immortal
|
Jul 18 2011, 12:34 PM
|
Getting Started

|
2 1/2 is RM888k, end lot is RM988k
|
|
|
|
|
|
Immortal
|
Jul 18 2011, 02:42 PM
|
Getting Started

|
2-storey is RM788k, 2 1/2 is RM888k, I went to the office just yesterday. 2-storey only left end-lot which facing road.
|
|
|
|
|
|
Immortal
|
Nov 8 2011, 08:43 PM
|
Getting Started

|
Anyone gets 'impressed' by the mild steel railing?  I personally not  .... a half a mil house by other developer gives better railing like glass.....
|
|
|
|
|
|
Immortal
|
Nov 8 2011, 09:36 PM
|
Getting Started

|
QUOTE(Antzfield @ Nov 8 2011, 09:14 PM) you managed to sneak in again?  ya, i agree with you, not really "impressed" with that, hopefully, looks better when completed later. how is the finishing of the floor tiles? is the gap between tiles reasonable? I noticed the new bungalow show house unit's floor tiles gap look awful. (TMS, hear this???) Wasn't checking about the floor tiles much as the floor is covering by plastic sheet. But you can always judge it by yourself looking at the wall tiles in toilets below. Hey......I walked in.. 
|
|
|
|
|
|
Immortal
|
Nov 9 2011, 12:02 PM
|
Getting Started

|
QUOTE(mrkenjiro @ Nov 9 2011, 09:20 AM) I totally agree with the steel railing thingy but it's something TMS inherited from MH so... but we're not paying peanuts and we should not get monkey.....so the railing really look cheap... wondering who's the ID consultant for this project
|
|
|
|
|
|
Immortal
|
Nov 9 2011, 06:40 PM
|
Getting Started

|
QUOTE(Karas Otoha @ Nov 9 2011, 04:00 PM) What the lousy job they do???? at least give us the glass railing la.. can't be so cheap right??? Anyone go and complaint this? Please do it.. don't wait untill they install.. They will install another timber handrail on top of the mild steel. But, it still look cheap like those 70s house... Really OMG.
|
|
|
|
|
|
Immortal
|
Nov 9 2011, 06:57 PM
|
Getting Started

|
QUOTE(krgia10 @ Nov 9 2011, 06:48 PM) I remember MH show unit at least came with stainless steel handrail. Wonder how to voice this out in order for MS to offer us another complimentary upgrade.  Haha... Let them hear our voice... Just a lil bit more salt on the wound, the 2nd floor balcony railing is mild steel too instead of glass railing like at 1st floor balcony...sigh why....even the opposite Damai link house c/w glass rail at balcony
|
|
|
|
|
|
Immortal
|
Nov 10 2011, 07:56 PM
|
Getting Started

|
Antz, you seem very particular on the gap between tiles, so I've got this picture specially for you. Ground floor tile...
|
|
|
|
|
|
Immortal
|
Nov 10 2011, 08:32 PM
|
Getting Started

|
QUOTE(krgia10 @ Nov 10 2011, 08:10 PM) Is this kind of workmanship consider acceptable? Well, it's very subjective. To me, it's acceptable. Met a contractor, he told be 2.5 storey is inspected by CONQUAS quality (65/100) minimum.
|
|
|
|
|
|
Immortal
|
Nov 10 2011, 09:13 PM
|
Getting Started

|
QUOTE(krgia10 @ Nov 10 2011, 09:07 PM) This is consider a better news to us. In fact, I never expect they will comply to CONQUAS standard. I actually thought only 3storey c/w CONQUAS, but the contractor told me 2 & 2.5 storey are complying to CONQUAS as well, but they're checking on selected units only, not all. Notice that most of the rooms are c/w aircond drain pipe only...you have to lay the copper pipe yourself. As for tile, pretty same as the 3storey show unit, but upper floors are using 500x500 tile....mostly KIMGRES
|
|
|
|
|
|
Immortal
|
Nov 10 2011, 09:28 PM
|
Getting Started

|
QUOTE(krgia10 @ Nov 10 2011, 09:18 PM) Normally copper pipe is not included. Standard A/C installation should include at least 10 feet copper pipe. 500 x 500mm same as 1.5 x 1.5 ft? I thought it will be 1 x 1. Yah, I thought the same too, I was surprised when I saw those boxed tiles placed on the 1st floor was 500x500....only the rooms at ground floor are using 1x1... another info from the contractor...for 2.5storey, the proposed staircase going up to the back aisle is now omitted, the retaining wall is constructed toward the backyard of 2storey.
|
|
|
|
|
|
Immortal
|
Nov 10 2011, 09:49 PM
|
Getting Started

|
if you look at the layout plan, you will see a staircase at your backyard. for 2.5storey only. which means, if you want to go to the back-lane you will have to climb up, coz the level is higher than your backyard. but for the latest design, backlane and backyard are same level.
|
|
|
|
|
|
Immortal
|
Nov 11 2011, 01:58 PM
|
Getting Started

|
I thought there is two entrance to phase 2B, one located at the Mahajaya show unit, another one at jalan DU4/7, the road separate 2.5 and 3 storey.
|
|
|
|
|
|
Immortal
|
Nov 11 2011, 02:19 PM
|
Getting Started

|
QUOTE(mrkenjiro @ Nov 11 2011, 02:11 PM) If this is the case then we can actually use the big KR gate to go home Couldn't agree with you more, nicer road with trees. Rather than passing by damai link houses. The entrance for phase 2B is pretty much fixed, a small guard house has been built at both entrance, but SA told me there could be a possibility they're going to upgrade to a bigger one which can fit CCTV system... Very much depend on the consultant.
|
|
|
|
|
|
Immortal
|
Nov 11 2011, 05:24 PM
|
Getting Started

|
I think I misunderstood the KR gate. You're talking about the main guard house next to the pool near 3SS show unit?
|
|
|
|
|
|
Immortal
|
Nov 11 2011, 06:27 PM
|
Getting Started

|
QUOTE(Karas Otoha @ Nov 11 2011, 06:17 PM) Ya..my SA told me there is a bridge on the longkang, but i'm not so sure how big/nice is it.. may be papan somemore ..  For 3 sty also got buit in security system right ? Only 2.5 and 2 sty no security system.. Of course i hope the guarded house will be nicer and bigger.. because we not only paid for the house.. we paid for the concept also.. and it's not cheap! 3SS c/w smart security system, touch screen. 2.5 & 2 sty c/w normal security system.
|
|
|
|
|
|
Immortal
|
Nov 14 2011, 03:19 PM
|
Getting Started

|
QUOTE(mrkenjiro @ Nov 14 2011, 09:37 AM) I would like to our house's main entrance to be via DU 4/7 (TMS, please make it a double volumne proper entrance) rather than the existing showhouse. I want to position my house as part of KR and NOT part of Damai Utama(MH's old development project) as this will impact valuation. Even though if my house was at the same row with MH units, I'd still use the main road with the KR signboard to get to my house.....like what you said, don't wanna be part of Damai Utama.....
|
|
|
|
|
|
Immortal
|
Nov 24 2011, 10:32 AM
|
Getting Started

|
QUOTE(mrkenjiro @ Nov 24 2011, 10:17 AM) First 2 years maintenance is free. But need to pay 50 bucks for those that opt for clubhouse I thought clubhouse fee is free too? Because I was told it's free for first 2yrs, thereafter would be optional.
|
|
|
|
|
|
Immortal
|
Nov 29 2011, 09:54 AM
|
Getting Started

|
QUOTE(mrkenjiro @ Nov 29 2011, 09:50 AM) The fella over at the other thread are finalizing the memorandum for KR. I think we should also 'try' to raise something for the 2 and 2 1/2 owners. Since most of our units are already 60% completed thus we couldn't do much about structure/layout of the house but we could ask for 1. Autogate 2. Security System like the those in Semi D and Bungalow (since we are also paying maintenance fees) 3. Decision on our main entrance (should be the same one as 3 storeys) 4. Anything else... They are submitting the memorandum tomorrow so we need to decide today. agreed to you. especially Item. 1....it's a must.
|
|
|
|
|