Then what the lawyer said?
For 2 1/2 storey, it should be follow the revised plan, of course the DMC is sided to the developer. |
|
|
May 20 2011, 09:00 AM
Return to original view | Post
#3
|
![]() ![]()
Junior Member
183 posts Joined: Oct 2010 From: 1 Malaysia 2 System 3 Voices |
Ya, supposedly it should come with 2 years free Security fee.
For 2 storey, you mean they will put back the balcony? Or corridor? So what is the latest built up size? |
|
|
May 20 2011, 09:08 AM
Return to original view | Post
#4
|
![]() ![]()
Junior Member
183 posts Joined: Oct 2010 From: 1 Malaysia 2 System 3 Voices |
Totally agree with you, if not much changes from MH design, why should you pay 28K to them?
The lawyer is the biggest failure for this deal! |
|
|
May 20 2011, 09:22 AM
Return to original view | Post
#5
|
![]() ![]()
Junior Member
183 posts Joined: Oct 2010 From: 1 Malaysia 2 System 3 Voices |
Wa... luckily did not mention which unit that I own...
We are severely behind schedule for S&P, Loan Agreement and MOT... buck up Mr. Lawyer ! |
|
|
May 20 2011, 11:42 AM
Return to original view | Post
#6
|
![]() ![]()
Junior Member
183 posts Joined: Oct 2010 From: 1 Malaysia 2 System 3 Voices |
But keeping us in dark will make the situation worse.
I am expecting at least some update from time to time. |
|
|
|
|
|
May 23 2011, 02:27 PM
Return to original view | Post
#7
|
![]() ![]()
Junior Member
183 posts Joined: Oct 2010 From: 1 Malaysia 2 System 3 Voices |
|
|
|
May 23 2011, 10:40 PM
Return to original view | Post
#8
|
![]() ![]()
Junior Member
183 posts Joined: Oct 2010 From: 1 Malaysia 2 System 3 Voices |
QUOTE(mrkenjiro @ May 23 2011, 09:20 PM) Hmm... if this is the one then it is not the same as the one I signed earlier as I remember there's no balcony... The one I got from MS was this The facede should be same for both MS & MH purchaser. Which design u prefer?![]() Uploaded with ImageShack.us One question I want to ask. Will those that purchase with MH and opt for upgrade has similar fascade as the one sold by MS? Added on May 23, 2011, 9:21 pm RM310 for which type? 2 storey? 2 1/2 storey? 3 storey? |
|
|
May 24 2011, 09:17 AM
Return to original view | Post
#9
|
![]() ![]()
Junior Member
183 posts Joined: Oct 2010 From: 1 Malaysia 2 System 3 Voices |
QUOTE(mrkenjiro @ May 24 2011, 09:01 AM) krgia10, IINM the design without balcony was rejected by local council, that's why the came out with this design.I've seen the balcony in the 3storey/semi D and it is too small to fit anything so I don't see a point of having a balcony. If it is not taken care well, it'll just gather dust and dirt. I would prefer without balcony and the space that the balcony occupied to be part of the masterbedroom, easily get additional 30-40 sq feets... I think we need to know what is the status right now. The way I understand it right now the layout is not approved by the local council... alfredx, Yes. There's gate. It's not open concept You will only know the finalized design when you sign your S&P. Get Mr. Lawyar. |
|
|
Sep 6 2011, 12:32 PM
Return to original view | Post
#10
|
![]() ![]()
Junior Member
183 posts Joined: Oct 2010 From: 1 Malaysia 2 System 3 Voices |
Vevex,
Thanks for the great photos. Have you decided to go with 2.5S or 3S after seeing the different in material quality? From the unfinished build, what is your opinion on the workmanship? |
|
|
Oct 3 2011, 10:55 AM
Return to original view | Post
#11
|
![]() ![]()
Junior Member
183 posts Joined: Oct 2010 From: 1 Malaysia 2 System 3 Voices |
Loan from OCBC - Not yet.
Last update got from Swan (few weeks ago) was pending MS Director signoff for a docs. |
|
|
Oct 9 2011, 12:10 PM
Return to original view | Post
#12
|
![]() ![]()
Junior Member
183 posts Joined: Oct 2010 From: 1 Malaysia 2 System 3 Voices |
Anyone got the stamped copy of Loan Agreement?
|
|
|
Nov 9 2011, 06:48 PM
Return to original view | Post
#13
|
![]() ![]()
Junior Member
183 posts Joined: Oct 2010 From: 1 Malaysia 2 System 3 Voices |
I remember MH show unit at least came with stainless steel handrail.
Wonder how to voice this out in order for MS to offer us another complimentary upgrade. |
|
|
|
|
|
Nov 10 2011, 08:10 PM
Return to original view | Post
#14
|
![]() ![]()
Junior Member
183 posts Joined: Oct 2010 From: 1 Malaysia 2 System 3 Voices |
Is this kind of workmanship consider acceptable?
|
|
|
Nov 10 2011, 09:07 PM
Return to original view | Post
#15
|
![]() ![]()
Junior Member
183 posts Joined: Oct 2010 From: 1 Malaysia 2 System 3 Voices |
|
|
|
Nov 10 2011, 09:18 PM
Return to original view | Post
#16
|
![]() ![]()
Junior Member
183 posts Joined: Oct 2010 From: 1 Malaysia 2 System 3 Voices |
QUOTE(Immortal @ Nov 10 2011, 09:13 PM) I actually thought only 3storey c/w CONQUAS, but the contractor told me 2 & 2.5 storey are complying to CONQUAS as well, but they're checking on selected units only, not all. Normally copper pipe is not included. Standard A/C installation should include at least 10 feet copper pipe. Notice that most of the rooms are c/w aircond drain pipe only...you have to lay the copper pipe yourself. As for tile, pretty same as the 3storey show unit, but upper floors are using 500x500 tile....mostly KIMGRES 500 x 500mm same as 1.5 x 1.5 ft? I thought it will be 1 x 1. |
|
|
Nov 10 2011, 09:40 PM
Return to original view | Post
#17
|
![]() ![]()
Junior Member
183 posts Joined: Oct 2010 From: 1 Malaysia 2 System 3 Voices |
QUOTE(Immortal @ Nov 10 2011, 09:28 PM) Yah, I thought the same too, I was surprised when I saw those boxed tiles placed on the 1st floor was 500x500....only the rooms at ground floor are using 1x1... Sorry, don't quite get you. How is it going to benefit us if the staircase is remove?another info from the contractor...for 2.5storey, the proposed staircase going up to the back aisle is now omitted, the retaining wall is constructed toward the backyard of 2storey. Now the eyesore is the staircase railing + balcony railing. MS, do something about this ! |
|
|
Nov 10 2011, 09:52 PM
Return to original view | Post
#18
|
![]() ![]()
Junior Member
183 posts Joined: Oct 2010 From: 1 Malaysia 2 System 3 Voices |
Ok, got it.
Anyway, just received the 45% progress billing today. I think my unit is the slowest among all the 2.5 storey. |
|
|
Nov 12 2011, 04:51 PM
Return to original view | Post
#19
|
![]() ![]()
Junior Member
183 posts Joined: Oct 2010 From: 1 Malaysia 2 System 3 Voices |
QUOTE(pcteck19 @ Nov 12 2011, 12:11 PM) then which gate u are referring? With 2 entrance, it will be good if they implement single flow system ie. 1 in & 1 out as the road for 2 & 2.5 storey is not wide enough to cater for 2 cars simultaneously. link-houses got 2 gates like u said, 1 located on the current 2.5sty show unit there, another gate located on Jalan 4/7 where 2.5sty and sty meet each other. i think gate on 4/7 will be the main gate for link-houses. Currently DU3 already implemented the manual bomb gate system. This may affect the access to the entrance near the JALAN DU 4/7. Anyone sneak in to the site this weekend? Can share some photo here |
|
|
Nov 12 2011, 06:41 PM
Return to original view | Post
#20
|
![]() ![]()
Junior Member
183 posts Joined: Oct 2010 From: 1 Malaysia 2 System 3 Voices |
It's still do-able as nowadays technology should be able to cater for this kind of scenario.
Let say the security guard scan the visitor ID and pass a visitor tag to visitor, when the visitor need to leave, they just return the visitor tag to the guard at the exit. Hehe... Just some weekend senseless idea. |
| Change to: | 0.0219sec
0.78
7 queries
GZIP Disabled
Time is now: 9th December 2025 - 11:54 PM |