Owners/Would be Owners of Taman Putra Impiana,

I hope you all can concentrate on this forum topic so we can have a discussion and maybe to open a meeting in near future to create the committe for better management of our beloved home!!!

Please start the comment!!!
WWJD
post Nov 2 2010, 12:01 PM

Getting Started
**
Junior Member
142 posts

Joined: Aug 2010
the title reads "taman putra impiana good or bad?"

are you asking input if it is good to invest there?

or you are asking ppl to voice their opinions as a neighbourhood community?
TSsnake4168
post Nov 7 2010, 12:25 AM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
Yeah, more sort of things like neighbourhood community. Not many ppl will invest on Leasehold property right?
yiptan2329
post Nov 7 2010, 01:09 PM

Getting Started
**
Junior Member
58 posts

Joined: Nov 2010
IMO, this Taman is quite near the pylons and it is leasehold. If you do not care about this two things, this place is another good place other than Taman Tasik Prima. For me, I would choose Taman Putra Prima, which is located further in. It is freehold and far away from the pylons. The only disadvantage is the road to Taman Putra Prima is not in good conditions due to too many heavy vehicles.
TSsnake4168
post Nov 8 2010, 06:09 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
I personally survey both site also but I love Putra Impiana because built design & of course I only can afford that price.

I didn't saw any others advantage of putra prima. Only because freehold have to fork out another RM100k!


Added on November 8, 2010, 6:13 pmBoth project also has complain & compliments from exisiting tenants. If the project is failure, should have a lot of people sell it!

Now I could not find any owner want to sell in Putra Impiana Phase 1 & 2. Which is good right?

Any owner want to comment? Could you update us any improvement or bad thing?


Added on November 22, 2010, 1:28 pmFor info:

Putra Impiana Phase 5
20 x70
Intermediate built up 1910sqft
RM418,990 discount RM3,000
MOT RM7000. Individual title ready. Transfer when sign S&P.
Leashold

Porcelain floor tiles:
Ground floor up to dry kitchen area (2x2)
1st floor (1.5x1.5)

Autogate point ready
Car porch full ceramic tiles
Plaster ceiling at 1st floor
All unit face north/south


This post has been edited by snake4168: Nov 22 2010, 01:28 PM
Sephir
post Jan 18 2011, 10:19 PM

New Member
*
Newbie
1 posts

Joined: Jan 2011


QUOTE(snake4168 @ Nov 8 2010, 06:09 PM)
I personally survey both site also but I love Putra Impiana because built design & of course I only can afford that price.

I didn't saw any others advantage of putra prima. Only because freehold have to fork out another RM100k!


Added on November 8, 2010, 6:13 pmBoth project also has complain & compliments from exisiting tenants. If the project is failure, should have a lot of people sell it!

Now I could not find any owner want to sell in Putra Impiana Phase 1 & 2. Which is good right?

Any owner want to comment? Could you update us any improvement or bad thing?


Added on November 22, 2010, 1:28 pmFor info:

Putra Impiana Phase 5
20 x70
Intermediate built up 1910sqft
RM418,990 discount RM3,000
MOT RM7000. Individual title ready. Transfer when sign S&P.
Leashold

Porcelain floor tiles:
Ground floor up to dry kitchen area (2x2)
1st floor (1.5x1.5)

Autogate point ready
Car porch full ceramic tiles
Plaster ceiling at 1st floor
All unit face north/south
*
-------------------------------------------------------------
Hi Snake 4168,

Your inner built up size was 1910 sqft ? Why the brochures stated 2108 sqft ( intermediate ) ? And the developer had promised me the build up size is 2108 sqft. TQ for your info again.


Hi other members,

Do any one of you have issue of PT number ? Without this PT number , S&P could not proceeded ?
Developer said there are 2 more buyer like me ?
PT number issue- members , how developer promise you to solve this issue ? TQ for your info.
-----------------------------------------------------------------





Dern
post Jan 18 2011, 11:52 PM

Regular
******
Senior Member
1,979 posts

Joined: Mar 2005


hi guys, wanna ask u guys if it's far or not to travel from puchong prima to kl sentral ?
joanalooidog
post Feb 21 2011, 03:43 PM

Look at all my stars!!
*******
Senior Member
2,823 posts

Joined: Feb 2005
Still available meh? think sold out liao....
TSsnake4168
post Feb 24 2011, 06:12 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
QUOTE(Sephir @ Jan 18 2011, 10:19 PM)
-------------------------------------------------------------
Hi Snake 4168,

Your inner built up size was 1910 sqft ? Why the brochures stated 2108 sqft  ( intermediate ) ?  And the developer had promised me the build up size is 2108 sqft. TQ for your info again.
Hi other members,

Do any one of you have issue of PT number ? Without this PT number , S&P could not proceeded ?
Developer said there are 2 more buyer like me ?
PT number issue- members , how developer promise you to solve this issue ?  TQ for your info.
-----------------------------------------------------------------
*
2108 sqft including car porch area. I don't have PT number issue. But the salesman won't tell you some secret!

When I visit the show house which is Phase 4, Tony Soo(Salesman) told me it will be exactly the same as Phase 5.

But I found out the Phase 4 land area is 20x75! Phase 5 is 20x70!


Added on February 24, 2011, 6:13 pm
QUOTE(Dern @ Jan 18 2011, 11:52 PM)
hi guys, wanna ask u guys if it's far or not to travel from puchong prima to kl sentral ?
*
Quite far also. Puchong jam area mah! tongue.gif tongue.gif


Added on February 24, 2011, 6:16 pm
QUOTE(joanalooidog @ Feb 21 2011, 03:43 PM)
Still available meh? think sold out liao....
*
They open another 2 rows which cause about RM438k++

Also they give preview for Semi D & 21/2 storeys house which cause RM618k++

This post has been edited by snake4168: Feb 24 2011, 06:16 PM
ketzupoo
post Mar 11 2011, 04:16 PM

New Member
*
Junior Member
22 posts

Joined: Oct 2008
Me also planing to buy there
PhasE 5 rm448k (tony said)
He also tell me exact like phase 4
Estimate dec next year done
For me got individual title better, coz no need to pay more legal fee for transfer in future for transfer and charge to bank
But any infor regarding the developer? izzit a big developer or famous?
TSsnake4168
post Mar 17 2011, 06:50 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
QUOTE(ketzupoo @ Mar 11 2011, 04:16 PM)
Me also planing to buy there
PhasE 5 rm448k (tony said)
He also tell me exact like phase 4
Estimate dec next year done
For me got individual title better, coz no need to pay more legal fee for transfer in future for transfer and charge to bank
But any infor regarding the developer? izzit a big developer or famous?
*
Yup agree.

The Developer not a big boy like Sime Darby or Plenitude Bhd.

But heard from some agent, they got some issue on their Bandar Baru Klang project last time.

Prepare for some delay as it happen to starting from Phase 1. Don't trust Tony much. he told me it should only be ready around mid 2012 for key collection.

for the workmanship, only 2-3 house from phase 1&2 complaint but better than Mahajaya project Damai Utama, Kinrara 5 (Almost all houses got roof leaking problem).

Anyway, even IOI project also got problem la.

This post has been edited by snake4168: Mar 17 2011, 06:52 PM
anniecyp2003
post Mar 24 2011, 09:15 PM

New Member
*
Junior Member
45 posts

Joined: Apr 2009


Hmmm... Eventually I also impressive on Taman Putra Impiana, therefore I survey the developer background and feel insecure after reading on below website http://www.realestate.net.my/forum/viewtop...9abecc72#124157
Do you think they will abandon the property in Tmn Putra Impiana just like in Bandar Baru Klang? Very worry as I wanna to decide by this few weeks too.
walentino
post Mar 29 2011, 10:26 AM

New Member
*
Newbie
1 posts

Joined: Mar 2011
the price now is rm 448k, discount 3k for early bird and tony said will complete by next yr end.
So i paid the deposit yesterday and now phase 5 left only 1 unit. but then after i gone thru this forum, im starting to worry on my decision.
Is there any 1 can give my some advice as this is my 1st time to buy a house.. HELP!!!

TSsnake4168
post Mar 30 2011, 02:53 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
QUOTE(anniecyp2003 @ Mar 24 2011, 09:15 PM)
Hmmm... Eventually I also impressive on Taman Putra Impiana, therefore I survey the developer background and feel insecure after reading on below website http://www.realestate.net.my/forum/viewtop...9abecc72#124157
Do you think they will abandon the property in Tmn Putra Impiana just like in Bandar Baru Klang? Very worry as I wanna to decide by this few weeks too.
*
Not goin to happen because this project already half done. Also i had a friend from RHB bank.
He said, to get a panel from RHB Bank is more harder. The developer must have certain deposit guarantee to obtain it.
patmos
post Mar 30 2011, 03:05 PM

Getting Started
**
Junior Member
118 posts

Joined: Jan 2009


Developer is Acmar, try ask people around Klang and hear what they have to say. The huge abandon building on the way turning to Jusco Klang is develop by Acmar.
hitilo
post Mar 31 2011, 01:55 PM

New Member
*
Junior Member
30 posts

Joined: Aug 2010
Actually I had booked one unit b4 but later found about about ACMAR and decided to pull out don't want to risk getting stuck in shit. But, honestly their design is one of the best in terms of practicality and also previous units have concrete imprint car porch (value add).
TSsnake4168
post Mar 31 2011, 08:20 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
There are half way done this project. Hopefully they won't do that. Must check their site as frequent as can.


Added on April 1, 2011, 10:49 amAnyone from Phase 1,2,3,4 to comment? Hopefully can get more info from them.

This post has been edited by snake4168: Apr 1 2011, 10:49 AM
tee81
post Apr 13 2011, 11:03 PM

New Member
*
Newbie
2 posts

Joined: Apr 2011
We booking Phase 5 on 21st Feb, but until now housing loan still in pending, i already check with Pxxxx bank, the reason is REJECT PROJECT, not is QUOTA FULL, now i still waiting Axbank feedback for me....
CanonG10
post Apr 15 2011, 09:47 PM

Getting Started
**
Junior Member
82 posts

Joined: May 2010
QUOTE(tee81 @ Apr 13 2011, 11:03 PM)
We booking Phase 5 on 21st Feb, but until now housing loan still in pending, i already check with Pxxxx bank, the reason is REJECT PROJECT, not is QUOTA FULL, now i still waiting Axbank feedback for me....
*
REJECT PROJECT??? How come still can launch until phase 5?

Anyone can share what is the SALE progress of the phase 5?
TSsnake4168
post Apr 15 2011, 11:09 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
How come REJECT PROJECT? I got loan from a same PXXXX Bank as well!!

I even signed S&P already! I didn't hear anything from banker wor?!

As I know their sales from Phase 5 is good.

They have no intention to promote it because they want to settle Phase 3 & 4 first.

So they sell it by walk in customers and mouth to mouth news only!

FG27
post Apr 15 2011, 11:30 PM

New Member
*
Junior Member
49 posts

Joined: Apr 2010
i'm staying at putra prima and i'm here not to talk bad about this project, just want to share with you what my friend (phase 2 buyer) had experienced. his house was unfortunately late in delivery by 7 months, now staying there almost one and a half years, still cannot apply for TM fixed line and rubbish collection is still being done by developer and not mpsepang

CanonG10
post Apr 15 2011, 11:43 PM

Getting Started
**
Junior Member
82 posts

Joined: May 2010
QUOTE(FG27 @ Apr 15 2011, 11:30 PM)
i'm staying at putra prima and i'm here not to talk bad about this project, just want to share with you what my friend (phase 2 buyer) had experienced. his house was unfortunately late in delivery by 7 months, now staying there almost one and a half years, still cannot apply for TM fixed line and rubbish collection is still being done by developer and not mpsepang
*
Sound like no CF... Hmmm..
TSsnake4168
post Apr 17 2011, 01:59 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
So No CF still can stay in? bad... How come nobody want to sell if it is so bad?

If their project is failure sure got a lot of people to sell!?? izzit?

Before i book for Phase 5, I want buy Phase 1 or 2. Couldn't find one there.


Added on April 17, 2011, 1:59 pm
QUOTE(FG27 @ Apr 15 2011, 11:30 PM)
i'm staying at putra prima and i'm here not to talk bad about this project, just want to share with you what my friend (phase 2 buyer) had experienced. his house was unfortunately late in delivery by 7 months, now staying there almost one and a half years, still cannot apply for TM fixed line and rubbish collection is still being done by developer and not mpsepang
*
Did the developer pay for compensation?

This post has been edited by snake4168: Apr 17 2011, 01:59 PM
tee81
post Apr 18 2011, 10:56 PM

New Member
*
Newbie
2 posts

Joined: Apr 2011
My case is the trust, the loan still in pending untill now around 2 month,
so what can i do?
TSsnake4168
post Apr 19 2011, 11:16 AM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
QUOTE(tee81 @ Apr 18 2011, 10:56 PM)
My case is the trust, the loan still in pending untill now around 2 month,
so what can i do?
*
Keep chasing answer from developer! ask bank to type the letter and ask developer why is REJECT project.

Acmar office quite slow & dumb. Keep bugging them, especially the salesman. They should do their job!


Added on April 19, 2011, 11:17 amAnyway, my loan also drag around 3 month+ only then settle.

Beacuse of their lawyer & dumbness of Acmar office lady!

This post has been edited by snake4168: Apr 19 2011, 11:17 AM
anniecyp2003
post May 9 2011, 04:25 PM

New Member
*
Junior Member
45 posts

Joined: Apr 2009


Latest News: Why phase 5 haven start work and some bank said quote full or reject project is because there is a small land belongs to TNB. And yet the develop and TNB haven successful nego. Therefore they pending here and there. And also the developer haven receive full payment for phase 5 from the bank panel. But over all the project is ok and even the ppl in the bank said no problem with developer. Recently they just have a new panel bank which is UOB...those who haven approve get UOB, I guess more safety as UOB is best friend of the developer. Anything happen, UOB will know the latest news first. Hahaha tongue.gif

Snake,

As you said we tried to keep pushing and call them to keep track the progress of works. The most I hate is the developer staff are not honestly enough. He keep on saying that they will start the work by this week, then next week, then another week even later says a month. If there is a problem jus like a land belong to TNB, then probably we understand or willing to wait developer for the result and final decision. But now the news not came from our own developer but from outsider. What an ashamed and un-confidence with the developer. shakehead.gif
TSsnake4168
post May 10 2011, 01:34 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
Glad that you have first hand information from the Bank. At least we know the project is not abandoned.

If not, we will stuck here for a very long ong time!

Heard from Tony, they already have ground breaking ceremony & estimated completion will be Sept 2012.

Well yes, they cannot be trust one.
anniecyp2003
post May 18 2011, 05:18 PM

New Member
*
Junior Member
45 posts

Joined: Apr 2009


QUOTE(snake4168 @ May 10 2011, 01:34 PM)
Glad that you have first hand information from the Bank. At least we know the project is not abandoned.

If not, we will stuck here for a very long ong time!

Heard from Tony, they already have ground breaking ceremony & estimated completion will be Sept 2012.

Well yes, they cannot be trust one.
*
Hi Snake,

Has u go to the site and have a look before??
Tony also cannot be believe. I went to the site last weekend, nothing is done at all and the ground just dry as now hehe... From my view, estimate completion definitely cannot be complete in Sept 2012. End of 2012 also a problem for them. rclxub.gif

Anyone here, SPA include MRTA? MRTA from the bank or from insurance companies is better?

Thanks.
preyanthi
post May 18 2011, 09:30 PM

New Member
*
Junior Member
37 posts

Joined: May 2011

hi!
I am phase 3 purchaser they do the samething in my case as well.

As per the brochure they stated as 2072 sq ft but in real after 3 yrs it is only 1803sq ft.

Please clarify up front.

i am looking forward phase 3 purchaser to do something on this misleading.
TSsnake4168
post May 19 2011, 10:01 AM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
QUOTE(preyanthi @ May 18 2011, 09:30 PM)
hi!
I am phase 3 purchaser they do the samething in my case as well.

As per the brochure they stated as 2072 sq ft but in real after 3 yrs it is only 1803sq ft.

Please clarify up front.

i am looking forward phase 3 purchaser to do something on this misleading.
*
Try to look at S&P agreement. Never trust brochure or salesman.
chongelicia
post May 23 2011, 12:11 AM

Getting Started
**
Junior Member
75 posts

Joined: May 2008
pls let me know if anyone have available unit for putra impiana double storey.l thanks
anniecyp2003
post May 24 2011, 03:16 PM

New Member
*
Junior Member
45 posts

Joined: Apr 2009


QUOTE(chongelicia @ May 23 2011, 12:11 AM)
pls let me know if anyone have available unit for putra impiana double storey.l thanks
*
Hi Chong, dun mind sharing here... what make ur mind buying in Putra Impiana??? hmm.gif
TSsnake4168
post May 24 2011, 06:35 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
High ceiling & no need big renovation!
phydoe
post May 31 2011, 09:10 AM

New Member
*
Newbie
1 posts

Joined: May 2011


hello.. i'm a phase 2 buyer, and have been living in TPI since November '09.. my phase was delivered 7 months late, and yes still got rubbish collection problem (every 2-3 days once).. there are some minor defects here and there, the worst defect happened to my unit is the leakage of water-proofing in my master bathroom.. but already been fixed by the developer.. apart from all that, i still think its a nice neighborhood to live.. smile.gif
TSsnake4168
post May 31 2011, 09:48 AM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
QUOTE(phydoe @ May 31 2011, 09:10 AM)
hello.. i'm a phase 2 buyer, and have been living in TPI since November '09.. my phase was delivered 7 months late, and yes still got rubbish collection problem (every 2-3 days once)..  there are some minor defects here and there,  the worst defect happened to my unit is the leakage of water-proofing in my master bathroom.. but already been fixed by the developer.. apart from all that, i still think its a nice neighborhood to live.. smile.gif
*
Thanks to your valuable comment. At least someone say is a nice neighborhood! rclxms.gif rclxms.gif
preyanthi
post Jun 28 2011, 03:08 PM

New Member
*
Junior Member
37 posts

Joined: May 2011
QUOTE(snake4168 @ Apr 17 2011, 01:59 PM)
So No CF still can stay in? bad... How come nobody want to sell if it is so bad?

If their project is failure sure got a lot of people to sell!?? izzit?

Before i book for Phase 5, I want buy Phase 1 or 2. Couldn't find one there.


Added on April 17, 2011, 1:59 pm

Did the developer pay for compensation?
*
IS THE COMPENSATION PAID FOR THE LATE DELIVERY?
TSsnake4168
post Jun 28 2011, 04:18 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
QUOTE(preyanthi @ Jun 28 2011, 03:08 PM)
IS THE COMPENSATION PAID FOR THE LATE DELIVERY?
*
It is compulsory in every S&P that every developer will have to pay for late delivery.

Normally is 10% of selling price per year divided by 12 months and times with how many months late.

Am I correct?

I didn't how much they pay for Phase 1 & 2 but no one in internet mention about it.

Maybe their case still pending in tribunal.
preyanthi
post Jul 5 2011, 02:21 PM

New Member
*
Junior Member
37 posts

Joined: May 2011
QUOTE(snake4168 @ Jun 28 2011, 04:18 PM)
It is compulsory in every S&P that every developer will have to pay for late delivery.

Normally is 10% of selling price per year divided by 12 months and times with how many months late.

Am I correct?

I didn't how much they pay for Phase 1 & 2 but no one in internet mention about it.

Maybe their case still pending in tribunal.
*
Yes,the calculation is correct but we would like to confirm whether ACMAR has act according to their promise.

Looking forwards for phase 1 and phase 2 buyers who have experience this compensation deals with ACMAR.

latest updates abt phase 4 constructions are actively goin on -completed the structure and phase 5 piling started.

edwinlcw
post Jul 5 2011, 04:08 PM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


went to Taman Putra Impiana last weekend.. all double storey sold out.
they will be launching new 2 1/2 storey houses at the same location with RM689k and discount RM15k....

This post has been edited by edwinlcw: Jul 5 2011, 04:08 PM
TSsnake4168
post Jul 6 2011, 02:33 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
QUOTE(preyanthi @ Jul 5 2011, 02:21 PM)
Yes,the calculation is correct but we would like to confirm whether ACMAR has act according to their promise.

Looking forwards for phase 1 and phase 2 buyers who have experience this compensation deals with ACMAR.

latest updates abt phase 4 constructions are actively goin on -completed the structure and phase 5 piling started.
*
I believe no Developer in Malaysia will pay you full amount.

As I encounter with my house, the developer will keep refer this case to the court and keep dragging the case until you frustrated and agree with the amount that they give you.

They should pay me RM9000+ but only settle with RM3800.

I also read in newspaper, others case settled on RM10k where the developer should pay RM40k.

That is their tactic.
preyanthi
post Jul 7 2011, 03:18 PM

New Member
*
Junior Member
37 posts

Joined: May 2011
QUOTE(snake4168 @ Jul 6 2011, 02:33 PM)
I believe no Developer in Malaysia will pay you full amount.

As I encounter with my house, the developer will keep refer this case to the court and keep dragging the case until you frustrated and agree with the amount that they give you.

They should pay me RM9000+ but only settle with RM3800.

I also read in newspaper, others case settled on RM10k where the developer should pay RM40k.

That is their tactic.
*
They should not do this as we are paying interest to the bank for their delays as well
PHASE 3 BUYERS !!!! We have to unite for the justice & please do not agree with their dealings.
based on your previous experince - is the black & white clearly stated the compensation clause?
we might consult with HBA (NATIONAL HOUSE BUYERS ASSOCIATION)on this issue if needed.

This post has been edited by preyanthi: Jul 7 2011, 03:24 PM
TSsnake4168
post Jul 7 2011, 08:38 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
QUOTE(preyanthi @ Jul 7 2011, 03:18 PM)
They should not do this as we are paying interest to the bank for their delays as well
PHASE 3 BUYERS !!!!  We have to unite for the justice & please do not agree with their dealings.
based on your previous experince - is the black & white clearly stated the compensation clause?
we might consult with HBA (NATIONAL HOUSE BUYERS ASSOCIATION)on this issue if needed.
*
Well the tribunal already instructed them to pay the full but they can apply a delay in higher court. Then their lawyers will always forgot to submit this documents, that documents so the case keep on postpone.

Then your lawyers will ask you for higher fees. At the end, house buyers will be the loser.
rickloke
post Jul 25 2011, 05:35 PM

New Member
*
Junior Member
48 posts

Joined: Jul 2011
got any owner wan sale tmn putra impiana ????? pls call me ~~~~i wan buy ~~~~~
edwinlcw
post Jul 26 2011, 09:18 AM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


Hi Guys.. can i know what's the interest rate you getting for the house?
I got offered BLR-2.2% only from UOB... seem very low..
DoYouKnow
post Jul 26 2011, 03:19 PM

New Member
*
Junior Member
40 posts

Joined: Jun 2011
phase5 seem like will be delay....
edwinlcw
post Jul 27 2011, 08:25 AM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


phase5 definitely will be delay.. i went to the site and is only starting to put in the pilars... shakehead.gif
DoYouKnow
post Jul 27 2011, 10:18 AM

New Member
*
Junior Member
40 posts

Joined: Jun 2011
can handover mid of next year?? or end of next year?
just scare delay til 2013 =.=
edwinlcw
post Jul 27 2011, 10:44 AM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


what i got is it will be completed after 20months from now.. but i think sure will be delay till year 2013...
TSsnake4168
post Jul 27 2011, 03:51 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
QUOTE(edwinlcw @ Jul 26 2011, 09:18 AM)
Hi Guys.. can i know what's the interest rate you getting for the house?
I got offered BLR-2.2% only from UOB... seem very low..
*
igot -2.3% from Public Bank but have to buy MLTR


Added on July 27, 2011, 3:53 pmThat is why their house consider cheap compare with Plenitude Bhd (Putra Prima) and Bolton (Tasik Prima)

This post has been edited by snake4168: Jul 27 2011, 03:53 PM
chrisie
post Aug 11 2011, 04:29 AM

New Member
*
Junior Member
7 posts

Joined: Aug 2011
Hi anyone want to sell the taman putra impiana phase 5. The design is square type brown color outside .. I want to buy anyone want to let go now please contact me at 014-2120091. Tq.
chrisie
post Aug 11 2011, 04:34 AM

New Member
*
Junior Member
7 posts

Joined: Aug 2011
Urgently wanted to buy a house ... Any kind person would like to sell of please contact me at 014-2120091.
i want this design shown ! anyone that wish to sell pls inform me tq!


Attached thumbnail(s)
Attached Image
rickloke
post Aug 11 2011, 04:47 PM

New Member
*
Junior Member
48 posts

Joined: Jul 2011
QUOTE(chrisie @ Aug 11 2011, 04:34 AM)
Urgently wanted to buy a house ... Any kind person would like to sell of please contact me at 014-2120091.
i want this design shown ! anyone that wish to sell pls inform me tq!
*
you wan phase 4 or 5 ????? this design is phase 4 .......phase 4 is next year b4 may finish.....
chrisie
post Aug 11 2011, 08:01 PM

New Member
*
Junior Member
7 posts

Joined: Aug 2011
QUOTE(rickloke @ Aug 11 2011, 04:47 PM)
you wan phase 4 or 5  ?????  this design is phase 4 .......phase 4 is next year b4 may finish.....
*
I want the pic i post outside is the brown color with the banner on it ... Oh phase 4 i also dunno wat phase very confusing actually ... do you have any ? me and my hubby want to buy ... any idea what price ?
rickloke
post Aug 12 2011, 08:11 PM

New Member
*
Junior Member
48 posts

Joined: Jul 2011
o......this pic is phase 4...... phase 4 i not have.......but phase 5 oso got this design.......you wan ???

chrisie
post Aug 13 2011, 01:32 AM

New Member
*
Junior Member
7 posts

Joined: Aug 2011
QUOTE(rickloke @ Aug 12 2011, 08:11 PM)
o......this pic is phase 4......  phase 4 i not have.......but phase 5 oso got this design.......you wan ???
*
But have to wait for 3 yrs only ready.. we want existing can move in and stay ... we cannot wait for so long ...

rickloke
post Aug 13 2011, 05:26 PM

New Member
*
Junior Member
48 posts

Joined: Jul 2011
QUOTE(chrisie @ Aug 13 2011, 01:32 AM)
But have to wait for 3 yrs only ready.. we want existing can move in and stay ... we cannot wait for so long ...
*
Phse 5 is next year dec can take the key........you wan fast phase 3 lo.......this oto
chrisie
post Aug 13 2011, 06:39 PM

New Member
*
Junior Member
7 posts

Joined: Aug 2011
QUOTE(rickloke @ Aug 13 2011, 05:26 PM)
Phse 5 is next year dec can take the key........you wan fast phase 3 lo.......this oto
*
phase 3 not nice the grey color roof top right ?
rickloke
post Aug 13 2011, 09:22 PM

New Member
*
Junior Member
48 posts

Joined: Jul 2011
QUOTE(chrisie @ Aug 13 2011, 06:39 PM)
phase 3 not nice the grey color roof top right ?
*
Ok lo..........but phase 4 now is 500k ++

chrisie
post Aug 14 2011, 01:17 AM

New Member
*
Junior Member
7 posts

Joined: Aug 2011
QUOTE(rickloke @ Aug 13 2011, 09:22 PM)
Ok lo..........but phase 4 now is 500k ++
*
ok geh
rickloke
post Aug 14 2011, 08:53 AM

New Member
*
Junior Member
48 posts

Joined: Jul 2011
QUOTE(chrisie @ Aug 14 2011, 01:17 AM)
ok geh
*
i try .......you can send you h/p give ??


Added on August 14, 2011, 1:01 pm
QUOTE(chrisie @ Aug 14 2011, 01:17 AM)
ok geh
*
phase 4 now i got 1 unit........

This post has been edited by rickloke: Aug 14 2011, 01:01 PM
kelvinsoh
post Aug 14 2011, 05:32 PM

New Member
*
Junior Member
17 posts

Joined: May 2011
Whose know when the Taman Putra Impiana Phase 3 can get CF/ key? I was sign the S&P since April 2008, it's was delayed almost 1.5 years base on S&P agreement (24mths). Please share the procedue for the late delivery claim. Thanks
rickloke
post Aug 14 2011, 07:15 PM

New Member
*
Junior Member
48 posts

Joined: Jul 2011
QUOTE(kelvinsoh @ Aug 14 2011, 05:32 PM)
Whose know when the Taman Putra Impiana Phase 3 can get CF/ key? I was sign the S&P since April 2008, it's was delayed almost 1.5 years base on S&P agreement (24mths). Please share the procedue for the late delivery claim. Thanks
*
Phase 3 is This year oto take key .........
kelvinsoh
post Aug 14 2011, 10:45 PM

New Member
*
Junior Member
17 posts

Joined: May 2011
QUOTE(rickloke @ Aug 14 2011, 07:15 PM)
Phase 3 is This year oto take key .........
*
May I know what meaning of "oto"?
rickloke
post Aug 15 2011, 10:59 AM

New Member
*
Junior Member
48 posts

Joined: Jul 2011
QUOTE(kelvinsoh @ Aug 14 2011, 10:45 PM)
May I know what meaning of "oto"?
*
Hahahahah..........is october....

kelvinsoh
post Aug 15 2011, 09:05 PM

New Member
*
Junior Member
17 posts

Joined: May 2011
QUOTE(rickloke @ Aug 15 2011, 10:59 AM)
Hahahahah..........is october....
*
October 2011? I think is impossible? I just go to the field by last week, the house yet install the window and also the electric & water. As i know we only able to get the CF / Key within 3-6 months after house completed.

Besides that, anyone can share the procedure of claim late delivery (LAD)? Any owerner for Phase 1 & 2 had success claim the late delivery from ACMAR? Please share.

Regards,
Kelvin Soh
chrisie
post Aug 15 2011, 11:56 PM

New Member
*
Junior Member
7 posts

Joined: Aug 2011
QUOTE(rickloke @ Aug 14 2011, 08:53 AM)
i try .......you can send you h/p give ??


Added on August 14, 2011, 1:01 pm
phase 4 now i got 1 unit........
*
is above i posted my h/p
sophiagoh
post Aug 27 2011, 01:23 AM

Getting Started
**
Junior Member
113 posts

Joined: Jul 2009


my dad wanna sell off his house in tmn putra impiana phase3..corner lot..pm me if interested.
andrewmivec
post Sep 6 2011, 10:45 PM

New Member
*
Newbie
3 posts

Joined: Aug 2008
rickloke, any units from Phase 4?

I'm interested.

...or Phase 3...??


Andrew.

kelvinsoh
post Sep 18 2011, 04:46 PM

New Member
*
Junior Member
17 posts

Joined: May 2011
QUOTE(rickloke @ Aug 15 2011, 10:59 AM)
Hahahahah..........is october....
*
Dear All Taman Putra Impiana Phase 3 Owner,

Please be informed that, recently ACMAR was requested owner to sign the letter which issued by SYABAS and stated the delayed of TAMAN PUTRA IMPIANA phase 3 is due to developer instead of SYABAS. I think this letter is to protect SYABAS themself. Please go to ACMAR office (KLANG) or field office to sign the letter in order SYABAS able to install the water at TAMAN PUTRA IMPIANA phase 3.

Yesterday I just go to the field, all the house was installed the electric except the last 2 blocks. So, i think recently they are pending of installation from SYABAS. In order to expedite the progress, please immeditely go to AMCAR office or field office to sign the letter. Thanks

This post has been edited by kelvinsoh: Sep 18 2011, 06:03 PM
preyanthi
post Sep 22 2011, 09:57 AM

New Member
*
Junior Member
37 posts

Joined: May 2011
QUOTE(kelvinsoh @ Sep 18 2011, 04:46 PM)
Dear All Taman Putra Impiana Phase 3 Owner,

Please be informed that, recently ACMAR was requested owner to sign the letter which issued by SYABAS and stated the delayed of TAMAN PUTRA IMPIANA phase 3 is due to developer instead of SYABAS. I think this letter is to protect SYABAS themself. Please go to ACMAR office (KLANG) or field office to sign the letter in order SYABAS able to install the water at TAMAN PUTRA IMPIANA phase 3.

Yesterday I just go to the field, all the house was installed the electric except the last 2 blocks. So, i think recently they are pending of installation from SYABAS. In order to expedite the progress, please immeditely go to AMCAR office or field office to sign the letter. Thanks
*
just got the right reason for signing this form.
I have done it last week.
please do so phase 3 owners!!!!
please be informed the letter can be signed at taman putra impiana site office as well.
please request through email / fax if unable to walk in.
please expedite to avoid any further delays
lancaii
post Sep 22 2011, 06:01 PM

New Member
*
Newbie
2 posts

Joined: Jun 2008
Hi all. I'm phase 5 purchaser. Recently, developer called and ask to sign another copy of S&P. The reason given is this copy is for state government.
Any phase 5 purchaser receive such call from developer?



TSsnake4168
post Sep 26 2011, 10:13 AM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
QUOTE(lancaii @ Sep 22 2011, 06:01 PM)
Hi all. I'm phase 5 purchaser. Recently, developer called and ask to sign another copy of S&P. The reason given is this copy is for state government.
Any phase 5 purchaser receive such call from developer?
*
Nope. Never heard from them. Maybe they not yet call me.
chew60
post Sep 26 2011, 12:41 PM

New Member
*
Newbie
3 posts

Joined: Sep 2011
QUOTE(snake4168 @ Sep 26 2011, 10:13 AM)
Nope. Never heard from them. Maybe they not yet call me.
*
I also received call from the developer to sign a new S & P together with Deed of Revocation, but I think we must read carefully about the deed of revocation before we sign, if can, please contect me 016-5027950
Mindy Mindy
post Sep 26 2011, 10:02 PM

New Member
*
Newbie
3 posts

Joined: Sep 2011
QUOTE(chew60 @ Sep 26 2011, 12:41 PM)
I also received call from the developer to sign a new S & P together with Deed of Revocation, but I think we must read carefully about the deed of revocation before we sign, if can, please contect me 016-5027950
*
Does anyone face problem letter of consent could not issued by land office ?

The developer said must sign second snp only could provide this s n p to state n then land office could issue the letter of consent ?

Also, do lawyer from bank side had given any of u , the official snp?

My bank lawyer rhb panel delay my snp bcoz of letter of consent ! Does any of u use Rhb bank as panel got tis problem ?

Do anyone can advise me that my case like this will cause late payment to second stage of construction?

do I kena late charges ? Thanks all
TSsnake4168
post Sep 27 2011, 12:06 AM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
QUOTE(chew60 @ Sep 26 2011, 12:41 PM)
I also received call from the developer to sign a new S & P together with Deed of Revocation, but I think we must read carefully about the deed of revocation before we sign, if can, please contect me 016-5027950
*
Maybe they try to protect themselves to avoid LAD claim. We should NOT sign 2nd S&P if already have stamp duty. It's legal and they must finish their job within period of time stated inside. Signing 2nd S&P will give them extra time to finish it. They should only photostat the original one instead signing the new one.
Mindy Mindy
post Sep 27 2011, 07:49 AM

New Member
*
Newbie
3 posts

Joined: Sep 2011
QUOTE(snake4168 @ Sep 27 2011, 12:06 AM)
Maybe they try to protect themselves to avoid LAD claim. We should NOT sign 2nd S&P if already have  stamp duty. It's legal and they must finish their job within period of time stated inside. Signing 2nd S&P will give them extra time to finish it. They should only photostat the original one instead signing the new one.
*
I think we must call the developer lawyer to ask for this, cant only listen to Tony. I think they may want to delay the project so ask us to sign the 2nd SnP. They said if we don't sign the 2nd SnP, 2nd phase of construction cannot start...

Does anyone call to the lawyer?
TSsnake4168
post Sep 27 2011, 01:30 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
QUOTE(Mindy Mindy @ Sep 27 2011, 07:49 AM)
I think we must call the developer lawyer to ask for this, cant only listen to Tony. I think they may want to delay the project so ask us to sign the 2nd SnP. They said if we don't sign the 2nd SnP, 2nd phase of construction cannot start...

Does anyone call to the lawyer?
*
Then ask his lawyer coordinate with your own lawyer who handle your case. Then let your lawyer explain to you will be better. Hakim Arabi not on our side! Better trust our own lawyer..
Mindy Mindy
post Sep 27 2011, 02:31 PM

New Member
*
Newbie
3 posts

Joined: Sep 2011
QUOTE(snake4168 @ Sep 27 2011, 01:30 PM)
Then ask his lawyer coordinate with your own lawyer who handle your case. Then let your lawyer explain to you will be better. Hakim Arabi not on our side! Better trust our own lawyer..
*
I really doubt with the 2nd SnP. Never heard about 2nd SnP!!!!! We must work together to follow up on this issue, in order no excuse for them to delay the project.


Added on September 27, 2011, 3:51 pm
QUOTE(Mindy Mindy @ Sep 27 2011, 02:31 PM)
I really doubt with the 2nd SnP. Never heard about 2nd SnP!!!!! We must work together to follow up on this issue, in order no excuse for them to delay the project.
*
I called Acmar Office, they said is not 2nd SnP, we have signed 4 copies of SnP, now the land office requested us to sign the fifth copy. The content is exactly same with the 1st SnP.
But the Acmar office didn't inform lawyer about this matter... And they didn't call us to sign the fifth copy as well.
The consent letter will be released after we sign the fifth copy.

Anyone signed adi?

This post has been edited by Mindy Mindy: Sep 27 2011, 03:51 PM
chew60
post Sep 27 2011, 09:34 PM

New Member
*
Newbie
3 posts

Joined: Sep 2011
QUOTE(Mindy Mindy @ Sep 27 2011, 02:31 PM)
I really doubt with the 2nd SnP. Never heard about 2nd SnP!!!!! We must work together to follow up on this issue, in order no excuse for them to delay the project.


Added on September 27, 2011, 3:51 pm
I called Acmar Office, they said is not 2nd SnP, we have signed 4 copies of SnP, now the land office requested us to sign the fifth copy. The content is exactly same with the 1st SnP.
But the Acmar office didn't inform lawyer about this matter... And they didn't call us to sign the fifth copy as well.
The consent letter will be released after we sign the fifth copy.

Anyone signed adi?
*
But what I got from Acmar office, they not only want us to signed a new copy of SnP, but also copy of deed of revocation.
TSsnake4168
post Sep 28 2011, 04:53 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
QUOTE(chew60 @ Sep 27 2011, 09:34 PM)
But what I got from Acmar office, they not only want us to signed a new copy of SnP, but also copy of deed of revocation.
*
sound fishy... Anyway, as I said, the one with stamp duty paid is legal and no need additional signing.

Call your lawyer before you do anything...not their lawyer! Let your lawyer talk to them...


kelvinsoh
post Oct 3 2011, 10:06 PM

New Member
*
Junior Member
17 posts

Joined: May 2011
QUOTE(preyanthi @ Sep 22 2011, 09:57 AM)
just got the right reason for signing this form.
I have done it last week.
please do so phase 3 owners!!!!
please be informed the letter can be signed at taman putra impiana site office as well.
please request through email / fax if unable to walk in.
please expedite to avoid any further delays
*
Dear All Taman Putra Impiana Phase 3 Owner,

I just received the letter for delivery of vacant possession which requested owner to take the key at site office on this weekend with condition owner had settle the balance of outstanding. Developer also requested owner bring the document as below during owner take the key:

1. Payment for settlement of the amount as per statement attached
2. IC
3. Confirmations from your end-financier that have released the full loan sum to us including the final 5% stake holder's monids that must be deposited with the solicitor below:

XXXXXX
XXXXXX

But I didnt receive the document for item no. 1 & 3 as developer stated. How about other owner? Will you all go to site office to take the key at this weekend?


TSsnake4168
post Oct 5 2011, 12:37 AM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
Congrats to Phase 3 owner! At last!

Only now Phase 3, when is going to Phase 5? Sigh.....
preyanthi
post Oct 11 2011, 09:30 AM

New Member
*
Junior Member
37 posts

Joined: May 2011
QUOTE(kelvinsoh @ Oct 3 2011, 10:06 PM)
Dear All Taman Putra Impiana Phase 3 Owner,

I just received the letter for delivery of vacant possession which requested owner to take the key at site office on this weekend with condition owner had settle the balance of outstanding. Developer also requested owner bring the document as below during owner take the key:

1. Payment for settlement of the amount as per statement attached
2. IC
3. Confirmations from your end-financier that have released the full loan sum to us including the final 5% stake holder's monids that must be deposited with the solicitor below:

XXXXXX
XXXXXX

But I didnt receive the document for item no. 1 & 3 as developer stated. How about other owner? Will you all go to site office to take the key at this weekend?
*
Hi Kelvin!

I have collected the key last sunday and paid late interest fee around 3++.++.

Some of the owners did not received the full documents.PLEASE CLARIFY.

have you collected the key?

ANY COMMENT....
chew60
post Oct 11 2011, 01:26 PM

New Member
*
Newbie
3 posts

Joined: Sep 2011
QUOTE(snake4168 @ Sep 28 2011, 04:53 PM)
sound fishy... Anyway, as I said, the one with stamp duty paid is legal and no need additional signing.

Call your lawyer before you do anything...not their lawyer! Let your lawyer talk to them...
*
Dear All Taman Putra Impiana Phase 5 Owner,

Please contact your S & P lawyer before you sign the new S & P and the deed of revocation, is something wrong there!
kelvinsoh
post Oct 11 2011, 11:44 PM

New Member
*
Junior Member
17 posts

Joined: May 2011
QUOTE(preyanthi @ Oct 11 2011, 09:30 AM)
Hi Kelvin!

I have collected the key last sunday and paid late interest fee around 3++.++.

Some of the owners did not received the full documents.PLEASE CLARIFY.

have you collected the key?

ANY COMMENT....
*
Hi... I also collected the key & CF by last week Saturday but the CF is stated "sementara". Why?

The condition for the house is very bad
1. floor very dirty
2. have big gap between tiles especially washroom
3. installation piping with big hole at wall
4. tile crack
5. having burn mark at master room

How about ur house?
Any idea for the late delivery compensation?
Why financiar paid the balance of 5% to M/S Jal & Lim?
TSsnake4168
post Oct 18 2011, 09:51 AM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
We should have resident association by now!


Added on October 19, 2011, 2:44 pmHey, I saw one house on Jalan Impiana 8 go for auction?!

Reserved price only RM275k, So cheap?!

This post has been edited by snake4168: Oct 19 2011, 02:44 PM
edwinlcw
post Oct 19 2011, 04:45 PM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


anyone from phase 5 has sign the so called 2nd s&p??
according to a project guy at the sales office (Tony & others went for company trip, so the project guy has to be there), the so called 2nd s&p actually is the same as the one that we signed early on. the reason to sign this s&p is due to the land/state office wants the original copy of the s&p....
anniecyp2003
post Oct 23 2011, 05:00 AM

New Member
*
Junior Member
45 posts

Joined: Apr 2009


QUOTE(edwinlcw @ Oct 19 2011, 04:45 PM)
anyone from phase 5 has sign the so called 2nd s&p??
according to a project guy at the sales office (Tony & others went for company trip, so the project guy has to be there), the so called 2nd s&p actually is the same as the one that we signed early on. the reason to sign this s&p is due to the land/state office wants the original copy of the s&p....
*
Same goes to us... Developer asked us to sign another 4th SnP with deed of revocation (not 5th SnP), mention by them is the same SnP that we signed earlier. Until now I also haven get the copy of doc from bank as the bank' lawyer said still waiting for developer land office to proceed something...omg so scary hopefully no problem with the phase 5. My bank is from Ambank...anyone take Ambank??
And what I can see and with my past experienced, I can see phase 5 definitely late of delivery...CONFIRM definitely in 2013. But since our SnP written delivery is 24mths upon signed SnP so if they delivery within 24mths, can we still claim our compensation??

How about those in Phase 3 owner?? Do they give any compensation since they delivered 1.5yrs?? Meanwhile, congrats on Phase 3 owner who collected the key... how is the condition of the hse??
TSsnake4168
post Oct 24 2011, 04:32 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
I didn't sign extra document for phase 5. they didn't call me also.

Difinitely will be late so prepare for LAD claim. Hopefully they will finish the house if they have intention to run away.
vsk
post Oct 26 2011, 01:36 AM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
mad.gif mad.gif

This post has been edited by vsk: May 15 2012, 02:55 PM
TSsnake4168
post Oct 28 2011, 09:37 AM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
What are they up to?

At least something to cheer up for those who don't know, Tasik Prima which is opposite our Taman will have 6 storey shopping complex & Hilton Hotel +Waterfront Theme Park + many new shops aka Boulevard Puchong styles.
littlebuddy
post Oct 28 2011, 04:08 PM

New Member
*
Junior Member
12 posts

Joined: Oct 2011


QUOTE(anniecyp2003 @ Oct 23 2011, 05:00 AM)
Same goes to us... Developer asked us to sign another 4th SnP with deed of revocation (not 5th SnP), mention by them is the same SnP that we signed earlier. Until now I also haven get the copy of doc from bank as the bank' lawyer said still waiting for developer land office to proceed something...omg so scary hopefully no problem with the phase 5. My bank is from Ambank...anyone take Ambank??
And what I can see and with my past experienced, I can see phase 5 definitely late of delivery...CONFIRM definitely in 2013. But since our SnP written delivery is 24mths upon signed SnP so if they delivery within 24mths, can we still claim our compensation??

How about those in Phase 3 owner?? Do they give any compensation since they delivered 1.5yrs?? Meanwhile, congrats on Phase 3 owner who collected the key... how is the condition of the hse??
*
I'm one of the buyer for phase 5 as well n the bank i took is Ambank. so far everything is ok. now i started to serve the interest.


Added on October 28, 2011, 4:14 pm
QUOTE(snake4168 @ Oct 18 2011, 09:51 AM)
We should have resident association by now!


Added on October 19, 2011, 2:44 pmHey, I saw one house on Jalan Impiana 8 go for auction?!

Reserved price only RM275k, So cheap?!
*
ya. we should start that.


Added on October 28, 2011, 4:36 pmHi Phase 5 owners,

I visited the site recently, so far got tiny progress after the piling works done n they r doing the drains. i saw another group of workers r aggressively build the show house for phase 6 (next to phase 5) the progress is extremely fast (the house frame almost there). if they build our phase 5's pace like that then good la.... smile.gif


Added on October 28, 2011, 4:41 pm
QUOTE(snake4168 @ Oct 28 2011, 09:37 AM)
What are they up to?

At least something to cheer up for those who don't know, Tasik Prima which is opposite our Taman will have 6 storey shopping complex & Hilton Hotel +Waterfront Theme Park + many new shops aka Boulevard Puchong styles.
*
beside that, the tesco is coming in there as well. near the carrefour. now already start the development.

This post has been edited by littlebuddy: Oct 28 2011, 04:41 PM
Suntharlal
post Nov 2 2011, 10:28 AM

New Member
*
Junior Member
12 posts

Joined: Nov 2011


QUOTE(chrisie @ Aug 11 2011, 04:34 AM)
Urgently wanted to buy a house ... Any kind person would like to sell of please contact me at 014-2120091.
i want this design shown ! anyone that wish to sell pls inform me tq!
*
I'm planning to sell my unit (phase 4) which is in the same row of the photo.

I havent survey the price yet, hope can get a good deal.

Anyone know what is the selling price for putra impiana (phase 4)?

I bought the house for 398K last year

This post has been edited by Suntharlal: Nov 2 2011, 10:29 AM
edwinlcw
post Nov 2 2011, 01:00 PM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


QUOTE(anniecyp2003 @ Oct 23 2011, 05:00 AM)
Same goes to us... Developer asked us to sign another 4th SnP with deed of revocation (not 5th SnP), mention by them is the same SnP that we signed earlier. Until now I also haven get the copy of doc from bank as the bank' lawyer said still waiting for developer land office to proceed something...omg so scary hopefully no problem with the phase 5. My bank is from Ambank...anyone take Ambank??
And what I can see and with my past experienced, I can see phase 5 definitely late of delivery...CONFIRM definitely in 2013. But since our SnP written delivery is 24mths upon signed SnP so if they delivery within 24mths, can we still claim our compensation??

How about those in Phase 3 owner?? Do they give any compensation since they delivered 1.5yrs?? Meanwhile, congrats on Phase 3 owner who collected the key... how is the condition of the hse??
*
my loan is from Ambank as well.. so far still didn't get any letter from bank that to release the 2nd payment...
damn.. feel like kena cheat..
TSsnake4168
post Nov 3 2011, 10:52 AM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
QUOTE(Suntharlal @ Nov 2 2011, 10:28 AM)
I'm planning to sell my unit (phase 4) which is in the same row of the photo.

I havent survey the price yet, hope can get a good deal.

Anyone know what is the selling price for putra impiana (phase 4)?

I bought the house for 398K last year
*
Agent will put the price around RM500k. But a bit hard to sell since the unit not yet ready.

Most Sub sale customer will want to see an actual house. Good luck!
edwinlcw
post Nov 8 2011, 09:07 AM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


when to the site yesterday... nothing in progress.. surely it will be delay till middle of year 2013... sad.gif
TSsnake4168
post Nov 8 2011, 10:39 AM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
They waiting money from Phase 6 mah.
vsk
post Nov 9 2011, 03:48 PM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
QUOTE(snake4168 @ Nov 8 2011, 10:39 AM)
They waiting money from Phase 6 mah.
*
f***er mad.gif

This post has been edited by vsk: May 15 2012, 02:57 PM
TSsnake4168
post Nov 10 2011, 10:26 AM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
Hopefully they have big land bank so Mah Sing will take over their project?! (Dreaming>>>)
edwinlcw
post Nov 14 2011, 11:49 AM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


What i heard is that the developer use the money from phase 5 to start another project..
and their phase 6 sales is not good... so far i heard only less than 5units..
littlebuddy
post Nov 14 2011, 04:20 PM

New Member
*
Junior Member
12 posts

Joined: Oct 2011


QUOTE(edwinlcw @ Nov 8 2011, 09:07 AM)
when to the site yesterday... nothing in progress.. surely it will be delay till middle of year 2013... sad.gif
*
ya...agreed with u...they also delay the Phase 4. i think mid of 2012 they only able to deliver phase 4...sigh...
TSsnake4168
post Nov 14 2011, 10:03 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
Hi everyone, just check from MHLG website.

Usahasama & Acmar Property not in blacklist. Relax...


Added on November 14, 2011, 10:03 pmHi everyone, just check from MHLG website.

Usahasama & Acmar Property not in blacklist. Relax...

http://www.kpkt.gov.my/kpkt/index.php/pages/view/31


This post has been edited by snake4168: Nov 14 2011, 10:03 PM
edwinlcw
post Nov 17 2011, 12:30 AM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


Just received a mail from the developer that request for another 10% payment as they claimed that the foundation and footing has been completed.... hmm.gif
will go to the site this week and have a look on it...
TSsnake4168
post Nov 17 2011, 12:09 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
Yeah, saw it last 2 weeks. But everytime go there, I didn't saw anyone working...
edwinlcw
post Nov 17 2011, 12:13 PM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


QUOTE(snake4168 @ Nov 17 2011, 12:09 PM)
Yeah, saw it last 2 weeks. But everytime go there, I didn't saw anyone working...
*
yea.. if got also only few people are working... doh.gif

This post has been edited by edwinlcw: Nov 17 2011, 12:14 PM
vsk
post Nov 20 2011, 09:22 PM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
mad.gif f***ER


This post has been edited by vsk: May 15 2012, 02:59 PM
littlebuddy
post Nov 23 2011, 10:53 AM

New Member
*
Junior Member
12 posts

Joined: Oct 2011


QUOTE(snake4168 @ Nov 14 2011, 10:03 PM)
Hi everyone, just check from MHLG website.

Usahasama & Acmar Property not in blacklist. Relax...


Added on November 14, 2011, 10:03 pmHi everyone, just check from MHLG website.

Usahasama & Acmar Property not in blacklist. Relax...

http://www.kpkt.gov.my/kpkt/index.php/pages/view/31
*
Thanks for the info. smile.gif
TSsnake4168
post Nov 23 2011, 11:58 AM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
QUOTE(vsk @ Nov 20 2011, 09:22 PM)

Added on November 20, 2011, 9:23 pm


Added on November 20, 2011, 9:27 pmHei snake not black list lah Bad list


Added on November 22, 2011, 10:05 pmAttn : (Phase 5 Puchaser) I just come back from Land Office Tingkat 3
                                      Bangunan Sultan Salahuddin Abdul Aziz
                                      Shah. I get inquiry from them, Request
                                      photocopy SPA only they show us owner
                                      record, We show her (REVOCATION) She
                                      say this is cheat document, 
                                      DEED OF REVOCATION)page 1 no2
                                      The Purchaser has requested vendor to
                                      Revoke the Sale Agreement and has futrher
                                      requested the  vendor to enter into a new
                                      sale and purchaser agreement in respect of
                                      said property with........................

Admin say give us black&white letter mention follow old SPA date onward 24 month to delivery,  land office talk to us  dont believe them this revoke old SPA stamping new SPA onwards again 24 month.Request vendor write a new Revocation.
          Mention; The Vendor has requested the purchaser to revoke the sale agreement and has  further requested the purchaser to enter to new SPA .regarding apply consent.

                          (Admin Maz Talk too Much Bull Shit)
*
Thats why need to view by our own lawyer before sign anything. I think some kena cheat already..
vsk
post Nov 24 2011, 01:12 PM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
vmad.gif

This post has been edited by vsk: May 15 2012, 03:00 PM
TSsnake4168
post Nov 24 2011, 04:42 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
QUOTE(vsk @ Nov 24 2011, 01:12 PM)
Dont Refer Back Your SPA Lawyer Collude With Vendor,  Find Another
Lawyer  vmad.gif
*
What? You mean we cannot even use our lawyer who deal with their lawyer?
Edison_CU
post Nov 24 2011, 04:54 PM

New Member
*
Junior Member
31 posts

Joined: Nov 2011


QUOTE(Dern @ Jan 18 2011, 11:52 PM)
hi guys, wanna ask u guys if it's far or not to travel from puchong prima to kl sentral ?
*
very far le...and jam..
vsk
post Nov 25 2011, 12:06 PM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
mad.gif

This post has been edited by vsk: May 15 2012, 03:04 PM
kelvinsoh
post Dec 4 2011, 08:45 PM

New Member
*
Junior Member
17 posts

Joined: May 2011
QUOTE(snake4168 @ Nov 14 2011, 10:03 PM)
Hi everyone, just check from MHLG website.

Usahasama & Acmar Property not in blacklist. Relax...


Added on November 14, 2011, 10:03 pmHi everyone, just check from MHLG website.

Usahasama & Acmar Property not in blacklist. Relax...

http://www.kpkt.gov.my/kpkt/index.php/pages/view/31
*
Dear All Owners Taman Putra Impiana Phase 3,

Any updated new for the compensation of the late delivery claim? It's developer had agree to paid the compensation according to S&P?

vsk
post Dec 5 2011, 05:19 PM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
mad.gif

This post has been edited by vsk: May 15 2012, 03:03 PM
TSsnake4168
post Dec 6 2011, 10:56 AM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
shit lor! owner runaway?!

kelvinsoh
post Dec 6 2011, 11:14 PM

New Member
*
Junior Member
17 posts

Joined: May 2011
QUOTE(snake4168 @ Dec 6 2011, 10:56 AM)
shit lor! owner runaway?!
*
Dear All Owners Taman Putra Impiana Phase 3,

Did u all had issue a letter of late delivery claim to Developer?

Kindly refer to this link as below for detail info:
http://www.hba.org.my/help/sample.htm
vsk
post Dec 7 2011, 03:54 PM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011

HKC

This post has been edited by vsk: May 15 2012, 03:05 PM
TSsnake4168
post Dec 7 2011, 05:13 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
I bought Phase 5, even Phase 3 already like that?! jialat liao

littlebuddy
post Dec 8 2011, 04:54 PM

New Member
*
Junior Member
12 posts

Joined: Oct 2011


QUOTE(snake4168 @ Dec 7 2011, 05:13 PM)
I bought Phase 5, even Phase 3 already like that?! jialat liao
*
Snake4168, What is going on?
kelvinsoh
post Dec 9 2011, 12:47 AM

New Member
*
Junior Member
17 posts

Joined: May 2011
QUOTE(littlebuddy @ Dec 8 2011, 04:54 PM)
Snake4168, What is going on?
*
Developer was called me to make a appointment for the LAD claim issue? How about u all? Any one had get the compensation from developer?

littlebuddy
post Dec 9 2011, 10:34 AM

New Member
*
Junior Member
12 posts

Joined: Oct 2011


QUOTE(kelvinsoh @ Dec 9 2011, 12:47 AM)
Developer was called me to make a appointment for the LAD claim issue? How about u all? Any one had get the compensation from developer?
*
ohh...i'm phase 5 buyer. now i understand why "snake" worry about. hope you can get your compensation sooner. i think phase 5 will face the same issue (late delivery), please share us once you done the LAD claim smile.gif Thx!
vsk
post Dec 17 2011, 08:42 PM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
I heard from owner phase 1 & 2 stay in 2008 untill now without Tm line, neighbour Taman meranti jaya ,Taman putra prima &Taman tasik prima have unifi coverage.stay in putra impiana owner say Mother f***er vendor haven submit to TM ...
Vendor SHAMEFUL sad.gif
tehaikseong
post Dec 27 2011, 09:26 AM

New Member
*
Junior Member
25 posts

Joined: Jun 2007
From: Puchong


For all house buyer of Phase 3A, kindly pay your SYABAS & TNB deposit ASAP. I already paid at the site office on 24/12/11. It seem like the progress of construction is under control.
littlebuddy
post Dec 29 2011, 10:29 AM

New Member
*
Junior Member
12 posts

Joined: Oct 2011


QUOTE(tehaikseong @ Dec 27 2011, 09:26 AM)
For all house buyer of Phase 3A, kindly pay your SYABAS & TNB deposit ASAP. I already paid at the site office on 24/12/11. It seem like the progress of construction is under control.
*
Good to hear that. rclxms.gif i think mid of next year u may collect ur house from developer. rclxm9.gif
tang1980
post Dec 29 2011, 03:43 PM

New Member
*
Junior Member
12 posts

Joined: Dec 2011


I have a unit of phase 3A wanna sell out. Please PM me for more details.
tehaikseong
post Dec 29 2011, 08:19 PM

New Member
*
Junior Member
25 posts

Joined: Jun 2007
From: Puchong


tang1980, how much do you want to sell?
tang1980
post Dec 30 2011, 12:14 PM

New Member
*
Junior Member
12 posts

Joined: Dec 2011


QUOTE(tehaikseong @ Dec 29 2011, 08:19 PM)
tang1980, how much do you want to sell?
*
PM you already. Thanks.
dcomas
post Dec 30 2011, 12:33 PM

New Member
*
Junior Member
10 posts

Joined: Oct 2010
Hi Tang, could you pm me your selling price. Thanks.
kelvinsoh
post Jan 3 2012, 10:22 PM

New Member
*
Junior Member
17 posts

Joined: May 2011
QUOTE(littlebuddy @ Dec 9 2011, 10:34 AM)
ohh...i'm phase 5 buyer. now i understand why "snake" worry about. hope you can get your compensation sooner. i think phase 5 will face the same issue (late delivery), please share us once you done the LAD claim smile.gif Thx!
*
Dear All Taman Putra Impiana Phase 3 Owner,

Please be informed that, recently the developer was offer the 3 options as below regarding the late delivery claim:

1) 100% claim amount- 18 months instalment.
2) 50% claim amount- 6 months instalment.
3) 30% claim amount- 3 months instalment.

But I was rejected all the offer as above due to we should receive the amount with 100% instead of reduce the claim amount and some more is base on instalment. How about you all?

vsk
post Jan 5 2012, 04:58 PM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
Attn:kelvinsoh mad.gif Call to inquire Tel:03-80605443 Advocates & Solicitors Bandar Puteri Puchong 47100.
dont argue with developer no use, let lawyer to take firm action.

This post has been edited by vsk: Jan 7 2012, 04:57 PM
devarul
post Jan 6 2012, 07:05 PM

New Member
*
Newbie
1 posts

Joined: Jan 2012
QUOTE(kelvinsoh @ Jan 3 2012, 10:22 PM)
Dear All Taman Putra Impiana Phase 3 Owner,

Please be informed that, recently the developer was offer the 3 options as below regarding the late delivery claim:

1) 100% claim amount- 18 months instalment.
2)  50% claim amount- 6 months instalment.
3)  30% claim amount- 3 months instalment.

But I was rejected all the offer as above due to we should receive the amount with 100% instead of reduce the claim amount and some more is base on instalment. How about you all?
*
The gave me the same offer as well, can we go to tribunal and get this sorted out or go to the courts? We have to be mindful that if we proceed legally the legal chargers will apply or unless the court rules that the cost of legal fees shall be bourn by the devolopers. BTW i rejected the offer!! Why should i take the money THEY OWE ME IN INSTALLMENTS!!!!! for every late payment chargers they charge us bu the date until settlement. Now i beleive that they should pay us the money on a daily calculation basis untill full settlement! My 2 cents
vsk
post Jan 7 2012, 04:22 AM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
mad.gif

This post has been edited by vsk: May 15 2012, 03:07 PM
govindrk
post Jan 7 2012, 01:27 PM

New Member
*
Newbie
3 posts

Joined: May 2005
Although everything looks good now, just had a bad feeling that unit of phase 3A will be delivered date...last week went to the developer office in Klang to pay SYABAS & TNB deposit, meet few other disgruntled buyers of the developers apartment in Klang which delay delivery also sad.gif(
vsk
post Jan 7 2012, 04:44 PM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
QUOTE(kelvinsoh @ Jan 3 2012, 10:22 PM)
Dear All Taman Putra Impiana Phase 3 Owner,

Please be informed that, recently the developer was offer the 3 options as below regarding the late delivery claim:

1) 100% claim amount- 18 months instalment.
2)  50% claim amount- 6 months instalment.
3)  30% claim amount- 3 months instalment.

But I was rejected all the offer as above due to we should receive the amount with 100% instead of reduce the claim amount and some more is base on instalment. How about you all?
*
100% instalment interest who pay ? The developer



This post has been edited by vsk: Jan 7 2012, 04:50 PM
tehaikseong
post Jan 7 2012, 06:39 PM

New Member
*
Junior Member
25 posts

Joined: Jun 2007
From: Puchong


Phase 3A may be late deliver but does not like the Phase 3.
kelvinsoh
post Jan 8 2012, 02:12 AM

New Member
*
Junior Member
17 posts

Joined: May 2011
QUOTE(vsk @ Jan 7 2012, 04:44 PM)
100% instalment interest who pay ? The  developer
*
the instalment is only paid to the total amount as you claim and it without additonal interest.

How long the lead time to get the claim if we bring the case to tribunal?
vsk
post Jan 9 2012, 06:10 PM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
mad.gif BUKI

This post has been edited by vsk: May 15 2012, 03:09 PM
littlebuddy
post Feb 1 2012, 04:53 PM

New Member
*
Junior Member
12 posts

Joined: Oct 2011


QUOTE(kelvinsoh @ Jan 3 2012, 10:22 PM)
Dear All Taman Putra Impiana Phase 3 Owner,

Please be informed that, recently the developer was offer the 3 options as below regarding the late delivery claim:

1) 100% claim amount- 18 months instalment.
2)  50% claim amount- 6 months instalment.
3)  30% claim amount- 3 months instalment.

But I was rejected all the offer as above due to we should receive the amount with 100% instead of reduce the claim amount and some more is base on instalment. How about you all?
*
Thanks for sharing the info.


Added on February 1, 2012, 4:59 pmPhase 5 buyer,

I received a mail from bank acknowledge me there is another 5% disbursement for sewerage. So far i haven pay a visit to the site, anyone know the site progress?

This post has been edited by littlebuddy: Feb 1 2012, 04:59 PM
vsk
post Feb 2 2012, 02:55 PM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
mad.gif

This post has been edited by vsk: May 15 2012, 03:11 PM
littlebuddy
post Feb 2 2012, 03:33 PM

New Member
*
Junior Member
12 posts

Joined: Oct 2011


QUOTE(vsk @ Feb 2 2012, 02:55 PM)
Phase 5 project already stop, Vendor no need to worry pay late delivery. 80% already sign New SPA
Yes I received also! R U sign Revocation & New SPA, 80% Owner already kena tipu.
Guarantee phase 5 delay one year +    If you sign DEED OF REVOCATION Vendor send to stamping guarantee u cant claim any
late delivery

I just heard phase 3 owner say still never give them sign late  delivery claim letter.
November 2011 ask until now mad.gif  Vendor  Deliberately Delay
*
Thanks. I'm not required to sign those documents, I had ask them before and they told me the early batch of the buyer's application was ok. Only the later batch buyers are required to do so.
vsk
post Feb 3 2012, 12:00 AM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
rclxub.gif

This post has been edited by vsk: May 15 2012, 03:12 PM
Chris Chew
post Feb 3 2012, 02:59 AM

10k Club
********
Senior Member
10,387 posts

Joined: Dec 2011


Hmm, another story of Acmar Group ...

The famous developer and family in Klang but with super bad reputation ...

If you go to Klang and ask the old folks, 8 of 10 would shoot heavily and the remaining 2 are the one who dunno anything about property ...

Bandar Baru Klang is indeed a great location in Klang, the area which nearest to Klang toll and Federal Highway as well as Jusco is there, but due to abandon projects of medium cost apartments, Carrefour, Hospital and late delivery and bad responses of services, made most of the current folks very unhappy ....


Sorry for Acmar Group!~


TSsnake4168
post Feb 3 2012, 11:35 AM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
Arghhhh! I just want my house ready. Please Acmar don't run away!

This post has been edited by snake4168: Feb 3 2012, 11:48 AM
edwinlcw
post Feb 3 2012, 03:12 PM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


QUOTE(vsk @ Feb 2 2012, 02:55 PM)
Phase 5 project already stop, Vendor no need to worry pay late delivery. 80% already sign New SPA
Yes I received also! R U sign Revocation & New SPA, 80% Owner already kena tipu.
Guarantee phase 5 delay one year +    If you sign DEED OF REVOCATION Vendor send to stamping guarantee u cant claim any
late delivery

I just heard phase 3 owner say still never give them sign late  delivery claim letter.
November 2011 ask until now mad.gif  Vendor  Deliberately Delay
*
are you sure phase 5 will be delay for one year +??? don't scare me.. 1st time property buyer.... cry.gif
kelvinsoh
post Feb 4 2012, 12:20 AM

New Member
*
Junior Member
17 posts

Joined: May 2011
QUOTE(edwinlcw @ Feb 3 2012, 03:12 PM)
are you sure phase 5 will be delay for one year +??? don't scare me.. 1st time property buyer.... cry.gif
*
Dear All Taman Putra Impiana Phase 3 owner,

Did you all have get the late delivery claim developer?

Regards,
Kelvin Soh
mashiro
post Feb 7 2012, 01:45 AM

New Member
*
Junior Member
5 posts

Joined: May 2008


I have bought a unit from phase 3A... last time developer said expected to complete by end of 2011. But now February already. Visited the site few days ago. They are plastering those walls. So far they are far too way behind schedule but we can still see progress. So expected another few months to complete. Hope it won't stretch till end of this year.. Huhuhu..
Chris Chew
post Feb 7 2012, 11:30 AM

10k Club
********
Senior Member
10,387 posts

Joined: Dec 2011
QUOTE(mashiro @ Feb 7 2012, 01:45 AM)
I have bought a unit from phase 3A... last time developer said expected to complete by end of 2011. But now February already. Visited the site few days ago. They are plastering those walls. So far they are far too way behind schedule but we can still see progress. So expected another few months to complete. Hope it won't stretch till end of this year.. Huhuhu..
*
Hopefully it can delivery to you guys soonest possible ...

Anyway, its better to get a house rather than they run away ...

Make sure check 1000% for the detect once you guys received the keys ...







govindrk
post Feb 7 2012, 01:36 PM

New Member
*
Newbie
3 posts

Joined: May 2005
Last week, I had a chat with the sales agent near the phase 3A construction site and he admitted there definitely will be delay on the delivery likely to be in 3rd quarter of 2012, the plastering is for the outside walls only, inside even the wiring is not completed. He gave some s**t reasons for the delay, TM line is another unsolved mystery. Need to start preparing for the late delivery claims.

Weird stuff is they're still selling the phase 6 & 7 after all this issues with previous phases.

Also noticed one of their sunsidary companies listed in the
Senarai Hitam Pemaju Terlibat Dengan Projek Sakit (till 31 Sec 2011)

Item 179 PNSB ACMAR SDN BHD

http://www.kpkt.gov.my/kpkt/fileupload/pem...NGGA_311211.pdf
anniecyp2003
post Feb 7 2012, 08:34 PM

New Member
*
Junior Member
45 posts

Joined: Apr 2009


QUOTE(tang1980 @ Dec 29 2011, 03:43 PM)
I have a unit of phase 3A wanna sell out. Please PM me for more details.
*
Hi Tang, Could u pls pm me ur selling price too wink.gif


Added on February 7, 2012, 8:44 pm
QUOTE(vsk @ Feb 2 2012, 02:55 PM)
Phase 5 project already stop, Vendor no need to worry pay late delivery. 80% already sign New SPA
Yes I received also! R U sign Revocation & New SPA, 80% Owner already kena tipu.
Guarantee phase 5 delay one year +    If you sign DEED OF REVOCATION Vendor send to stamping guarantee u cant claim any
late delivery

I just heard phase 3 owner say still never give them sign late  delivery claim letter.
November 2011 ask until now mad.gif  Vendor  Deliberately Delay
*
vsk, omg.. I signed Deed Of Revocation, wha they said its just a temporary SPA to apply what ever land. omg... so definitely will delay another 1yr seem like now they are not working anything at the site. We must set up a committee for phase 5 too. Or we gather every phase 5 purchaser to make sure it not delay too long. I expecting to move before end 2013.


Added on February 7, 2012, 8:51 pm
QUOTE(snake4168 @ Feb 3 2012, 11:35 AM)
Arghhhh! I just want my house ready. Please Acmar don't run away!
*
Snake, jialat la... this is my first hse. how? did u sign the Deed of Revocation? or any new SPA to replace the old? The site is not working... So worry when read all those real fact here from phase 3 purchaser... hope phase 3 purchase will teach phase 5 how to claim late of delivery later cry.gif

This post has been edited by anniecyp2003: Feb 7 2012, 08:51 PM
Dangerous
post Feb 7 2012, 09:52 PM

Getting Started
**
Junior Member
63 posts

Joined: Sep 2011


QUOTE(govindrk @ Feb 7 2012, 01:36 PM)
Last week, I had a chat with the sales agent near the phase 3A construction site and he admitted there definitely will be delay on the delivery likely to be in 3rd quarter of 2012, the plastering is for the outside walls only, inside even the wiring is not completed. He gave some s**t reasons for the delay, TM line is another unsolved mystery. Need to start preparing for the late delivery claims.

Weird stuff is they're still selling the phase 6 & 7 after all this issues with previous phases.

Also noticed one of their sunsidary companies listed in the
Senarai Hitam Pemaju Terlibat Dengan Projek Sakit (till 31 Sec 2011)

Item 179 PNSB ACMAR SDN BHD

http://www.kpkt.gov.my/kpkt/fileupload/pem...NGGA_311211.pdf
*
Of course is black listed, since there have 1 abandon building nearby Bukit Raja or more in Klang, I thinks most of the Klang Kaki know well of this developer.

Klang Kaki correctly If I'm wrong!!! icon_question.gif
Chris Chew
post Feb 8 2012, 12:44 AM

10k Club
********
Senior Member
10,387 posts

Joined: Dec 2011
QUOTE(Dangerous @ Feb 7 2012, 09:52 PM)
Of course is black listed, since there have 1 abandon building nearby Bukit Raja or more in Klang, I thinks most of the Klang Kaki know well of this developer.

Klang Kaki correctly If I'm wrong!!! icon_question.gif
*
Correct.

Although I am not from Klang but I work in Klang for more than 2 years previously in this field.

So I heard a lot as my comment/reply to the thread above.


edwinlcw
post Feb 8 2012, 10:37 AM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


QUOTE(anniecyp2003 @ Feb 7 2012, 08:34 PM)
Hi Tang, Could u pls pm me ur selling price too wink.gif


Added on February 7, 2012, 8:44 pm

vsk, omg.. I signed Deed Of Revocation, wha they said its just a temporary SPA to apply what ever land. omg... so definitely will delay another 1yr seem like now they are not working anything at the site. We must set up a committee for phase 5 too. Or we gather every phase 5 purchaser to make sure it not delay too long. I expecting to move before end 2013.


Added on February 7, 2012, 8:51 pm
Snake, jialat la... this is my first hse. how? did u sign the Deed of Revocation? or any new SPA to replace the old? The site is not working... So worry when read all those real fact here from phase 3 purchaser... hope phase 3 purchase will teach phase 5 how to claim late of delivery later  cry.gif
*
I also a first time property buyer.. i just wish to get my house.. please don't abandon the project and run away... damn... cry.gif
i went to the site last weekend... it seems like no progress at all since my last visit a couple of weeks ago.. not even a worker is working on it... vmad.gif
tehaikseong
post Feb 8 2012, 02:43 PM

New Member
*
Junior Member
25 posts

Joined: Jun 2007
From: Puchong


I stay nearby Putra Impiana so i visit the site for Phase 3A every weekend, seem like still on progress but slow... shakehead.gif

This post has been edited by tehaikseong: Feb 8 2012, 02:57 PM
vsk
post Feb 8 2012, 04:26 PM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
-------------------------------------------------------------------- mad.gif

This post has been edited by vsk: May 15 2012, 03:14 PM
Dangerous
post Feb 8 2012, 10:50 PM

Getting Started
**
Junior Member
63 posts

Joined: Sep 2011


Good luck all...!!!
TSsnake4168
post Feb 9 2012, 09:03 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
QUOTE(anniecyp2003 @ Feb 7 2012, 08:34 PM)
Hi Tang, Could u pls pm me ur selling price too wink.gif


Added on February 7, 2012, 8:44 pm

vsk, omg.. I signed Deed Of Revocation, wha they said its just a temporary SPA to apply what ever land. omg... so definitely will delay another 1yr seem like now they are not working anything at the site. We must set up a committee for phase 5 too. Or we gather every phase 5 purchaser to make sure it not delay too long. I expecting to move before end 2013.


Added on February 7, 2012, 8:51 pm
Snake, jialat la... this is my first hse. how? did u sign the Deed of Revocation? or any new SPA to replace the old? The site is not working... So worry when read all those real fact here from phase 3 purchaser... hope phase 3 purchase will teach phase 5 how to claim late of delivery later  cry.gif
*
No, They didn't call me. I think I'm not in the early list. LAD claim is quite a long process. Quite a few procedure. At least they still selling Phase 6 & 7 so they might need to finish Phase 5 before they cabut kaki!


Added on February 9, 2012, 9:05 pmAlready told you guys to check with your own lawyer before sign anything!

This post has been edited by snake4168: Feb 9 2012, 09:05 PM
littlebuddy
post Feb 11 2012, 09:03 AM

New Member
*
Junior Member
12 posts

Joined: Oct 2011


QUOTE(vsk @ Feb 3 2012, 12:00 AM)
Dont listen vendor cheater , i purchase december 2010, delay my SPA stamping date on april 2011
my friend SPA stamping date january 2011 is early or later bacth ?
also need to sign again SPA .

When your SPA stamping date? please refer back to share with me
Thanks
*
Hi, VSK. I had check my purchasing date is 14th Aug 2010 and my SPA stamping date is 22nd Sep 2010.
vsk
post Feb 16 2012, 07:36 PM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
rclxub.gif

This post has been edited by vsk: May 15 2012, 03:15 PM
pesa
post Feb 21 2012, 10:23 AM

New Member
*
Junior Member
22 posts

Joined: Apr 2007


Hi guys, I'm a house buyer for the Phase 4 of Putra Impiana. Actually I happened to bump into this thread and after reading it, it really worries me that earlier phase was late and there're issues with CF.

Since I happened to be an officer in KPKT, this morning I went to see the officer in charge for Sepang area in Jabatan Perumahan Negara (JPN) for clarification on this project/ developer. He's currently checking on the reason for non-compliace to the CF requirement on earlier phase. I'll try to post any updates on the matter ASAP.

Please share any other issues that I may get clarification from JPN and hopefully we can try to settle it together for everyone's sake.


vsk
post Feb 21 2012, 08:22 PM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
mad.gif

This post has been edited by vsk: May 15 2012, 03:16 PM
littlebuddy
post Feb 22 2012, 10:10 AM

New Member
*
Junior Member
12 posts

Joined: Oct 2011


QUOTE(vsk @ Feb 16 2012, 07:36 PM)
Are u malay guy ?
*
I'm Chinese. What's the diff? hmm.gif
TSsnake4168
post Feb 22 2012, 11:36 AM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
QUOTE(pesa @ Feb 21 2012, 10:23 AM)
Hi guys, I'm a house buyer for the Phase 4 of Putra Impiana. Actually I happened to bump into this thread and after reading it, it really worries me that earlier phase was late and there're issues with CF.

Since I happened to be an officer in KPKT, this morning I went to see the officer in charge for Sepang area in Jabatan Perumahan Negara (JPN) for clarification on this project/ developer. He's currently checking on the reason for non-compliace to the CF requirement on earlier phase. I'll try to post any updates on the matter ASAP.

Please share any other issues that I may get clarification from JPN and hopefully we can try to settle it together for everyone's sake.
*
Glad to have you here, Pesa. Hopefully we all can stay connected here so everyone can get first hand info about this project!
tehaikseong
post Feb 23 2012, 02:40 PM

New Member
*
Junior Member
25 posts

Joined: Jun 2007
From: Puchong


Thank you Pesa. It glad to hear that you will help us all to find out the problem, especially the TM line.
pesa
post Feb 25 2012, 10:28 AM

New Member
*
Junior Member
22 posts

Joined: Apr 2007


Sorry for the late reply...been caught up with work for the past few days. I talked to the officer in charge (Mr. Aidy) and he confirmed that phase 3 already have full CF in which they have a copy of it.

He also said that phase 4 is having a 'slight' delay; but JPN is already talking to the developer and trying to make sure they speed it as per progress planned.

One interesting thing though...I was also told that the developer's sale permit will expire in March 2012...in which they have to apply for renewal with JPN so that they can sell future units. Hopefully JPN can 'twist' their arm a bit to make them comply/speed progress...will monitor how things are regularly with Mr. Aidy

This post has been edited by pesa: Feb 25 2012, 10:29 AM
vsk
post Feb 25 2012, 03:22 PM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
mad.gif

This post has been edited by vsk: May 15 2012, 03:18 PM
pesa
post Feb 25 2012, 10:57 PM

New Member
*
Junior Member
22 posts

Joined: Apr 2007


QUOTE(vsk @ Feb 25 2012, 03:22 PM)
Pesa Dont believe Developer is cheater .  Phase 6 difficult to sell because bad Developer. Phase 4 steal for less material version with the sample house does not same.
*
VSK,

Care to elaborate on that? What do u mean by "Phase 4 steal for less material version with the sample house does not same"?
vsk
post Feb 26 2012, 12:58 AM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
rclxub.gif

This post has been edited by vsk: May 15 2012, 03:19 PM
pesa
post Feb 26 2012, 10:39 AM

New Member
*
Junior Member
22 posts

Joined: Apr 2007


Anyone owner of Phase 3 can confirm whether TM line is available?
trasher_zone
post Feb 26 2012, 11:41 AM

New Member
*
Junior Member
10 posts

Joined: Jan 2009


Hello guys !
So much to talk about on TAMAN PUTRA IMPIANA,Let me introduce myself a bit, i'm phase 2 owner,bought this house bck in 2008. Until now, no phone line available,talked to TM and they said Developer not preparing the infra and TM even gave me proof letter. Of cause i'm very disappointed with the behavior of this Developer .Lot's of prob..i'm also one of the committee members of this Taman ( we got license from Gov/Rukun Tetangga last year ) but this community is not progressing. Not sure of what reason...last action we took was sent out letter to meet developer to express all the prob here but no reply .

Problem here
========
Potholes
stray dogs
dirty playground
uneven playing field with abandoned track
safety
ugly guard house
TM line

Well, we our phase 2 also received our house key a bit late(3-4month) than expected last time. But lucky no prob of the house just minor defect . And the reason for this stupid late is due to the manpower . If you guys realize, just a few of bangla/Indo workers built the house and i spoke to them and all they said this developer is not paying them on time and fully utilized them to the max . I guess ACMAR want to untung lebih and cut all the cost !
Now i can see they building up new show unit ( 3 storey behind playgnd ) . I think it is time we at least show to the developer how ugly they manage this Taman . U can see how big different our neighbor ( Meranti Jaya ) environment. And they all can enjoy Unifi !!

Anyway i just share my experience here . Keep on following up with the Dev on the progressing. Good luck !

Few pic of this Taman :
https://picasaweb.google.com/10558750330384...ImpianaPuchong#
pesa
post Feb 27 2012, 12:15 AM

New Member
*
Junior Member
22 posts

Joined: Apr 2007


trasher_zone,

Thanks for sharing the info. Still no CF for phase 1 and 2? I think it's really unfair for the developer not to complete all the infra that they're supposed to...any advice from the lawyer?


Added on February 27, 2012, 12:33 amBTW, who currently employ the security? I was visiting the site yesterday, and the guard couldn't even be bothered to stop the car and check with us. I'm currently staying in phase 2B Taman Putra Prima and our security is top notch when it comes to checking incoming visitors and also security rounds. That gives peace of mind when staying here. The point of buying property in gated community is that; better security. Nothing worse than having a bad security company in charge!

This post has been edited by pesa: Feb 27 2012, 12:36 AM
trasher_zone
post Feb 27 2012, 08:54 AM

New Member
*
Junior Member
10 posts

Joined: Jan 2009


QUOTE(pesa @ Feb 27 2012, 12:15 AM)
trasher_zone,

Thanks for sharing the info. Still no CF for phase 1 and 2? I think it's really unfair for the developer not to complete all the infra that they're supposed to...any advice from the lawyer?


Added on February 27, 2012, 12:33 amBTW, who currently employ the security? I was visiting the site yesterday, and the guard couldn't  even be bothered to stop the car and check with us. I'm currently staying in phase 2B Taman Putra Prima and our security is top notch when it comes to checking incoming visitors and also security rounds. That gives peace of mind when staying here. The point of buying property in gated community is that; better security. Nothing worse than having a bad security company in charge!
*
Hi Pesa,
We got the CF since they handover the key. Just the TM line still not ready,it's normal if the area is new, but this is more than 3 years already. I'm not sure about u guys but mine i used developer's lawyer since it came in the package when i bought the house. Drawback is that lawyer is always on developer site . We all just need to push the developer, that's it.

For security,it is still under developer, they sell the house and put "24h security" . So they should manage it properly otherwise don't use it. The guard did not do any guarding work . And fyi, last 2 month my neighbor's house kena rompak in the middle of the day ! Lucky they didn't hurt his wife . Prior to that ( last year ) , someone in Jalan 8 kena ragut in front of her house ! . Developer told us that once we form a community, we can take over the guard and security and manage it ourself like Taman Meranti Jaya and Taman Putra Prima. BUT developer NEVER AND CANNOT use 24h security as their selling point.

I think we should come out with banner so that this tak guna developer will open their eyes . Or gather on the same day they launch the new show unit thumbup.gif
pesa
post Feb 29 2012, 08:51 AM

New Member
*
Junior Member
22 posts

Joined: Apr 2007


QUOTE(trasher_zone @ Feb 27 2012, 08:54 AM)
I think we should come out with banner so that this tak guna developer will open their eyes . Or gather on the same day they launch the new show unit  thumbup.gif
*
Sound like a good idea!!! Maybe the resident association should do that next time they're launching a new phase! rclxms.gif rclxms.gif rclxms.gif

JHLow9986
post Feb 29 2012, 05:44 PM

New Member
*
Newbie
1 posts

Joined: Feb 2012
QUOTE(tehaikseong @ Dec 27 2011, 09:26 AM)
For all house buyer of Phase 3A, kindly pay your SYABAS & TNB deposit ASAP. I already paid at the site office on 24/12/11. It seem like the progress of construction is under control.
*
Yes? We can pay at site office? Any receipt provided? Office in Klang seems too far for me. I need to check back whether i received the mail notification or not. Thanks for your reminder.

tehaikseong
post Mar 4 2012, 01:50 PM

New Member
*
Junior Member
25 posts

Joined: Jun 2007
From: Puchong


Now, they already completed two unit of sample house for 2.5 or 3 storey house.... shakehead.gif
Better they completed all requirement for the previous phase than built a new one...


Added on March 5, 2012, 8:35 am
QUOTE(JHLow9986 @ Feb 29 2012, 06:44 PM)
Yes? We can pay at site office? Any receipt provided? Office in Klang seems too far for me. I need to check back whether i received the mail notification or not. Thanks for your reminder.
*
I also pay at the site office and get a temporary receipt. After few week they will send the official receipt to you.

This post has been edited by tehaikseong: Mar 5 2012, 08:35 AM
edwin_panther
post Mar 7 2012, 11:13 AM

New Member
*
Junior Member
16 posts

Joined: Oct 2008


Any owner wants to sell PU3?
flipacoin2k
post Mar 7 2012, 11:27 AM

Getting Started
**
Junior Member
136 posts

Joined: Sep 2008
QUOTE(trasher_zone @ Feb 26 2012, 11:41 AM)
That's horrible.... yea I have a friend who is staying there complaining the exact same things: TM Line, Rubbish collection problem. I think everyone knows this developer is horrible in their management and post-sales.
SKfolk
post Mar 8 2012, 05:12 AM

Enthusiast
*****
Senior Member
928 posts

Joined: Mar 2012
I went to the project site for phase 5 as my friend asking me to view for him as I stay nearby. Found out that some piles were not cut off and some only the pile cap had been done. None of the column can be seen. No Construction activity on the buildings.Project signboard shows complete in August 2012. My friend is worrying.
anniecyp2003
post Mar 8 2012, 11:43 PM

New Member
*
Junior Member
45 posts

Joined: Apr 2009


QUOTE(trasher_zone @ Feb 27 2012, 08:54 AM)

I think we should come out with banner so that this tak guna developer will open their eyes . Or gather on the same day they launch the new show unit  thumbup.gif
*
Good idea, lets do it. rclxms.gif


Added on March 8, 2012, 11:46 pm
QUOTE(SKfolk @ Mar 8 2012, 05:12 AM)
I went to the project site for phase 5 as my friend asking me to view for him as I stay nearby. Found out that some piles were not cut off and some only the pile cap had been done. None of the column can be seen. No Construction activity on the buildings.Project signboard shows complete in August 2012. My friend is worrying.
*
Neither to me too... very worried after reading above statement rclxub.gif

This post has been edited by anniecyp2003: Mar 8 2012, 11:46 PM
Bahkuteh
post Mar 9 2012, 10:42 PM

Enthusiast
*****
Senior Member
777 posts

Joined: Nov 2011


Why not go to their hq in klang to clarify on delay?
Maybe they may respond. Good luck
SKfolk
post Mar 9 2012, 11:13 PM

Enthusiast
*****
Senior Member
928 posts

Joined: Mar 2012
QUOTE(Bahkuteh @ Mar 9 2012, 10:42 PM)
Why not go to their hq in klang to clarify on delay?
Maybe they may respond. Good luck
*
Yes, at least ask them what's the reason, is it the contractor cannot perform or the developer got no money to pay to the contractor which of course they won't admit, or majlis suspend their work which they start work b 4 obtain majlis approval which we can find out from majlis or any other reason?


Added on March 10, 2012, 10:52 am
QUOTE(patmos @ Mar 30 2011, 03:05 PM)
Developer is Acmar, try ask people around Klang and hear what they have to say. The huge abandon building on the way turning to Jusco Klang is develop by Acmar.
*
Another TALAM. House buyer please be careful. Can smell the fish.

This post has been edited by SKfolk: Mar 10 2012, 10:52 AM
TSsnake4168
post Mar 10 2012, 04:15 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
The first important thing is we need a strong Residence Association! Hope they will organize something so we all give good support
tehaikseong
post Mar 12 2012, 02:38 PM

New Member
*
Junior Member
25 posts

Joined: Jun 2007
From: Puchong


QUOTE(snake4168 @ Mar 10 2012, 05:15 PM)
The first important thing is we need a strong Residence Association! Hope they will organize something so we all give good support
*
I 100% support it... thumbup.gif
edwinlcw
post Mar 14 2012, 06:33 PM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


went to the site last week... and is totally no progress since cny.. i'm the phase 5 buyer.. this is my 1st property... and i'm damn regret now..... cry.gif
SKfolk
post Mar 14 2012, 09:34 PM

Enthusiast
*****
Senior Member
928 posts

Joined: Mar 2012
QUOTE(edwinlcw @ Mar 14 2012, 06:33 PM)
went to the site last week... and is totally no progress since cny.. i'm the phase 5 buyer.. this is my 1st property... and i'm damn regret now..... cry.gif
*
Buying property from reputable developer is essential as some of us are buying a house once in a life time. To avoid encounter of this problem, buy completed house or 2nd hand house.
Bahkuteh
post Mar 14 2012, 09:51 PM

Enthusiast
*****
Senior Member
777 posts

Joined: Nov 2011


I'm surprised construction work is so slow. It's actually a good location. Sales should be good.
SKfolk
post Mar 14 2012, 10:58 PM

Enthusiast
*****
Senior Member
928 posts

Joined: Mar 2012
QUOTE(Bahkuteh @ Mar 14 2012, 09:51 PM)
I'm surprised construction work is so slow. It's actually a good location. Sales should be good.
*
Building work in phase 5 has no activity at all.
TSsnake4168
post Mar 15 2012, 02:19 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
QUOTE(edwinlcw @ Mar 14 2012, 06:33 PM)
went to the site last week... and is totally no progress since cny.. i'm the phase 5 buyer.. this is my 1st property... and i'm damn regret now..... cry.gif
*
Me too! But with this price hardly can find at nearby location anymore.
SKfolk
post Mar 15 2012, 02:24 PM

Enthusiast
*****
Senior Member
928 posts

Joined: Mar 2012
QUOTE(snake4168 @ Mar 15 2012, 02:19 PM)
Me too! But with this price hardly can find at nearby location anymore.
*
This is the reason easily get trapped as ppl always look for cheap price instead of the developer reputation.

This post has been edited by SKfolk: Mar 15 2012, 02:25 PM
Bahkuteh
post Mar 15 2012, 07:11 PM

Enthusiast
*****
Senior Member
777 posts

Joined: Nov 2011


Alamak,good location also got this type of problem. What is moh doing?!?

Anyway,I think is just a temporary delay. Dont worry too much.
SKfolk
post Mar 15 2012, 07:20 PM

Enthusiast
*****
Senior Member
928 posts

Joined: Mar 2012
QUOTE(Bahkuteh @ Mar 15 2012, 07:11 PM)
Alamak,good location also got this type of problem. What is moh doing?!?

Anyway,I think is just a temporary delay. Dont worry too much.
*
Have u found out with developer and ask them why the site work is stopped?As this is not delayed but totally stop work.

This post has been edited by SKfolk: Mar 15 2012, 07:20 PM
Bahkuteh
post Mar 15 2012, 08:11 PM

Enthusiast
*****
Senior Member
777 posts

Joined: Nov 2011


Wah piang,if stop work then v serious man.

Maybe ask moh too help?

Good luck bro.


Added on March 15, 2012, 8:14 pmBtw,their d rapport project in ampang also delayed. doh.gif

This post has been edited by Bahkuteh: Mar 15 2012, 08:14 PM
trasher_zone
post Mar 18 2012, 10:42 PM

New Member
*
Junior Member
10 posts

Joined: Jan 2009


QUOTE(SKfolk @ Mar 15 2012, 07:20 PM)
Have u found out with developer and ask them why the site work is stopped?As this is not delayed but totally stop work.
*
i can see everyday they bz focusing building up 3 storey house show unit ( behind playground ) . It's true, no progress or VERY slow for phase 5. wondering if you guys received progress billing from developer ? I would think they ran out of money, and launching new unit is the only way to pump the money as ppl will pay for deposit .

Fyi, this is very lousy developer .
SKfolk
post Mar 19 2012, 12:55 AM

Enthusiast
*****
Senior Member
928 posts

Joined: Mar 2012
QUOTE(trasher_zone @ Mar 18 2012, 10:42 PM)
i can see everyday they bz focusing building up 3 storey house show unit ( behind playground ) . It's true, no progress or VERY slow for phase 5. wondering if you guys received progress billing from developer ? I would think they ran out of money, and launching new unit is the only way to pump the money as ppl will pay for deposit .

Fyi, this is very lousy developer .
*
That's why they must finish the show unit to launch more new products.
Bahkuteh
post Mar 19 2012, 03:26 AM

Enthusiast
*****
Senior Member
777 posts

Joined: Nov 2011


Getting very complicated.

Good luck guys. icon_rolleyes.gif
TSsnake4168
post Mar 19 2012, 05:17 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
Just call Tony. He say they had change new company of workers and should start back work within 2 weeks.

I dunno whether he bluffing or what. But he say end of the year should be no problem... susah mau trust him
Bahkuteh
post Mar 19 2012, 06:47 PM

Enthusiast
*****
Senior Member
777 posts

Joined: Nov 2011


Just wait 2 weeks n see what happens. Good luck
SKfolk
post Mar 19 2012, 07:41 PM

Enthusiast
*****
Senior Member
928 posts

Joined: Mar 2012
QUOTE(snake4168 @ Mar 19 2012, 05:17 PM)
Just call Tony. He say they had change new company of workers and should start back work within 2 weeks.

I dunno whether he bluffing or what. But he say end of the year should be no problem... susah mau trust him
*
Just trust him for this moment. Other than this, what can u do as the contract has not expired yet.
hihi811
post Mar 20 2012, 08:59 PM

New Member
*
Junior Member
9 posts

Joined: Mar 2012
Hope what he advise is true but a house finish build whitin 9 months seem very fast will it safe to stay???

SKfolk
post Mar 20 2012, 11:33 PM

Enthusiast
*****
Senior Member
928 posts

Joined: Mar 2012
QUOTE(hihi811 @ Mar 20 2012, 08:59 PM)
Hope what he advise is true but a house finish build whitin 9 months seem very fast will it safe to stay???
*
Just a double storey house not high rise building, can one depends on how many workers and machinery they use.

This post has been edited by SKfolk: Mar 21 2012, 01:01 AM
Bahkuteh
post Mar 21 2012, 12:53 AM

Enthusiast
*****
Senior Member
777 posts

Joined: Nov 2011


What's d stage of work now?
edwinlcw
post Mar 21 2012, 08:38 AM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


QUOTE(snake4168 @ Mar 19 2012, 05:17 PM)
Just call Tony. He say they had change new company of workers and should start back work within 2 weeks.

I dunno whether he bluffing or what. But he say end of the year should be no problem... susah mau trust him
*
end of the year??? what a lies... now not even see the base of the house.. how they can finish the house for another 9months???
B|ACK^SuNdAY
post Mar 21 2012, 12:24 PM

New Member
*
Junior Member
10 posts

Joined: Mar 2012


Hi Guys, been looking for a forum for Taman putra impiana and I’m glad that I finally bumped into one... well, I’m also a purchaser for the phase 3a (grey roof double story - 20 x 75). got my keys but there are some major defects to be done. I’m also renovating my kitchen at the moment... just to add some comments on the LAD... the total delayed days for my unit is 195 and I have filed a case with Tribunal to get it sorted out... The 1st hearing was yesterday and the judge has instructed the Developer to pay the full amount (The calculation for LAD was done based on the S&P price and not the purchase price). Also heard from the developer that there might be delays in completing the new phases due to some financial crisis...

There are a few issues that I would like to raise to the developer (Eg: TM line, rubbish collection, irresponsible guards and etc)... can we have a Community forum set up for phase 3? If we can get this forum set up, I’m sure we can come up with a Community for our area... Please let me know what you guys think... Thanks!


This post has been edited by B|ACK^SuNdAY: Mar 21 2012, 12:31 PM
SKfolk
post Mar 21 2012, 12:50 PM

Enthusiast
*****
Senior Member
928 posts

Joined: Mar 2012
QUOTE(B|ACK^SuNdAY @ Mar 21 2012, 12:24 PM)
Hi Guys, been looking for a forum for Taman putra impiana and I’m glad that I finally bumped into one... well, I’m also a purchaser for the phase 3a (grey roof double story - 20 x 75). got my keys but there are some major defects to be done. I’m also renovating my kitchen at the moment... just to add some comments on the LAD... the total delayed days for my unit is 195 and I have filed a case with Tribunal to get it sorted out... The 1st hearing was yesterday and the judge has instructed the Developer to pay the full amount (The calculation for LAD was done based on the S&P price and not the purchase price). Also heard from the developer that there might be delays in completing the new phases due to some financial crisis...

There are a few issues that I would like to raise to the developer (Eg: TM line, rubbish collection, irresponsible guards and etc)... can we have a Community forum set up for phase 3? If we can get this forum set up, I’m sure we can come up with a Community for our area... Please let me know what you guys think... Thanks!
*
What financial crisis they r facing?
B|ACK^SuNdAY
post Mar 21 2012, 02:27 PM

New Member
*
Junior Member
10 posts

Joined: Mar 2012


that i'm not too sure SKfolk... the Developers are having issues to pay the current LAD for the previous phases... so, imagine how r they gonna fund millions to complete the new phase? that's what they (staffs from the developer's office) have been talking about... which to me, seems to be true... i'm sure they will complete the new projects, but, there's definitely gonna be a delay in handing over the property....
TSsnake4168
post Mar 21 2012, 03:51 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
QUOTE(B|ACK^SuNdAY @ Mar 21 2012, 12:24 PM)
Hi Guys, been looking for a forum for Taman putra impiana and I’m glad that I finally bumped into one... well, I’m also a purchaser for the phase 3a (grey roof double story - 20 x 75). got my keys but there are some major defects to be done. I’m also renovating my kitchen at the moment... just to add some comments on the LAD... the total delayed days for my unit is 195 and I have filed a case with Tribunal to get it sorted out... The 1st hearing was yesterday and the judge has instructed the Developer to pay the full amount (The calculation for LAD was done based on the S&P price and not the purchase price). Also heard from the developer that there might be delays in completing the new phases due to some financial crisis...

There are a few issues that I would like to raise to the developer (Eg: TM line, rubbish collection, irresponsible guards and etc)... can we have a Community forum set up for phase 3? If we can get this forum set up, I’m sure we can come up with a Community for our area... Please let me know what you guys think... Thanks!
*
I agree with community forum but it should start from exisiting owner already occupy the area instead of buyer from Phase 4 onwards.
B|ACK^SuNdAY
post Mar 21 2012, 04:11 PM

New Member
*
Junior Member
10 posts

Joined: Mar 2012


QUOTE(snake4168 @ Mar 21 2012, 03:51 PM)
I agree with community forum but it should start from exisiting owner already occupy the area instead of buyer from Phase 4 onwards.
*
i'm cool with that too... the thing is, do we have a community forum except this one? i doubt it man... been googling but i couldn't find any... it's good if we already have one coz it would be easier for us to share toughts and communicate...

This post has been edited by B|ACK^SuNdAY: Mar 21 2012, 04:15 PM
tehaikseong
post Mar 22 2012, 03:20 PM

New Member
*
Junior Member
25 posts

Joined: Jun 2007
From: Puchong


If the current resident do not want to join, then we set up our own, fence up to new phase only.
TSsnake4168
post Mar 24 2012, 11:52 AM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
QUOTE(tehaikseong @ Mar 22 2012, 03:20 PM)
If the current resident do not want to join, then we set up our own, fence up to new phase only.
*
Well, if only Phase 5, the cost will be high. It is very important for other older phase to take initiative first.
tehaikseong
post Mar 26 2012, 09:35 AM

New Member
*
Junior Member
25 posts

Joined: Jun 2007
From: Puchong


Is better the recent resident community employ a new security guard which is controlled by the community itself, then the new phase will join in the community to give support.
edwinlcw
post Mar 26 2012, 10:40 AM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


something to share...
i went to the site of phase 5 on last weekend.. and there is a little progress on going... they are start doing the outside drain and some part has been done .. and there are few piles of wood inside the site...
and i saw only 3 workers is working there... rclxub.gif
TSsnake4168
post Mar 26 2012, 04:03 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
Better than nothing!
Bahkuteh
post Mar 26 2012, 08:00 PM

Enthusiast
*****
Senior Member
777 posts

Joined: Nov 2011


3 guys,enuff to play mahjong! What lah!
pesa
post Mar 26 2012, 10:38 PM

New Member
*
Junior Member
22 posts

Joined: Apr 2007


Hi guys, I went to see Putra Impiana after work today....for Phase 3A, the row with the show unit is almost finish except for the aluminium louvres and gates. The row behind it is already painted and fitted with windows, but still missing a few things. The next 2 rows are yet to be painted with still some plaster work going on. Hopefully the whole phase can be done around July...
littlebuddy
post Mar 28 2012, 11:01 AM

New Member
*
Junior Member
12 posts

Joined: Oct 2011


QUOTE(pesa @ Mar 26 2012, 10:38 PM)
Hi guys, I went to see Putra Impiana after work today....for Phase 3A, the row with the show unit is almost finish except for the aluminium louvres and gates. The row behind it is already painted and fitted with windows, but still missing a few things. The next 2 rows are yet to be painted with still some plaster work going on. Hopefully the whole phase can be done around July...
*
yup. phase 4 this time the progress is better (keep going). before CNY this year, the progress is on n off. now phase 5 only start continue working on it. will pay a visit this weekend as well. smile.gif
pesa
post Mar 28 2012, 12:51 PM

New Member
*
Junior Member
22 posts

Joined: Apr 2007


Every time I drop by the area, it's really hard to bump into any of the residents. I wonder whether the older phases already have Resident Association...Since there're quite a number of us in here, maybe we can organize a get together/ teh tarik session one of these days to create networking in real world and maybe think/ take actions on some of the issues. After all, we're going to be neighbours right? Who else gonna take care of the area if not us. The sooner the better and there's always strength in numbers. What do u guys say?

Oh, BTW, the developer is finishing up to road from Putra Impiana to HERO/ Meranti Jaya...it's gonna be both ways soon. That's a good development IMO. It's been tarred and hopefully they gonna clear all the debris round soon too!! I'm getting a bit optimistic with latest progress.
anniecyp2003
post Mar 29 2012, 02:03 AM

New Member
*
Junior Member
45 posts

Joined: Apr 2009


QUOTE(edwinlcw @ Mar 26 2012, 10:40 AM)
something to share...
i went to the site of phase 5 on last weekend.. and there is a little progress on going... they are start doing the outside drain and some part has been done .. and there are few piles of wood inside the site...
and i saw only 3 workers is working there... rclxub.gif
*
Yea I also went to the site last wkend, they going to complete the drain soon. I believe these job done is due to attract new buying to view the 2 1/2-storey showroom. A few workers @ Phase 5 just hang around at the site, seem like nothing they're doing.


Added on March 29, 2012, 2:05 am
QUOTE(pesa @ Mar 28 2012, 12:51 PM)
Every time I drop by the area, it's really hard to bump into any of the residents. I wonder whether the older phases already have Resident Association...Since there're quite a number of us in here, maybe we can organize a get together/ teh tarik session one of these days to create networking in real world and maybe think/ take actions on some of the issues. After all, we're going to be neighbours right? Who else gonna take care of the area if not us. The sooner the better and there's always strength in numbers. What do u guys say?

Oh, BTW, the developer is finishing up to road from Putra Impiana to HERO/ Meranti Jaya...it's gonna be both ways soon. That's a good development IMO. It's been tarred and hopefully they gonna clear all the debris round soon too!! I'm getting a bit optimistic with latest progress.
*
Yes same goes to me icon_rolleyes.gif I didnt manage to bump any Phase 5 buyer. yes, we can organise a get together session to create a Resident Association.

This post has been edited by anniecyp2003: Mar 29 2012, 02:05 AM
edwinlcw
post Mar 29 2012, 08:32 AM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


QUOTE(anniecyp2003 @ Mar 29 2012, 02:03 AM)
Yea I also went to the site last wkend, they going to complete the drain soon. I believe these job done is due to attract new buying to view the 2 1/2-storey showroom. A few workers @ Phase 5 just hang around at the site, seem like nothing they're doing.


Added on March 29, 2012, 2:05 am

Yes same goes to me  icon_rolleyes.gif I didnt manage to bump any Phase 5 buyer. yes, we can organise a get together session to create a Resident Association.
*
yes.. that's what i thought too.. they are going to finish up some of the part in order to lure more buyers for their phase 6.. as the phase 6 sales is not going anywhere...

LTSAudrey
post Apr 2 2012, 04:34 PM

New Member
*
Junior Member
28 posts

Joined: Apr 2012
QUOTE(snake4168 @ Feb 3 2012, 11:35 AM)
Arghhhh! I just want my house ready. Please Acmar don't run away!
*
Trust me snake4168, when u take your house.... u will even cry more. Just like me, I am one of the owner from phase 1


Added on April 2, 2012, 4:51 pm
QUOTE(trasher_zone @ Feb 27 2012, 08:54 AM)
Hi Pesa,
We got the CF since they handover the key. Just the TM line still not ready,it's normal if the area is new, but this is more than 3 years already. I'm not sure about u guys but mine i used developer's lawyer since it came in the package when i bought the house. Drawback is that lawyer is always on developer site . We all just need to push the developer, that's it.

For security,it is still under developer, they sell the house and put "24h security" . So they should manage it properly otherwise don't use it. The guard did not do any guarding work . And fyi, last 2 month my neighbor's house kena rompak in the middle of the day ! Lucky they didn't hurt his wife . Prior to that ( last year ) , someone in Jalan 8 kena ragut in front of her house !  . Developer told us that once we form a community, we can take over the guard and security  and manage it ourself like Taman Meranti Jaya and  Taman Putra Prima. BUT developer NEVER AND CANNOT use 24h security as their selling point.

I think we should come out with banner so that this tak guna developer will open their eyes . Or gather on the same day they launch the new show unit  thumbup.gif
*
OMG.... really someone kena ragut at jalan 8..... i am staying in jalan 9, but the house kena rompak i know about it. but my neighbour told me is because the husband hutang AH LONG, so the ah long came and take what ever is necessary. It seems like a lot of neighbour witness this incident.

This post has been edited by LTSAudrey: Apr 2 2012, 04:51 PM
edwinlcw
post Apr 2 2012, 04:58 PM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


QUOTE(LTSAudrey @ Apr 2 2012, 04:34 PM)
Trust me snake4168, when u take your house.... u will even cry more. Just like me, I am one of the owner from phase 1


Added on April 2, 2012, 4:51 pm

OMG.... really someone kena ragut at jalan 8..... i am staying in jalan 9, but the house kena rompak i know about it. but my neighbour told me is because the husband hutang AH LONG, so the ah long came and take what ever is necessary. It seems like a lot of neighbour witness this incident.
*
why you will cry more when you take your key?? many defected materiel inside the house??

btw.. when to phase 5 site yesterday.. the drain outside has been done and i can see that there is alot more piles of wood there and the extra pillar has been cut...
LTSAudrey
post Apr 2 2012, 05:02 PM

New Member
*
Junior Member
28 posts

Joined: Apr 2012
QUOTE(tehaikseong @ Mar 22 2012, 03:20 PM)
If the current resident do not want to join, then we set up our own, fence up to new phase only.
*
Hai tehaikseong, i would like to join, unfortunately a lot of people from phase 1/2 seems like they have no interest in it. Is really frustrated that after 3 years we still have no TM line.

Lately my main fuss box masuk air, and my living area ceiling got a big patch of water stain. So I call the renovation guy cum plumber to come and c this problem, he claims that my master bedroom toilet pipe was not fix probably and there is a lot of gaps around the flooring, and the stupid designer, design the house in a way that the main fuss box is build below the master bedroom toilet. AND IS A BIG STUPID DESIGN.


Added on April 2, 2012, 5:07 pm
QUOTE(edwinlcw @ Apr 2 2012, 04:58 PM)
why you will cry more when you take your key?? many defected materiel inside the house??

btw.. when to phase 5 site yesterday.. the drain outside has been done and i can see that there is alot more piles of wood there and the extra pillar has been cut...
*
Ya lor edwinlcw, uncountable defects.... and the best part is after 3 years you still c defects. And when you ask people to come and fix your defects they are not cheap.... minimum at least 1k and above...... crazyyyyyyyyyyyyy

This post has been edited by LTSAudrey: Apr 2 2012, 05:07 PM
edwinlcw
post Apr 2 2012, 05:14 PM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


QUOTE(LTSAudrey @ Apr 2 2012, 05:02 PM)
Hai tehaikseong, i would like to join, unfortunately a lot of people from phase 1/2 seems like they have no interest in it. Is really frustrated that after 3 years we still have no TM line.

Lately my main fuss box masuk air, and my living area ceiling got a big patch of water stain. So I call the renovation guy cum plumber to come and c this problem, he claims that my master bedroom toilet pipe was not fix probably and there is a lot of gaps around the flooring, and the stupid designer, design the house in a way that the main fuss box is build below the master bedroom toilet. AND IS A BIG STUPID DESIGN.


Added on April 2, 2012, 5:07 pm

Ya lor edwinlcw, uncountable defects.... and the best part is after 3 years you still c defects. And when you ask people to come and fix your defects they are not cheap.... minimum at least 1k and above...... crazyyyyyyyyyyyyy
*
damn.. looks like it is a bad move for me to buy this house as my 1st property.... cry.gif
LTSAudrey
post Apr 2 2012, 05:24 PM

New Member
*
Junior Member
28 posts

Joined: Apr 2012
QUOTE(edwinlcw @ Apr 2 2012, 05:14 PM)
damn.. looks like it is a bad move for me to buy this house as my 1st property.... cry.gif
*
Well, edwinlcw....... yes may be it is a bad move for you to buy your first house. But look on the bright side, you might be the lucky one to get the house with the minimal defects. not all the houses is like this, is just our luck. but be prepare to c a lot lot lot of crack, hair crack etc.
pesa
post Apr 4 2012, 07:29 AM

New Member
*
Junior Member
22 posts

Joined: Apr 2007


Since I was told by Jab Perumahan Negara that Phase 3 already have CF, can anyone confirm if they have TM line? I'll be really upset if I can't have Unifi when I move in to Phase 4 later.

@LTSAudrey, since you've been staying there, can you share any info?

So guys, when can we have teh tarik session for current and future residents? Can we have it soon; say this weekend (Sunday @ 10 am) at the mamak near Meranti Jaya? Anyone interested to join? Please put your name down and we'll see if we have enough kaki...

1. Pesa

This post has been edited by pesa: Apr 4 2012, 07:39 AM
LTSAudrey
post Apr 4 2012, 10:39 AM

New Member
*
Junior Member
28 posts

Joined: Apr 2012
QUOTE(pesa @ Apr 4 2012, 07:29 AM)
Since I was told by Jab Perumahan Negara that Phase 3 already have CF, can anyone confirm if they have TM line? I'll be really upset if I can't have Unifi when I move in to Phase 4 later.

@LTSAudrey, since you've been staying there, can you share any info?

So guys, when can we have teh tarik session for current and future residents? Can we have it soon; say this weekend (Sunday @ 10 am) at the mamak near Meranti Jaya? Anyone interested to join? Please put your name down and we'll see if we have enough kaki...

1. Pesa
*
Pesa, let me tell you 3 years ago when we first move in TM told me INI TEMPAT BARU, SO TAK ADA PHONE LINE LAGI, now you go and ask them they will say INI TEMPAT BARU, SO TAK ADA PHONE LINE LAGI, future you go they will also say INI TEMPAT BARU, SO TAK ADA PHONE LINE LAGI.

We wont be able to get a phone line, due to this stupid developer did not submit some necessary document to apply for the TM line. We have been using P1 since we move in till now. Service is bad, but no choice. Pesa why dont we have it near the playground. 2. Audrey
pesa
post Apr 4 2012, 10:25 PM

New Member
*
Junior Member
22 posts

Joined: Apr 2007


user posted image

I'm seriously upset now!! cry.gif cry.gif cry.gif cry.gif cry.gif cry.gif cry.gif cry.gif
LTSAudrey
post Apr 5 2012, 10:01 AM

New Member
*
Junior Member
28 posts

Joined: Apr 2012
QUOTE(pesa @ Apr 4 2012, 10:25 PM)
user posted image

I'm seriously upset now!!  cry.gif  cry.gif  cry.gif  cry.gif  cry.gif  cry.gif  cry.gif  cry.gif
*
cry.gif
edwinlcw
post Apr 5 2012, 02:11 PM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


QUOTE(pesa @ Apr 4 2012, 10:25 PM)
user posted image

I'm seriously upset now!!  cry.gif  cry.gif  cry.gif  cry.gif  cry.gif  cry.gif  cry.gif  cry.gif
*
cry.gif
B|ACK^SuNdAY
post Apr 5 2012, 05:59 PM

New Member
*
Junior Member
10 posts

Joined: Mar 2012


hi guys, sorry, been away for a while... well, if u guys are talking bout defects, i think my unit was the paling teruk kena defect... the main water pipe that supplies water to the unit broke somewhere in between. so, if i turn on the main tap, water starts seeping thru the tiles... now, the entire tiles in the ground floor rosak... and, this stupid developer don't want to change it coz the cost is too high... erghhhhhhhhh! i screwed up a project manager by the name of kevin... not sure if u guys know him... still requesting them to change... one good experience for me - pls do not do ANY renovation works to ur unit for at least 2 months after u get the keys... coz, u won't be able to claim anything from the developers...

btw, teh tarik sounds like a good plan... i'm in too... pls tell me the date and time...

regards,
vasan
edwinlcw
post Apr 6 2012, 08:39 AM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


QUOTE(B|ACK^SuNdAY @ Apr 5 2012, 05:59 PM)
hi guys, sorry, been away for a while... well, if u guys are talking bout defects, i think my unit was the paling teruk kena defect... the main water pipe that supplies water to the unit broke somewhere in between. so, if i turn on the main tap, water starts seeping thru the tiles... now, the entire tiles in the ground floor rosak... and, this stupid developer don't want to change it coz the cost is too high... erghhhhhhhhh! i screwed up a project manager by the name of kevin... not sure if u guys know him... still requesting them to change... one good experience for me - pls do not do ANY renovation works to ur unit for at least 2 months after u get the keys... coz, u won't be able to claim anything from the developers...

btw, teh tarik sounds like a good plan... i'm in too... pls tell me the date and time...

regards,
vasan
*
that's bad.. really think shouldn't get a property from this developer.. i can see that the abandon development in bandar baru klang.. is like 70% completed.. but yet they choose to abandon it...
a bit regret on the purchase... i think i'm the last person to get a unit in phase5 as i managed to get the unit after someone failed to secure a loan and was got it via the company's GM(one of my wife's client)...

about the gathering... not able to make it on this coming sunday... will heading back to my hometown this weekend..
LTSAudrey
post Apr 6 2012, 10:16 AM

New Member
*
Junior Member
28 posts

Joined: Apr 2012
QUOTE(B|ACK^SuNdAY @ Apr 5 2012, 05:59 PM)
hi guys, sorry, been away for a while... well, if u guys are talking bout defects, i think my unit was the paling teruk kena defect... the main water pipe that supplies water to the unit broke somewhere in between. so, if i turn on the main tap, water starts seeping thru the tiles... now, the entire tiles in the ground floor rosak... and, this stupid developer don't want to change it coz the cost is too high... erghhhhhhhhh! i screwed up a project manager by the name of kevin... not sure if u guys know him... still requesting them to change... one good experience for me - pls do not do ANY renovation works to ur unit for at least 2 months after u get the keys... coz, u won't be able to claim anything from the developers...

btw, teh tarik sounds like a good plan... i'm in too... pls tell me the date and time...

regards,
vasan
*
OOOPS that is bad
vsk
post Apr 8 2012, 12:28 PM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
f***ER

This post has been edited by vsk: May 15 2012, 03:20 PM
LTSAudrey
post Apr 9 2012, 09:32 AM

New Member
*
Junior Member
28 posts

Joined: Apr 2012
QUOTE(vsk @ Apr 8 2012, 12:28 PM)
Phase 3A:- 屋子手工起到很粗地砖起到不平衡墙壁跟厕所窗口起到不平没有90度外面的车旁不平衡,跟那个样本屋子手工的做法完全不同。
Phase 5:- 承包商跑了因为发展商没付钱,又换了新的承包商。
*
Guys, did you all c the notice at the guard house. If yes, please present on 22/4/12 at jalan putra impiana 9 playground for committee meeting. (subject about TM and security guard)
edwinlcw
post Apr 9 2012, 10:56 AM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


QUOTE(LTSAudrey @ Apr 9 2012, 09:32 AM)
Guys, did you all c the notice at the guard house. If yes, please present on 22/4/12 at jalan putra impiana 9 playground for committee meeting. (subject about TM and security guard)
*
How's the TT on last weekend?? anyone attend??
I'm the phase5 owner, don't think is appropriate for me to join since it is still under develop.

Went to view the phase5 site last weekend... finally can see some progress on it... what a relief but still can't put too much hope on it until they handover the key to me...
trasher_zone
post Apr 9 2012, 11:02 AM

New Member
*
Junior Member
10 posts

Joined: Jan 2009


QUOTE(LTSAudrey @ Apr 9 2012, 09:32 AM)
Guys, did you all c the notice at the guard house. If yes, please present on 22/4/12 at jalan putra impiana 9 playground for committee meeting. (subject about TM and security guard)
*
Hello guys !
Firstly before we can address any problem,we need to form a strong community,like it or not..that's the only way to scare the developer. It's true we have a community (joined by phase 1 & 2 ) and it's registered under kementerian perumahan/rukuntetangga. Unfortunately ,there wasn't any progress since our last committee meeting on May 2011. So last Saturday night, we had another round of follow up meeting and below are the outputs :

1. Our community license going to be revoked unless we submit Yearly General Meeting to gov.
2. Same old problem - TMLine,Guard,Stray dogs,potholes,house defect,water prob...
3. Same bullshit reason given by developer when we address our prob - contractor died,workers sudah lari,new contract..bla bla

We have come out with new solutions :

1- We will meet up with all the residents to get to know each other and to open up member registration to residents including for those who want to join as committee members . Please join us on 22/4 at 8.30am Venue : Playground Jln 9

2- We will be collecting petition and sign from all the residents during the meeting and submit it to TM , SKMM/MCMC(Malaysian Communication & Multimedia Corp),Biro Pengaduan Awam JPM & Developer to install the phone line ASAP .

3- Other issues will be addressed by our Acting Chairman ...

HOPE TO SEE U GUYS ! icon_rolleyes.gif
LTSAudrey
post Apr 9 2012, 12:03 PM

New Member
*
Junior Member
28 posts

Joined: Apr 2012
QUOTE(trasher_zone @ Apr 9 2012, 11:02 AM)
Hello guys !
Firstly before we can address any problem,we need to form a strong community,like it or not..that's the only way to scare the developer. It's true we have a community (joined by phase 1 & 2 ) and it's registered under kementerian perumahan/rukuntetangga. Unfortunately ,there wasn't any progress since our last committee meeting on May 2011. So last Saturday night, we had another round of follow up meeting and below are the outputs :

1. Our community license going to be revoked unless we submit Yearly General Meeting to gov.
2. Same old problem - TMLine,Guard,Stray dogs,potholes,house defect,water prob...
3. Same bullshit reason given by developer when we address our prob - contractor died,workers sudah lari,new contract..bla bla

We have come out with new solutions :

1- We will meet up with all the residents to get to know each other and to open up member registration to residents including for those who want to join as committee members . Please join us on 22/4 at 8.30am Venue : Playground Jln 9</b>

2- We will be collecting petition and sign from all the residents during the meeting and submit it to TM , SKMM/MCMC(Malaysian Communication & Multimedia Corp),Biro Pengaduan Awam JPM & Developer to install the phone line ASAP .

3- Other issues will be addressed by our Acting Chairman ...

HOPE TO SEE U GUYS !  icon_rolleyes.gif
*
Who is our Acting Chairman?


Added on April 9, 2012, 12:05 pm
QUOTE(edwinlcw @ Apr 9 2012, 10:56 AM)
How's the TT on last weekend?? anyone attend??
I'm the phase5 owner, don't think is appropriate for me to join since it is still under develop.

Went to view the phase5 site last weekend... finally can see some progress on it... what a relief but still can't put too much hope on it until they handover the key to me...
*
It doesn't matter edwinlcw, as long as you buy a house at taman putra impiana, you are entitled to attend the meeting. hope to c u there

This post has been edited by LTSAudrey: Apr 9 2012, 12:05 PM
tehaikseong
post Apr 9 2012, 03:11 PM

New Member
*
Junior Member
25 posts

Joined: Jun 2007
From: Puchong


22/4/2012 i still in my hometown, cannot not join for the meeting. Hopefully this coming meeting will be successful.
(I am Phase 3A house owner)
tang1980
post Apr 9 2012, 03:40 PM

New Member
*
Junior Member
12 posts

Joined: Dec 2011


QUOTE(vsk @ Apr 8 2012, 12:28 PM)
Phase 3A:- 屋子手工起到很粗地砖起到不平衡墙壁跟厕所窗口起到不平没有90度外面的车旁不平衡,跟那个样本屋子手工的做法完全不同。
Phase 5:- 承包商跑了因为发展商没付钱,又换了新的承包商。
*
I am one of the phase 3A house owner, the house really got so much of problems? WTF of this developer?? Not only delay the progress, now even create so much of problems!!
LTSAudrey
post Apr 9 2012, 05:09 PM

New Member
*
Junior Member
28 posts

Joined: Apr 2012
QUOTE(vsk @ Apr 8 2012, 12:28 PM)
Phase 3A:- 屋子手工起到很粗地砖起到不平衡墙壁跟厕所窗口起到不平没有90度外面的车旁不平衡,跟那个样本屋子手工的做法完全不同。
Phase 5:- 承包商跑了因为发展商没付钱,又换了新的承包商。
*
Some contractor didn't run away, because the developer contra a unit to them, just like my neighbour. He told me is contra, because Developer is unable to pay him
govindrk
post Apr 9 2012, 07:49 PM

New Member
*
Newbie
3 posts

Joined: May 2005
Agreed 100% we need to have this meeting.."trasher_zone" thanks for arranging this, i will definitely attend this. (I am Phase 3A house owner)
pesa
post Apr 10 2012, 12:38 AM

New Member
*
Junior Member
22 posts

Joined: Apr 2007


Will attend the meeting too. Hope to see u guys there!

Phase 3A:- 屋子手工起到很粗地砖起到不平衡墙壁跟厕所窗口起到不平没有90度外面的车旁不平衡,跟那个样本屋子手工的做法完全不同。
Phase 5:- 承包商跑了因为发展商没付钱,又换了新的承包商。 <--- Anyone care to translate/ share what this is all about? TQ

This post has been edited by pesa: Apr 10 2012, 12:39 AM
amyckl
post Apr 10 2012, 02:39 PM

New Member
*
Newbie
3 posts

Joined: Jun 2011
hi..i am the phase 5 owner..i think i am also the last batch of buyer, i able to buy a unit cos of someone loan was rejected...was went to the site last week and they have some progress on the site....hope everything is smooth..........
B|ACK^SuNdAY
post Apr 10 2012, 03:16 PM

New Member
*
Junior Member
10 posts

Joined: Mar 2012


QUOTE(edwinlcw @ Apr 6 2012, 08:39 AM)
that's bad.. really think shouldn't get a property from this developer.. i can see that the abandon development in bandar baru klang.. is like 70% completed.. but yet they choose to abandon it...
a bit regret on the purchase... i think i'm the last person to get a unit in phase5 as i managed to get the unit after someone failed to secure a loan and was got it via the company's GM(one of my wife's client)...

about the gathering... not able to make it on this coming sunday... will heading back to my hometown this weekend..
*
honestly guys, this developer sux big time! it has been months and they have not fixed my tap issue yet... can u imagine? i'm getting mad but there's nothing much that i can do... have to wait till they solve my prob lor... sad.gif


Added on April 10, 2012, 3:18 pm
QUOTE(LTSAudrey @ Apr 6 2012, 10:16 AM)
OOOPS that is bad
*
trust me... it's really really bad....


Added on April 10, 2012, 3:23 pm
QUOTE(trasher_zone @ Apr 9 2012, 11:02 AM)
Hello guys !
Firstly before we can address any problem,we need to form a strong community,like it or not..that's the only way to scare the developer. It's true we have a community (joined by phase 1 & 2 ) and it's registered under kementerian perumahan/rukuntetangga. Unfortunately ,there wasn't any progress since our last committee meeting on May 2011. So last Saturday night, we had another round of follow up meeting and below are the outputs :

1. Our community license going to be revoked unless we submit Yearly General Meeting to gov.
2. Same old problem - TMLine,Guard,Stray dogs,potholes,house defect,water prob...
3. Same bullshit reason given by developer when we address our prob - contractor died,workers sudah lari,new contract..bla bla

We have come out with new solutions :

1- We will meet up with all the residents to get to know each other and to open up member registration to residents including for those who want to join as committee members . Please join us on 22/4 at 8.30am Venue : Playground Jln 9</b>

2- We will be collecting petition and sign from all the residents during the meeting and submit it to TM , SKMM/MCMC(Malaysian Communication & Multimedia Corp),Biro Pengaduan Awam JPM & Developer to install the phone line ASAP .

3- Other issues will be addressed by our Acting Chairman ...

HOPE TO SEE U GUYS !  icon_rolleyes.gif
*
i saw the notice too... will be there to meet u guys... as said, it's best to address our problems with a strong committee... i think all of us should join and make this a good one... then, let's see what the developers has to say...

This post has been edited by B|ACK^SuNdAY: Apr 10 2012, 03:23 PM
amyckl
post Apr 10 2012, 03:42 PM

New Member
*
Newbie
3 posts

Joined: Jun 2011
QUOTE(B|ACK^SuNdAY @ Apr 10 2012, 04:16 PM)
honestly guys, this developer sux big time! it has been months and they have not fixed my tap issue yet... can u imagine? i'm getting mad but there's nothing much that i can do... have to wait till they solve my prob lor... sad.gif


Added on April 10, 2012, 3:18 pm

trust me... it's really really bad....


Added on April 10, 2012, 3:23 pm

i saw the notice too... will be there to meet u guys... as said, it's best to address our problems with a strong committee... i think all of us should join and make this a good one... then, let's see what the developers has to say...
*
ya i believe that if have a strong community the problem sure can solve...as i am staying condo now...last time management in-charge....service so bad but now take over by strong community many changes have done .....
vsk
post Apr 10 2012, 04:18 PM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
f***ER

This post has been edited by vsk: May 8 2012, 09:39 PM
LTSAudrey
post Apr 10 2012, 04:33 PM

New Member
*
Junior Member
28 posts

Joined: Apr 2012
QUOTE(amyckl @ Apr 10 2012, 03:42 PM)
ya i believe that if have a strong community the problem sure can solve...as i am staying condo now...last time management in-charge....service so bad but now take over by strong community many changes have done .....
*
we shall hope for the best
B|ACK^SuNdAY
post Apr 10 2012, 05:23 PM

New Member
*
Junior Member
10 posts

Joined: Mar 2012


QUOTE(LTSAudrey @ Apr 10 2012, 04:33 PM)
we shall hope for the best
*
for a start, we need everyone to participate in the meeting this coming 22nd... let's take it on from there... i hope everyone can turn up and give suggestions to improvise our neighbourhood.... smile.gif
TSsnake4168
post Apr 10 2012, 09:47 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
Good start! Please suggest to committee to set up a online forum like this since it was free! So every owner can share their thought from time to time!
B|ACK^SuNdAY
post Apr 10 2012, 11:46 PM

New Member
*
Junior Member
10 posts

Joined: Mar 2012


QUOTE(snake4168 @ Apr 10 2012, 09:47 PM)
Good start! Please suggest to committee to set up a online forum like this since it was free! So every owner can share their thought from time to time!
*
indeed, it's a good start... i'm not sure if we have any other forums for TPI... but, we can use this one for time being... smile.gif
trasher_zone
post Apr 11 2012, 05:27 AM

New Member
*
Junior Member
10 posts

Joined: Jan 2009


QUOTE(B|ACK^SuNdAY @ Apr 10 2012, 11:46 PM)
indeed, it's a good start... i'm not sure if we have any other forums for TPI... but, we can use this one for time being... smile.gif
*
Indeed Good Idea ! if u guys realize, other Taman like Meranti Jaya, Bukit Puchong, NusaPutra have their own Forum, and some got facebook page .
anniecyp2003
post Apr 11 2012, 07:36 PM

New Member
*
Junior Member
45 posts

Joined: Apr 2009


QUOTE(trasher_zone @ Apr 11 2012, 05:27 AM)
Indeed Good Idea ! if u guys realize, other Taman like Meranti Jaya, Bukit Puchong, NusaPutra have their own Forum, and some got facebook page .
*
rclxms.gif lets set up


Added on April 11, 2012, 7:37 pm
QUOTE(pesa @ Apr 10 2012, 12:38 AM)
Will attend the meeting too. Hope to see u guys there!

Phase 3A:- 屋子手工起到很粗地砖起到不平衡墙壁跟厕所窗口起到不平没有90度外面的车旁不平衡,跟那个样本屋子手工的做法完全不同。
Phase 5:- 承包商跑了因为发展商没付钱,又换了新的承包商。 <--- Anyone care to translate/ share what this is all about? TQ
*
Pesa, meaning

Phase 5:- The contractor ran because the developers did not pay for a new contractor.


Added on April 11, 2012, 7:41 pmSo is the TT session ON? I guess I past the last wkend.

This post has been edited by anniecyp2003: Apr 11 2012, 07:41 PM
TSsnake4168
post Apr 12 2012, 04:40 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
Please update here anything about committee meeting.
Better to inform every house owner that they can have discussion in this forum or create a new one by committee!
edwinlcw
post Apr 12 2012, 05:08 PM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


went to the site of phase 5 yesterday... glad to see that the site is progressing and got workers working as well... but it still to early to judge....
B|ACK^SuNdAY
post Apr 16 2012, 05:29 PM

New Member
*
Junior Member
10 posts

Joined: Mar 2012


QUOTE(snake4168 @ Apr 12 2012, 04:40 PM)
Please update here anything about committee meeting.
Better to inform every house owner that they can have discussion in this forum or create a new one by committee!
*
hi snake4168,

yea, that's a good idea... i think all of us here know that the meeting is held on the 22nd... as soon as we gather up there, we'll let everyone know that we've got this forum for TPI folks... and, let's discuss how to move forward from then onwards...


Added on April 16, 2012, 5:31 pm
QUOTE(edwinlcw @ Apr 12 2012, 05:08 PM)
went to the site of phase 5 yesterday... glad to see that the site is progressing and got workers working as well... but it still to early to judge....
*
hi edwinlcw, that's good news... at least we know that there's something happening... smile.gif

This post has been edited by B|ACK^SuNdAY: Apr 16 2012, 05:31 PM
pesa
post Apr 16 2012, 09:43 PM

New Member
*
Junior Member
22 posts

Joined: Apr 2007


Dropped by at the site today. Progress at Phase 3A seems to be good. The 1st 3 rows from show unit is almost completed. It's been painted, fitted with glass windows and gates. The bulk of the work seems to be on the last row. Hopefully, they can finish everything off soon!!
Bahkuteh
post Apr 16 2012, 10:26 PM

Enthusiast
*****
Senior Member
777 posts

Joined: Nov 2011


QUOTE(pesa @ Apr 16 2012, 09:43 PM)
Dropped by at the site today. Progress at Phase 3A seems to be good. The 1st 3 rows from show unit is almost completed. It's been painted, fitted with  glass windows and gates. The bulk of the work seems to be on the last row. Hopefully, they can finish everything off soon!!
*
That's good news bro. biggrin.gif
vsk
post Apr 18 2012, 03:21 PM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
PHASE:3A HANDWORK LIKE BULL SHIT MANY EFFECT mad.gif
TSsnake4168
post Apr 18 2012, 10:46 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
QUOTE(vsk @ Apr 18 2012, 03:21 PM)
PHASE:3A  HANDWORK LIKE BULL SHIT MANY EFFECT mad.gif
*
Mind to post some pic?
tehaikseong
post Apr 19 2012, 08:55 AM

New Member
*
Junior Member
25 posts

Joined: Jun 2007
From: Puchong


QUOTE(vsk @ Apr 18 2012, 04:21 PM)
PHASE:3A  HANDWORK LIKE BULL SHIT MANY EFFECT mad.gif
*
Pls share some picture with us, we all want to know more...
edwinlcw
post Apr 19 2012, 10:18 AM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


QUOTE(vsk @ Apr 18 2012, 03:21 PM)
PHASE:3A  HANDWORK LIKE BULL SHIT MANY EFFECT mad.gif
*
mind to share some photo about it?? now i'm worry about the phase 5 handwork... sweat.gif
vsk
post Apr 19 2012, 02:24 PM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
This sunday 8.30am 22/04/12 have meeting in Tmn Putra Impiana playground area,Photo cant see 3D go watch your self Phase 3A , Handwork like shit

(Phase 5 different contractor different handwork) Hope a lucky

This post has been edited by vsk: Apr 21 2012, 01:13 AM
anniecyp2003
post Apr 21 2012, 07:20 PM

New Member
*
Junior Member
45 posts

Joined: Apr 2009


QUOTE(vsk @ Apr 19 2012, 02:24 PM)
This sunday 8.30am 22/04/12 have meeting in Tmn Putra Impiana playground area,Photo cant see 3D go watch your self Phase 3A , Handwork like shit

(Phase 5 different contractor different handwork)  Hope a lucky
*
See you there tomoro biggrin.gif
kelvinsoh
post Apr 21 2012, 10:50 PM

New Member
*
Junior Member
17 posts

Joined: May 2011
QUOTE(anniecyp2003 @ Apr 21 2012, 07:20 PM)
See you there tomoro biggrin.gif
*
I am owner for Phase 3. Sorry I am unable to join u all on tomorrow meeting. Anyway please keep update the info at this forum.
edwinlcw
post Apr 23 2012, 08:22 AM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


Sorry... unable to make it yesterday for the meeting... any outcome from the meeting?
Btw.. here is the phote I took on last Saturday on the phase5 site... seem like the progress is going well...
sorry about the pic quality.. as snapped with my phone...
Attached Image

This post has been edited by edwinlcw: Apr 23 2012, 08:30 AM
B|ACK^SuNdAY
post Apr 23 2012, 10:17 AM

New Member
*
Junior Member
10 posts

Joined: Mar 2012


hi guys,

sorry, i was not able to join the meeting due a sudden situation at my workplace... btw, any updates on the meeting? how did it go?
trasher_zone
post Apr 25 2012, 11:02 AM

New Member
*
Junior Member
10 posts

Joined: Jan 2009


QUOTE(B|ACK^SuNdAY @ Apr 23 2012, 10:17 AM)
hi guys,

sorry, i was not able to join the meeting due a sudden situation at my workplace... btw, any updates on the meeting? how did it go?
*
Hello guys !

First of all, i would like to extend my sincerest thanks and appreciation to those who came and support us during the meeting. For those who not able to make it, thanks for keep supporting us !

Below are the things that we discussed during the meeting :

1. Selection of the committee members
- All agreed(with voted ) that Chairman , Asst Chairman, Treasurer , Secretary will remain the same as last year . For AJK , we all have selected using nomination/votes and now have new faces . Thanks again . The name/phone # and address will be displayed soon, most probably in guard house for time being.

2. Briefly explained what community have been done for the past 1 year
- Get our community registered under kementerian perumahan - rukun tetangga. Certificate had been displayed during the meeting.
- Couple of times tried to set meeting with developer but failed.
- Plan to do some project - road hump, street light, signboard. But failed due to financial issue.

3. Plan to collect small amount of money - maybe $10 per month and will be used for community purpose. - printing,banner,photostat,paper , etc... dun worry, cause all will be recorded by treasurer . BUT this has not been decided yet.

4. People that attended that day, chip in money to start and fund our community . rclxms.gif

5. In two weeks time, we will be having our 1st committee meeting to start moving forward.

6. For those who still want to join as a members, can do so anytime by sending name,phone,house num and jalan to : tamanputra_impiana@yahoo.com.my

7. I'm in the midst of creating official website and forum for Taman Putra Impiana so that we all can move forward and communicate better thumbup.gif

Again. Thank you all for your support !



B|ACK^SuNdAY
post Apr 25 2012, 11:31 AM

New Member
*
Junior Member
10 posts

Joined: Mar 2012


awesome work trasher_zone! this is good news! smile.gif i'll send my details to the given e-mail add and hopefully we can meet in 2 weeks time... smile.gif
tehaikseong
post Apr 25 2012, 05:17 PM

New Member
*
Junior Member
25 posts

Joined: Jun 2007
From: Puchong


trasher_zone, can i join as a member as i am Phase 3A house owner?
trasher_zone
post Apr 27 2012, 09:45 AM

New Member
*
Junior Member
10 posts

Joined: Jan 2009


QUOTE(tehaikseong @ Apr 25 2012, 05:17 PM)
trasher_zone, can i join as a member as i am Phase 3A house owner?
*
Hi,
Can as long you're the resident here. But for exco members, the nomination has been closed during the Annual General Meeting that day. But you will be listed as part of community and registered members .

There's suggestion from our team that flyer with form will be sent directly to your house mailbox and you can reply and submit it in mailbox in guard house . This is to collect your details and as i mention , will be listed as part of community and registered members .

For time being please email your concern/details to tamanputra_impiana@yahoo.com.my


Thanks again smile.gif
dcomas
post May 4 2012, 01:26 PM

New Member
*
Junior Member
10 posts

Joined: Oct 2010
Hi,

I have made a complaint to MCMC about telephone and broadband services in Taman Putra Impiana. MCMC has contacted TM and TM responded to me that they will organize a meeting with the developer next week. I will follow up closely with both parties and will keep you guys posted with the latest update.

tehaikseong
post May 4 2012, 03:24 PM

New Member
*
Junior Member
25 posts

Joined: Jun 2007
From: Puchong


Thank you "dcomas", is glad to heard it.


Added on May 5, 2012, 9:05 pmThe access road to Taman Putra Impiana and the internal road for Phase 3A already re-pave with bituminous.

This post has been edited by tehaikseong: May 5 2012, 09:05 PM
edwinlcw
post May 6 2012, 11:25 AM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


QUOTE(dcomas @ May 4 2012, 01:26 PM)
Hi,

I have made a complaint to MCMC about telephone and broadband services in Taman Putra Impiana. MCMC has contacted TM and TM responded to me that they will organize a meeting with the developer next week.  I will follow up closely with both parties and will keep you guys posted with the latest update.
*
Thanks...
vsk
post May 8 2012, 02:37 PM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
rclxlh.gif

This post has been edited by vsk: May 15 2012, 03:23 PM
Bahkuteh
post May 8 2012, 08:45 PM

Enthusiast
*****
Senior Member
777 posts

Joined: Nov 2011


shocking.gif
dc_rf_pch
post May 8 2012, 09:59 PM

New Member
*
Junior Member
10 posts

Joined: May 2012
Prospective buyer looking for a unit in Putra Impiana, please call 016-2197411.
dcomas
post May 17 2012, 11:49 AM

New Member
*
Junior Member
10 posts

Joined: Oct 2010
QUOTE(dcomas @ May 4 2012, 01:26 PM)
Hi,

I have made a complaint to MCMC about telephone and broadband services in Taman Putra Impiana. MCMC has contacted TM and TM responded to me that they will organize a meeting with the developer next week.  I will follow up closely with both parties and will keep you guys posted with the latest update.
*
TM finally has a meeting with the developer. Developer promised that they will prepare the necessary facilities by the end of this month so that TM can provide telephone and broadband services in our area.

Lets see.
mineSweeper
post May 17 2012, 06:31 PM

Getting Started
**
Junior Member
171 posts

Joined: Mar 2006

QUOTE(dcomas @ May 17 2012, 11:49 AM)
TM finally has a meeting with the developer. Developer promised that they will prepare the necessary facilities by the end of this month so that TM can provide telephone and broadband services in our area.

Lets see.
*
thanks for the effort and good news rclxm9.gif
but then, don't have much hope at the developer's words and promises.
tehaikseong
post May 18 2012, 11:05 AM

New Member
*
Junior Member
25 posts

Joined: Jun 2007
From: Puchong


QUOTE(mineSweeper @ May 17 2012, 07:31 PM)
thanks for the effort and good news  rclxm9.gif
but then, don't have much hope at the developer's words and promises.
*
The new committee have to gather the support from current residents and pressure to developer...
TSsnake4168
post May 19 2012, 10:26 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
QUOTE(dcomas @ May 17 2012, 11:49 AM)
TM finally has a meeting with the developer. Developer promised that they will prepare the necessary facilities by the end of this month so that TM can provide telephone and broadband services in our area.

Lets see.
*
Are you comittee member?
dcomas
post May 19 2012, 10:35 PM

New Member
*
Junior Member
10 posts

Joined: Oct 2010
No. I‘m not.
vsk
post May 21 2012, 01:51 AM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
Dont Hope Much Believe Developer rclxlh.gif

This post has been edited by vsk: May 21 2012, 06:54 PM
Suntharlal
post Jun 13 2012, 12:06 PM

New Member
*
Junior Member
12 posts

Joined: Nov 2011


I just called ACMAR to enquiry the status for Phase 3A, they are waiting for CF and estimate to hand over by end of June or early July.
They informed that the TELEKOM line is available for Taman Putra Impiana. Please help to confirm on this, thanks

thumbup.gif
tehaikseong
post Jun 13 2012, 01:49 PM

New Member
*
Junior Member
25 posts

Joined: Jun 2007
From: Puchong


This is a good new, everything is ready include TMline (If the statement is correct). rclxms.gif
anniecyp2003
post Jun 20 2012, 02:16 PM

New Member
*
Junior Member
45 posts

Joined: Apr 2009


Developer are going to have pre-sales preview this coming wkend to launch Phase 6.


Added on June 21, 2012, 6:40 pmHi Phase 3 & 3a purchaser, would like to check. How to take for developer to complete Phase 3?

This post has been edited by anniecyp2003: Jun 21 2012, 06:40 PM
Almondbox
post Jul 2 2012, 02:56 PM

New Member
*
Junior Member
9 posts

Joined: May 2012
hi there, i just wondering how to find out the project phase 3a is late to hand over the keys?how do we justify it?from the s and p we signed or from the date we booked the unit?pls advised.

thanks
macho dog
post Jul 2 2012, 03:51 PM

Enthusiast
*****
Senior Member
792 posts

Joined: Jun 2011
QUOTE(anniecyp2003 @ Jun 20 2012, 02:16 PM)
Developer are going to have pre-sales preview this coming wkend to launch Phase 6.


Added on June 21, 2012, 6:40 pmHi Phase 3 & 3a purchaser,  would like to check. How to take for developer to complete Phase 3?
*
You tell the developer u and ur gangs of the home buyers will hold a huge protest in front of their sales office for the Ph 6 sale preview this weekend and also on their future launches lor...maybe they will be scared to complete the Ph 3 project asap? sweat.gif



This post has been edited by macho dog: Jul 2 2012, 03:56 PM
tang1980
post Jul 2 2012, 04:52 PM

New Member
*
Junior Member
12 posts

Joined: Dec 2011


Today already 2nd of July, still don't have any news about Phase 3A progress... really cannot trust this developer...
TSsnake4168
post Jul 3 2012, 09:53 AM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
Huh?! They still not yet deliver Phase 3?
tang1980
post Jul 3 2012, 11:18 AM

New Member
*
Junior Member
12 posts

Joined: Dec 2011


QUOTE(snake4168 @ Jul 3 2012, 09:53 AM)
Huh?! They still not yet deliver Phase 3?
*
not yet deliver phase3A.
hihi811
post Jul 4 2012, 01:30 PM

New Member
*
Junior Member
9 posts

Joined: Mar 2012
QUOTE(tang1980 @ Jul 3 2012, 11:18 AM)
not yet deliver phase3A.
*
Phase 4 complete?
TSsnake4168
post Jul 12 2012, 09:41 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
Phase 5 build very fast liao
hihi811
post Jul 13 2012, 11:19 AM

New Member
*
Junior Member
9 posts

Joined: Mar 2012
QUOTE(snake4168 @ Jul 12 2012, 09:41 PM)
Phase 5 build very fast liao
*
Hope can get cf by next year for phase 5
tang1980
post Jul 13 2012, 01:52 PM

New Member
*
Junior Member
12 posts

Joined: Dec 2011


QUOTE(hihi811 @ Jul 4 2012, 01:30 PM)
Phase 4 complete?
*
Phase 3A = Phase 4

Until today haven't get the CF yet.
TSsnake4168
post Jul 13 2012, 04:26 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
rclxms.gif rclxms.gif

Phase 5

This post has been edited by snake4168: Jul 13 2012, 04:37 PM


Attached thumbnail(s)
Attached Image
TSsnake4168
post Jul 13 2012, 04:39 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
tongue.gif


Attached thumbnail(s)
Attached Image
tehaikseong
post Jul 25 2012, 02:26 PM

New Member
*
Junior Member
25 posts

Joined: Jun 2007
From: Puchong


Last weekend, i visit the site, Phase 3A already install TNB meter but left out SYABAS meter... blush.gif
Suntharlal
post Jul 27 2012, 11:54 AM

New Member
*
Junior Member
12 posts

Joined: Nov 2011


Just called the developer for the update - Phase 3A.Has been informed that the key will be deliver after Raya.
james3674
post Jul 27 2012, 03:57 PM

New Member
*
Junior Member
13 posts

Joined: Nov 2008
Too bad this developer keep on delay the date of deliver phase 3A. I am so disappointed about what they said. Really do not know that when they promise is true.....Plan to sales off my phase 3A house after they deliver my house. Who interested to buy kindly PM me?
TSsnake4168
post Jul 29 2012, 02:10 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
QUOTE(james3674 @ Jul 27 2012, 03:57 PM)
Too bad this developer keep on delay the date of deliver phase 3A. I am so disappointed about what they said. Really do not know that when they promise is true.....Plan to sales off my phase 3A house after they deliver my house. Who interested to buy kindly PM me?
*
Why want to sell when developer respond badly?

I think the neighbourhood friendliness and quality finishing is more important.

james3674
post Aug 1 2012, 02:53 PM

New Member
*
Junior Member
13 posts

Joined: Nov 2008
Of course. This developer really low productivity .They spend almost 3 years for complete build 66 units double storey house but now still not yet deliver. Other developer already completed for built 300++unit condominium ready and success get the house key using the 3 years time and paradigm shopping mall built late than them already complete and doing business with 100 of retails shop inside. Some more KFC in font our taman putra impiana also built late than us already in business...We are still Jam at waiting the CF at the 'Date Infinity' for getting the house key. Last time, when i bought that time the salesman told me 'Very fast one develop double storey..aiya 10 months already complete the construction. 2012 before CNY sure can move in stay.'. At the end what was the result?
TSsnake4168
post Aug 1 2012, 05:39 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
QUOTE(james3674 @ Aug 1 2012, 02:53 PM)
Of course. This developer really low productivity .They spend almost 3 years for complete build 66 units double storey house but now still not yet deliver. Other developer already completed for built 300++unit condominium ready and success get the house key using the 3 years time and paradigm shopping mall built late than them already complete and doing business with 100 of retails shop inside. Some more KFC in font our taman putra impiana also built late than us already in business...We are still Jam at waiting the CF at the 'Date Infinity' for getting the house key. Last time, when i bought that time the salesman told me 'Very fast one develop double storey..aiya 10 months already complete the construction. 2012 before CNY sure can move in stay.'.  At the end what was the result?
*
Agree, agree. they are not reliable. Lucky they had finish the house. At least you can sell it off.

I predict Phase 5 will be delay again.

But reliable company like Mah Sing & Setia very expensive.. out of my budget..
james3674
post Aug 1 2012, 11:13 PM

New Member
*
Junior Member
13 posts

Joined: Nov 2008
Be honest lah...agree that this developer cannot compare with Mah Sing & Setia those big construction company. At less they suppose to deliver on time or overdue few days still acceptable. They cannot simply open the pop cheque to their house buyer abt when wan deliver. At the end delay and delay. B'cos some of us really the first time buyer or maybe we are only buy one time house in our life time and spend most of the saving to buy this property.

Hope this developer can speed up their process for deliver our property ..

This post has been edited by james3674: Aug 1 2012, 11:14 PM
edwinlcw
post Aug 2 2012, 06:46 PM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


hopefully all goes well with phase 5..
anyone gone to the site of phase 5 recently? how is the progress??? still got workers working there??? sweat.gif
dcomas
post Aug 2 2012, 11:13 PM

New Member
*
Junior Member
10 posts

Joined: Oct 2010
TM is almost here in TPI.
Here is the Unifi Commitment Sale in TPI. Meaning, if we have enough requests, TM will provide Unifi to TPI.
Do come and support on 4&5 Aug 2012 10am - 2pm

user posted image
iCa
post Aug 2 2012, 11:26 PM

Getting Started
**
Junior Member
62 posts

Joined: Jul 2006


unifi finally is coming!! the brochure says that they will be opening a booth in front of the guard house for registration of interest at 10am to 2pm this saturday and sunday.. they are here to see if the demand is sufficient for them to install the fibre optic.. lets go and hope they will install it veryy soon thumbup.gif
TSsnake4168
post Aug 3 2012, 11:20 AM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
Good progress! Our committee is good!
tang1980
post Aug 3 2012, 11:22 AM

New Member
*
Junior Member
12 posts

Joined: Dec 2011


Unifi is coming! This is a good news!
But I haven't get the keys yet (I am phase3A buyer), can I go to register for Unifi this weekend?
TSsnake4168
post Aug 3 2012, 11:58 AM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
just go and register first. It will help them to decide whether to proceed with installation or not

tehaikseong
post Aug 3 2012, 03:43 PM

New Member
*
Junior Member
25 posts

Joined: Jun 2007
From: Puchong


I 100% will go there and fill up the form for registration even though i am Phase 3a owner. rclxms.gif

This post has been edited by tehaikseong: Aug 3 2012, 05:57 PM
gary1159
post Aug 6 2012, 02:47 PM

New Member
*
Newbie
2 posts

Joined: Aug 2012
QUOTE(Suntharlal @ Jul 27 2012, 11:54 AM)
Just called the developer for the update - Phase 3A.Has been informed that the key will be deliver after Raya.
*
I hope they will keep this promise as i have been waiting for so LOOOONG!!!

Anyway, thank you very much for your comments, ideas & updates...

Cheers!!!
angel-face
post Aug 6 2012, 03:30 PM

On my way
****
Senior Member
626 posts

Joined: Jan 2009


QUOTE(gary1159 @ Aug 6 2012, 02:47 PM)
I hope they will keep this promise as i have been waiting for so LOOOONG!!!

Anyway, thank you very much for your comments, ideas & updates...

Cheers!!!
*
how much u bought the house bro??
gary1159
post Aug 6 2012, 04:14 PM

New Member
*
Newbie
2 posts

Joined: Aug 2012
QUOTE(angel-face @ Aug 6 2012, 03:30 PM)
how much u bought the house bro??
*
395k.. after discount 3k..

Are you the owner of phase 3a?
zomba
post Aug 17 2012, 04:02 AM

New Member
*
Junior Member
21 posts

Joined: Aug 2012
today i went to putra impiana and looked at the notice project information board and saw the date of project expected to completed is on 31st August 2012. Hmmmm .. I wonder whether it can be done.

And also guys ... we are worried about the landscape around the housing area. I called Acmar and had mention about this concern as we are buying at quite expensive price and we expect good landscape around the area. Especially when it comes to the guard house. Need your help as well who ever is buying at phase 5 to voice out your concern about the landscape. If the landscape is good then it would be one of the best place. If not ..its not worth it paying over RM450K house where as other place we can get good surrounding landscape. Please guys voice out to Acmar holding.
james3674
post Aug 18 2012, 01:48 AM

New Member
*
Junior Member
13 posts

Joined: Nov 2008
Today i called back to office the staff said that first week of September can get the Key. Don't know true a not.
TeannaLim
post Aug 19 2012, 05:16 PM

Getting Started
**
Junior Member
102 posts

Joined: Jun 2011
Please see this URL:
http://www.propwall.my/answers/1060/d-rapp...an-ampang-delay
As mentioned by one of the respondents in the above "... built by the same group under Acmar International which is famous for their many stalled/delayed projects (for more than 12 years, eg. BBK shopping mall & Acmar International Hotel which is visible on the right-side of the highway to Klang) in Bandar Baru Klang"

D'Rapport was launched in 2007 but until now it is still delayed despite many 'successful' re-launches.

I can only feel sorry for the buyers of Taman Putra Impiana. Consider yourself lucky if you manage to collect your keys despite the delay - others are not that lucky.


vsk
post Aug 19 2012, 11:14 PM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
shakehead.gif

(To all Putra Impiana Phase 5 owner)That i Say Dont Trust This Vendor, Very Famous in Klang Bad List
Refer Back Your S&P Agreement, SPECIFICATION:
FLOOR FINISHES: Bedrooms 1,2,3 & Guest : Polished porcelain tiles:
Tipu Lagi f***er Vendor Change to Ceramic Tiles, Cheaper Save Cost & Easy Break Soft Material
Attn: All Phase 5 Purchaser Before Hand Over, Vendor Must Paid Back to Purchaser if Vendor Not Agree. Setup Committee
Bring This Case to Putrajaya Claim The f***er Vendor Back.


Alamat:Ibu Pejabat TTPR Aras 3-4 No.51 Persiaran Perdana Presint 4, 62100 Putrajaya Telefon:03-88914758/4774/4746


This post has been edited by vsk: Aug 20 2012, 12:17 PM
hihi811
post Aug 22 2012, 05:33 PM

New Member
*
Junior Member
9 posts

Joined: Mar 2012
QUOTE(vsk @ Aug 19 2012, 11:14 PM)
shakehead.gif

(To all Putra Impiana Phase 5 owner)That i Say Dont Trust This Vendor, Very Famous in Klang Bad List
Refer Back Your S&P Agreement, SPECIFICATION:
FLOOR FINISHES: Bedrooms 1,2,3 & Guest : Polished porcelain tiles:
Tipu Lagi f***er Vendor Change to Ceramic Tiles, Cheaper Save Cost & Easy Break Soft Material
Attn: All Phase 5 Purchaser Before Hand Over, Vendor Must Paid Back to Purchaser if Vendor Not Agree. Setup Committee
Bring This Case to Putrajaya Claim The f***er Vendor Back.


Alamat:Ibu Pejabat TTPR  Aras 3-4 No.51 Persiaran Perdana Presint 4, 62100 Putrajaya Telefon:03-88914758/4774/4746

*
Already doing tiles????

Crystal2
post Aug 23 2012, 10:26 AM

Casual
***
Junior Member
450 posts

Joined: Mar 2011
My advice to all potential buyers and realty negotiators: don't ever go near any projects carried out by that Group of companies. You will only have numerous heart sicks and disappointments every step of the way. No projects carried out by them were done well or on time. Just drive around BBK and you will know what I mean. Caveat Emptor!!
TSsnake4168
post Aug 23 2012, 09:22 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
Already half way what to do? Pray to God hope they will deliver it nicely
Almondbox
post Aug 26 2012, 03:56 PM

New Member
*
Junior Member
9 posts

Joined: May 2012
Hi phase 3a owner..

Currently I received vacant possession for the property of taman putra impiana phase 3a and there is a late interest charges up to 7k. Does anyone have this issue?? The property are ready to collect keys as well .
hihi811
post Aug 26 2012, 05:29 PM

New Member
*
Junior Member
9 posts

Joined: Mar 2012
Went to phase 5 site yesterday. There is few unit complete the interior. Go to have a view... Felt changed a lot ...
james3674
post Aug 26 2012, 10:28 PM

New Member
*
Junior Member
13 posts

Joined: Nov 2008
QUOTE(Almondbox @ Aug 26 2012, 03:56 PM)
Hi phase 3a owner..

Currently I received vacant possession for the property of taman putra impiana phase 3a and there is a late interest charges up to 7k. Does anyone have this issue?? The property are ready to collect keys as well .
*
Hi, Are you received the letter from Developer the Phase 3A property is ready to collect key? Why i still not receive the letter yet? How abt other owner?
tehaikseong
post Aug 27 2012, 08:11 AM

New Member
*
Junior Member
25 posts

Joined: Jun 2007
From: Puchong


i also have not receive any letter/call from developer... sad.gif

This post has been edited by tehaikseong: Aug 27 2012, 08:11 AM
Suntharlal
post Aug 27 2012, 10:29 AM

New Member
*
Junior Member
12 posts

Joined: Nov 2011


Hi Phase 3A Owner,

Just got a confirmation from the developer that the key will be delivered on 3rd & 4th Sep from 10am-5pm.

Please be there, thanks thumbup.gif


james3674
post Aug 27 2012, 11:05 AM

New Member
*
Junior Member
13 posts

Joined: Nov 2008
Really good news..Finally they deliver the phase 3A property after delay quite number of months. rclxms.gif
Almondbox
post Aug 27 2012, 11:15 AM

New Member
*
Junior Member
9 posts

Joined: May 2012
QUOTE(james3674 @ Aug 26 2012, 10:28 PM)
Hi, Are you received the letter from Developer the Phase 3A property is ready to collect key? Why i still not receive the letter yet? How abt other owner?
*
yes i did received the letter but dont worry i think the u all can get it soon.

tehaikseong
post Aug 27 2012, 11:20 AM

New Member
*
Junior Member
25 posts

Joined: Jun 2007
From: Puchong


Just call to Acmar, confirm on 3-4 September 10am-5pm can collect the key, but you have to pay the outstanding 1st.... rclxm9.gif

This post has been edited by tehaikseong: Aug 27 2012, 11:26 AM
Suntharlal
post Aug 27 2012, 12:04 PM

New Member
*
Junior Member
12 posts

Joined: Nov 2011


QUOTE(tehaikseong @ Aug 27 2012, 11:20 AM)
Just call to Acmar, confirm on 3-4 September 10am-5pm can collect the key, but you have to pay the outstanding 1st.... rclxm9.gif
*
You have 14 days to settle the amount from the date you collected key. Meeting at Taman Putra Impiana not at Acmar.
Please be informed, see you all there. I'm sure we have lot of things to bring up


tang1980
post Aug 27 2012, 12:48 PM

New Member
*
Junior Member
12 posts

Joined: Dec 2011


Glad to hear that we can collect our keys on 3rd - 4th Sept..
Guys, which day and what time you will go to collect the keys? Let's go at the same time and we can bring up the issues to developer..
Suntharlal
post Aug 27 2012, 01:14 PM

New Member
*
Junior Member
12 posts

Joined: Nov 2011


QUOTE(tang1980 @ Aug 27 2012, 12:48 PM)
Glad to hear that we can collect our keys on 3rd - 4th Sept..
Guys, which day and what time you will go to collect the keys? Let's go at the same time and we can bring up the issues to developer..
*
I'm going on 3rd Sep- at 11am, join us if you are free.
james3674
post Aug 27 2012, 02:14 PM

New Member
*
Junior Member
13 posts

Joined: Nov 2008
I can't make it on Monday. Most probably will go there collect my key on Tuesday morning.
Almondbox
post Aug 27 2012, 05:19 PM

New Member
*
Junior Member
9 posts

Joined: May 2012
congrats to all new residents in taman putra impiana Phase 3A rclxms.gif ..

Btw do u guys know how to calculate the late hand over keys interest?is it from the s n p date?
vsk
post Aug 27 2012, 09:13 PM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
Don't agree pay late payment charge interest to vendor . Loan agreement aready deal with bank . Late payment charge vendor refer to bank not us.


Added on August 27, 2012, 9:22 pmLate hand over interest calculate Rm400k x 10% ÷ 12 month = Rm3333.33

This post has been edited by vsk: Aug 27 2012, 09:22 PM
TSsnake4168
post Aug 27 2012, 11:18 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
Congrats! Hope you all gets super nice house
edwinlcw
post Aug 28 2012, 12:01 PM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


how's the development of phase 5??
according to the letter i receive from the developer... now only left the 10% of external and internal work of the building...

btw... congratz to all the phase 3a owner... rclxms.gif

This post has been edited by edwinlcw: Aug 28 2012, 12:02 PM
tehaikseong
post Aug 28 2012, 01:02 PM

New Member
*
Junior Member
25 posts

Joined: Jun 2007
From: Puchong


my bank has not received the letter from developer to pay for the last progress payment, seem like i cannot collect my key on next week cry.gif

This post has been edited by tehaikseong: Aug 28 2012, 01:03 PM
hihi811
post Aug 28 2012, 01:28 PM

New Member
*
Junior Member
9 posts

Joined: Mar 2012
QUOTE(edwinlcw @ Aug 28 2012, 12:01 PM)
how's the development of phase 5??
according to the letter i receive from the developer... now only left the 10% of external and internal work of the building...

btw... congratz to all the phase 3a owner... rclxms.gif
*
Edwin,
Some unit completed the internal. U may go site to hv a look
james3674
post Aug 28 2012, 02:16 PM

New Member
*
Junior Member
13 posts

Joined: Nov 2008
QUOTE(tehaikseong @ Aug 27 2012, 11:20 AM)
Just call to Acmar, confirm on 3-4 September 10am-5pm can collect the key, but you have to pay the outstanding 1st.... rclxm9.gif
*
Which bank you finance your house? I think Bank will release the outstanding balance as soon as possible.
edwinlcw
post Aug 28 2012, 02:29 PM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


QUOTE(hihi811 @ Aug 28 2012, 01:28 PM)
Edwin,
Some unit completed the internal. U may go site to hv a look
*
hmm... i shall take a visit to the site... can we just walk into the site and view those completed unit??
tehaikseong
post Aug 28 2012, 02:35 PM

New Member
*
Junior Member
25 posts

Joined: Jun 2007
From: Puchong


QUOTE(james3674 @ Aug 28 2012, 03:16 PM)
Which bank you finance your house? I think Bank will release the outstanding balance as soon as possible.
*
I just call to PB, they say has not receive the letter...
tang1980
post Aug 28 2012, 04:42 PM

New Member
*
Junior Member
12 posts

Joined: Dec 2011


QUOTE(tehaikseong @ Aug 28 2012, 02:35 PM)
I just call to PB, they say has not receive the letter...
*
Me too. I have called to Public Bank, they said haven't receive the letter from developer yet, this mean that I can't go to collect my keys by next week, right???
hihi811
post Aug 28 2012, 05:59 PM

New Member
*
Junior Member
9 posts

Joined: Mar 2012
QUOTE(edwinlcw @ Aug 28 2012, 02:29 PM)
hmm... i shall take a visit to the site... can we just walk into the site and view those completed unit??
*
Ya Edwin I went to the site last weekend
One2Six
post Aug 29 2012, 12:13 AM

New Member
*
Newbie
2 posts

Joined: Aug 2012
I also received the vacant possession letter today. But there are late payment charge and misc. charges total of RM1,085. Will find out from them tomorrow.

Do go through your S&P, my defect liability period is covered up to 24months & LAD said liquidated damages shall be paid by the Vendor to Purchaser immediately upon the date the Purchase takes vacant possession of the said building. I think we have file in Tribunal to claims the full amount since they did not mention any LAD payment when I called the office.

Hope these links will help:
http://www.hba.org.my/faq/list.htm
http://ehome.kpkt.gov.my/main.php

Cheers.


Almondbox
post Aug 29 2012, 03:30 PM

New Member
*
Junior Member
9 posts

Joined: May 2012
QUOTE(tehaikseong @ Aug 28 2012, 01:02 PM)
my bank has not received the letter from developer to pay for the last progress payment, seem like i cannot collect my key on next week  cry.gif
*
u have to let ur bank know.like me my bank also didnt received any letter from developer until i call them.the bank now start preparing the remaining balance to them.
james3674
post Aug 29 2012, 03:54 PM

New Member
*
Junior Member
13 posts

Joined: Nov 2008
I had called my bank to check this morning, the bank officer inform me that the final release amount already credit to developer account. The official letter and cheque already send to lawyer side.


Added on August 30, 2012, 2:23 pmHi Phase 3A owner, any of you encounter the late payment charge by developer? I call both party financier bank and loan lawyer, all of them also escape the issue. Too bad. Is it you all will going to pay the late charge?

This post has been edited by james3674: Aug 30 2012, 02:23 PM
Almondbox
post Aug 30 2012, 04:41 PM

New Member
*
Junior Member
9 posts

Joined: May 2012
QUOTE(james3674 @ Aug 29 2012, 03:54 PM)
I had called my bank to check this morning, the bank officer inform me that the final release amount already credit to developer account. The official letter and cheque already send to lawyer side.


Added on August 30, 2012, 2:23 pmHi Phase 3A owner, any of you encounter the late payment charge by developer? I call both party financier bank and loan lawyer, all of them also escape the issue. Too bad. Is it you all will going to pay the late charge?
*
I did encounter the issue but i keep all my receipt from my bank and developer and they manage to waive the interest charges for me cause the issue is not come from me here.so i would suggest u find back the receipt and check which progressive payment is delay.then only u can talk to your bank, lawyer and developer about this issue.perhaps u can ask your bank and lawyer to provide u the chronology of the event to rectify the payment.i hope this will help u .
james3674
post Aug 30 2012, 05:04 PM

New Member
*
Junior Member
13 posts

Joined: Nov 2008
QUOTE(Almondbox @ Aug 30 2012, 04:41 PM)
I did encounter the issue but i keep all my receipt from my bank and developer and they manage to waive the interest charges for me cause the issue is not come from me here.so i would suggest u find back the receipt and check which progressive payment is delay.then only u can talk to your bank, lawyer and developer about this issue.perhaps u can ask your bank and lawyer to provide u the chronology of the event to rectify the payment.i hope this will help u .
*
Tq for your advise. I had call the loan lawyer to find out why they delay release my loan. Hope they will come back to me asap. May i know which party problem due to your late payment charge? Lawyer, developer / bank?
vsk
post Aug 30 2012, 09:32 PM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
Don't pay any interest to vendor, my cousin phase 3 facing this case october 2011 before. Refer to lawyer inform no need pay any late payment charge to vendor, don't be stupid purchaser you deal with bank only. before hand over just pay syabas & Tnb deposit only. my cousin know the rules argue with vendor, Vendor hand over key to my cousin, one cent also no need to pay.

Tribunal Tuntutan Pembeli Rumah

Alamat:Ibu Pejabat TTPR Aras 3-4 No.51 Persiaran Perdana Presint 4, 62100 Putrajaya Telefon:03-88914758/4774/4746



tehaikseong
post Sep 1 2012, 05:25 PM

New Member
*
Junior Member
25 posts

Joined: Jun 2007
From: Puchong


Phase 3A Owner, Serious problem!!!
Just now (4.30pm 1/9/12) i go to visit my Phase 3A house, i found that SYABAS meter has not installed yet.
Talked to developer officer at site office, he say may be install on next week, is MAY BE.
We will collect the key on Monday, but can not use any water, is this call "finish completed" and hand over to customer?
I cannot collect my key on next Monday or Tuesday, if any Phase 3A owner collect his key, kindly bring this issue to developer that we cannot accept the date of delivery of vacant possession as stated on the letter.
If any one know to handle this situation, kindly advise.


This post has been edited by tehaikseong: Sep 1 2012, 05:38 PM
tang1980
post Sep 3 2012, 08:30 AM

New Member
*
Junior Member
12 posts

Joined: Dec 2011


QUOTE(tehaikseong @ Sep 1 2012, 05:25 PM)
Phase 3A Owner, Serious problem!!!
Just now (4.30pm 1/9/12) i go to visit my Phase 3A house, i found that SYABAS meter has not installed yet.
Talked to developer officer at site office, he say may be install on next week, is MAY BE.

*
I went to visit my "house" last saturday too, ya, the syabas meter has not installed yet!!! How come the developer can deliver the house without the syabas meter?? Is this call COMPLETED?? If the developer keep on delaying the installation of syabas meter after we take keys, then what should we do?


Added on September 3, 2012, 8:35 amBy the way, I cannot go to take my keys on today or tomorrow, due to bank haven't release the balance amount to developer.
Anyone who will go to take the keys, kindly bring up this issue.
One more question: can we refuse to take the keys as the syabas meter has not install yet?

This post has been edited by tang1980: Sep 3 2012, 08:35 AM
Almondbox
post Sep 3 2012, 09:08 AM

New Member
*
Junior Member
9 posts

Joined: May 2012
QUOTE(james3674 @ Aug 30 2012, 05:04 PM)
Tq for your advise. I had call the loan lawyer to find out why they delay release my loan. Hope they will come back to me asap. May i know which party problem due to your late payment charge?  Lawyer, developer / bank?
*
The issue come from the developer. My bank already give the payment and they didn't update it.
Suntharlal
post Sep 5 2012, 10:39 AM

New Member
*
Junior Member
12 posts

Joined: Nov 2011


I don’t find any reason why we should pay high amount for miscellaneous cost including for Security. They just have one pondok buruk with grandfather sitting inside without doing any checking.

Anyone can enter and go as their wish so why we need to pay!!!!!!!!!!!! This is ridiculous, they don’t even have a access card entry

I can only think how stupid the developer with the wall height that they have built to protect the community, anyone can jump into the housing area…so call guarded community, I believe even dog can jump that high.

Just compare with the wall at next Taman which is good enough and well protected, Seriously I’m going to whack the developer kaw kaw mad.gif mad.gif mad.gif vmad.gif vmad.gif vmad.gif when I’m paying the settlement to get the key until the developer rclxub.gif rclxub.gif rclxub.gif

This post has been edited by Suntharlal: Sep 5 2012, 10:46 AM
tang1980
post Sep 11 2012, 09:55 AM

New Member
*
Junior Member
12 posts

Joined: Dec 2011


I have got my keys. The defects is really @@ (speechless)...
One2Six
post Sep 11 2012, 03:45 PM

New Member
*
Newbie
2 posts

Joined: Aug 2012
Have anyone fill in TTPR to claims late delivery charges against Usahasama?

How much is the claims value? and outcome?
TSsnake4168
post Sep 11 2012, 10:34 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
QUOTE(tang1980 @ Sep 11 2012, 09:55 AM)
I have got my keys. The defects is really @@ (speechless)...
*
Would you mind take some picture of defect area and post here?!
Angry Owner 5
post Sep 12 2012, 09:07 PM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


Hi GUys
Just came back from the phase 5 site, 1st floor and ground floor bed room tiles has been changed from porcelain (as what stated in the brochure) to cheap ceramic tiles size 1 x 1. WTF!! This is consider cheating d...

Can we do something about it, stop them from further installing? Meet with the developer? file a suit against them? Since this a a collaboration project between states agency ( setiausaha kerajaan negeri selangor), can we go and meet up with Sepang MP?

Shall we meet up and discuss about it?
TSsnake4168
post Sep 12 2012, 09:54 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
QUOTE(Angry Owner 5 @ Sep 12 2012, 09:07 PM)
Hi GUys
Just came back from the phase 5 site, 1st floor and ground floor bed room tiles has been changed from porcelain (as what stated in the brochure) to cheap ceramic tiles size 1 x 1. WTF!! This is consider cheating d...

Can we do something about it, stop them from further installing? Meet with the developer? file a suit against them? Since this a a collaboration project between states agency ( setiausaha kerajaan negeri selangor), can we go and meet up with Sepang MP?

Shall we meet up and discuss about it?
*
The brochure didn't state including bedroom. Must check S&P. Hardly we can see this brochure flaw when we bought the house.

But the S&P already stated clearly, then we can complain to tribunal.
Angry Owner 5
post Sep 12 2012, 10:38 PM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


Are u phase 5 owner also? Did the S&P stated it is porcelain tiles?


Added on September 12, 2012, 10:44 pm
QUOTE(snake4168 @ Sep 12 2012, 09:54 PM)
The brochure didn't state including bedroom. Must check S&P. Hardly we can see this brochure flaw when we bought the house.

But the S&P already stated clearly, then we can complain to tribunal.
*
Did the S&P stated that it come with porcelain tiles for all bedroom and first floor?


Added on September 12, 2012, 10:52 pm
QUOTE(Angry Owner 5 @ Sep 12 2012, 10:38 PM)
Are u phase 5 owner also? Did the S&P stated it is porcelain tiles?


Added on September 12, 2012, 10:44 pm
Did the S&P stated that it come with porcelain tiles for all bedroom and first floor?
*
but even the first floor living installed with the cheap 1x1 ceramic tiles and it is sticky type....sure out feet felt uncomfortable later on

This post has been edited by Angry Owner 5: Sep 12 2012, 10:52 PM
edwinlcw
post Sep 13 2012, 10:33 AM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


QUOTE(Angry Owner 5 @ Sep 12 2012, 10:38 PM)
Are u phase 5 owner also? Did the S&P stated it is porcelain tiles?


Added on September 12, 2012, 10:44 pm
Did the S&P stated that it come with porcelain tiles for all bedroom and first floor?


Added on September 12, 2012, 10:52 pm

but even the first floor living installed with the cheap 1x1 ceramic tiles and it is sticky type....sure out feet felt uncomfortable later on
*
i'm a phase 5 owner.. let me go back and check it out from the s&p...
my wife's boss knows one of the MD from Acmar and she also bought a corner unit from phase 5... if something wrong with the unit from what it should be.. i'm sure she will complain 99 one.. she is those not easy going type of people...
Angry Owner 5
post Sep 13 2012, 11:12 AM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(edwinlcw @ Sep 13 2012, 10:33 AM)
i'm a phase 5 owner.. let me go back and check it out from the s&p...
my wife's boss knows one of the MD from Acmar and she also bought a corner unit from phase 5... if something wrong with the unit from what it should be.. i'm sure she will complain 99 one.. she is those not easy going type of people...
*
But it is confirm first floor with ceramic tiles and size (1x1) can see it is a cheap material and plaster work bad, I can see many wall surface and finishing senget, pls ask ur wife's boss visit the site and starts complain before too late.
edwinlcw
post Sep 13 2012, 02:12 PM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


QUOTE(Angry Owner 5 @ Sep 13 2012, 11:12 AM)
But it is confirm first floor with ceramic tiles and size (1x1) can see it is a cheap material  and plaster work bad, I can see many wall surface and finishing senget, pls ask ur wife's boss visit the site and starts complain before too late.
*
if my memory serve me right... 1st floor family hall should be using 1.5x1.5 tiles... really have to check the s&p...
how you manage to get in the site of phase 5 to view the house??
Angry Owner 5
post Sep 13 2012, 02:58 PM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(edwinlcw @ Sep 13 2012, 02:12 PM)
if my memory serve me right... 1st floor family hall should be using 1.5x1.5 tiles... really have to check the s&p...
how you manage to get in the site of phase 5 to view the house??
*
I go there at 6pm, just walk in and tell the guard and then they will let u in, our standard Malaysian body language, just tabit to them and all get thru. In the brochure says is porcelain tiles.
TSsnake4168
post Sep 13 2012, 06:04 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
S&P stated 1st floor family hall & 4 rooms also 1 x 1 porcelain tiles.

Ground floor living hall till dry kitchen 1.5 x 1.5
edwinlcw
post Sep 13 2012, 06:24 PM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


QUOTE(snake4168 @ Sep 13 2012, 06:04 PM)
S&P stated 1st floor family hall  & 4 rooms also 1 x 1 porcelain tiles.

Ground floor living hall till dry kitchen 1.5 x 1.5
*
not 2x2 tiles??

vsk
post Sep 13 2012, 07:26 PM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
Vendor Tipu Phase 5 Buyer,Family Hall&1,2,3,Guest Room Refer SPA 100% Comfirm Polished Porcelain Tiles,Vendor Change to Ceramic Tiles . Refer GOV Rules Can't Get CF Approval

If Can Get:- MPK RASUAH


This post has been edited by vsk: Sep 13 2012, 07:49 PM
Angry Owner 5
post Sep 13 2012, 08:49 PM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(snake4168 @ Sep 13 2012, 06:04 PM)
S&P stated 1st floor family hall  & 4 rooms also 1 x 1 porcelain tiles.

Ground floor living hall till dry kitchen 1.5 x 1.5
*
the actual is all 4 bed room and first floor with cheap material 1x1 ceramic tiles, white color, very slippery....can we do something about it?
what shld we do now before the contractor has finished install all the tiles....


Added on September 13, 2012, 8:52 pm
QUOTE(vsk @ Sep 13 2012, 07:26 PM)
Vendor Tipu Phase 5 Buyer,Family Hall&1,2,3,Guest Room Refer SPA 100% Comfirm Polished Porcelain Tiles,Vendor Change to Ceramic Tiles .          Refer GOV Rules Can't Get CF Approval 
                         
                                If Can Get:- MPK RASUAH         

*
apa kita boleh buat ya? sekarang kan musim pilihan raya , mungkin adun adun dapat tolong kita???

This post has been edited by Angry Owner 5: Sep 13 2012, 08:52 PM
edwinlcw
post Sep 13 2012, 08:58 PM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


QUOTE(Angry Owner 5 @ Sep 13 2012, 08:49 PM)
the actual is all 4 bed room and first floor with cheap material 1x1 ceramic tiles, white color, very slippery....can we do something about it?
what shld we do now before the contractor has finished install all the tiles....


Added on September 13, 2012, 8:52 pm

apa kita boleh buat ya? sekarang kan musim pilihan raya , mungkin adun adun dapat tolong kita???
*
just checked on my s&p.. living room, dining, dry kitchen, 4 bedrooms clearly stated "Polished porcelain tiles" but didn't stated what is the size of the tiles... feel cheated... sad.gif
Angry Owner 5
post Sep 13 2012, 09:18 PM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(edwinlcw @ Sep 13 2012, 08:58 PM)
just checked on my s&p.. living room, dining, dry kitchen, 4 bedrooms clearly stated "Polished porcelain tiles" but didn't stated what is the size of the tiles... feel cheated... sad.gif
*
but atleast it stated it is porcelain, but actual they put in cheap ceramic tiles.....totally unacceptable....


Added on September 13, 2012, 9:24 pm
QUOTE(Angry Owner 5 @ Sep 13 2012, 02:58 PM)
I go there at 6pm, just walk in and tell the guard and then they will let u in, our standard Malaysian body language, just tabit to them and all get thru. In the brochure says is porcelain tiles.
*
Edwin, we really need ur wife to complain to the Acmar MD, i can join also , not problem....

This post has been edited by Angry Owner 5: Sep 13 2012, 09:24 PM
woengx2
post Sep 13 2012, 10:14 PM

Casual
***
Junior Member
311 posts

Joined: Apr 2009
QUOTE(Angry Owner 5 @ Sep 13 2012, 09:18 PM)
but atleast it stated it is porcelain, but actual they put in cheap ceramic tiles.....totally unacceptable....


Added on September 13, 2012, 9:24 pm

Edwin, we really need ur wife to complain to the Acmar MD, i can join also , not problem....
*
Unless there is clauses stating in PAM ( Pertubuhan Akitek Malaysia ) the different between "Procelain" & "Ceramis" otherwise at what "base" you go and argue with developer ?


Added on September 13, 2012, 10:15 pm=====> "Procelain" & "Ceramic"

This post has been edited by woengx2: Sep 13 2012, 10:15 PM
Angry Owner 5
post Sep 13 2012, 10:42 PM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(woengx2 @ Sep 13 2012, 10:14 PM)
Unless there is clauses stating in PAM ( Pertubuhan Akitek Malaysia ) the different between "Procelain" & "Ceramis" otherwise at what "base" you go and argue with developer ?


Added on September 13, 2012, 10:15 pm=====> "Procelain" & "Ceramic"
*
shld be la, can not be Malaysia alreayd so 'fan shu' in everything, this architect asso. also so 'fan shu'
Bahkuteh
post Sep 14 2012, 12:33 AM

Enthusiast
*****
Senior Member
777 posts

Joined: Nov 2011


As I know 1'by 1' are ceramic only. Porcelain for bigger tlles ie 2' by 2' onwards.
Angry Owner 5
post Sep 14 2012, 07:00 AM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(Bahkuteh @ Sep 14 2012, 12:33 AM)
As I know 1'by 1' are ceramic only. Porcelain for bigger tlles ie 2' by 2' onwards.
*
Phase 5 kena con d, 3rd and 4th row has toll install tiles yet, maybe can stop them from installing those cheap quality ceramic tiles? But how?
Crystal2
post Sep 14 2012, 03:03 PM

Casual
***
Junior Member
450 posts

Joined: Mar 2011
According to the guideline issued by The Ministry of Housing and Local Government, the relevant commencement date for LAD claim should be the date when purchasers paid the booking fees and not the subsequent date when the S&P Agreement was signed.

NB: Sorry, the picture is not very clear. (Source: Ren Ha, Facebook of Residency @ Park 51 Condo)


Attached thumbnail(s)
Attached Image
TSsnake4168
post Sep 15 2012, 06:21 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
Anyone please try to post a picture of the problem instead. We can discuss about it.

I had log a official complian to Acmar. They say will talk to project manager.

I'm afraid that they ask me back where is the proof..
woengx2
post Sep 15 2012, 08:12 PM

Casual
***
Junior Member
311 posts

Joined: Apr 2009
QUOTE(snake4168 @ Sep 15 2012, 06:21 PM)
Anyone please try to post a picture of the problem instead. We can discuss about it.

I had log a official complian to Acmar. They say will talk to project manager.

I'm afraid that they ask me back where is the proof..
*
Go to the site and take few pieces of the tiles, go to any tile shop and check to confirm it is ceramic or porcelain, that you will have the proof. biggrin.gif
Angry Owner 5
post Sep 16 2012, 11:29 AM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(snake4168 @ Sep 15 2012, 06:21 PM)
Anyone please try to post a picture of the problem instead. We can discuss about it.

I had log a official complian to Acmar. They say will talk to project manager.

I'm afraid that they ask me back where is the proof..
*
if the project manager / Acmar ask for proof, lets ask them to go visit the site with all of us, the first row, 25 houses has been installed with ceramic tiles on ground floor's bed room, and the whole first floor...only living & kichen with porcelain...
woengx2
post Sep 16 2012, 12:40 PM

Casual
***
Junior Member
311 posts

Joined: Apr 2009
QUOTE(Angry Owner 5 @ Sep 16 2012, 11:29 AM)
if the project manager / Acmar ask for proof, lets ask them to go visit the site with all of us, the first row, 25 houses has been installed with ceramic tiles on ground floor's bed room, and the whole first floor...only living & kichen with porcelain...
*
I'm not a owner or buyer for this project but just give my 2cent, hope it helps any owner or buyer. tongue.gif

It is no point going to the project manager, as a project manager, he has already knew it.
The construction drawing with architectural specification laid down everything of what materials, sizes, colors, etc etc BEFORE the contractor execute the work.

Ask yourself how does the contractor got approval on laying the cheap ceramic tiles instead of porcelain tiles ?

Angry Owner 5
post Sep 16 2012, 03:00 PM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(woengx2 @ Sep 16 2012, 12:40 PM)
I'm not a owner or buyer for this project but just give my 2cent, hope it helps any owner or buyer.  tongue.gif

It is no point going to the project manager, as a project manager, he has already knew it.
The construction drawing with architectural specification laid down everything of what materials, sizes, colors, etc etc BEFORE the contractor execute the work.

Ask yourself how does the contractor got approval on laying the cheap ceramic tiles instead of porcelain tiles ?
*
I see i see, then must be the developer give the greenlight to the contractor.


Added on September 19, 2012, 11:54 pm
QUOTE(Angry Owner 5 @ Sep 16 2012, 03:00 PM)
I see i see, then must be the developer give the greenlight to the contractor.
*

Added on September 20, 2012, 12:10 am
QUOTE(Angry Owner 5 @ Sep 16 2012, 03:00 PM)
I see i see, then must be the developer give the greenlight to the contractor.


Added on September 19, 2012, 11:54 pm
*
S&P really stated family hall, bedroom 1,2,3 & guest with porcelain tiles...is this enough to argue with the contractor or developer? bikin x serupa cakap?

This post has been edited by Angry Owner 5: Sep 20 2012, 12:10 AM
TSsnake4168
post Sep 22 2012, 04:45 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
This is sample of the 1 x 1 tiles from the site.

It's confirmed they use ceramic tiles.

I had ask some shop. This tiles already ex stock selling at RM1.80 for clearance and the problem is if one of this tiles broken, you may face problem to replace it.


Attached thumbnail(s)
Attached Image
Angry Owner 5
post Sep 23 2012, 03:11 PM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(snake4168 @ Sep 22 2012, 04:45 PM)
This is sample of the 1 x 1 tiles from the site.

It's confirmed they use ceramic tiles.

I had ask some shop. This tiles already ex stock selling at RM1.80 for clearance and the problem is if one of this tiles broken, you may face problem to replace it.
*
Do u think we can file a suit or complain to the tribunal base on our S&P stated it was polished porcelain tiles and claim for compensation?

This post has been edited by Angry Owner 5: Sep 24 2012, 12:16 AM
TSsnake4168
post Sep 24 2012, 02:41 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
I'm not the lawyer. I also want joint with you all to fila a complain. I think you may need to go Tribunal to file a complain first before go to court.
edwinlcw
post Sep 30 2012, 07:15 PM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


i just went to the site of phase5 this afternoon... all those 1x1 tiles is confirmed ceramic as i did took a look on the sample tiles there.... at the back of the tiles clearly stated ceramic... about the 2x2 living room tiles.. i don't know how to identify whether if it is ceramic or procelain tiles...

i met with the site supervisor... he told me that the developer wants them to complete the whole phase on end of Oct... but according to him, it is impossible... the fastest he said will be by year end... now the are working 7 days a week to rush it..

btw, i received sms from acmar that they require my details for applying the tnb and syabas service.... anyone of you receive the same??
TSsnake4168
post Oct 1 2012, 12:15 AM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
Yes, I did receive SMS as well. I think any complain have to wait when we all get the key & get RA to go to tribunal.

I did complain to Acmar, but they always no feedback. Always say the management will have meeting with main contractor.

Did you guys log a complain?!
Angry Owner 5
post Oct 3 2012, 01:08 AM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(edwinlcw @ Sep 30 2012, 07:15 PM)
i just went to the site of phase5 this afternoon... all those 1x1 tiles is confirmed ceramic as i did took a look on the sample tiles there.... at the back of the tiles clearly stated ceramic... about the 2x2 living room tiles.. i don't know how to identify whether if it is ceramic or procelain tiles...

i met with the site supervisor... he told me that the developer wants them to complete the whole phase on end of Oct... but according to him, it is impossible... the fastest he said will be by year end... now the are working 7 days a week to rush it..

btw, i received sms from acmar that they require my details for applying the tnb and syabas service.... anyone of you receive the same??
*
living and kitchen is porcelain...only first floor install with the damn ceramic, totally different from S &P...


Added on October 3, 2012, 1:12 am
QUOTE(snake4168 @ Oct 1 2012, 12:15 AM)
Yes, I did receive SMS as well. I think any complain have to wait when we all get the key & get RA to go to tribunal.

I did complain to Acmar, but they always no feedback. Always say the management will have meeting with main contractor.

Did you guys log a complain?!
*
do u think we shld go to their HQ in Klang and make hell of noise? cos i think once they put up the tiles...gone case lioa...

This post has been edited by Angry Owner 5: Oct 3 2012, 01:12 AM
edwinlcw
post Oct 3 2012, 02:09 AM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


QUOTE(Angry Owner 5 @ Oct 3 2012, 01:08 AM)
living and kitchen is porcelain...only first floor install with the damn ceramic, totally different from S &P...


Added on October 3, 2012, 1:12 am

do u think we shld go to their HQ in Klang and make hell of noise? cos i think once they put up the tiles...gone case lioa...
*
the whole 1st, 2nd and partial of the 3rd row already put in the tiles... other will be coming soon...
Crystal2
post Oct 3 2012, 09:07 AM

Casual
***
Junior Member
450 posts

Joined: Mar 2011
QUOTE(Angry Owner 5 @ Oct 3 2012, 01:08 AM)
living and kitchen is porcelain...only first floor install with the damn ceramic, totally different from S &P...


Added on October 3, 2012, 1:12 am

do u think we shld go to their HQ in Klang and make hell of noise? cos i think once they put up the tiles...gone case lioa...
*
Actually, if you asked me - it is gone case the moment you booked. Deemed yourself lucky that your house is delivered albeit not to your satisfaction.
vsk
post Oct 4 2012, 02:33 PM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
Attn: All Phase 5 Owner , I Receive Mail From TTPR. After CF Ready
Vendor Send You Letter Hand Over Key. After Check Your Tiles Something Go Wrong Please Don,t Sign Any Delivery Letter.
We Waiting Delivery Then Only Can Set Up Committee Bring The Case
To TTPR Can Help Us .

edwinlcw
post Oct 4 2012, 02:54 PM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


QUOTE(vsk @ Oct 4 2012, 02:33 PM)
Attn: All Phase 5 Owner , I Receive Mail From TTPR. After CF Ready
        Vendor Send You Letter Hand Over Key. After Check Your Tiles Something Go Wrong Please Don,t Sign Any Delivery Letter.
We Waiting Delivery Then Only Can Set Up Committee Bring The Case
To TTPR Can Help Us .

*
TTPR is???
TSsnake4168
post Oct 4 2012, 10:07 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
Is it government agency?

Angry Owner 5
post Oct 4 2012, 10:54 PM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(snake4168 @ Oct 4 2012, 10:07 PM)
Is it government agency?
*
Tribunal Tuntutan Pembeli Rumah, agency who will and can help us...
edwinlcw
post Oct 5 2012, 02:43 PM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


QUOTE(Angry Owner 5 @ Oct 4 2012, 10:54 PM)
Tribunal Tuntutan Pembeli Rumah, agency who will and can help us...
*
ya.. then we should form a group for phase 5 buyers and file a complain to TTPR regards this matter...
TSsnake4168
post Oct 6 2012, 10:47 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
If we don't sign the letter then we cannot get the key lor? Then what should we do leh?

Anyone who had contact of existing RA? Can we ask them for help?
edwinlcw
post Oct 17 2012, 10:12 AM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


is all the phase 3a owner happy with the house condition??? why no one update?
james3674
post Oct 17 2012, 05:51 PM

New Member
*
Junior Member
13 posts

Joined: Nov 2008
QUOTE(edwinlcw @ Oct 17 2012, 10:12 AM)
is all the phase 3a owner happy with the house condition??? why no one update?
*
Last week my house already start for defect repairing. I heard from contractor who doing defect that the developer was not paid them on schedule. They will plan to terminate the contract soon if still not receive the payment. Guess that the defect repairing process will stop and delay. Some more heard that the Indonesian and cleaner worker for doing defect also no paid the salary on time.

Phase 3A owner, May i know anybody are still chase the developer to refund back their late interest charge? You all got inquiry them about when they will pay back phase 3A owner the late property delivery interest charge?
Suntharlal
post Nov 9 2012, 04:39 PM

New Member
*
Junior Member
12 posts

Joined: Nov 2011


I'm trying to contact Acmar office for the past few days, they are not answering any call when i called 03-3343 8888
Phase 3A owners anyone have update on when the developer will pay the late delivery charges?
Also please provide me the contact number of personnel to check further on this, thanks
Almondbox
post Nov 13 2012, 05:10 PM

New Member
*
Junior Member
9 posts

Joined: May 2012
Phase 3A owner,Does anyone's face roof leaking or water tank leaking at the 2nd floor bedroom?i can see some water stain on top of the ceiling.how to ask them to check?
TSsnake4168
post Nov 14 2012, 09:36 AM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
I think they should have some document or form to be filled and pass back to them?!

This post has been edited by snake4168: Nov 14 2012, 09:36 AM
tehaikseong
post Nov 22 2012, 11:17 AM

New Member
*
Junior Member
25 posts

Joined: Jun 2007
From: Puchong


House owner for Phase 3A, to inform that the site office is on fire few week ago. All the defect check list and key which given to them for repairing, all burn out.

This post has been edited by tehaikseong: Nov 22 2012, 11:19 AM
TSsnake4168
post Nov 22 2012, 05:52 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
Huh?! homeowner revenge?
boxbox8855
post Nov 23 2012, 04:55 PM

New Member
*
Junior Member
9 posts

Joined: Nov 2012
hi guys.

I m one of the phase 3a owner. I submitted the defect lists the moment i received the key. Basically the defects at that time is a very minor one but unfortunately after 3 months nothing much have been done. Then the rain came. Then my ceiling started to have a water mark all over the place especially at the master bedroom and family hall. Then i fould out that my bathroom floor is leaking. I can see a water mark at the living room's ceiling. vmad.gif vmad.gif vmad.gif

So this morning i submitted to them a new defect lists as a record. I saw that their site office was burn down. Should i said it serve them right? We should't kick a flat ball should we? But still i said it serve them right tongue.gif

I have no choice but to move in by the end of this month. Just pray that no rain is falling on my head.
LTSAudrey
post Nov 26 2012, 10:13 AM

New Member
*
Junior Member
28 posts

Joined: Apr 2012
QUOTE(boxbox8855 @ Nov 23 2012, 04:55 PM)
hi guys.

I m one of the phase 3a owner. I submitted the defect lists the moment i received the key. Basically the defects at that time is a very minor one but unfortunately after 3 months nothing much have been done. Then the rain came. Then my ceiling started to have a water mark all over the place especially at the master bedroom and family hall. Then i fould out that my bathroom floor is leaking. I can see a water mark at the living room's ceiling.  vmad.gif  vmad.gif  vmad.gif

So this morning i submitted to them a new defect lists as a record. I saw that their site office was burn down. Should i said it serve them right? We should't kick a flat ball should we? But still i said it serve them right tongue.gif

I have no choice but to move in by the end of this month. Just pray that no rain is falling on my head.
*
At least it happen after 3 months, our house have the exact same problem like yours after one year we move, it leave such a big ugly stain on our living room's ceiling. And also the water leak through our main switch power. We just got it fix recently, trust me, so much of hacking and work to be down.


Suntharlal
post Nov 26 2012, 05:08 PM

New Member
*
Junior Member
12 posts

Joined: Nov 2011


Things are far better now rclxms.gif

This post has been edited by Suntharlal: Sep 5 2018, 01:53 AM
boxbox8855
post Nov 26 2012, 06:22 PM

New Member
*
Junior Member
9 posts

Joined: Nov 2012
Hi guys

Unfortunately i have to agree with Mr. Suntharlal. But in a not so strong words i would like to say that for a new house buyer please shop around before making a decision to buy a house at Putra Impiana. There are a lot of houses coming up from more reputable developers around our areas.

And as Audrey said, i do expect a mess at my master bedroom and bathroom in this coming week. They promise me they will rectify it within 1 week. I don't have a deep pocket so i hope they will keep their promise.

And yes, i have not talking about claiming an LAD yet. Arrgghh rclxub.gif rclxub.gif rclxub.gif !!!
Chris Chew
post Nov 26 2012, 07:01 PM

10k Club
********
Senior Member
10,387 posts

Joined: Dec 2011
Acmar!

Sigh.
tehaikseong
post Nov 27 2012, 02:38 PM

New Member
*
Junior Member
25 posts

Joined: Jun 2007
From: Puchong


Just to want to know, who from Phase 3A already agree and sign the term for LAD? Why should we accept the installment?
Suntharlal
post Nov 28 2012, 11:17 AM

New Member
*
Junior Member
12 posts

Joined: Nov 2011


QUOTE(tehaikseong @ Nov 27 2012, 02:38 PM)
Just to want to know, who from Phase 3A already agree and sign the term for LAD? Why should we accept the installment?
*
You need to consult with your lawyer for a advice, normally even if we bring this case to Tribunal they will still allow Developer to pay in installment from 3-5 months.
I havent sign the letter yet, developer going to prepare the letter soon.

If you get to know any more information just let us know, thanks
LTSAudrey
post Nov 29 2012, 09:42 AM

New Member
*
Junior Member
28 posts

Joined: Apr 2012
QUOTE(boxbox8855 @ Nov 26 2012, 06:22 PM)
Hi guys

Unfortunately i have to agree with Mr. Suntharlal. But in a not so strong words i would like to say that for a new house buyer please shop around before making a decision to buy a house at Putra Impiana. There are a lot of houses coming up from more reputable developers around our areas.

And as Audrey said, i do expect a mess at my master bedroom and bathroom in this coming week. They promise me they will rectify it within 1 week. I don't have a deep pocket so i hope they will keep their promise.

And yes, i have not talking about claiming an LAD yet. Arrgghh  rclxub.gif  rclxub.gif  rclxub.gif !!!
*
Do let me know if you need me to recommend my own contractor to you. My contractor wont charge you too high and is reasonable and also reliable. So far after he repair anything in my house, I have no complain. Trust me, it will incurred a lot of $$$$$$ to repair the toilet leakage.
SKfolk
post Nov 29 2012, 10:31 PM

Enthusiast
*****
Senior Member
928 posts

Joined: Mar 2012
QUOTE(Suntharlal @ Nov 26 2012, 05:08 PM)
mad.gif  vmad.gif  mad.gif
FOR ALL THE PROSPECT BUYER OF TAMAN PUTRA IMPIANA, I AS OWNER OF PHASE 3A WOULD LIKE ADVICE YOU PLEASE LOOK FOR OTHER PROJECT/DEVELOPER

DONT GET CHEATED WITH SAMPLE HOUSE!!!

THE QUALITY OF THE HOUSE IS LIKE A SHIT SERVED ON SILVER PLATE!!!

THE DEVELOPER DONT EVEN HAVE A MONEY TO PAY LAD, THEY HAVE DECIDED TO PAY THE LAD WITH 5 MONTH INSTALLMENT JUST TO SETTLE MYR5XXX

JUST IMAGINE THEIR CONDITION, EVEN TO REPAIR THE DEFECT OF THE HOUSE TAKING FEW MONTHS AND YOU WILL GET ALL KIND OF REASONS ON THEIR DELAY

HONESTLY...I WILL REQUEST THE NEW BUYER TO THINK TWICE AND MAKE A WISE DECISION

THEY ARE NOT BOTHERING ABOUT THE TRIBUNAL OR COURT, CAUSE THEY KNOW THE FACT THEY CAN GET THE FAVOUR ON THEIR SIDE

WATCH OUT!!!!!! vmad.gif  mad.gif  vmad.gif

[COLOR=red][SIZE=14][FONT=Impact]
*
Are they a reputable developer?
Suntharlal
post Dec 4 2012, 10:21 AM

New Member
*
Junior Member
12 posts

Joined: Nov 2011


QUOTE(SKfolk @ Nov 29 2012, 10:31 PM)
Are they a reputable developer?
*
Not at all, the defect percentage is one of the prove. I visited one of my neighbour house yesterday and got shocked to see the defect list in his house. I thought my one was worse until i see his house.

They will show the perfect house only for the show unit..dont expect the house to be same quality, expect delay in completing the house, expect delay in LAD payment, expect delay in repairing defect, expect bad security for your housing area, expect bad quality of environment (recreation)

WORSE DEVELOPER!!! EVEN THOUGH I'M BUYER I WILL ADVICE DONT DEAL WITH THEM AS I HAVE NO MUCH OPTION TO SELL THE HOUSE AS THIS IS MY 1ST HOUSE



boxbox8855
post Dec 4 2012, 11:08 AM

New Member
*
Junior Member
9 posts

Joined: Nov 2012
QUOTE(LTSAudrey @ Nov 29 2012, 09:42 AM)
Do let me know if you need me to recommend my own contractor to you. My contractor wont charge you too high and is reasonable and also reliable. So far after he repair anything in my house, I have no complain. Trust me, it will incurred a lot of $$$$$$ to repair the toilet leakage.
*
Tqvm Audrey.

But since their DLP is not over yet i"ll let them do their work first. If they can't do their job then i"ll do it myself and send the bill to them later.

TQ.
Angry Owner 5
post Dec 5 2012, 12:21 AM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(boxbox8855 @ Dec 4 2012, 11:08 AM)
Tqvm Audrey.

But since their DLP is not over yet i"ll let them do their work first. If they can't do their job then i"ll do it myself and send the bill to them later.

TQ.
*
hopefully phase 5 and phase 6 wont be that bad la....phase 6 is consider luxury type...buyer all loaded ppl, if they delivered a cock up house, think those loaded guys wont simply let they go just like that...
mineSweeper
post Dec 6 2012, 12:35 AM

Getting Started
**
Junior Member
171 posts

Joined: Mar 2006

so what's the unifi person doing near entrance? this taman looks set and ready.

boxbox8855
post Dec 6 2012, 04:54 PM

New Member
*
Junior Member
9 posts

Joined: Nov 2012
QUOTE(mineSweeper @ Dec 6 2012, 12:35 AM)
so what's the unifi person doing near entrance? this taman looks set and ready.
*
they told me that they are registering a new unifi user. they said that our taman will get unifi in 2 weeks time.
they said lar but when i check with TM they said that our taman will get the unifi at the end of January next year.

so lets see lah how.
mineSweeper
post Dec 6 2012, 07:52 PM

Getting Started
**
Junior Member
171 posts

Joined: Mar 2006

QUOTE(boxbox8855 @ Dec 6 2012, 04:54 PM)
they told me that they are registering a new unifi user. they said that our taman will get unifi in 2 weeks time.
they said lar but when i check with TM they said that our taman will get the unifi at the end of January next year.

so lets see lah how.
*
end of january doh.gif sweat.gif
lets see.

LTSAudrey
post Dec 7 2012, 10:19 AM

New Member
*
Junior Member
28 posts

Joined: Apr 2012
QUOTE(boxbox8855 @ Dec 4 2012, 11:08 AM)
Tqvm Audrey.

But since their DLP is not over yet i"ll let them do their work first. If they can't do their job then i"ll do it myself and send the bill to them later.

TQ.
*
ok
yunalesca
post Dec 10 2012, 10:44 PM

On my way
****
Senior Member
695 posts

Joined: Jan 2005
Putra Homes 6

2 1/2 storey terrace 20 x 70
Build up : 3219 sqft (corner), 2629 sqft (intermediate)
24 hours round the clock security
leasehold 99 years (expire 23/10/2104)
rebate 8%
price (before rebate): rm 888666 - rm 1470221

Attached Image Attached Image Attached Image Attached Image Attached Image
yunalesca
post Dec 10 2012, 10:46 PM

On my way
****
Senior Member
695 posts

Joined: Jan 2005
Attached Image Attached Image Attached Image Attached Image Attached Image
yunalesca
post Dec 10 2012, 10:47 PM

On my way
****
Senior Member
695 posts

Joined: Jan 2005
Attached Image Attached Image Attached Image Attached Image Attached Image
yunalesca
post Dec 10 2012, 10:49 PM

On my way
****
Senior Member
695 posts

Joined: Jan 2005
Attached Image Attached Image Attached Image Attached Image Attached Image
yunalesca
post Dec 10 2012, 10:51 PM

On my way
****
Senior Member
695 posts

Joined: Jan 2005
Attached Image Attached Image Attached Image
Angry Owner 5
post Dec 12 2012, 12:03 AM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(yunalesca @ Dec 10 2012, 10:51 PM)
Attached Image Attached Image Attached Image
*
this page ppl talk bad about acmar, u dare to post phase 6 here? phase 4 and even phase 5 the workmanship really like shit, wall senget like hell, u can see from the floor skirting, ppl are losing confident towards acmar,....

This post has been edited by Angry Owner 5: Dec 13 2012, 11:01 PM
Chris Chew
post Dec 12 2012, 12:07 AM

10k Club
********
Senior Member
10,387 posts

Joined: Dec 2011
QUOTE(Angry Owner 5 @ Dec 12 2012, 12:03 AM)
this page ppl talk bad about acmar, u dare to post phase 6 here? phase 4 and even phase 5 the workmanship really like shit, wall senget like hell, u can see from the floor skirting, ppl are loading confident towards acmar,....
*
Too bad ...

Actually, I had been know this Actmar had been so bad since few years ago. Most Klang people really annoyed with them and would tell every relatives, friends and neighbours not to buy anything from Actmar ...

In fact, most banks and contractors / associates ban them as well ...



edwinlcw
post Dec 14 2012, 04:24 PM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


recently i go view phase 5 houses... as i'm one of the buyer.. the workmanship really bad...
really regretted.. this is my 1st property.. and it ended up with a bad experience...
fhwong30
post Dec 14 2012, 07:02 PM

New Member
*
Newbie
4 posts

Joined: Dec 2012


frankly speaking, buying from this developer is like buying proton car. definately will find many lemon here n there. This developer has same reputation, so dont expect high 'quality'.

But reputable developer or not, nowdays everywhere also the same. U go other developer projects, they too have their own issues. As long as your house doesnt leak, crack, flood, or worse, abandoned like the klang ones, count your blessing. This is unfortunately the reality.

Press the project ppl hard to fix any defects. It is their job and responsibility.

And never regret your decision. It may not be a good one but certainly not the worst. Impiana has a good location, and you cant easily find one in puchong with the same specifications at the same price.

Angry Owner 5
post Dec 16 2012, 11:30 PM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(fhwong30 @ Dec 14 2012, 07:02 PM)
frankly speaking, buying from this developer is like buying proton car. definately will find many lemon here n there. This developer has same reputation, so dont expect high 'quality'.

But reputable developer or not, nowdays everywhere also the same. U go other developer projects, they too have their own issues. As long as your house doesnt leak, crack, flood, or worse, abandoned like the klang ones, count your blessing. This is unfortunately the reality.

Press the project ppl hard to fix any defects. It is their job and responsibility.

And never regret your decision. It may not be a good one but certainly not the worst. Impiana has a good location, and you cant easily find one in puchong with the same specifications at the same price.
*
did u own a unit @ impiana too?
fhwong30
post Dec 17 2012, 09:53 AM

New Member
*
Newbie
4 posts

Joined: Dec 2012


yes... 3a. but subsales.
TSsnake4168
post Dec 17 2012, 12:00 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
Phase 5 near to end finishing. Thanks god they didn't abandon this phase.
I also find some defect here and there but just a minor one. Hope fully no new defect after move in future time.
edwinlcw
post Dec 17 2012, 12:09 PM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


QUOTE(snake4168 @ Dec 17 2012, 12:00 PM)
Phase 5 near to end finishing. Thanks god they didn't abandon this phase.
I also find some defect here and there but just a minor one. Hope fully no new defect after move in future time.
*
yes.. they didn't touch up the crack at the wall where the pillar is... i could see it in my house... will ask them to touch it up when got the key...
Angry Owner 5
post Dec 17 2012, 10:45 PM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(edwinlcw @ Dec 17 2012, 12:09 PM)
yes.. they didn't touch up the crack at the wall where the pillar is... i could see it in my house... will ask them to touch it up when got the key...
*
but in SnP it stated first floor fitted with percelain tiles, but in actual it is with ceramic tiles, how do we claim on this? and also, in future, anyone interested to set up a RA to take care of our community?

the current security is not function at all.
TSsnake4168
post Dec 18 2012, 11:12 AM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
They already have RA.

Now the security provided by developer. Maybe their contract not yet expired.

We shall get more information from RA..
fhwong30
post Dec 18 2012, 11:26 AM

New Member
*
Newbie
4 posts

Joined: Dec 2012


Agreed. RA is badly needed, current security is laughable for a taman this size. but heard that developer will construct brick fence (same to current brick fence) to enclave the whole taman c/w new guard house once phase 5 and 6 completed. Then we can have something like next door Meranti Jaya security, quite impressive. But that maybe another 3 or 4 years down the road.
Angry Owner 5
post Dec 20 2012, 12:54 AM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(fhwong30 @ Dec 18 2012, 11:26 AM)
Agreed. RA is badly needed, current security is laughable for a taman this size. but heard that developer will construct brick fence (same to current brick fence) to enclave the whole taman c/w new guard house once phase 5 and 6 completed. Then we can have something like next door Meranti Jaya security, quite impressive. But that maybe another 3 or 4 years down the road.
*
if depends on this developer, then maybe no hope. they like to talk for 'song'
fhwong30
post Dec 20 2012, 12:55 PM

New Member
*
Newbie
4 posts

Joined: Dec 2012


This is where RA comes in. It needs to stand and voice up for the residents. Afterall, RA is THE residents.

If RA is inactive, then there is really no hope.


Added on December 27, 2012, 6:06 pmacmar website got putra homes 7 already. 2 1/2 storey size 40x80. this one is where? i tot phase 6 is last phase cause really no more land already? isnt the empty land beside meranti factory belongs to meranti?

putra impiana seems very aggresive nowdays. phase 5 finishing and phase 6 piling already started. dont think they will abandon our taman.... good, at least we will have high class residential area within.

This post has been edited by fhwong30: Dec 27 2012, 06:06 PM
Angry Owner 5
post Dec 28 2012, 12:33 AM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(fhwong30 @ Dec 20 2012, 12:55 PM)
This is where RA comes in. It needs to stand and voice up for the residents. Afterall, RA is THE residents.

If RA is inactive, then there is really no hope.


Added on December 27, 2012, 6:06 pmacmar website got putra homes 7 already. 2 1/2 storey size 40x80. this one is where? i tot phase 6 is last phase cause really no more land already? isnt the empty land beside meranti factory belongs to meranti?

putra impiana seems very aggresive nowdays. phase 5 finishing and phase 6 piling already started. dont think they will abandon our taman.... good, at least we will have high class residential area within.
*
phase 7 is the empty opp. near to the lake / pylon.
TSsnake4168
post Dec 31 2012, 01:14 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
Anyone know who is the RA committee?? Maybe can ask them to create a post and update anything about our Taman?!

boxbox8855
post Dec 31 2012, 03:21 PM

New Member
*
Junior Member
9 posts

Joined: Nov 2012
QUOTE(snake4168 @ Dec 31 2012, 01:14 PM)
Anyone know who is the RA committee?? Maybe can ask them to create a post and update anything about our Taman?!
*
Hi Guys

If i m not mistaken in the earlier treads there is a discussion about RA and they did held an election for RA committee and so on. this is
before phase 3A is completed.

Need to track back.
tang1980
post Jan 4 2013, 01:59 PM

New Member
*
Junior Member
12 posts

Joined: Dec 2011


Good News!!
Just received call from TM, the unifi at Taman Putra Impiana is ready, they can come to install it anytime!
zomba
post Jan 8 2013, 01:22 AM

New Member
*
Junior Member
21 posts

Joined: Aug 2012
Guys - The house in phase 5 are purchased with a high price RM450K to RM680K and we all do expect good workmanship, good landscape and good guard house.

Can we all bring this up to acmar so that they can provide good landscape around our houses? At least our house will look more exclusive. I have the head of the project telephone number in which you can make suggestion to make our Taman look good as corresponding with the price purchased.

Site Manager - Kevin (016 661 1529)
Angry Owner 5
post Jan 9 2013, 12:13 AM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(zomba @ Jan 8 2013, 01:22 AM)
Guys - The house in phase 5 are purchased with a high price RM450K to RM680K and we all do expect good workmanship, good landscape and good guard house.

Can we all bring this up to acmar so that they can provide good landscape around our houses? At least our house will look more exclusive. I have the head of the project telephone number in which you can make suggestion to make our Taman look good as corresponding with the price purchased.

Site Manager - Kevin (016 661 1529)
*
when look at the phase 5 workmanship already damn 'dulan', like low cost flat finishing.....Fxxx them
zomba
post Jan 9 2013, 12:54 AM

New Member
*
Junior Member
21 posts

Joined: Aug 2012
I feel regret for not buying at Sierra 16, near to Puchong Gateway there. Same price but beautiful scenery and workmanship. WTF!! mad.gif vmad.gif

This post has been edited by zomba: Jan 9 2013, 12:55 AM
TSsnake4168
post Jan 9 2013, 10:09 AM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
QUOTE(zomba @ Jan 9 2013, 12:54 AM)
I feel regret for not buying at Sierra 16, near to Puchong Gateway there. Same price but beautiful scenery and workmanship. WTF!!  mad.gif  vmad.gif
*
But I know it cost much more for Sierra 16, is it? The Townhouse when they launch already RM400k
Angry Owner 5
post Jan 9 2013, 09:22 PM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(snake4168 @ Jan 9 2013, 10:09 AM)
But I know it cost much more for Sierra 16, is it? The Townhouse when they launch already RM400k
*
16 sierra only 500k during launch, now of course cost more, it is subsales now...500k to get the workmanship and environment ,,,,worth it...
not expecting the acmar quality was so fuxking bad....
zomba
post Jan 10 2013, 01:49 AM

New Member
*
Junior Member
21 posts

Joined: Aug 2012
Sierra 16 i mean not the town house...the terrest house. Last time i went they to see its about 499K for intermidiate. But the scenery and landscape was good.

I dont mind buying 500K or 600K house but please build the house at that quality.

The higher price purchased the higher expectation we have!!!! mad.gif mad.gif

This post has been edited by zomba: Jan 10 2013, 01:51 AM
zomba
post Jan 10 2013, 02:21 AM

New Member
*
Junior Member
21 posts

Joined: Aug 2012
TO --> USAHASAMA UTAMA SDN.BHD or ACMAR,

If you are seeing this post, please make sure the houses in PUTRA IMPIANA Phase 5 and the surroundings looks like RM400k above quality houses and not like RM200k quality!!!

If not we all will log a complaint to the Ministry of Housing Affairs or Medias to have your company to be Black Listed for ever and ever
.
mad.gif mad.gif mad.gif mad.gif mad.gif mad.gif mad.gif


http://www.kpkt.gov.my/kpkt_bi/

http://ehome.kpkt.gov.my/aduan-online/entr...anperumahan.cfm
edwinlcw
post Jan 10 2013, 12:26 PM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


what's the progress now at phase 5??
last i visit was they are still doing the road there...
TSsnake4168
post Jan 10 2013, 03:42 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
QUOTE(edwinlcw @ Jan 10 2013, 12:26 PM)
what's the progress now at phase 5??
last i visit was they are still doing the road there...
*
Almost done and I had just paid RM420 to them for Syabas & TNB deposit account.

Maybe can collect key within 2 month from now.
edwinlcw
post Jan 10 2013, 03:55 PM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


QUOTE(snake4168 @ Jan 10 2013, 03:42 PM)
Almost done and I had just paid RM420 to them for Syabas & TNB deposit account.

Maybe can collect key within 2 month from now.
*
is it???
i still not receive any call to ask for the rm420 deposit for syabas and tnb.... hmm.gif
btw.. what's your house no?? tongue.gif

This post has been edited by edwinlcw: Jan 10 2013, 03:56 PM
Crystal2
post Jan 10 2013, 04:04 PM

Casual
***
Junior Member
450 posts

Joined: Mar 2011
QUOTE(zomba @ Jan 10 2013, 02:21 AM)
TO  -->  USAHASAMA UTAMA SDN.BHD or ACMAR,

If you are seeing this post, please make sure the houses in PUTRA IMPIANA Phase 5 and the surroundings looks like RM400k above quality houses and not like RM200k quality!!!

If not we all will log a complaint to the Ministry of Housing Affairs or Medias to have your company to be Black Listed for ever and ever
.
  mad.gif  mad.gif  mad.gif  mad.gif  mad.gif  mad.gif  mad.gif 
http://www.kpkt.gov.my/kpkt_bi/

http://ehome.kpkt.gov.my/aduan-online/entr...anperumahan.cfm
*
Do you think that Usahasama Utama and other Acmar group of companies are worried about your complaint? Think again.

Please count your blessings when they finally deliver your house. Other projects developed by them are not so lucky and some are still waiting after more than 12 years.

HaHaHa ....




edwinlcw
post Jan 10 2013, 04:15 PM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


QUOTE(Crystal2 @ Jan 10 2013, 04:04 PM)
Do you think that Usahasama Utama and other Acmar group of companies are worried about your complaint? Think again.

Please count your blessings when they finally deliver your house. Other projects developed by them are not so lucky and some are still waiting after more than 12 years. 

HaHaHa ....
*
agreed... as long as they can deliver the house to me... is enough.. dare not to expect more from them...
just look at their abandoned klang project... sweat.gif
littlebuddy
post Jan 10 2013, 05:11 PM

New Member
*
Junior Member
12 posts

Joined: Oct 2011


QUOTE(edwinlcw @ Jan 10 2013, 04:15 PM)
agreed... as long as they can deliver the house to me... is enough.. dare not to expect more from them...
just look at their abandoned klang project... sweat.gif
*
Yes. U r right. thumbup.gif count the blessing ! Very soon we will get the house. Thanks to all of u always provide us the information n update in this forum these two years rclxms.gif
edwinlcw
post Jan 10 2013, 05:37 PM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


this weekend might go to view the house again.. wink.gif
zomba
post Jan 10 2013, 06:58 PM

New Member
*
Junior Member
21 posts

Joined: Aug 2012
People always keep quiet and accept all conditions... thats why they dare to do that.

We are consumer and we have the rights to complaint. Remember this is not RM200k or rm300k house. Its half a million over price!!! So put your expectation big as the price is big!!

I would not have care if the house are purchased around RM200 or RM300K. And also i don't care if the surroundings is not good as the price we pay cheap. But this house is half a million guyssss.... think..think..and think....



Angry Owner 5
post Jan 10 2013, 10:47 PM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(zomba @ Jan 10 2013, 06:58 PM)
People always keep quiet and accept all conditions... thats why they dare to do that.

We are consumer and we have the rights to complaint. Remember this is not RM200k or rm300k house. Its half a million over price!!! So put your expectation big as the price is big!!

I would not have care if the house are purchased around RM200 or RM300K. And also i don't care if the surroundings is not good as the price we pay cheap. But this house is half a million guyssss.... think..think..and think....
*
yes agree, the thing i very dulan is in SPA, it says first floor with polish porcelain tiles but end up giving us cheap ceramic tiles, i am not going to sign the delivery when CF ready, i am going to bring this to the tribunal.....is like cheating...
Crystal2
post Jan 11 2013, 07:54 AM

Casual
***
Junior Member
450 posts

Joined: Mar 2011
QUOTE(zomba @ Jan 10 2013, 06:58 PM)
People always keep quiet and accept all conditions... thats why they dare to do that.

We are consumer and we have the rights to complaint. Remember this is not RM200k or rm300k house. Its half a million over price!!! So put your expectation big as the price is big!!

I would not have care if the house are purchased around RM200 or RM300K. And also i don't care if the surroundings is not good as the price we pay cheap. But this house is half a million guyssss.... think..think..and think....
*
Don't get me wrong. Your message on 10th Jan in this forum is asking (more like begging) the developer to build your house according to the RM400+K quality standard or else you will report to the relevant authorities.

My message to you is don't waste your time begging but go ahead and complain although your complaints will not affect them - they are hardcore delinquent.

You should just go ahead to complain to all relevant authorities and media as you have been shortchanged. In fact, if you have done your homework, you would not have bought anything developed by this Group or the Tee family. Good Luck.

This post has been edited by Crystal2: Jan 11 2013, 07:59 AM
zachozoi
post Jan 11 2013, 09:33 AM

u come at the king, u best not miss
*****
Senior Member
748 posts

Joined: Apr 2012
From: Planet Earth



QUOTE(zomba @ Jan 10 2013, 09:58 AM)
People always keep quiet and accept all conditions... thats why they dare to do that.

We are consumer and we have the rights to complaint. Remember this is not RM200k or rm300k house. Its half a million over price!!! So put your expectation big as the price is big!!

I would not have care if the house are purchased around RM200 or RM300K. And also i don't care if the surroundings is not good as the price we pay cheap. But this house is half a million guyssss.... think..think..and think....
*
ya..true tat bro...
Chris Chew
post Jan 11 2013, 09:48 AM

10k Club
********
Senior Member
10,387 posts

Joined: Dec 2011
QUOTE(Crystal2 @ Jan 11 2013, 07:54 AM)
Don't get me wrong. Your message on 10th Jan in this forum is asking (more like begging) the developer to build your house according to the RM400+K quality standard or else you will report to the relevant authorities.

My message to you is don't waste your time begging but go ahead and complain although your complaints will not affect them - they are hardcore delinquent.

You should just go ahead to complain to all relevant authorities and media as you have been shortchanged. In fact, if you have done your homework, you would not have bought anything developed by this Group or the Tee family. Good Luck.
*
He bought the house at RM 400+k and at this stage of developer under performing, he requested the developer to deliver it at RM 400+k, its fair and what's wrong with it? He not begging for RM 600+k quality... Or anything that I missed out?

But I have to agree that, if one who known to property development, he / she would not buying anything from this Acmar Group or Tee brothers or families. They had terrible record and names in Klang, not only properties but others as well.

Crystal2
post Jan 11 2013, 10:25 AM

Casual
***
Junior Member
450 posts

Joined: Mar 2011
QUOTE(Chris Chew @ Jan 11 2013, 09:48 AM)
He bought the house at RM 400+k and at this stage of developer under performing, he requested the developer to deliver it at RM 400+k, its fair and what's wrong with it? He not begging for RM 600+k quality... Or anything that I missed out?

But I have to agree that, if one who known to property development, he / she would not buying anything from this Acmar Group or Tee brothers or families. They had terrible record and names in Klang, not only properties but others as well.
*
It is a fair request but quite pointless to expect quality work from this Group. Please read the opening 5 words of Zomba's 2nd para "If not we all will ...". Frankly the developer will not be bothered with any threats. So my advice still stands - please lodge your report now (as your threat to report will not work) to all the relevant authorities and media.



zomba
post Jan 11 2013, 03:22 PM

New Member
*
Junior Member
21 posts

Joined: Aug 2012
QUOTE(Crystal2 @ Jan 11 2013, 10:25 AM)
It is a fair request but quite pointless to expect quality work from this Group. Please read the opening 5 words of Zomba's 2nd para "If not we all will ...". Frankly the developer will not be bothered with any threats. So my advice still stands - please lodge your report now (as your threat to report will not work) to all the relevant authorities and media.
*
Lets wait until all are completed and measure our house and surroundings appearance towards the 200K and 300k house just not far away from phase 5.
If we all knew Acmar is this type of developer we would not have came close to buy the house.

Anyway lets make things short if they deliver the house under a quality of450++k what is the next action you should take? I am asking Crystal2 to elaborate and share to us. Keeping quiet is not good enough.
edwinlcw
post Jan 11 2013, 03:33 PM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


QUOTE(zomba @ Jan 11 2013, 03:22 PM)
Lets wait until all are completed and measure our house and surroundings appearance towards the 200K and 300k house just not far away from phase 5.
If we all knew Acmar is this type of developer we would not have came close to buy the house.

Anyway lets make things short if they deliver the house under a quality of450++k what is the next action you should take? I am asking Crystal2 to elaborate and share to us. Keeping quiet is not good enough.
*
i think they will take sometime to make up the surrounding... since phase 6 still in progress and alot of trucks going in and out from there...
Crystal2
post Jan 11 2013, 06:42 PM

Casual
***
Junior Member
450 posts

Joined: Mar 2011
QUOTE(zomba @ Jan 11 2013, 03:22 PM)
Lets wait until all are completed and measure our house and surroundings appearance towards the 200K and 300k house just not far away from phase 5.
If we all knew Acmar is this type of developer we would not have came close to buy the house.

Anyway lets make things short if they deliver the house under a quality of450++k what is the next action you should take? I am asking Crystal2 to elaborate and share to us. Keeping quiet is not good enough.
*
You might want to refer to the developers blacklisted in the Ministry of Housing and Local Government website.

1] Blacklist of Developers with Sick Projects:
http://www.kpkt.gov.my/kpkt/fileupload/pem...T_31DIS2012.pdf

No: 123 Perspektif Masa Sdn Bhd
No: 127 PNSB Acmar Sdn Bhd
No: 178 Usahasama Utama Sdn Bhd

2] Blacklist of Developers who failed to pay compound fine
http://www.kpkt.gov.my/kpkt/fileupload/pem...n_31DIS2012.pdf

No: 349 Perspektif Masa Sdn Bhd

Then read up the 3-parts article on Amendment to Housing Development (Control and Licensing) Act 1966:
http://www.iproperty.com.my/news/tag/the-h...opment-act/4225

If you think you have a case, then lodge your complaints to the Tribunal for house buyers (there is a upper limit of RM50,000):

http://ehome.kpkt.gov.my/main.php?Content=...115&IID=&Page=1

If claim value exceeds RM50,000 you will need to file a civil suit through your lawyer.

Please refer to the following websites on their completed, current and stalled/delayed projects:

http://www.acmar.com/Kl%20Ampang.html
http://www.drapportvilla.com/index.html
http://www.acmar.com/Property%20Development.html
http://www.acmar.com/page1043.html

When they do finally deliver your house, it is the beginning of your other nightmares. Good Luck.

CAVEAT EMPTOR
Crystal2
post Jan 12 2013, 10:42 AM

Casual
***
Junior Member
450 posts

Joined: Mar 2011
QUOTE(zomba @ Jan 11 2013, 03:22 PM)
Lets wait ....

.... I am asking Crystal2 to elaborate and share to us. Keeping quiet is not good enough.
*
Who do you blame if you paid the down-payment and signed the Sales & Purchase Agreement without doing enough background check on what you are buying into?

Who do you blame if you never check the reputation of the developer or the persons behind the developer company?

Who do you blame if you are seduced by beautiful brochures?

Who do you blame if you never check the end products (example Phases 1 – 4) before buying?

Who do you blame if you never check out the location (which is former mining land and near pylons)?

Who do you blame if you are inexperience but never (or too proud to) consult others before buying?

Who do you blame if you leap before you look?

Who do you blame if you just complain in this forum instead of going to the authorities?

Who do you blame if, after graduating, you still expect others to spoon feed you with information (just like when you were still in the varsity)?

Who do you blame if you are slow in exercising (or never exercise) your rights as a buyer/consumer?

Who do you blame if you ignore the mantra for buying property, i.e. Location, Location, & Location?

Who do you blame if you just sit there looking pretty and expect others to do the homework for you?

Who do you blame if you ignore the century old advice in Latin “Caveat Emptor” (Let the Buyer Beware)?

Answer:
ONLY YOU YOURSELF TO BLAME!!

vsk
post Jan 12 2013, 09:31 PM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
Build up phase 5 Difference Main Cond
Phase 5 hand work can accept lol
Phase 5 Owner Need to Claim Back From Vendor
Re:SPA Ground floor room & First floor Pocerlain Tiles Change to Ceramic Tiles.

If vendor dont agree paid back to us , set up committee bring this case to putrajaya .

Calculations Quotation Min Need 10k~12k to re change back
Pocerlain Tiles

This post has been edited by vsk: Jan 13 2013, 07:49 PM
Angry Owner 5
post Jan 12 2013, 10:41 PM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(Crystal2 @ Jan 12 2013, 10:42 AM)
Who do you blame if you paid the down-payment and signed the Sales & Purchase Agreement without doing enough background check on what you are buying into?

Who do you blame if you never check the reputation of the developer or the persons behind the developer company?

Who do you blame if you are seduced by beautiful brochures?

Who do you blame if you never check the end products (example Phases 1 – 4) before buying?

Who do you blame if you never check out the location (which is former mining land and near pylons)?

Who do you blame if you are inexperience but never (or too proud to) consult others before buying?

Who do you blame if you leap before you look?

Who do you blame if you just complain in this forum instead of going to the authorities?

Who do you blame if, after graduating, you still expect others to spoon feed you with information (just like when you were still in the varsity)?

Who do you blame if you are slow in exercising (or never exercise) your rights as a buyer/consumer?

Who do you blame if you ignore the mantra for buying property, i.e. Location, Location, & Location?

Who do you blame if you just sit there looking pretty and expect others to do the homework for you?

Who do you blame if you ignore the century old advice in Latin “Caveat Emptor” (Let the Buyer Beware)?

Answer:
ONLY YOU YOURSELF TO BLAME!!
*
enough crap la, what cock u r talking, damage is done, now is the remedy time, ppl ask u question and u answer dono what crap....pls stop commenting, u r making ppl sick...!
Angry Owner 5
post Jan 12 2013, 10:42 PM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(vsk @ Jan 12 2013, 09:31 PM)
Difference Main Cond Difference Hand Work
Phase 5 Satisfied
Phase 5 Owner Need to Claim Back From Vendor
Re: Pocerlain Tiles Change to Ceramic Tiles.
*
?? what talking u?
TSsnake4168
post Jan 12 2013, 10:49 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
QUOTE(Crystal2 @ Jan 12 2013, 10:42 AM)
Who do you blame if you paid the down-payment and signed the Sales & Purchase Agreement without doing enough background check on what you are buying into?

Who do you blame if you never check the reputation of the developer or the persons behind the developer company?

Who do you blame if you are seduced by beautiful brochures?

Who do you blame if you never check the end products (example Phases 1 – 4) before buying?

Who do you blame if you never check out the location (which is former mining land and near pylons)?

Who do you blame if you are inexperience but never (or too proud to) consult others before buying?

Who do you blame if you leap before you look?

Who do you blame if you just complain in this forum instead of going to the authorities?

Who do you blame if, after graduating, you still expect others to spoon feed you with information (just like when you were still in the varsity)?

Who do you blame if you are slow in exercising (or never exercise) your rights as a buyer/consumer?

Who do you blame if you ignore the mantra for buying property, i.e. Location, Location, & Location?

Who do you blame if you just sit there looking pretty and expect others to do the homework for you?

Who do you blame if you ignore the century old advice in Latin “Caveat Emptor” (Let the Buyer Beware)?

Answer:
ONLY YOU YOURSELF TO BLAME!!
*
Hi Crystal,

Yes, most of us are first time home buyer and try to find a good house.

But does it mean they can cheat us like that?

I hope we are here to provide a healthy communication, help people to understand and also give them a good information so we know what is the next step to do when facing a problem from buying Tmn Putra Impiana house.

biggrin.gif biggrin.gif cheers

TSsnake4168
post Jan 12 2013, 11:01 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
Phase 1-2 should be good because no one willing to sell when I try to search for sub sales house before I decided to buy phase 5.

That time Phase 3A just left corner house.

This post has been edited by snake4168: Jan 12 2013, 11:01 PM
vsk
post Jan 13 2013, 05:52 PM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
QUOTE(Angry Owner 5 @ Jan 12 2013, 10:42 PM)
?? what talking u?
*
phase 1.2.3&3A hand work like shit, phase 5 aready can accept


no ppl force you to purchase this house , why you so
angry .


Request 100% condition good , buy land to build up self

This post has been edited by vsk: Jan 13 2013, 06:38 PM
LTSAudrey
post Jan 14 2013, 11:47 AM

New Member
*
Junior Member
28 posts

Joined: Apr 2012
QUOTE(Crystal2 @ Jan 12 2013, 10:42 AM)
Who do you blame if you paid the down-payment and signed the Sales & Purchase Agreement without doing enough background check on what you are buying into?

Who do you blame if you never check the reputation of the developer or the persons behind the developer company?

Who do you blame if you are seduced by beautiful brochures?

Who do you blame if you never check the end products (example Phases 1 – 4) before buying?

Who do you blame if you never check out the location (which is former mining land and near pylons)?

Who do you blame if you are inexperience but never (or too proud to) consult others before buying?

Who do you blame if you leap before you look?

Who do you blame if you just complain in this forum instead of going to the authorities?

Who do you blame if, after graduating, you still expect others to spoon feed you with information (just like when you were still in the varsity)?

Who do you blame if you are slow in exercising (or never exercise) your rights as a buyer/consumer?

Who do you blame if you ignore the mantra for buying property, i.e. Location, Location, & Location?

Who do you blame if you just sit there looking pretty and expect others to do the homework for you?

Who do you blame if you ignore the century old advice in Latin “Caveat Emptor” (Let the Buyer Beware)?

Answer:
ONLY YOU YOURSELF TO BLAME!!
*
Very well said
AMINT
post Jan 14 2013, 12:12 PM

Look at all my stars!!
*******
Senior Member
7,446 posts

Joined: Sep 2008
QUOTE(Crystal2 @ Jan 12 2013, 10:42 AM)
Who do you blame if you paid the down-payment and signed the Sales & Purchase Agreement without doing enough background check on what you are buying into?

Who do you blame if you never check the reputation of the developer or the persons behind the developer company?

Who do you blame if you are seduced by beautiful brochures?

Who do you blame if you never check the end products (example Phases 1 – 4) before buying?

Who do you blame if you never check out the location (which is former mining land and near pylons)?

Who do you blame if you are inexperience but never (or too proud to) consult others before buying?

Who do you blame if you leap before you look?

Who do you blame if you just complain in this forum instead of going to the authorities?

Who do you blame if, after graduating, you still expect others to spoon feed you with information (just like when you were still in the varsity)?

Who do you blame if you are slow in exercising (or never exercise) your rights as a buyer/consumer?

Who do you blame if you ignore the mantra for buying property, i.e. Location, Location, & Location?

Who do you blame if you just sit there looking pretty and expect others to do the homework for you?

Who do you blame if you ignore the century old advice in Latin “Caveat Emptor” (Let the Buyer Beware)?

Answer:
ONLY YOU YOURSELF TO BLAME!!


Holy shit!
*
Angry Owner 5
post Jan 14 2013, 11:01 PM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(vsk @ Jan 13 2013, 05:52 PM)
phase 1.2.3&3A hand work like shit, phase 5 aready can accept
no ppl force you to purchase this house , why you so
angry .
Request 100% condition good , buy land to build up self
*
bro, relax, 'what talking you' is not a cursing, is a kind of kampung boy saying ' sorry, i dint get u'....cos earlier u put up a few words, so i direct translate from canto ' nei kong mat yeh'.....cool man cool.....
Angry Owner 5
post Jan 14 2013, 11:04 PM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(vsk @ Jan 12 2013, 09:31 PM)
Build up phase 5 Difference Main Cond
Phase 5 hand work can accept lol
Phase 5 Owner Need to Claim Back From Vendor
Re:SPA Ground floor room & First floor Pocerlain Tiles Change to Ceramic Tiles.

If vendor dont agree paid back to us , set up committee bring this case to putrajaya .

Calculations Quotation Min Need 10k~12k to re change back
Pocerlain Tiles
*
VSK, now i get u, after u write down in full sentence,,, smile.gif rclxms.gif
zomba
post Jan 15 2013, 12:59 AM

New Member
*
Junior Member
21 posts

Joined: Aug 2012
QUOTE(Crystal2 @ Jan 12 2013, 10:42 AM)
Who do you blame if you paid the down-payment and signed the Sales & Purchase Agreement without doing enough background check on what you are buying into?

Who do you blame if you never check the reputation of the developer or the persons behind the developer company?

Who do you blame if you are seduced by beautiful brochures?

Who do you blame if you never check the end products (example Phases 1 – 4) before buying?

Who do you blame if you never check out the location (which is former mining land and near pylons)?

Who do you blame if you are inexperience but never (or too proud to) consult others before buying?

Who do you blame if you leap before you look?

Who do you blame if you just complain in this forum instead of going to the authorities?

Who do you blame if, after graduating, you still expect others to spoon feed you with information (just like when you were still in the varsity)?

Who do you blame if you are slow in exercising (or never exercise) your rights as a buyer/consumer?

Who do you blame if you ignore the mantra for buying property, i.e. Location, Location, & Location?

Who do you blame if you just sit there looking pretty and expect others to do the homework for you?

Who do you blame if you ignore the century old advice in Latin “Caveat Emptor” (Let the Buyer Beware)?

Answer:
ONLY YOU YOURSELF TO BLAME!!
*
You must be one of the Acmar Staff. Yes we bought the house. But we do not know that we'll be cheated. So now we all are trying to find a way to get back the value of what we'd paid that's all. I believe, like your self also if you buy a flight ticket through an agency and paid thousands over ringgit for that flight ticket, at last they gave you a bus ticket. So how would you feel? Worst come to worst you still want to travel by the flight ticket that you had bought, if they said you cannot travel by flight fine ...return the balance of the amount that you had paid. As simple as that.

We are not finding fights here, we are trying to get back what we deserve. And the method hopefully will be discussed here. You may say those words up there, most probably you did not buy any of the houses there. That is my guess, or if you did you would not have sounded like the above.

Spending 500 over thousand ringgit is not a small amount of money unless you are very2 rich. Now we are spending 500 over thousand and we want 500 thousand quality houses. Simple, if the developer does not deliver up to that that quality they have to give the necessary refund, simple right?



Crystal2
post Jan 15 2013, 05:25 PM

Casual
***
Junior Member
450 posts

Joined: Mar 2011
QUOTE(Angry Owner 5 @ Jan 12 2013, 10:41 PM)
enough crap la, what cock u r talking, damage is done, now is the remedy time, ppl ask u question and u answer dono what crap....pls stop commenting, u r making ppl sick...!
*
In case you didn’t realise that I have answered, please read my earlier post #459. Whatever crap I wrote in post #460 I am glad I got your attention and hopefully the attention of all future buyers as well. Before you can solve a problem you must first acknowledge that there is a problem and that you are also contributory to the problem. The truth always hurts, especially so when you can’t blame anyone else for your (in a way, self inflicted wounds &) problems.

I will not stop commenting in this forum as long as I know there will be more gullible buyers (for phase 6) being enticed by their websites and beautiful brochures.

QUOTE(vsk @ Jan 12 2013, 09:31 PM)
... set up committee bring this case to putrajaya .
Calculations Quotation Min Need 10k~12k to re change back …
*
That is one good solution (i.e., initiating a Class Action or Representative Action), but it is tough and expensive. If you want faster resolution you should lodge your individual complaint directly to the Tribunal /Pemudah if your claim does not exceed RM50,000.

QUOTE(snake4168 @ Jan 12 2013, 10:49 PM)
…. But does it mean they can cheat us like that? …
*
Of course not. The developer must not try to short-change the buyers and neither should the buyers allow them to get away without paying for their folly. Frankly I think the Group has been getting away with lots of unfulfilled promises – see also their D’Rapport, BBK Business Park, Port Tech City projects. That is why I said earlier that you should consider yourself lucky if they finally deliver your house.

QUOTE(zomba @ Jan 15 2013, 12:59 AM)
You must be one of the Acmar Staff….

... most probably you did not buy any of the houses there ...

…. if the developer does not deliver up to that that quality they have to give the necessary refund, simple right?
*
Sorry to disappoint you - I am not one of Acmar Staff. If I were, I must be mad to crack my own rice-bowl.

I am just an investor and have been following this Group's development projects after I nearly bought one of their projects launched sometime in 2007/08 and till to date they have re-launched 2-3 times but still nothing comes up above ground level, except for the showroom and foundation pile-caps.

Yes, you are right that I didn't buy any in Taman Putra Impiana. I did go to the showhouse for Phase 3A or 5 (can't really remember which phase but it was in April 2010) and was very impressed by its built-up quality and design but luckily I was told by my friend that it is the same Acmar Group and then I remembered their other stalled projects in Klang and Kuala Lumpur.

I fully agreed with you that the developer has to deliver to the quality standards promised / shown in their show-house and failing which they have to reimburse the buyers if they can't or won't make good their promise.

This post has been edited by Crystal2: Jan 15 2013, 08:40 PM
Angry Owner 5
post Jan 15 2013, 10:52 PM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(Crystal2 @ Jan 15 2013, 05:25 PM)
In case you didn’t realise that I have answered, please read my earlier post #459. Whatever crap I wrote in post #460 I am glad I got your attention and hopefully the attention of all future buyers as well. Before you can solve a problem you must first acknowledge that there is a problem and that you are also contributory to the problem. The truth always hurts, especially so when you can’t blame anyone else for your (in a way, self inflicted wounds &) problems.

I will not stop commenting in this forum as long as I know there will be more gullible buyers (for phase 6) being enticed by their websites and beautiful brochures.
That is one good solution (i.e., initiating a Class Action or Representative Action), but it is tough and expensive. If you want faster resolution you should lodge your individual complaint directly to the Tribunal /Pemudah if your claim does not exceed RM50,000.
Of course not. The developer must not try to short-change the buyers and neither should the buyers allow them to get away without paying for their folly. Frankly I think the Group has been getting away with lots of unfulfilled promises – see also their D’Rapport, BBK Business Park, Port Tech City projects. That is why I said earlier that you should consider yourself lucky if they finally deliver your house. 
Sorry to disappoint you - I am not one of Acmar Staff. If I were, I must be mad to crack my own rice-bowl.

I am just an investor and have been following  this Group's development projects after I nearly bought one of their projects launched sometime in 2007/08 and till to date they have re-launched 2-3 times but still nothing comes up above ground level, except for the showroom and foundation pile-caps. 

Yes, you are right that I didn't buy any in Taman Putra Impiana. I did go to the showhouse for Phase 3A or 5 (can't really remember which phase but it was in April 2010) and was very impressed by its built-up quality and design but luckily I was told by my friend that it is the same Acmar Group and then I remembered their other stalled projects in Klang and Kuala Lumpur.

I fully agreed with you that the developer has to deliver to the quality standards promised / shown in their show-house and failing which they have to reimburse the buyers if they can't or won't make good their promise.
*
u see, apparently u r not welocme here and ppl dont like the way u approached issues, damage already done for phase 5 buyers....no need to tell so many grandmother story, ppl had bought the house, now is not the time for story telling. ppl need help here. and da, no need u tell here future buyer will definitely blacklist acmar when they come in this blog. Phase 5 almost complete, ppl r discussing how to minimize the damage. u dont jump in middle of no way and tell all ' who dont know mother is woman' bible....future buyer had get the message, ok? do u copy? do u acknowledge? do u get it?
Crystal2
post Jan 16 2013, 08:56 AM

Casual
***
Junior Member
450 posts

Joined: Mar 2011
QUOTE(Angry Owner 5 @ Jan 15 2013, 10:52 PM)
u see, apparently u r not welocme here and ppl dont like the way u approached issues, damage already done for phase 5 buyers....no need to tell so many grandmother story, ppl had bought the house, now is not the time for story telling. ppl need help here. and da, no need u tell here future buyer will definitely blacklist acmar when they come in this blog. Phase 5 almost complete, ppl r discussing how to minimize the damage. u dont jump in middle of no way and tell all ' who dont know mother is woman' bible....future buyer had get the message, ok? do u copy? do u acknowledge? do u get it?
*
This is a free country and I have as much right as you have to participate in this forum.

You would serve your community better if you could channel your anger and fiery energy to tackle the developer.

Don’t bark at the wrong tree and don’t let your anger blind you that you can’t strategise further to solving your problem. Throwing tantrums in this forum will not solve your problems. With more bad publicity their Phase 6 and subsequent phases will not sell and that may force the developer to improve and also keep their promises to the older phases. Ability to plan and strategise in this situation will ‘separate the men from the boys’.

For a start if it is not already done, why don’t you set up a Residents Association to pull all your Phase 1-5 buyers together?

This post has been edited by Crystal2: Jan 16 2013, 08:56 AM
TSsnake4168
post Jan 16 2013, 06:53 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
I believe the committee already been setup but they don't communicate in here. I think whoever already stay in the Taman, please help us to talk the RA how we can communicate more efficiently.

I prefer they use forum like this or setup Facebook group for residence discussion.
zomba
post Jan 16 2013, 08:47 PM

New Member
*
Junior Member
21 posts

Joined: Aug 2012
QUOTE(snake4168 @ Jan 16 2013, 06:53 PM)
I believe the committee already been setup but they don't communicate in here. I think whoever already stay in the Taman, please help us to talk the RA how we can communicate more efficiently.

I prefer they use forum like this or setup Facebook group for residence discussion.
*
snake4168
I believe the committee is for new phase which is phase 5.

I heard phase 5 will get their house keys by end of January 2013. Do anyone have any confirmation on this? Hopefully the guard house are built properly and well guarded as there are too many Indonesian around building phase 6. Too risky.

sweat.gif sweat.gif sweat.gif
Angry Owner 5
post Jan 16 2013, 10:31 PM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(Crystal2 @ Jan 16 2013, 08:56 AM)
This is a free country and I have as much right as you have to participate in this forum.

You would serve your community better if you could channel your anger and fiery energy to tackle the developer.

Don’t bark at the wrong tree and don’t let your anger blind you that you can’t strategise further to solving your problem. Throwing tantrums in this forum will not solve your problems. With more bad publicity their Phase 6 and subsequent phases will not sell and that may force the developer to improve and also keep their promises to the older phases. Ability to plan and strategise in this situation will ‘separate the men from the boys’.

For a start if it is not already done, why don’t you set up a Residents Association to pull all your Phase 1-5 buyers together?
*
i am ocean calm, calmer before u step in...
zomba
post Jan 16 2013, 11:09 PM

New Member
*
Junior Member
21 posts

Joined: Aug 2012
i was not calm when seeing the house start to be built on gray bricks instead of red.

I remember last time one housing under sunway near the sunway TOL the price was close to 500K per house. They built the house using red bricks. We can see from far the quality of the house being invested by the Developer.
edwinlcw
post Jan 17 2013, 09:01 AM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


QUOTE(zomba @ Jan 16 2013, 08:47 PM)
snake4168
I believe the committee is for new phase which is phase 5.

I heard phase 5 will get their house keys by end of January 2013. Do anyone have any confirmation on this? Hopefully the guard house are built properly and well guarded as there are too many Indonesian around building phase 6. Too risky.

sweat.gif  sweat.gif  sweat.gif
*
you sure end of January 2013?? now already mid January d... and the road inside phase still not yet complete.... sweat.gif
Crystal2
post Jan 17 2013, 10:31 AM

Casual
***
Junior Member
450 posts

Joined: Mar 2011
House buyers should band together in order to have more clout when dealing with developers and agencies.

Read this article by National House Buyers Association:
http://www.hba.org.my/articles/buyer_watch...uyers_unite.htm

How to form a legal Residents Association
(Information sourced from the Registrar of Societies website)

1) The founding meeting should be attended by at least seven members and their names have to be included in the meeting minutes.

2) The members have to:-

– agree on the formation of the association;

– agree on the name of association;

– decide on the association’s registered address;

– elect the sponsoring committee members to handle the registration for the association;

– approve the constitution and regulations of the association; and

– jot down the minutes of the meeting, including the motions above.

Societies Act 1966:
http://www.ros.gov.my/editor/files/File/do..._Pertubuhan.pdf

Sample Constitution of the Residents Association:
http://www.ros.gov.my/editor/files/File/Un...h%20Version.pdf

For more information on how to get a pro tem committee registered, call 03-8886 3295/ 603-8886 3296, visit www.ros.gov.my, or email jppm@ros.gov.my.

The ROS is located at Aras 2 & 5, Blok B, Bangunan Chancery Place, Jalan Diplomatik 2, Presint Diplmatic, 62546 Putrajaya.


zomba
post Jan 17 2013, 09:17 PM

New Member
*
Junior Member
21 posts

Joined: Aug 2012
QUOTE(edwinlcw @ Jan 17 2013, 09:01 AM)
you sure end of January 2013?? now already mid January d... and the road inside phase still not yet complete.... sweat.gif
*
I called them up. The manager was expecting the CF by end of January.
LTSAudrey
post Jan 18 2013, 10:04 AM

New Member
*
Junior Member
28 posts

Joined: Apr 2012
Just to inform all of putra impiana resident, please be very very careful with all the indon's workers. I just found out that the first house at Jalan putra impiana 6, was robbed a few weeks ago. Please be very careful.
Angry Owner 5
post Jan 20 2013, 02:51 PM

New Member
*
Junior Member
32 posts

Joined: Sep 2012


QUOTE(zomba @ Jan 17 2013, 09:17 PM)
I called them up. The manager was expecting the CF by end of January.
*
phase 5, are they going to enclose the perimeter? didnt see any wall or fencing setting up...
vsk
post Jan 20 2013, 08:31 PM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
Request Vendor Fair Pay to Purchaser.

Fast Take Action

Only Here Can Do it "TTPR" Attn Phase 5 Owner Don't Waste your
Time to Other Departments

TRIBUNAL TUNTUTAN PEMBELI RUMAH
Alamat:Ibu Pejabat TTPR Aras 3-4 No:51
Persiaran Perdana Presint, 4 62100 Putrajaya
Tel:03-88914758/4774/4746


This post has been edited by vsk: Jan 20 2013, 11:29 PM
zomba
post Jan 23 2013, 06:24 PM

New Member
*
Junior Member
21 posts

Joined: Aug 2012
QUOTE(vsk @ Jan 20 2013, 08:31 PM)
Request Vendor Fair Pay to Purchaser.
               
                  Fast Take Action
                         
        Only Here Can Do it  "TTPR"  Attn Phase 5 Owner Don't Waste your
        Time to Other Departments

TRIBUNAL TUNTUTAN PEMBELI RUMAH
Alamat:Ibu Pejabat TTPR Aras 3-4 No:51
Persiaran Perdana Presint, 4 62100 Putrajaya
Tel:03-88914758/4774/4746

*
GOOD INFO VSK . THANK YOU !!!! rclxms.gif rclxms.gif
vsk
post Jan 27 2013, 11:45 AM

Getting Started
**
Junior Member
57 posts

Joined: Oct 2011
May be Sucker vendor cut cost , without 5 feet high
Brick wall fencing and security house in phase 5 area

edwinlcw
post Jan 29 2013, 10:24 AM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


tnb and syabas meters installation is in progress now... should be ready soon...
yes... i did notice that there is no brick wall fencing and security house...
zomba
post Jan 31 2013, 12:50 AM

New Member
*
Junior Member
21 posts

Joined: Aug 2012
Lets propose guard house something like this (as attached picture) to Kevin the Big boss for the site.


Attached thumbnail(s)
Attached Image
zomba
post Jan 31 2013, 12:51 AM

New Member
*
Junior Member
21 posts

Joined: Aug 2012
Phase 5 serounding fencing ... as attached picture as an example

This post has been edited by zomba: Jan 31 2013, 12:54 AM


Attached thumbnail(s)
Attached Image
zomba
post Jan 31 2013, 12:54 AM

New Member
*
Junior Member
21 posts

Joined: Aug 2012
or guard house similar to this.


Attached thumbnail(s)
Attached Image
zomba
post Jan 31 2013, 01:06 AM

New Member
*
Junior Member
21 posts

Joined: Aug 2012
Side fencing around phase 5 attached picture just for an example. Anyone dare to suggest to the developer?


Attached thumbnail(s)
Attached Image
edwinlcw
post Jan 31 2013, 10:59 AM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


don't think the developer will care much on this if you proposed... sweat.gif
zomba
post Jan 31 2013, 01:53 PM

New Member
*
Junior Member
21 posts

Joined: Aug 2012
If all people make noise. Things will happen.
TSsnake4168
post Feb 1 2013, 09:51 AM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
They will not pay for extra cost..
edwinlcw
post Feb 6 2013, 10:16 AM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


gone to the site last weekend... still no sign of fencing wall... sweat.gif
i think the earliest to get the key would be around march/april...
trasher_zone
post Feb 15 2013, 09:02 AM

New Member
*
Junior Member
10 posts

Joined: Jan 2009


Hello guys ! Happy CNY & Holiday !


Sorry for taking very long time to be here and check this forum again. Our Residents Association is still there and progressing even it's a bit slow ( due to job/family commitment ) .

We will try our best to support and help each other in this residential area. The good news is, i managed to create forum and also fb group so that we can communicate better . rclxms.gif

Feel free to register and join our forum at :

www.tamanputraimpiana.com
fb : tamanputraimpiana
email : committee@tamanputraimpiana.com


Thanks all !
Secretary
Taman Putra Impiana RA

This post has been edited by trasher_zone: Feb 15 2013, 09:04 AM
boxbox8855
post Feb 15 2013, 02:10 PM

New Member
*
Junior Member
9 posts

Joined: Nov 2012
QUOTE(trasher_zone @ Feb 15 2013, 09:02 AM)
Hello guys ! Happy CNY & Holiday !
Sorry for taking very long time to be here and check this forum again. Our Residents Association is still there and progressing even it's a bit slow ( due to job/family commitment ) .

We will try our best to support and help each other in this residential area. The good news is, i managed to create forum and also fb group so that we can communicate better .    rclxms.gif

Feel free to register and join our forum at :

www.tamanputraimpiana.com
fb    : tamanputraimpiana
email : committee@tamanputraimpiana.com


Thanks all !
Secretary
Taman Putra Impiana RA
*
rclxms.gif rclxms.gif rclxms.gif rclxm9.gif rclxm9.gif
TSsnake4168
post Feb 16 2013, 03:01 PM

Getting Started
**
Junior Member
187 posts

Joined: Sep 2007
QUOTE(boxbox8855 @ Feb 15 2013, 02:10 PM)
rclxms.gif  rclxms.gif  rclxms.gif  rclxm9.gif  rclxm9.gif
*
Great! Now we can communicate directly to RA
edwinlcw
post Feb 18 2013, 12:09 PM

Regular
******
Senior Member
1,754 posts

Joined: Jan 2003
From: Puchong


QUOTE(trasher_zone @ Feb 15 2013, 09:02 AM)
Hello guys ! Happy CNY & Holiday !
Sorry for taking very long time to be here and check this forum again. Our Residents Association is still there and progressing even it's a bit slow ( due to job/family commitment ) .

We will try our best to support and help each other in this residential area. The good news is, i managed to create forum and also fb group so that we can communicate better .    rclxms.gif

Feel free to register and join our forum at :

www.tamanputraimpiana.com
fb    : tamanputraimpiana
email : committee@tamanputraimpiana.com


Thanks all !
Secretary
Taman Putra Impiana RA
*
great!!!! notworthy.gif
zomba
post Feb 25 2013, 09:42 AM

New Member
*
Junior Member
21 posts

Joined: Aug 2012
QUOTE(trasher_zone @ Feb 15 2013, 09:02 AM)
Hello guys ! Happy CNY & Holiday !
Sorry for taking very long time to be here and check this forum again. Our Residents Association is still there and progressing even it's a bit slow ( due to job/family commitment ) .

We will try our best to support and help each other in this residential area. The good news is, i managed to create forum and also fb group so that we can communicate better .    rclxms.gif

Feel free to register and join our forum at :

www.tamanputraimpiana.com
fb    : tamanputraimpiana
email : committee@tamanputraimpiana.com


Thanks all !
Secretary
Taman Putra Impiana RA
*
thumbup.gif rclxm9.gif rclxm9.gif rclxm9.gif rclxms.gif rclxms.gif thumbup.gif

Good Job!!! At least we have a proper forum community to secure up the neighborhood.