QUOTE(pcteck19 @ Jul 25 2011, 09:59 AM)
yesterday i was able to "sneak" into the project area, and get looking within my house.
roof covered, wall has been coated, ground floor bathroom & kitchen tiles until ceiling heights, current progress is plaster ceiling works at 1st floor (ground floor completed).
1 thing a bit disappointed me is about the tiles at kitchen, although using Kimgres tiles as written in the upgrade plan letter, but its size just only 1X1 (MHJY show unit is 1X2), tiles color is something white color (MHJY show unit is something beige color kind), looks not so classy for me.
Thanks for the sharing man roof covered, wall has been coated, ground floor bathroom & kitchen tiles until ceiling heights, current progress is plaster ceiling works at 1st floor (ground floor completed).
1 thing a bit disappointed me is about the tiles at kitchen, although using Kimgres tiles as written in the upgrade plan letter, but its size just only 1X1 (MHJY show unit is 1X2), tiles color is something white color (MHJY show unit is something beige color kind), looks not so classy for me.
Any photo that can share?
Jul 25 2011, 04:25 PM

Quote
0.0195sec
0.48
7 queries
GZIP Disabled