Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

Investment 3RDNVENUE @ EMBASSY ROW | NEU SUITES, China CREC JV Titijaya for RM2.1 billion

views
     
TSaccetera
post Jun 29 2015, 10:51 PM, updated 2y ago

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


Property news source: https://renthouz.my/news-hub.

Block A - 48 storeys (420 units)

Block B - 44 storeys (676 units)

Block C - 46 storeys (304 units)

Block Office Tower - 40 storeys

Atop a 2-level retail floors.


Location: Jalan Nipah, off Jalan Ampang Gleneagles.

Expected Price: N/A

Target Launch: 2016

Developer: Titijaya Land

Status: DO submission

http://www.epbt.gov.my/osc/Proj1_Info.cfm?Name=591034&S=S

This post has been edited by accetera: Jul 11 2024, 11:25 AM
owj
post Jun 30 2015, 10:57 AM

Enthusiast
*****
Senior Member
875 posts

Joined: Apr 2006


Wow. 1000++ more units at this area
kh8668
post Jul 1 2015, 06:05 PM

Mamma Mia!
*******
Senior Member
5,488 posts

Joined: Jun 2008
QUOTE(accetera @ Jun 29 2015, 10:51 PM)
Block A - 48 storeys (420 units)

Block B - 44 storeys (676 units)

Block C - 46 storeys (304 units)

Block Office Tower - 40 storeys

Atop a 2-level retail floors.
Location: Jalan Nipah, off Jalan Ampang Gleneagles.

Expected Price: N/A

Target Launch: 2016

Developer: Titijaya Land

Status: DO submission

http://www.epbt.gov.my/osc/Proj1_Info.cfm?Name=591034&S=S
*
CADANGAN PEMBANGUNAN PERDAGANGAN YANG MENGANDUNGI:- FASA 1 1) MENARA PEJABAT 38 TINGKAT-570 UNIT DI ARAS 2-ARAS 6 DAN ARAS 8-ARAS 38 BESERTA:- - 1 TINGKAT RUANG KEMUDAHAN DI ARAS 7 - - 2 TINGKAT RUANG PERNIAGAAN DI ARAS G-ARAS 1 - 1 TINGKAT SEPARA BESMEN TEMPAT LETAK KERETA, DAN - 1 TINGKAT BESMEN TEMPAT LETAK KERETA FASA 2 1) PANGSAPURI PERKHIDMATAN 45 TINGKAT (BLOK A1)-688 UNI DI ARAS 3-ARAS 45 BESERTA:  1 TINGKAT RUANG KEMUDAHAN DI ARAS 2  2 TINGKAT RUANG PERNIAGAN DI ARAS G-ARAS 1  1 TINGKAT SEPARA BESMEN TEMPAT LETAK KERETA DAN  1 TINGKAT BESMEN TEMPAT LETAK KERETA 2) PANGSAPURI PERKHIDMATAN 7 TINGKAT (BLOK A2)  110 UNIT DI ARAS 3-ARAS 7 BESERTA - 1 TINGKAT RUANG KEMUDAHAN DI ARAS 2 - 3 TINGKAT RUANG TEMPAT LETAK KERETA DI ARAS G  ARAS 1A - 1 TINGKAT SEPARA BESMEN TEMPAT LETAK KERETA DAN - 1 TINGKAT BESMEN TEMPAT LETAK KERETA FASA 3 1) PANGSAPURI PERKHIDMATAN 40 TINGKAT (BLOK B1)  264 UNIT DI ARAS 8  ARAS 40 BESERTA:- - 1 TINGKAT RUANG KEMUDAHAN DI ARAS 7 - 8 TINGKAT RUANG TEMPAT LETAK KERETA DI ARAS G-ARAS 6 - 1 TINGKAT SEPARA BESMEN TEMPAT LETAK KERETA DI ATAS LOT 104, JALAN NIPAH, MUKIM AMPANG, MUKIM AMPANG, KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR

http://www.epbt.gov.my/osc/Borang_info.cfm...80&NoForm=Form2

kh8668
post Jul 3 2015, 03:57 PM

Mamma Mia!
*******
Senior Member
5,488 posts

Joined: Jun 2008
http://www.epbt.gov.my/osc/Borang_info.cfm...24&NoForm=Form2

another project behind it

Status Permohonan :
LS - LULUS BERSYARAT
Agensi :
Dewan Bandaraya Kuala Lumpur - W.Persekutuan
Kategori Projek :
A - Projek Biasa
Jenis Pemajuan :
A - Perumahan
No. Fail Rujukan Permohonan :
DBKL.OSC (B) A13 U3 140721-006 (K5 141110) (P2)
Tajuk Permohonan :
1. CADANGAN MENAMBAH KEPADATAN PENDUDUK DARIPADA 10 OSE KEPADA 600 OSE 2. CADANGAN PELAN SUSUNATUR BAGI PEMBANGUNAN KEDIAMAN 3. CADANGAN PEMBANGUNAN PERUMAHAN YANG MENGANDUNGI:- A) 1 BLOK PANGSAPURI 54 TINGKAT (BLOK A)  616 UNIT B) 1 BLOK PANGSAPURI 24&35 TINGKAT (BLOK B)  386 UNIT C) 18 UNIT RUMAH VILLA 2 TINGKAT BESERTA D) 8 TINGKAT PODIUM TEMPAT LETAK KENDERAAN DAN RUANG KEMUDAHAN DI ATAS LOT 11979, JALAN NIPAH, MUKIM AMPANG, BANDAR KUALA LUMPUR

Untuk Tetuan (Pemohon) :
TETUAN TULUS LAGENDA SDN BHD, N-16-01, PENTHOUSE, LEVEL 16, FIRST SUBANGM JALAN SS15-4G 47500 SUBANG JAYA SELANGOR TEL 03-80229999/FAX 03-80229977
Jenis Permohonan :
A13 - Kebenaran Merancang (KM)
Tarikh Terima Permohonan :
10-N

http://titijayaland.listedcompany.com/news.html/id/463439



This post has been edited by kh8668: Jul 3 2015, 03:58 PM
kh8668
post Jul 3 2015, 03:59 PM

Mamma Mia!
*******
Senior Member
5,488 posts

Joined: Jun 2008
http://www.epbt.gov.my/osc/Proj1_Info.cfm?Name=587163&S=S
mthc
post Jul 3 2015, 04:06 PM

Look at all my stars!!
*******
Senior Member
4,525 posts

Joined: Feb 2006


I suddenly feel 1.5k is an average dense for a project in jalan ampang. Seriously this jalan ampang is gonna be super high dense.

Idk who is gonna invest here. I was so close to purchasing Elements 4 years ago. Thank god the bank rejected my loan back then. I still remember when I was naive and new to property, I bought single words everything the SA said.

Good luck investors. The jam is disgusting. Jalan Ampang is disgusting.
TSaccetera
post Jul 3 2015, 04:21 PM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


user posted image
kh8668
post Jul 3 2015, 05:12 PM

Mamma Mia!
*******
Senior Member
5,488 posts

Joined: Jun 2008
two land plots here.

1) Lot 104 - mixed commercial development

total apartment units = 1,400 units


2) Lot 11979 - residential development

total apartment units = 1,002 units (inclusive of 306 units which deems to be priced at affordable pricing. LOL


two plots here already see 2,402 units in 5 - 6 years time.


another Lot 76 to be jv between Crest Builder and Lembaga Getah Malaysia

estimated to have at least 550 units apartments.

so, we will see about 3,000 units cluster together at the corner. Dun forget also the Jalan Berembang one 1,099 units which was abandoned for so many times already.

This post has been edited by kh8668: Jul 3 2015, 05:19 PM
HarpArtist
post Jul 3 2015, 11:21 PM

Look at all my stars!!
*******
Senior Member
3,838 posts

Joined: Sep 2013


jalan ampang need a damn monorail or Xrt... just ANYTHING to deal with this high density. from klcc to ampang point.
TSaccetera
post Jan 28 2016, 12:22 AM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


They got another land opposite.

About 2.4k+ units in total.
airwolf2010
post Jan 28 2016, 08:59 AM

Getting Started
**
Junior Member
188 posts

Joined: Nov 2010
wah!! Jam Jam Jam!!!

VincentProperty
post Jan 28 2016, 09:26 AM

On my way
****
Senior Member
603 posts

Joined: Dec 2014
From: KEPONG


QUOTE(accetera @ Jan 28 2016, 12:22 AM)
They got another land opposite.

About 2.4k+ units in total.
*
wow thumbup.gif
TSaccetera
post Sep 23 2016, 03:26 PM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


Hearsay selling soon?
TSaccetera
post Oct 10 2016, 09:22 PM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


Launching First
Phase 1: Mini Dual-key SoVos (1,110 units)

First posted: https://www.facebook.com/PTLMalaysia/

user posted image

user posted image

user posted image

This post has been edited by accetera: Oct 10 2016, 09:23 PM
axisresidence17
post Oct 15 2016, 05:08 PM

Casual
***
Junior Member
352 posts

Joined: Mar 2009


Wow DDD!
VincentProperty
post Oct 27 2016, 02:55 PM

On my way
****
Senior Member
603 posts

Joined: Dec 2014
From: KEPONG


QUOTE(imperiumbrothers @ Oct 15 2016, 01:24 PM)
Tentatively price range at RM300k-450k with dual key concept to maximize rental
8 min walking distance to Jelatek LRT station
8-12 min driving distance to KLCC, KL Tower, Pavillion, Times Square, TRX and Bukit Bintang

so its easier to rent out with such distance and convenient
most importantly entry price is low
*
thumbsup.gif
AskarPerang
post Oct 28 2016, 11:12 PM

~tUPaI...~
*********
All Stars
23,688 posts

Joined: Aug 2007
From: Outer Space



so the project name Ampang Avenue confirm?
heavensea
post Oct 28 2016, 11:14 PM

Look at all my stars!!
*******
Senior Member
9,616 posts

Joined: Dec 2013
QUOTE(imperiumbrothers @ Oct 28 2016, 09:49 PM)
First Phase is SoVo first
*
What's sovo? Something like soho?
heavensea
post Oct 29 2016, 01:51 AM

Look at all my stars!!
*******
Senior Member
9,616 posts

Joined: Dec 2013
QUOTE(imperiumbrothers @ Oct 29 2016, 12:44 AM)
SoVo - Small Office Versatile Office

SoHo - Small Office Home Office

Actually some will say same. But difference will be SoVo is commercial. SoHo depends whether they have HDA.
The difference is SoVo loan max 85%
*
Thanks bro, for such informative details.
This means sovo = 100% commercial rates of water and electricity bills?
TSaccetera
post Oct 29 2016, 08:52 AM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


The Phase 1 is a Menara Pejabat to begin with... it's interesting that it has been partitioned to about 30 sovo units to sell.

This post has been edited by accetera: Oct 29 2016, 08:53 AM
wnvoo
post Oct 29 2016, 07:21 PM

Getting Started
**
Junior Member
69 posts

Joined: Nov 2009


Nice
AskarPerang
post Oct 30 2016, 10:32 PM

~tUPaI...~
*********
All Stars
23,688 posts

Joined: Aug 2007
From: Outer Space



better layout pics now

Attached Image

Attached Image
Nymphetamine666
post Oct 30 2016, 11:33 PM

Enthusiast
*****
Senior Member
708 posts

Joined: Aug 2011


Exact location?
rachel_xxx
post Oct 31 2016, 12:13 AM

Look at all my stars!!
*******
Senior Member
2,294 posts

Joined: Sep 2009
QUOTE(imperiumbrothers @ Oct 30 2016, 11:41 PM)
Opposite of Great Eastern Mall, 8 min walking distance to LRT, 5 min to KLCC
*
can stay or not
Nymphetamine666
post Oct 31 2016, 12:15 AM

Enthusiast
*****
Senior Member
708 posts

Joined: Aug 2011


I see.. it sited at the Fairview School is or? Or the other side where previously was a used car dealer?

To intrested buyers, pls buy!! Superb loc. No need to think liao.

Closest station should be Jelatek lor hoh?
AskarPerang
post Oct 31 2016, 12:30 AM

~tUPaI...~
*********
All Stars
23,688 posts

Joined: Aug 2007
From: Outer Space



QUOTE(Nymphetamine666 @ Oct 31 2016, 12:15 AM)
I see.. it sited at the Fairview School is or? Or the other side where previously was a used car dealer?

To intrested buyers, pls buy!! Superb loc. No need to think liao.

Closest station should be Jelatek lor hoh?
*
Attached Image
TSaccetera
post Oct 31 2016, 05:50 PM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


Location:

user posted image


I believe Ampang Avenue (South Parcel) is not gonna be the final name because it sounded too generalised and developer will go for branding for this big project.

There will be 3 other blocks of condo in the same land. Phase 2, 3 and 4 of South Parcel.

Further up north (North Parcel), there will be future development of condos and RUMAWIP.


user posted image


Neighbouring CB Galleria project can refer to >>> https://forum.lowyat.net/topic/2753835.

This post has been edited by accetera: Oct 31 2016, 05:51 PM
TSaccetera
post Oct 31 2016, 06:06 PM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


QUOTE(imperiumbrothers @ Oct 31 2016, 06:02 PM)
Ampang Avenue is not the name for sure. That's the company name only. Yet finalize the name of the project.

Now is the first phase of the project
*
Don't worry... i know this project as was involved in planning for neighbouring project.
AskarPerang
post Oct 31 2016, 07:09 PM

~tUPaI...~
*********
All Stars
23,688 posts

Joined: Aug 2007
From: Outer Space



rumahwip. haha. all project cannot run away without that. maybe is the criteria being inforced. so many now.
TSaccetera
post Oct 31 2016, 08:47 PM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


QUOTE(imperiumbrothers @ Oct 31 2016, 07:44 PM)
U working in CB mah smile.gif
*
Now no more...
Pain4UrsinZ
post Oct 31 2016, 08:49 PM

Regular
******
Senior Member
1,856 posts

Joined: Dec 2008
From: In The HELL FIRE



when rumahwip open for registration ?
TSaccetera
post Oct 31 2016, 10:12 PM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


QUOTE(imperiumbrothers @ Oct 31 2016, 09:39 PM)
Whats the CB Galleria pricing like? Got anchor tenant for the mall already?
*
No more mall.... and pricing is not finalised. They just submitted DO somewhere in Sept.
Moneylust
post Nov 1 2016, 04:47 PM

Getting Started
**
Junior Member
178 posts

Joined: May 2006
QUOTE(imperiumbrothers @ Oct 31 2016, 10:16 PM)
Ah. too bad no more mall.
*
Does the 430sq ft units come with any free carpark?

Open for booking already? What's the package like?
Veda
post Nov 3 2016, 06:35 PM

On my way
****
Senior Member
650 posts

Joined: Oct 2009
From: Formerly Perak, now KL
My 2 sen:

Pros:

Location is good.

Price is very attractive


Cons:

Sovo
- got 6% GST
- whether it can be used as residential is grey area aka debatable but most 'investors' simply don't care.

Yes & no for carpark? LOL. No carpark is a big no no.

High density. Intense competition for tenants/buyers.

430sf 2r 2b is very cramped. I've been inside 301sf studio and one-room 452sf unit so I've an idea how tight the space is gonna be.


Other note:

As for developer worksmanship. I used to own a unit in Casa Tiara and the worksmanship is acceptable since there is no leaking or peeling paint etc even after 6 years. But .... look at the threads in LYN on the SS19 projects.

This post has been edited by Veda: Nov 3 2016, 06:37 PM
icemanfx
post Nov 4 2016, 03:31 AM

20k VIP Club
*********
All Stars
21,454 posts

Joined: Jul 2012


thumbsup.gif rclxms.gif
heavensea
post Nov 4 2016, 04:44 AM

Look at all my stars!!
*******
Senior Member
9,616 posts

Joined: Dec 2013
So small, but cheap.
Buy liao Airbnb?

This post has been edited by heavensea: Nov 4 2016, 04:44 AM
BEANCOUNTER
post Nov 4 2016, 09:58 AM

20k VIP Club
*********
All Stars
20,146 posts

Joined: May 2011
Good to rent out hourly....
For kwik fix...
BEANCOUNTER
post Nov 4 2016, 11:40 AM

20k VIP Club
*********
All Stars
20,146 posts

Joined: May 2011
QUOTE(jonathanho @ Nov 4 2016, 11:22 AM)
That's why tenant is niche market
Better

Market shall be on recovering by the time completion, so entry price low can give u some edge and global economy doesn't seems going to fix anytime, so budget traveling will be the major market in coming years
*
the perfect storm not yet arrived......

you already talked about recovering........ bye.gif
BEANCOUNTER
post Nov 4 2016, 12:55 PM

20k VIP Club
*********
All Stars
20,146 posts

Joined: May 2011
QUOTE(jonathanho @ Nov 4 2016, 12:04 PM)
I m talking on 3 years later la. Expect next year say meltdown... Don't think will lasted two years or else everyone die
*
japan property bubbles last for 20 years and still recovering.

BEANCOUNTER
post Nov 4 2016, 01:29 PM

20k VIP Club
*********
All Stars
20,146 posts

Joined: May 2011
QUOTE(jonathanho @ Nov 4 2016, 01:11 PM)
Ok la.. if Malaysia is equal to Japan. Dont see Malaysia that way... But politic wise leave it to outcome of next election haha.

Anyway back to property haha, if low entry price also cannot do after three years, say market not recover... I think basically no need do investment liaw haha, as outcome will be same, isn't it?
Just discussion
*
ok...fair enuf...Malaysia long way to Japan...

but do we need mircoflats here in KUL? we are not landtrapped like hongkong or Taiwan....
kswee
post Nov 4 2016, 10:56 PM

On my way
****
Junior Member
577 posts

Joined: May 2012




Expected 1sq maintenance fee?
Any rebate?
icemanfx
post Nov 5 2016, 02:09 AM

20k VIP Club
*********
All Stars
21,454 posts

Joined: Jul 2012


QUOTE(jonathanho @ Nov 4 2016, 11:22 AM)
That's why tenant is niche market
Better

Market shall be on recovering by the time completion, so entry price low can give u some edge and global economy doesn't seems going to fix anytime, so budget traveling will be the major market in coming years
*
If global economy doesn't seems going to fix anytime, how market is going to recover?

QUOTE(jonathanho @ Nov 4 2016, 01:11 PM)
Ok la.. if Malaysia is equal to Japan. Dont see Malaysia that way... But politic wise leave it to outcome of next election haha.

Anyway back to property haha, if low entry price also cannot do after three years, say market not recover... I think basically no need do investment liaw haha, as outcome will be same, isn't it?
Just discussion
*
Kv property is not the only investment opportunity. Last of dibs property is expected to vp in 2018 if without delay, mean oversupply in subsale could be peaked in 3 years time.
icemanfx
post Nov 5 2016, 06:40 AM

20k VIP Club
*********
All Stars
21,454 posts

Joined: Jul 2012


QUOTE(jonathanho @ Nov 5 2016, 04:17 AM)
pls la

Frankly, if u think oversupply, kV property not the only investment opportunity, global economy doesn't seems fix anytime and market not going to recover... (Bear in mind, this is all u written above) then why u looking at this thread and why looking in property talk? I don't get it then...

Ok not fighting ya. Let's say nicely

I never say I not agree. I do agree whole market will oversupply. I never not admit, does it mean u stop invest? Doesn't everyone looking for below market price, urgent sale and good deal?

Then this 30% below market price (RM700psf) comparing current surrounding project deal (range RM1000-1400psf) and even below Subsale of The Element (RM8xxpsf), then u tell me what else to buy? Perhaps just stop buying and in fact, no need waste time in this forum right?

If really that bad, and insist on commenting bad, I think we can comment on every thread that market is bad, oversupply, other than KV got opportunity
*
Rm psf is subject to location, design, facilities, finishing materials, perception, market sentiment, etc. If this development is sold at rm 700 psf; by default, the market price for this development is rm 700 psf.

heavensea
post Nov 5 2016, 07:44 AM

Look at all my stars!!
*******
Senior Member
9,616 posts

Joined: Dec 2013
QUOTE(jonathanho @ Nov 4 2016, 11:22 AM)
That's why tenant is niche market
Better

Market shall be on recovering by the time completion, so entry price low can give u some edge and global economy doesn't seems going to fix anytime, so budget traveling will be the major market in coming years
*
2018 = brace yourself.

QUOTE(BEANCOUNTER @ Nov 4 2016, 12:55 PM)
japan property bubbles last for 20 years and still recovering.
*
Japan property bubble is very different than our current situation.
BEANCOUNTER
post Nov 5 2016, 10:28 AM

20k VIP Club
*********
All Stars
20,146 posts

Joined: May 2011
QUOTE(jonathanho @ Nov 5 2016, 10:23 AM)
👏👏👏
Then perhaps buyer next time no need ask psf. Haha coz no point to compare haha. Selling 1500psf its the value of the property, don't say expensive as its the market price smile.gif
👏👏👏
*
jonathan,
frankly, if the panel bank valued this particular property at 1000psf...you think the developer will do charity by selling them at 700psf????
icemanfx
post Nov 5 2016, 12:46 PM

20k VIP Club
*********
All Stars
21,454 posts

Joined: Jul 2012


QUOTE(jonathanho @ Nov 5 2016, 10:23 AM)
👏👏👏
Then perhaps buyer next time no need ask psf. Haha coz no point to compare haha. Selling 1500psf its the value of the property, don't say expensive as its the market price smile.gif
👏👏👏
*
Isn't this how market price for new launch is established by developer?

BEANCOUNTER
post Nov 5 2016, 02:59 PM

20k VIP Club
*********
All Stars
20,146 posts

Joined: May 2011
QUOTE(jonathanho @ Nov 5 2016, 10:57 AM)
What if I tell u its definitely higher than 700psf?

U won't believe also right? No point to argue.

And then if at the same time beside (really beside, ask accetera since his previous company CB land is just beside) and opposite can sell 1300-1400psf, u think this worth 700psf only? 50% off?

Just give a real thought about it

Not argue because I sell this. But let's say in fact.
Just doesn't make sense right?

Then comes the marketing plan...
Bear in mind this have four phase in total
*
higher I believe...but not to 1000-1400psf and developer discounted 50% to sell at 700psf.
yes 4 blocks...but one block is affortable housing rite????

we yet to see the price appreciation of highrise with affortable housing in the same project.

also I believe those sold at 1400psf now finding difficult to sell.......1400psf can get one in city center already.
forever1979
post Nov 8 2016, 08:51 PM

Look at all my stars!!
*******
Senior Member
2,854 posts

Joined: Jul 2013


how to pronounce ?

i thought is Avenue ?

5th avenue in US is kind of high end area
TSaccetera
post Nov 8 2016, 09:29 PM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


Titijaya partners CREC for RM2.1 billion Off Jalan Ampang project
BY TOH KAR INN | The StarBiz
Tuesday, 8 November 2016 | MYT 1:30 PM
http://www.thestar.com.my/business/busines...2-1bil-project/


KUALA LUMPUR: A subsidiary of property developer Titijaya Land Bhd, Titijaya Resources Sdn Bhd, has signed an agreement with CREC Development (M) Sdn Bhd for a mixed development project at Embassy Row in Jalan Ampang, Kuala Lumpur

The proposed development on 6.06 acres is expected to have a gross development value of RM2.1bil.

To carry out the project, the two companies acquired Ampang Avenue Development Sdn Bhd, whose subsidiary is the registered proprietor of the land, for RM80mil.

Titijaya group managing director Tan Sri Lim Soon Peng said the signing marked an important milestone for Titijaya in its efforts to broaden its revenue stream.

“The rationale of the proposed acquisition of Ampang Avenue is for Titijaya Resources together with CREC as shareholders of the JV company to form a strategic collaboration in relation to the proposed development of the land.

“We believe that this corporate exercise will enable us to seek new strategic growth and ensure earnings sustainability for Titijaya, moving forward,” said Lim.

He added that the proposed JV with CREC will enable both parties to leverage on synergistic outcome for mutual benefits.

CREC is a wholly-owned subsidiary of China Railway Engineering Corporation (M) Sdn Bhd, which in turn is a wholly-owned subsidiary of China Railway Group Ltd.

CREC is one of the world’s largest construction companies, with a history of more than 100 years and ranked 57th among Fortune World Top 500 Enterprises and 7th among Top 500 Chinese Enterprises in 2016.
BEANCOUNTER
post Nov 8 2016, 09:31 PM

20k VIP Club
*********
All Stars
20,146 posts

Joined: May 2011
Pronouced as
3rd N venue qua
kswee
post Nov 8 2016, 09:34 PM

On my way
****
Junior Member
577 posts

Joined: May 2012




QUOTE(BEANCOUNTER @ Nov 8 2016, 10:31 PM)
Pronouced as
3rd N venue qua
*
women name brows.gif nvenue.
how much is the rumawip cost?any layout..
TSaccetera
post Nov 8 2016, 09:47 PM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


The 6.06 acre is referring to the southern parcel only.
gks
post Nov 8 2016, 09:56 PM

Look at all my stars!!
*******
Senior Member
3,831 posts

Joined: May 2008
It is reported the price starts from rm500k where agent mentioned the SOVO starts from rm300k

Which is correct?
propertybbb
post Nov 8 2016, 10:10 PM

Look at all my stars!!
*******
Senior Member
2,663 posts

Joined: Feb 2013
QUOTE(accetera @ Nov 8 2016, 10:47 PM)
The 6.06 acre is referring to the southern parcel only.
*
So how many in totally?
jorgsacul
post Nov 9 2016, 06:24 AM

Regular
******
Senior Member
1,377 posts

Joined: Aug 2009
Sales?
Babizz
post Nov 9 2016, 07:13 AM

10k Club
********
All Stars
12,522 posts

Joined: Feb 2013
Super suck name, extremely high dense with 2400 units over 6.06 acres. Recipe for failure from the beginning.
gks
post Nov 11 2016, 04:44 PM

Look at all my stars!!
*******
Senior Member
3,831 posts

Joined: May 2008
QUOTE(jonathanho @ Nov 9 2016, 08:04 AM)
Now is collecting cheque stages. Cheque won't bank in. Will invite for VIP unit selection when soft launch for those submit cheque earlier before collection is stop.

So basically no risk booking

The collection is around 60+% quota so far. Gotta be quick before closing
*
The price is still from RM300K for 430sqft?
enviro
post Nov 11 2016, 06:51 PM

On my way
****
Junior Member
511 posts

Joined: Nov 2011
No location map. Next to Gleneagles hospital?
AskarPerang
post Nov 11 2016, 07:58 PM

~tUPaI...~
*********
All Stars
23,688 posts

Joined: Aug 2007
From: Outer Space



QUOTE(enviro @ Nov 11 2016, 06:51 PM)
No location map. Next to Gleneagles hospital?
*
aiyo just scroll few pages back.
this thread also how many pages only.
wnvoo
post Nov 13 2016, 10:12 PM

Getting Started
**
Junior Member
69 posts

Joined: Nov 2009


Nice
Donald Trump
post Nov 13 2016, 11:25 PM

Regular
******
Senior Member
1,686 posts

Joined: Aug 2011
QUOTE(jonathanho @ Nov 13 2016, 10:35 PM)
Quick book one smile.gif
Collected many cheques. Dont wait till quota reach and close collection smile.gif
Haha
*
quick book one? lai lai all go hollan together....
this TT tak jaya even klang and subang products also like shit u expect it to deliver gd for KL products
tens of thousans unit along jln ampang...unless top quality developer at cheap psf price else confirm hollan
Donald Trump
post Nov 13 2016, 11:29 PM

Regular
******
Senior Member
1,686 posts

Joined: Aug 2011
QUOTE(jonathanho @ Nov 13 2016, 10:35 PM)
Quick book one smile.gif
Collected many cheques. Dont wait till quota reach and close collection smile.gif
Haha
*
ohh agentsss.....b4 i forget....must be raw firm with raw agents
dont be happy when u sell ITS products....u hv to wait months and months and mayb yrs for ur comm....likely contra units
kswee
post Nov 13 2016, 11:31 PM

On my way
****
Junior Member
577 posts

Joined: May 2012




QUOTE(Donald Trump @ Nov 14 2016, 12:25 AM)
quick book one? lai lai all go hollan together....
this TT tak jaya even klang and subang products also like shit u expect it to deliver gd for KL products
tens of thousans unit along jln ampang...unless top quality developer at cheap psf price else confirm hollan
*
hollan alot more to pop out along jln ampang, but tt jv crec , quality wise hard to say.
cheap= quality wise sure will reduce.
Donald Trump
post Nov 13 2016, 11:44 PM

Regular
******
Senior Member
1,686 posts

Joined: Aug 2011
QUOTE(jonathanho @ Nov 13 2016, 11:41 PM)
First why so offensive leh? If you want, we can meet up and I can tell you I am not selling that. Something different. But I am not side on Developer. I am just sharing some analysis.

eh... pls check with my background before you start saying RAW. You can refer to someone called Jonathan in Sfera or Court 28... I am not some newbie... and my professionalism is being praise by my client. Of course, you can say what you want I cant say much.

Of course we know about our commission. Anyway thanks for your reminder.

I think Top Quality or not, not even one developer out there can guarantee la. All using subcon. Thought so easy to control them meh... So far in the market only one developer have people who really monitor the progress on daily basis. Maybe you can share with me more on who can guarantee on good finishing?

But I think Titijaya getting 2016 award on Top Quality and Finishing for nothing right? If award also cannot proof, then I think other developer without award no need to think liaw. For your record, I dont deny Titijaya have project that is having poor delivery, but I am saying only one developer as I know in whole market can guarantee good finishing in ALL project they do. Titijaya do have good project as well.
*
yes ah.....which gd project...kind enough to tell?

Donald Trump
post Nov 13 2016, 11:47 PM

Regular
******
Senior Member
1,686 posts

Joined: Aug 2011
QUOTE(jonathanho @ Nov 13 2016, 11:44 PM)
If really hollan, those above 800psf also hollan... which mean all projects along Jalan Ampang hollan....

Say subsale M Suites also 1100psf.

Anyway this is basic unit package, so pricing is lower as well, if that make sense
*
it shows that u do not even know them well....or may i ask u know the top boss?
Sfera court 28????...not to insult u but hardly heard of these 2
kswee
post Nov 13 2016, 11:54 PM

On my way
****
Junior Member
577 posts

Joined: May 2012




QUOTE(jonathanho @ Nov 14 2016, 12:44 AM)
If really hollan, those above 800psf also hollan... which mean all projects along Jalan Ampang hollan....

Say subsale M Suites also 1100psf.

Anyway this is basic unit package, so pricing is lower as well, if that make sense
*
What you mean by basic unit package? the most basis of equipment provided?

300k still valid?
Babizz
post Nov 14 2016, 07:53 AM

10k Club
********
All Stars
12,522 posts

Joined: Feb 2013
QUOTE(Donald Trump @ Nov 13 2016, 09:25 AM)
quick book one? lai lai all go hollan together....
this TT tak jaya even klang and subang products also like shit u expect it to deliver gd for KL products
tens of thousans unit along jln ampang...unless top quality developer at cheap psf price else confirm hollan
*
Agreed. Buy in jalan ampang is going holland la. More thann 12k new apartment with many ME moving in.

Jonathan, pls list any successful titijaya project in recent times.
TSaccetera
post Nov 14 2016, 10:56 AM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


Jalan Ampang market is heavily rely on foreigners and expatriates and it might be the current mood that is not too conducive. Hopefully, it will be better in the future.

We noted that there are alot of developments on Jalan Ampang having some issue in getting tenant, subsale, value-holding and even the completeness or delivery of product. Developments that are "off Jalan Ampang" typically will bring price-competition to those on the main road as the off ones are priced cheaper.

And there are approx. 15,000 incoming supply, out of which about 8,000 are not launched yet and these are just getting D.O. first and not planning to launch anytime soon. Some are mysteriously undercon such as two projects behind near the lake.



This post has been edited by accetera: Nov 14 2016, 10:58 AM
HarpArtist
post Nov 14 2016, 12:00 PM

Look at all my stars!!
*******
Senior Member
3,838 posts

Joined: Sep 2013


jalan ampang is a bloodbath of condos. nonhda will die even faster. enter if you are feeling suicidal lah. i know one mshite owner crying everynight.
gks
post Nov 14 2016, 01:11 PM

Look at all my stars!!
*******
Senior Member
3,831 posts

Joined: May 2008
If the price for studio is from RM300K, think 3rdnvenue has the USP and value proposition for prospect tenants. The walking distance to LRT Station seems bearable.

Of course leaving behind the argument of usage which nowadays is the risk for every non-sch h projects.
gks
post Nov 14 2016, 02:06 PM

Look at all my stars!!
*******
Senior Member
3,831 posts

Joined: May 2008
Based on the indicative absolute price, this 3rdnvenue should be price leader in whole jalan ampang stretch. I do not think any other development along jalang ampang are selling for RM300k abs point.
Maybe Suria Jelatek where developer price was sub RM300K 6-7years ago.
destfull
post Nov 14 2016, 09:32 PM

Brain for Creativity
******
Senior Member
1,063 posts

Joined: Jul 2005



I have RM13k voucher, won from a drone competition : http://www.titijaya.com.my/contest/. It's transferable and I'm selling it. Just let me know if anyone are interested. smile.gif


Attached thumbnail(s)
Attached Image
destfull
post Nov 15 2016, 12:13 PM

Brain for Creativity
******
Senior Member
1,063 posts

Joined: Jul 2005



Yeap, just last Sunday. heheh
Moneylust
post Nov 17 2016, 05:21 PM

Getting Started
**
Junior Member
178 posts

Joined: May 2006
QUOTE(jonathanho @ Nov 13 2016, 11:41 PM)
First why so offensive leh? If you want, we can meet up and I can tell you I am not selling that selling point. Something different. But I am not sided on Developer. I am just sharing some analysis.

eh... pls check with my background before you start saying RAW. You can refer to someone called Jonathan in Sfera or Court 28... I am not some newbie... and my professionalism is being praise by my client. Of course, you can say what you want I cant say much.

Of course we know about our commission. Anyway thanks for your reminder.

I think Top Quality or not, not even one developer out there can guarantee la. All using subcon. Thought so easy to control them meh... So far in the market only one developer have people who really monitor the progress on daily basis. Maybe you can share with me more on who can guarantee on good finishing?

But I think Titijaya getting 2016 award on Top Quality and Finishing for nothing right? If award also cannot proof, then I think other developer without award no need to think liaw. For your record, I dont deny Titijaya have project that is having poor delivery, but I am saying only one developer as I know in whole market can guarantee good finishing in ALL project they do. Titijaya do have good project as well.
*
Mind to share which is the only developer that can guarantee good finishing? UEM Sunrise? IJM? UOA? BRDB?

This post has been edited by Moneylust: Nov 17 2016, 05:22 PM
ChuiChuiShui
post Nov 17 2016, 05:51 PM

Regular
******
Senior Member
1,020 posts

Joined: Aug 2015


Hearsay, just hearsay ah, without any valid proof 1. Titijaya changing their subcons, interior contractors. So could it be better than last time?
HarpArtist
post Nov 17 2016, 07:21 PM

Look at all my stars!!
*******
Senior Member
3,838 posts

Joined: Sep 2013


the name is super confusing with the cyberjaya project.
HarpArtist
post Nov 17 2016, 07:23 PM

Look at all my stars!!
*******
Senior Member
3,838 posts

Joined: Sep 2013


the name is super confusing with the cyberjaya project.
HarpArtist
post Nov 17 2016, 11:32 PM

Look at all my stars!!
*******
Senior Member
3,838 posts

Joined: Sep 2013


QUOTE(jonathanho @ Nov 17 2016, 11:10 PM)
u mean 3rd Avenue? smile.gif
*
yes obviously
kbandito
post Nov 18 2016, 09:55 PM

Regular
******
Senior Member
1,181 posts

Joined: May 2005


oh man why are people arguing to compare office against residential.
apple is better than orange, orange is better than apple.
maybe pineapple is the best.
lekjuan
post Nov 21 2016, 08:16 AM

New Member
*
Junior Member
28 posts

Joined: May 2008
QUOTE(jonathanho @ Nov 18 2016, 10:22 PM)
APPA 😂😂😂
*
suitable for investment only?
i quite confuse about soho, sovo & sofo.

nod.gif


BEANCOUNTER
post Nov 24 2016, 02:24 AM

20k VIP Club
*********
All Stars
20,146 posts

Joined: May 2011
QUOTE(jonathanho @ Nov 21 2016, 04:49 PM)
Soho is mostly with HDA. Loan 90%
SoVo and SoFo is without. Loan 80-85%
*
Soho can be used as opis or resi or both.

Sovo and sofo purely and legally can only used as opis...as stated in the non schedule spa.

I know many turn sovo and sofo intto resi.

This is story for another day.
zk9
post Nov 24 2016, 08:36 PM

Getting Started
**
Junior Member
298 posts

Joined: Jan 2003


so sovo cant stay? why cant they make it soho zzzz
Veda
post Nov 29 2016, 05:06 PM

On my way
****
Senior Member
650 posts

Joined: Oct 2009
From: Formerly Perak, now KL
May consider this when the serviced apartments are launched. If price is no longer attractive, there are options elsewhere.

Anyway, I dislike the name "3rdnvenue".
Veda
post Dec 1 2016, 06:45 PM

On my way
****
Senior Member
650 posts

Joined: Oct 2009
From: Formerly Perak, now KL
QUOTE(jonathanho @ Dec 1 2016, 12:45 AM)
Yeah i also don't feel nice with the name haha
Bit tough to say out also 3rd-N-venue and also bit confuse for those who know Cyberjaya Third Avenue.

Anyway name is fix haha
Main thing can earn money then ok la.
*
Agreed.

Just pronounce it as "Third Avenue", easier that way.

Anyway, do update us when the serviced apartment phase are open for booking ....

kbandito
post Dec 4 2016, 05:23 PM

Regular
******
Senior Member
1,181 posts

Joined: May 2005


QUOTE(jonathanho @ Nov 24 2016, 09:46 PM)
Haha guess u can refer to the chat over the sofo, soho, sovo in Lowyat here. But this will lead to another debate haha

Who believe can stay then buy loh since have few examples which ppl staying now. Who not buy the idea, then just move on haha. Malaysia boleh
*
this one ngam teng.
just like if you believe Najib then vote BN loh, if you don't subscribe to his ideology then vote opposition lo.
aaron1717
post Dec 6 2016, 11:26 AM

Chui Shui in Property Manyak Best!
********
All Stars
10,188 posts

Joined: Apr 2012
good location.... good price point.... if wanted to compare to all the projects along jalan ampang that are different price point... doesnt seems apple to apple anyway...
aaron1717
post Dec 6 2016, 11:34 AM

Chui Shui in Property Manyak Best!
********
All Stars
10,188 posts

Joined: Apr 2012
QUOTE(jonathanho @ Dec 6 2016, 11:31 AM)
Yeah. Price wise totally cannot compare. Just price alone already the key point. As all we looking at low entry. This is super low entry for this area. Whether Apple to apple or not, a hotel suite looking design won't be bad, and different for more than 30% in same location, already good enough to justify
*
developer absorb the GST ka? so good...? means its gonna be 5% downpayment for this project...? 430 sq ft also can dual key.... wonder will it feel stuffy... if not comparing to a hotel unit la biggrin.gif biggrin.gif
BEANCOUNTER
post Dec 6 2016, 12:04 PM

20k VIP Club
*********
All Stars
20,146 posts

Joined: May 2011
QUOTE(aaron1717 @ Dec 6 2016, 11:34 AM)
developer absorb the GST ka? so good...? means its gonna be 5% downpayment for this project...? 430 sq ft also can dual key.... wonder will it feel stuffy... if not comparing to a hotel unit la  biggrin.gif  biggrin.gif
*
Welcome to hong kong style living....

Anywhere dun understand why people want to live like hong kong here in kuala lumpur....except investors always believe there will be hongkies queuing up to live in one.
aaron1717
post Dec 6 2016, 12:08 PM

Chui Shui in Property Manyak Best!
********
All Stars
10,188 posts

Joined: Apr 2012
QUOTE(BEANCOUNTER @ Dec 6 2016, 12:04 PM)
Welcome to hong kong style living....

Anywhere dun understand why people want to live like hong kong here in kuala lumpur....except investors always believe there will be hongkies queuing up to live in one.
*
maybe its been a dream of those tvb fans to own one unit of studio size apartment... and feel like they are living in one in the tvb dramas... hahahah... and also the concept of.... die die must stay at kl area.... tenants like to stay in kl area... small size nvm... janji pricing nice ma... biggrin.gif biggrin.gif
BEANCOUNTER
post Dec 6 2016, 12:18 PM

20k VIP Club
*********
All Stars
20,146 posts

Joined: May 2011
QUOTE(aaron1717 @ Dec 6 2016, 12:08 PM)
maybe its been a dream of those tvb fans to own one unit of studio size apartment... and feel like they are living in one in the tvb dramas... hahahah... and also the concept of.... die die must stay at kl area.... tenants like to stay in kl area... small size nvm... janji pricing nice ma...  biggrin.gif  biggrin.gif
*
Haha...if u watch enuf tvb dramas...u know that their studio unit sets are WAY far bigger than what majority hongkies stay de....

The average condo unit in hongkong abt 400sq nia....

I dunno how the new gen think these days.....even if you buy one for own stay....how long u can stay in 460sq 'room'?

I would say most units are and will be sapued by investors.
aaron1717
post Dec 6 2016, 12:25 PM

Chui Shui in Property Manyak Best!
********
All Stars
10,188 posts

Joined: Apr 2012
QUOTE(BEANCOUNTER @ Dec 6 2016, 12:18 PM)
Haha...if u watch enuf tvb dramas...u know that their studio unit sets are WAY far bigger than what majority hongkies stay de....

The average condo unit in hongkong abt 400sq nia....

I dunno how the new gen think these days.....even if you buy one for own stay....how long u can stay in 460sq 'room'?

I would say most units are and will be sapued by investors.
*
wont for long for sure... i have plenty of friends enjoy this kind of studio units for maybe 3-5 years... and subsequently when family grow... they will also sell their unit.... well in this case... this is a 430 sq ft dual key unit... u can trully enjoy hongkie style staying here.... rclxms.gif rclxms.gif but comparably... other projects like liberty at the outer part of ampany that is also 450 sq ft... selling at this price also... so... standard jor i guess the min pricing sweat.gif
BEANCOUNTER
post Dec 6 2016, 02:08 PM

20k VIP Club
*********
All Stars
20,146 posts

Joined: May 2011
QUOTE(jonathanho @ Dec 6 2016, 02:02 PM)
Don't worry
If don't like dual key. We also have non dual key unit. Cater different preference buyer. So actually no issue at all
*
Dual keys or not...the size is almost the same.

Anywhere its not my game. Thanks for your response.
aaron1717
post Dec 6 2016, 02:16 PM

Chui Shui in Property Manyak Best!
********
All Stars
10,188 posts

Joined: Apr 2012
QUOTE(jonathanho @ Dec 6 2016, 02:02 PM)
Don't worry
If don't like dual key. We also have non dual key unit. Cater different preference buyer. So actually no issue at all
*
do you have any hint on what size their service apartment would like? or any indicative pricing?

AskarPerang
post Dec 14 2016, 03:10 PM

~tUPaI...~
*********
All Stars
23,688 posts

Joined: Aug 2007
From: Outer Space



user posted image
aaron1717
post Dec 14 2016, 03:15 PM

Chui Shui in Property Manyak Best!
********
All Stars
10,188 posts

Joined: Apr 2012
QUOTE(AskarPerang @ Dec 14 2016, 03:10 PM)
user posted image
*
wow.... good prospect of the actual feelings haha...
SUSempatTan
post Dec 14 2016, 04:18 PM

Regular
******
Senior Member
1,678 posts

Joined: Mar 2016


QUOTE(AskarPerang @ Dec 14 2016, 03:10 PM)
user posted image
*
Kesian.
tiancai1
post Dec 14 2016, 04:32 PM

Getting Started
**
Junior Member
104 posts

Joined: Apr 2016
QUOTE(empatTan @ Dec 14 2016, 04:18 PM)
Kesian.
*
Tq. Nice

HarpArtist
post Dec 16 2016, 08:24 AM

Look at all my stars!!
*******
Senior Member
3,838 posts

Joined: Sep 2013


QUOTE(AskarPerang @ Dec 14 2016, 03:10 PM)
user posted image
*
😂yikes
archery
post Dec 17 2016, 02:18 PM

Getting Started
**
Junior Member
116 posts

Joined: Apr 2009


QUOTE(AskarPerang @ Dec 14 2016, 03:10 PM)
user posted image
*
To tight and small. 😫😫😫
noname2188
post Dec 30 2016, 01:59 AM

On my way
****
Senior Member
651 posts

Joined: Dec 2009
QUOTE(jonathanho @ Dec 30 2016, 01:04 AM)
Its going to select unit soon. Its on early Jan. 8th Jan 17. Dont miss out.
Now is cheque collection stage. Closing up soon
*
How's the sales going? Can show the chart? My friend is interested in this project and I am helping him to scout also...
LuVz
post Dec 30 2016, 07:53 PM

Getting Started
**
Junior Member
169 posts

Joined: Dec 2007
From: Kota Kemuning , Subang Jaya , Bandar Sunway
Hi Jonathan, can you pm me more details on this projects. How many types? And the price ranging. This post too much already, didn't bother to read 1by1. Tq
yck1987
post Dec 30 2016, 11:05 PM

Enthusiast
*****
Senior Member
808 posts

Joined: Apr 2009
QUOTE(AskarPerang @ Dec 14 2016, 03:10 PM)
user posted image
*
If have to buy, i guess non dual key will have better prospect since can turn into a proper room, bigger living room space with pantry. Just imo.
maskcooler
post Jan 2 2017, 03:24 PM

On my way
****
Junior Member
540 posts

Joined: Sep 2010
any comment about this project? worth to invest?
Uglyman
post Jan 5 2017, 10:08 PM

New Member
*
Junior Member
21 posts

Joined: Mar 2014
Agent called tom deposit 3k for ballot coming Monday 8th at Pullman hotel... Go or no go 😅
Quang1819
post Jan 8 2017, 10:57 AM

Look at all my stars!!
*******
Senior Member
2,604 posts

Joined: Dec 2012
Anyone came to Pullman to select unit today?
The earliest bird started queueing since 2am lol. My first time queueing though

This post has been edited by Quang1819: Jan 8 2017, 11:03 AM
nova80
post Jan 8 2017, 11:02 AM

Getting Started
**
Junior Member
197 posts

Joined: Apr 2009
First time here too. Deposit paid before the launch and still have to queue up like hell. What good to engage an agent at all?
A unit that charge everything in commercial rate, a car park that need to pay at least 53k for it. High density for your competition.
Yet to get any wristband band waited. Just fucking distribute them! If want to chicken out now, how soon can I get back my deposit in full?

This post has been edited by nova80: Jan 8 2017, 11:05 AM
AskarPerang
post Jan 8 2017, 11:16 AM

~tUPaI...~
*********
All Stars
23,688 posts

Joined: Aug 2007
From: Outer Space



Read on FB Propcafe. Crowded with people. Good luck those there.
nova80
post Jan 8 2017, 11:30 AM

Getting Started
**
Junior Member
197 posts

Joined: Apr 2009
The second batch told me floor plan changed.
What more surprise?
Quang1819
post Jan 8 2017, 11:36 AM

Look at all my stars!!
*******
Senior Member
2,604 posts

Joined: Dec 2012
QUOTE(nova80 @ Jan 8 2017, 11:02 AM)
First time here too. Deposit paid before the launch and still have to queue up like no grandma business. What good to have an agent at all?
A unit that charge everything in commercial rate, a car park that need to pay at least 53k for it. 1.5k density aka competition.
Yet to get any wristband band, if to chicken out now, how soon can I get back my booking?
*
No shit. But I noticed many agents here are actually queueing for their buyers.
I thought all the same bro?

Now delay for another half an hour.
eddieyee
post Jan 8 2017, 12:00 PM

New Member
*
Junior Member
14 posts

Joined: Nov 2011


Pm more info pls..10q
nova80
post Jan 8 2017, 12:00 PM

Getting Started
**
Junior Member
197 posts

Joined: Apr 2009
Agent know nothing say this developer release no information to them.
I'm thinking to chicken out. How to get back the deposit in full even before choosing an unit? My agent advise me to get the number first, then make my bank loan application fail. I worry this will destroy my credibility with the bank.

Which is the best way to get out without hurt?
1. Surrender before choosing a unit
2. Surrender after choosing a unit
3. Surrender after apply bank loan

This post has been edited by nova80: Jan 8 2017, 12:02 PM
Quang1819
post Jan 8 2017, 12:11 PM

Look at all my stars!!
*******
Senior Member
2,604 posts

Joined: Dec 2012
QUOTE(nova80 @ Jan 8 2017, 12:00 PM)
Agent know nothing say this developer release no information to them.
I'm thinking to chicken out. How to get back the deposit in full even before choosing an unit? My agent advise me to get the number first, then make my bank loan application fail. I worry this will destroy my credibility with the bank.

Which is the best way to get out without hurt?
1. Surrender before choosing a unit
2. Surrender after choosing a unit
3. Surrender after apply bank loan
*
Surrender before choosing the unit lah. Since you're not keen already
Asgaard
post Jan 8 2017, 12:11 PM

Regular
******
Senior Member
1,249 posts

Joined: Apr 2012
Sovo can't cook
No parking
2k unit
Everything commercial rate
Titijaya as developer.

Pass..
Quang1819
post Jan 8 2017, 12:25 PM

Look at all my stars!!
*******
Senior Member
2,604 posts

Joined: Dec 2012
QUOTE(Asgaard @ Jan 8 2017, 12:11 PM)
Sovo can't cook
No parking
2k unit
Everything commercial rate
Titijaya as developer. ???

Pass..
*
1k units only.
But the price wise is way below market price leh literally 30-50% lower

This post has been edited by Quang1819: Jan 8 2017, 06:59 PM
nova80
post Jan 8 2017, 12:28 PM

Getting Started
**
Junior Member
197 posts

Joined: Apr 2009
QUOTE(Quang1819 @ Jan 8 2017, 12:11 PM)
Surrender before choosing the unit lah. Since you're not keen already
*
Will I still get the deposit refund in full?
alchmiya
post Jan 8 2017, 12:48 PM

Getting Started
**
Junior Member
288 posts

Joined: Jan 2013
QUOTE(nova80 @ Jan 8 2017, 12:28 PM)
Will I still get the deposit refund in full?
*
How did u pay ur deposit?
After paying deposit, u never receive any tnc about refund if u decided not to purchase the unit?
nova80
post Jan 8 2017, 01:32 PM

Getting Started
**
Junior Member
197 posts

Joined: Apr 2009
QUOTE(alchmiya @ Jan 8 2017, 12:48 PM)
How did u pay ur deposit?
After paying deposit, u never receive any tnc about refund if u decided not to purchase the unit?
*
Paid with cheque, they deposit it before the launching. Money gone through.
The tnc says subject to seller to accept. Believe still have to provide 'acceptable' reason. Not that cancel as simple as possible.
archery
post Jan 8 2017, 03:06 PM

Getting Started
**
Junior Member
116 posts

Joined: Apr 2009


QUOTE(nova80 @ Jan 8 2017, 12:28 PM)
Will I still get the deposit refund in full?
*
Yes you will. I'm thinking also not to choose and get back the deposit
nova80
post Jan 8 2017, 03:47 PM

Getting Started
**
Junior Member
197 posts

Joined: Apr 2009
QUOTE(archery @ Jan 8 2017, 03:06 PM)
Yes you will. I'm thinking also not to choose and get back the deposit
*
Thanks, Archery. Your assurance give a picece of mind this newbie who know nothing about property purchasing and alhaving unreliable agent only look after own interest.

I also asked the titijaya people despite agent's advise on get-a-unit-first-regardless-what. The salesperson say can entitle full refund since haven't choose any unit yet.

I didn't get any unit.
HarpArtist
post Jan 8 2017, 03:52 PM

Look at all my stars!!
*******
Senior Member
3,838 posts

Joined: Sep 2013


i salute this dev. jalan ampang home prices will be affordable in no time once vp
max_cavalera
post Jan 8 2017, 03:59 PM

rebirth
*******
Senior Member
5,613 posts

Joined: Jun 2006
From: Cyberjaya, Shah Alam, Ipoh



QUOTE(nova80 @ Jan 8 2017, 01:00 PM)
Agent know nothing say this developer release no information to them.
I'm thinking to chicken out. How to get back the deposit in full even before choosing an unit? My agent advise me to get the number first, then make my bank loan application fail. I worry this will destroy my credibility with the bank.

Which is the best way to get out without hurt?
1. Surrender before choosing a unit
2. Surrender after choosing a unit
3. Surrender after apply bank loan
*
U want chose that 290k unit ka?

I see no problem for u to pass to other buyer in case ur loan not succesful or u cancel...😄

Literally its really cheap compare to other neighbour ing development
max_cavalera
post Jan 8 2017, 04:00 PM

rebirth
*******
Senior Member
5,613 posts

Joined: Jun 2006
From: Cyberjaya, Shah Alam, Ipoh



QUOTE(HarpArtist @ Jan 8 2017, 04:52 PM)
i salute this dev. jalan ampang home prices will be affordable in no time once vp
*
M City owner.... 😢
JonathanIB
post Jan 8 2017, 04:15 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


Jonathan here. Whatever unit for 430sf today all sold off. Left 601sf only.
AskarPerang
post Jan 8 2017, 04:16 PM

~tUPaI...~
*********
All Stars
23,688 posts

Joined: Aug 2007
From: Outer Space



wow really BBB. kick start 2017 with BBB mode.
propertybbb
post Jan 8 2017, 06:10 PM

Look at all my stars!!
*******
Senior Member
2,663 posts

Joined: Feb 2013
QUOTE(Asgaard @ Jan 8 2017, 01:11 PM)
Sovo can't cook
No parking
2k unit
Everything commercial rate
Titijaya as developer.

Pass..
*
Sovo...many sovo in kl all can cook
Carpark available..pay 53k...if not rent it better..normal nowaday
This block 1k unit...another two blocks are service apartment not sovo..1.4k units
Yes commercial rate
Titijaya plus CREC

Jus to correct the info.

This post has been edited by propertybbb: Jan 8 2017, 06:10 PM
BEANCOUNTER
post Jan 8 2017, 06:17 PM

20k VIP Club
*********
All Stars
20,146 posts

Joined: May 2011
May i know if all sovo in malaysia compulsory to install smoke alarm in the entire units?

Can disable the smoke alarm rite if use for resi?
HarpArtist
post Jan 8 2017, 06:55 PM

Look at all my stars!!
*******
Senior Member
3,838 posts

Joined: Sep 2013


QUOTE(BEANCOUNTER @ Jan 8 2017, 06:17 PM)
May i know if all sovo in malaysia compulsory to install smoke alarm in the entire units?

Can disable the smoke alarm rite if use for resi?
*
no idea but just to share that summer suites i have experienced cooking and nothing happened hmm.gif
Quang1819
post Jan 8 2017, 06:55 PM

Look at all my stars!!
*******
Senior Member
2,604 posts

Joined: Dec 2012
QUOTE(max_cavalera @ Jan 8 2017, 03:59 PM)
U want chose that 290k unit ka?

I see no problem for u to pass to other buyer in case ur loan not succesful or u cancel...😄

Literally its really cheap compare to other neighbour ing development
*
sadly 299k finished liao cry.gif
David_77
post Jan 8 2017, 06:57 PM

In a hurry to make up for lost time!
*******
Senior Member
2,396 posts

Joined: Aug 2016


QUOTE(HarpArtist @ Jan 8 2017, 03:52 PM)
i salute this dev. jalan ampang home prices will be affordable in no time once vp
*
Better to pick up sub-sales?
Quang1819
post Jan 8 2017, 06:58 PM

Look at all my stars!!
*******
Senior Member
2,604 posts

Joined: Dec 2012
QUOTE(nova80 @ Jan 8 2017, 03:47 PM)
Thanks, Archery. Your assurance give a picece of mind this newbie who know nothing about property purchasing and alhaving unreliable agent only look after own interest.

I also asked the titijaya people despite agent's advise on get-a-unit-first-regardless-what. The salesperson say can entitle full refund since haven't choose any unit yet.

I didn't get any unit.
*
You stayed there until what time? lol
Quang1819
post Jan 8 2017, 06:59 PM

Look at all my stars!!
*******
Senior Member
2,604 posts

Joined: Dec 2012
QUOTE(archery @ Jan 8 2017, 03:06 PM)
Yes you will. I'm thinking also not to choose and get back the deposit
*
Mind telling why?
HarpArtist
post Jan 8 2017, 07:06 PM

Look at all my stars!!
*******
Senior Member
3,838 posts

Joined: Sep 2013


QUOTE(David_77 @ Jan 8 2017, 06:57 PM)
Better to pick up sub-sales?
*
but whats the game plan here. its like everytime you thought getting stable, the developers keep muntah supply into the market
David_77
post Jan 8 2017, 07:12 PM

In a hurry to make up for lost time!
*******
Senior Member
2,396 posts

Joined: Aug 2016


QUOTE(HarpArtist @ Jan 8 2017, 07:06 PM)
but whats the game plan here. its like everytime you thought getting stable, the developers keep muntah supply into the market
*
For developers and to an extend DBKL, I think it's just about money.

But for investors, could potentially pick up below valuation upon VP (from those lack holding power)? Unless this area goes south, could still see healthy return?
max_cavalera
post Jan 8 2017, 07:20 PM

rebirth
*******
Senior Member
5,613 posts

Joined: Jun 2006
From: Cyberjaya, Shah Alam, Ipoh



QUOTE(AskarPerang @ Jan 8 2017, 05:16 PM)
wow really BBB. kick start 2017 with BBB mode.
*
As long as the price below market value the surround...sure sudden insta BBB...

Investor got wolf sense of smell 😄
HarpArtist
post Jan 8 2017, 07:34 PM

Look at all my stars!!
*******
Senior Member
3,838 posts

Joined: Sep 2013


QUOTE(David_77 @ Jan 8 2017, 07:12 PM)
For developers and to an extend DBKL, I think it's just about money.

But for investors, could potentially pick up below valuation upon VP (from those lack holding power)? Unless this area goes south, could still see healthy return?
*
i quote my friend: better buy when halfway up than halfway down. wld stay clear of so.. "uncertain" mkt personally la.

This post has been edited by HarpArtist: Jan 8 2017, 07:34 PM
David_77
post Jan 8 2017, 07:37 PM

In a hurry to make up for lost time!
*******
Senior Member
2,396 posts

Joined: Aug 2016


QUOTE(HarpArtist @ Jan 8 2017, 07:34 PM)
i quote my friend: better buy when halfway up than halfway down. wld stay clear of so.. "uncertain"  mkt personally la.
*
Good quote 👍
BEANCOUNTER
post Jan 8 2017, 08:35 PM

20k VIP Club
*********
All Stars
20,146 posts

Joined: May 2011
QUOTE(HarpArtist @ Jan 8 2017, 06:55 PM)
no idea but just to share that summer suites i have experienced cooking and nothing happened hmm.gif
*
Maybe owner disable the smoke alarm and sprinkle system.
If fire happened...insurance wont cover lioa...

According to my knowledge all offices must have smoke alarm and water sprinkle system...and main door cant fix grilles.


nova80
post Jan 8 2017, 08:55 PM

Getting Started
**
Junior Member
197 posts

Joined: Apr 2009
QUOTE(Quang1819 @ Jan 8 2017, 06:55 PM)
sadly 299k finished liao  cry.gif
*
Well, don't have to be sad. Every floor higher they increase about 3.3k, so only the lowest floor get that. Those remaining goes up to 500k.
nova80
post Jan 8 2017, 08:57 PM

Getting Started
**
Junior Member
197 posts

Joined: Apr 2009
QUOTE(JonathanIB @ Jan 8 2017, 04:15 PM)
Jonathan here. Whatever unit for 430sf today all sold off. Left 601sf only.
*
Are you sure about that? I'm the last 50 to choose and flip thru 3 phases, half of them, and are 400k and above still available empty.
nova80
post Jan 8 2017, 09:05 PM

Getting Started
**
Junior Member
197 posts

Joined: Apr 2009
QUOTE(max_cavalera @ Jan 8 2017, 03:59 PM)
U want chose that 290k unit ka?

I see no problem for u to pass to other buyer in case ur loan not succesful or u cancel...😄

Literally its really cheap compare to other neighbour ing development
*
Indeed that is what attracts me in the first place. Cheap. Then this developer get greedy for all the responses. From 297k, now 299k. From having track record of charging 1k per floor higher, now 3.3k per floor higher. Agent are not given any privilege. Sign up early with them doesn't mean get it first. Still have to queue up for wristband. WTF. I doubt when the condo got problem, they will be deal with it with arrogant. No wonder I notice titijaya was blacklisted by agent in few prop forums.
Quang1819
post Jan 8 2017, 09:24 PM

Look at all my stars!!
*******
Senior Member
2,604 posts

Joined: Dec 2012
QUOTE(nova80 @ Jan 8 2017, 08:55 PM)
Well, don't have to be sad. Every floor higher they increase about 3.3k, so only the lowest floor get that. Those remaining goes up to 500k.
*
The weird thing is, I thought they said 1k increase for every higher storey?

This post has been edited by Quang1819: Jan 8 2017, 09:40 PM
HarpArtist
post Jan 8 2017, 09:25 PM

Look at all my stars!!
*******
Senior Member
3,838 posts

Joined: Sep 2013


QUOTE(BEANCOUNTER @ Jan 8 2017, 08:35 PM)
Maybe owner disable the smoke alarm and sprinkle system.
If fire happened...insurance wont cover lioa...

According to my knowledge all offices must have smoke alarm and water sprinkle system...and main door cant fix grilles.
*
but but... as i know, summer suites came sf with the kitchen equipment...
Quang1819
post Jan 8 2017, 09:35 PM

Look at all my stars!!
*******
Senior Member
2,604 posts

Joined: Dec 2012
QUOTE(nova80 @ Jan 8 2017, 09:05 PM)
Indeed that is what attracts me in the first place. Cheap. Then this developer get greedy for all the responses. From 297k, now 299k. From having track record of charging 1k per floor higher, now 3.3k per floor higher. Agent are not given any privilege. Sign up early with them doesn't mean get it first. Still have to queue up for wristband. WTF. I doubt when the condo got problem, they will be deal with it with arrogant. No wonder I notice titijaya was blacklisted by agent in few prop forums.
*
quite topkek from the way the devs. are treating their buyers
MaxKHOO
post Jan 8 2017, 10:28 PM

Getting Started
**
Junior Member
233 posts

Joined: Mar 2011


QUOTE(nova80 @ Jan 8 2017, 08:55 PM)
Well, don't have to be sad. Every floor higher they increase about 3.3k, so only the lowest floor get that. Those remaining goes up to 500k.
*
How you get RM500k? There are a total of 1110 units in the block with 30 units per floor. So there are 37 floors. If at Rm3300 increase per floor, the highest floor should be around RM420K for the 430 sf units

This post has been edited by MaxKHOO: Jan 8 2017, 10:29 PM
JonathanIB
post Jan 8 2017, 10:31 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(nova80 @ Jan 8 2017, 08:57 PM)
Are you sure about that? I'm the last 50 to choose and flip thru 3 phases, half of them, and are 400k and above still available empty.
*
Yes I am there to check as we selling this project. I am there till around 3pm. About the last two Or three customer which is my colleague choosing his unit. But there is still unit they haven't release. Its about 24 level only they release today
BEANCOUNTER
post Jan 8 2017, 10:38 PM

20k VIP Club
*********
All Stars
20,146 posts

Joined: May 2011
QUOTE(JonathanIB @ Jan 8 2017, 10:31 PM)
Yes I am there to check as we selling this project. I am there till around 3pm. About the last two Or three customer which is my colleague choosing his unit. But there is still unit they haven't release. Its about 24 level only they release today
*
Jonathan u earlier claimed that the smallest 430sq units all sold out.

Were they all taken up to 24storey or the entire block?
JonathanIB
post Jan 8 2017, 10:42 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(Quang1819 @ Jan 8 2017, 09:24 PM)
The weird thing is, I thought they said 1k increase for every higher storey?
*
Yeap. What been passing the message from developer is RM1k difference per floor. Actually in the end, many thing have some changes also. The layout for A1 is different in the end.
JonathanIB
post Jan 8 2017, 10:44 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(BEANCOUNTER @ Jan 8 2017, 10:38 PM)
Jonathan u earlier claimed that the smallest 430sq units all sold out.

Were they all taken up to 24storey or the entire block?
*
This is what I write "Jonathan here. Whatever unit for 430sf today all sold off. Left 601sf only." I say today, maybe bit misleading


Yes it is until the floor they release today. Cannot finish entire block today as the booking they receive is more than 600. But total unit for 430sf is around 800+. So how can entire block smile.gif

This post has been edited by JonathanIB: Jan 8 2017, 10:46 PM
MaxKHOO
post Jan 8 2017, 10:45 PM

Getting Started
**
Junior Member
233 posts

Joined: Mar 2011


Only 600 units released for sale today. Total units are 1110 units. So still got 510 units not yet release for sale

This post has been edited by MaxKHOO: Jan 8 2017, 10:45 PM
BEANCOUNTER
post Jan 8 2017, 10:58 PM

20k VIP Club
*********
All Stars
20,146 posts

Joined: May 2011
QUOTE(JonathanIB @ Jan 8 2017, 10:44 PM)
This is what I write "Jonathan here. Whatever unit for 430sf today all sold off. Left 601sf only."  I say today, maybe bit misleading
Yes it is until the floor they release today. Cannot finish entire block today as the booking they receive is more than 600. But total unit for 430sf is around 800+. So how can entire block smile.gif
*
Its ok. Just to clatify.
Quang1819
post Jan 8 2017, 10:58 PM

Look at all my stars!!
*******
Senior Member
2,604 posts

Joined: Dec 2012
QUOTE(JonathanIB @ Jan 8 2017, 10:42 PM)
Yeap. What been passing the message from developer is RM1k difference per floor. Actually in the end, many thing have some changes also. The layout for A1 is different in the end.
*
Yup, noticed about the layout design too
Uglyman
post Jan 8 2017, 11:04 PM

New Member
*
Junior Member
21 posts

Joined: Mar 2014
Hi all.
Was there today and found out that in the sales brief while waiting to select unit that it's not a dual key unit as said by agents but dev will build the missing door after CF. only those two design of the available three (I.e. Those with two toilets) will be affected
Uglyman
post Jan 8 2017, 11:08 PM

New Member
*
Junior Member
21 posts

Joined: Mar 2014
Dev had opened odd levels to the 1st batch and I guess even levels to the queueing batch. Theres no balloting for a lucky dip to get the cheaper units of 299k. What a let down. Agents were flabbergasted or least mine were 😂
JonathanIB
post Jan 8 2017, 11:08 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(Uglyman @ Jan 8 2017, 11:04 PM)
Hi all.
Was there today and found out that in the sales brief while waiting to select unit that it's not a dual key unit as said by agents but dev will build the missing door after CF. only those two design of the available three (I.e. Those with two toilets) will be affected
*
There is a reason on that as Sovo is under Office Suite status. They can't put a door there due to Rules & Regulation for commercial suites.

But anyway I think all party share all also on the dual key design. Just add a door will do. I think the newer design for A1 is better now as more space.
JonathanIB
post Jan 8 2017, 11:10 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(Uglyman @ Jan 8 2017, 11:08 PM)
Dev had opened odd levels to the 1st batch and I guess even levels to the queueing batch. Theres no balloting for a lucky dip to get the cheaper units of 299k. What a let down. Agents were flabbergasted or least mine were 😂
*
Haha no comment on that on the agent haha.

The initial method of choosing unit suppose to have one more step. But this is better as less complicated than initial plan
DavidKool
post Jan 8 2017, 11:22 PM

On my way
****
Junior Member
501 posts

Joined: Jun 2012
Hmm, how come all the responses like BBB for the sovo?

If SOHO, maybe la since this is phase 1, but 1.1k units in just 1 block but no buyers worry that sovo definitely classified as office in the future and cannot own stay or rented out like SOHO with HDA? Even now, sovo never officially treated as a resi but office.

Furthermore, another 3 more blocks of service apartment to go in just 6 acres land. I think another project of 2.4k units on the proposal and just opposite land? Not sure whether true or not.
propertybbb
post Jan 8 2017, 11:53 PM

Look at all my stars!!
*******
Senior Member
2,663 posts

Joined: Feb 2013
QUOTE(JonathanIB @ Jan 9 2017, 12:08 AM)
There is a reason on that as Sovo is under Office Suite status. They can't put a door there due to Rules & Regulation for commercial suites.

But anyway I think all party share all also on the dual key design. Just add a door will do. I think the newer design for A1 is better now as more space.
*
Can share thr new layout here?
MaxKHOO
post Jan 9 2017, 08:02 AM

Getting Started
**
Junior Member
233 posts

Joined: Mar 2011


How much is price of 601 sf units?
nova80
post Jan 9 2017, 11:26 AM

Getting Started
**
Junior Member
197 posts

Joined: Apr 2009
QUOTE(MaxKHOO @ Jan 8 2017, 10:28 PM)
How you get RM500k? There are a total of 1110 units in the block with 30 units per floor. So there are 37 floors. If at Rm3300 increase per floor, the highest floor should be around RM420K for the 430 sf units
*
user posted image
nova80
post Jan 9 2017, 11:28 AM

Getting Started
**
Junior Member
197 posts

Joined: Apr 2009
See that facilities view, top row.
Quang1819
post Jan 9 2017, 03:03 PM

Look at all my stars!!
*******
Senior Member
2,604 posts

Joined: Dec 2012
QUOTE(Uglyman @ Jan 8 2017, 11:04 PM)
Hi all.
Was there today and found out that in the sales brief while waiting to select unit that it's not a dual key unit as said by agents but dev will build the missing door after CF. only those two design of the available three (I.e. Those with two toilets) will be affected
*
Wait... So the A1 now it's actually not dual key?
JonathanIB
post Jan 9 2017, 03:55 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(Quang1819 @ Jan 9 2017, 03:03 PM)
Wait... So the A1 now it's actually not dual key?
*
QUOTE(propertybbb @ Jan 8 2017, 11:53 PM)
Can share thr new layout here?
*
It's still dual key concept design just due to office suites status, they cannot partition there. The red circle there is where to add in the partition door.


Attached thumbnail(s)
Attached Image Attached Image Attached Image
JonathanIB
post Jan 9 2017, 03:55 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


Will get a clearer version later as that's what I have in my phone now
gks
post Jan 9 2017, 04:09 PM

Look at all my stars!!
*******
Senior Member
3,831 posts

Joined: May 2008
I am amaze this project 1110 units but only 5+1 lifts provided. It is a whopping 220units/lift. To put in perspective, summer suites one block about 440units are with 4+1 lifts with ratio of 110units/ lift.

it should be at least 5 lifts on low zone and another 5 lifts on high zone for office suites.

This post has been edited by gks: Jan 9 2017, 04:12 PM
BEANCOUNTER
post Jan 9 2017, 05:18 PM

20k VIP Club
*********
All Stars
20,146 posts

Joined: May 2011
Very narrow walkway......
Dunno can carry tilam inside the unit or not
HarpArtist
post Jan 9 2017, 05:21 PM

Look at all my stars!!
*******
Senior Member
3,838 posts

Joined: Sep 2013


QUOTE(BEANCOUNTER @ Jan 9 2017, 05:18 PM)
Very narrow walkway......
Dunno can carry tilam inside the unit or not
*
the keyword here is airbnb. i struggle to see what sort of size u need to be to sleep in here with comfort. for lillipution maybe... most of the room 2 window is so small... worse than many kl budget hotel
Quang1819
post Jan 9 2017, 05:26 PM

Look at all my stars!!
*******
Senior Member
2,604 posts

Joined: Dec 2012
QUOTE(JonathanIB @ Jan 9 2017, 03:55 PM)
Will get a clearer version later as that's what I have in my phone now
*
That quality is fine. Thanks for the heads up smile.gif
propertybbb
post Jan 9 2017, 07:06 PM

Look at all my stars!!
*******
Senior Member
2,663 posts

Joined: Feb 2013
QUOTE(nova80 @ Jan 9 2017, 12:26 PM)
user posted image
*
Cannot see. I guess the 500k units are those 601sf?
Asali
post Jan 9 2017, 08:53 PM

Regular
******
Senior Member
1,680 posts

Joined: Oct 2012
I heard price has increase 10% after 500 units booked. Is that true?
JonathanIB
post Jan 9 2017, 09:04 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(propertybbb @ Jan 9 2017, 07:06 PM)
Cannot see. I guess the 500k units are those 601sf?
*
Actually when I see this chart there (I am 35 years old) I also have difficulty to see. The uncle beside me is like give up hahahaha 😂😂😂😭😭😭
JonathanIB
post Jan 9 2017, 09:05 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(Asali @ Jan 9 2017, 08:53 PM)
I heard price has increase 10% after  500 units booked. Is that true?
*
Percentage I not sure as didn't really count yet. But yes two differ by phase price
MaxKHOO
post Jan 10 2017, 12:10 AM

Getting Started
**
Junior Member
233 posts

Joined: Mar 2011


QUOTE(nova80 @ Jan 9 2017, 11:26 AM)
user posted image
*
Thanks for the Price List. Noted from the Price List, the price at Level 6 starts from RM341,200 for the 430 sq feet. If price of each floor increase is RM3300, why is there an increase of RM41K just over 5 levels if the lowest starts from RM300K?
LaBoost008
post Jan 10 2017, 08:56 AM

Casual
***
Junior Member
373 posts

Joined: Dec 2016
QUOTE(MaxKHOO @ Jan 10 2017, 12:10 AM)
Thanks for the Price List. Noted from the Price List, the price at Level 6 starts from RM341,200 for the 430 sq feet. If price of each floor increase is RM3300, why is there an increase of RM41K just over 5 levels if the lowest starts from RM300K?
*
not discounted yet? btw, air bnb can works here with so many units? very doubtfull. its a risky investment if tht is the selling point.
aaron1717
post Jan 10 2017, 09:33 AM

Chui Shui in Property Manyak Best!
********
All Stars
10,188 posts

Joined: Apr 2012
QUOTE(LaBoost008 @ Jan 10 2017, 08:56 AM)
not discounted yet? btw, air bnb can works here with so many units? very doubtfull. its a risky investment if tht is the selling point.
*
any project along jalan ampang also a doubtful investment.... depends on your own view.... others pricing above 1000 psf... airbnb nope, rental nope, appreciation nope.... this one the only issue seems high density and commercial title.... but compare to normal size condo... maybe its just 500 per block only... biggrin.gif biggrin.gif
JustNobody
post Jan 10 2017, 10:17 AM

Look at all my stars!!
*******
Senior Member
2,004 posts

Joined: Mar 2011
QUOTE(LaBoost008 @ Jan 10 2017, 08:56 AM)
not discounted yet? btw, air bnb can works here with so many units? very doubtfull. its a risky investment if tht is the selling point.
*
Yea, not sure what's the attractive points that it can be good in airbnb..
LaBoost008
post Jan 10 2017, 10:23 AM

Casual
***
Junior Member
373 posts

Joined: Dec 2016
QUOTE(JustNobody @ Jan 10 2017, 10:17 AM)
Yea, not sure what's the attractive points that it can be good in airbnb..
*
the only attractive point is the layout design is air bnb friendly.
boonboon
post Jan 10 2017, 11:54 PM

Casual
***
Junior Member
323 posts

Joined: Sep 2004


Why there is a big increase from 10th to 11th floor?
mthc
post Jan 10 2017, 11:59 PM

Look at all my stars!!
*******
Senior Member
4,525 posts

Joined: Feb 2006


Bloodbath in jalan ampang. Good luck
BEANCOUNTER
post Jan 11 2017, 12:02 AM

20k VIP Club
*********
All Stars
20,146 posts

Joined: May 2011
They beat the rest along jln ampang on price.

Many investors were hoping that this is empire or monoland brother come to rescue.
nova80
post Jan 11 2017, 06:59 AM

Getting Started
**
Junior Member
197 posts

Joined: Apr 2009
QUOTE(boonboon @ Jan 10 2017, 11:54 PM)
Why there is a big increase from 10th to 11th floor?
*
Greed.
AskarPerang
post Jan 11 2017, 08:13 AM

~tUPaI...~
*********
All Stars
23,688 posts

Joined: Aug 2007
From: Outer Space



QUOTE(BEANCOUNTER @ Jan 11 2017, 12:02 AM)
They beat the rest along jln ampang on price.

Many investors were hoping that this is empire or monoland brother come to rescue.
*
Location as well. Walking distance to existing LRT.

Can compare to Liberty Arc. Along MRR2 to be more precise the location. Offering better package but is far from transportation ease. Don't know can do airbnb or not.
BEANCOUNTER
post Jan 11 2017, 08:16 AM

20k VIP Club
*********
All Stars
20,146 posts

Joined: May 2011
QUOTE(AskarPerang @ Jan 11 2017, 08:13 AM)
Location as well. Walking distance to existing LRT.

Can compare to Liberty Arc. Along MRR2 to be more precise the location. Offering better package but is far from transportation ease. Don't know can do airbnb or not.
*
Why cant do? Its sovo.
aaron1717
post Jan 11 2017, 09:33 AM

Chui Shui in Property Manyak Best!
********
All Stars
10,188 posts

Joined: Apr 2012
QUOTE(BEANCOUNTER @ Jan 11 2017, 08:16 AM)
Why cant do? Its sovo.
*
i think he meant liberty.... not really sure is it good for airbnb or not... because of the location from public transportation...
aaron1717
post Jan 11 2017, 09:33 AM

Chui Shui in Property Manyak Best!
********
All Stars
10,188 posts

Joined: Apr 2012
QUOTE(boonboon @ Jan 10 2017, 11:54 PM)
Why there is a big increase from 10th to 11th floor?
*
maybe due to bare unit vs semi furnishing vs fully furnishing...
JonathanIB
post Jan 11 2017, 09:41 AM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


Basically the layout and location for 3rdnvenue best fit for short term stay
Uglyman
post Jan 12 2017, 10:21 AM

New Member
*
Junior Member
21 posts

Joined: Mar 2014
Dev sms that phase 1 of the private viewing had been sold out .. Congraz to those brave and bold
Uglyman
post Jan 12 2017, 10:22 AM

New Member
*
Junior Member
21 posts

Joined: Mar 2014
Carpark gotta buy at 53k. Tandem 65k
kenlaw72
post Jan 12 2017, 10:28 AM

On my way
****
Senior Member
697 posts

Joined: Feb 2013
QUOTE(Uglyman @ Jan 12 2017, 10:22 AM)
Carpark gotta buy at 53k. Tandem 65k
*
over supply this area.
i heard that cannot cooking at this sovo?
Uglyman
post Jan 12 2017, 10:30 AM

New Member
*
Junior Member
21 posts

Joined: Mar 2014
Yes my opinion that the private viewing though organized well - no mad rush but the info presented were in small print - I was the many who can't see it well. I must thank one particular participant there to raise hell that selected floors (odd vs even floors) were excluded from the first batch of viewers 1-300
Uglyman
post Jan 12 2017, 10:36 AM

New Member
*
Junior Member
21 posts

Joined: Mar 2014
Don't remember seeing kitchen in the layout. But that wouldn't stop us from boiling water ... For Maggie mee lol
Uglyman
post Jan 12 2017, 10:37 AM

New Member
*
Junior Member
21 posts

Joined: Mar 2014
Though it's reported cheap at 299k it's very very limited that it's not made known to the those attending 😅😅
gks
post Jan 12 2017, 10:40 AM

Look at all my stars!!
*******
Senior Member
3,831 posts

Joined: May 2008
QUOTE(kenlaw72 @ Jan 12 2017, 10:28 AM)
over supply this area.
i heard that cannot cooking at this sovo?
*
If you see the layout, it will only permit either pantry or living area not both. Also not sure whether drain, water supply and electricity points will be provided or not.
Uglyman
post Jan 12 2017, 11:12 AM

New Member
*
Junior Member
21 posts

Joined: Mar 2014
Did anyone calc the per sqft for the preview units vs the current units avail at M-suites or other current condos along Jalan ampang?
aaron1717
post Jan 12 2017, 11:17 AM

Chui Shui in Property Manyak Best!
********
All Stars
10,188 posts

Joined: Apr 2012
QUOTE(Uglyman @ Jan 12 2017, 10:37 AM)
Though it's reported cheap at 299k it's very very limited that it's not made known to the those attending 😅😅
*
err... they are selling one block only... i believe your agent show u the layout right... haha... 299k should be the lowest floor... and only 24 units for grabs for that particular level? i think its quite rational to assume this even they didn't inform i guess... and 700 ppl snatching for 24 units... poof... gone in 10 mins maybe.... just that the price increment for each floor really higher than usual... sweat.gif sweat.gif
aaron1717
post Jan 12 2017, 11:18 AM

Chui Shui in Property Manyak Best!
********
All Stars
10,188 posts

Joined: Apr 2012
QUOTE(Uglyman @ Jan 12 2017, 11:12 AM)
Did anyone calc the per sqft for the preview units vs the current units avail at M-suites or other current condos along Jalan ampang?
*
generally nett pricing wise... this project still lower than most of it in term of psf.... launching nett price vs launching nett price...
Uglyman
post Jan 12 2017, 11:20 AM

New Member
*
Junior Member
21 posts

Joined: Mar 2014
I read u Aaron but there's was supposed to a balloting for the very limited units. The dev ppl tells me then that the balloting was decidedly cancelled.
We will queue overbite even if there's a ballot for one 299k unit. 😂
Uglyman
post Jan 12 2017, 11:22 AM

New Member
*
Junior Member
21 posts

Joined: Mar 2014
If there's any one here reading for TTj , my congraz to them for a successful mktg effort. Kudos👍🏼🎉
aaron1717
post Jan 12 2017, 11:31 AM

Chui Shui in Property Manyak Best!
********
All Stars
10,188 posts

Joined: Apr 2012
QUOTE(Uglyman @ Jan 12 2017, 11:20 AM)
I read u Aaron but there's was supposed to a balloting for the very limited units. The dev ppl tells me then that the balloting was decidedly cancelled.
We will queue overbite even if there's a ballot for one 299k unit. 😂
*
yeah... i think many kena also.... a few things changed i guess in the event.... and if ppl still going for it... means there are value for this project... despite all the negativity....
Uglyman
post Jan 12 2017, 12:10 PM

New Member
*
Junior Member
21 posts

Joined: Mar 2014
My own feel was that I was too ambitious aka greedy when presented by a development to ANY units below 300k. I guess our mindsets is not being used to see such lower offers in a historical perspective. Hope more developers will come onboard and not shortchange us buyers.
JonathanIB
post Jan 12 2017, 09:51 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(aaron1717 @ Jan 12 2017, 11:17 AM)
err... they are selling one block only... i believe your agent show u the layout right... haha... 299k should be the lowest floor... and only 24 units for grabs for that particular level? i think its quite rational to assume this even they didn't inform i guess... and 700 ppl snatching for 24 units... poof... gone in 10 mins maybe....  just that the price increment for each floor really higher than usual...  sweat.gif  sweat.gif
*
Exactly
JonathanIB
post Jan 12 2017, 09:54 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


Anyway I think it's quite too ambitious if u can get 299k. For me as long as after nett price is below 340k is fine and that's the right mindset. If got the better then its bonus
JonathanIB
post Jan 14 2017, 12:46 AM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


First Phase Fully booked.

http://www.malaysianewpropertylaunch.com/n...aya-new-launch/

This post has been edited by JonathanIB: Jan 14 2017, 12:46 AM
kelly140117
post Jan 14 2017, 02:32 PM

New Member
*
Newbie
2 posts

Joined: Jan 2017


QUOTE(Veda @ Dec 1 2016, 06:45 PM)
Agreed.

Just pronounce it as "Third Avenue", easier that way.

Anyway, do update us when the serviced apartment phase are open for booking ....
*
Last week launch was crazy.. so many people there and stay overnight.. Btw, i think they just have a new name called Neu Suite..Nice name..
AskarPerang
post Jan 14 2017, 02:44 PM

~tUPaI...~
*********
All Stars
23,688 posts

Joined: Aug 2007
From: Outer Space



As usual nice unbiased write up by PropCafe.

http://propcafe.net/propcafe-buyer-diary-w...ssy-row-ampang/
propertybbb
post Jan 15 2017, 07:31 PM

Look at all my stars!!
*******
Senior Member
2,663 posts

Joined: Feb 2013
QUOTE(AskarPerang @ Jan 14 2017, 03:44 PM)
As usual nice unbiased write up by PropCafe.

http://propcafe.net/propcafe-buyer-diary-w...ssy-row-ampang/
*
The buyer in the write up seems very positive. Density is the killer but i think if can only afford 300k prop now, i think this location, cannot be picky already. Lol. At least, new generation buyers take action to own a piece in kl city centre rather than jus complaining and do nothing..or want big house n relying on FAMA support.
sirazlan
post Jan 15 2017, 08:38 PM

New Member
*
Junior Member
49 posts

Joined: Feb 2016


So rm300k for a sovo..but how much is the price for serviced apartment? Has it launched yet?
LaBoost008
post Jan 15 2017, 09:26 PM

Casual
***
Junior Member
373 posts

Joined: Dec 2016
QUOTE(sirazlan @ Jan 15 2017, 08:38 PM)
So rm300k for a sovo..but how much is the price for serviced apartment? Has it launched yet?
*
price inclusive gst since this is commercial?
propertybbb
post Jan 15 2017, 10:09 PM

Look at all my stars!!
*******
Senior Member
2,663 posts

Joined: Feb 2013
QUOTE(LaBoost008 @ Jan 15 2017, 10:26 PM)
price inclusive gst since this is commercial?
*
Absorbed by developer.
JonathanIB
post Jan 16 2017, 10:05 AM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(propertybbb @ Jan 15 2017, 07:31 PM)
The buyer in the write up seems very positive. Density is the killer but i think if can only afford 300k prop now, i think this location, cannot be picky already. Lol. At least, new generation buyers take action to own a piece in kl city centre rather than jus complaining and do nothing..or want big house n relying on FAMA support.
*
Right To the point

JonathanIB
post Jan 16 2017, 10:06 AM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(sirazlan @ Jan 15 2017, 08:38 PM)
So rm300k for a sovo..but how much is the price for serviced apartment? Has it launched yet?
*
Not yet. But price wont be this low for sure
JonathanIB
post Feb 18 2017, 09:05 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


Coming Soon... Stay tune on more news
JonathanIB
post Feb 27 2017, 10:28 AM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


New unit release soon
Booking RM3k
surf-it
post Feb 27 2017, 02:20 PM

Landlord
******
Senior Member
1,747 posts

Joined: May 2005
From: Malaysia
QUOTE(JonathanIB @ Feb 27 2017, 10:28 AM)
New unit release soon
Booking RM3k
*
can advise the price and package?
thanks
JonathanIB
post Feb 27 2017, 02:21 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(surf-it @ Feb 27 2017, 02:20 PM)
can advise the price and package?
thanks
*
To be finalize soon. Can register for fast latest updates

This post has been edited by JonathanIB: Feb 27 2017, 02:22 PM
Better Life
post Mar 1 2017, 06:45 PM

New Member
*
Junior Member
44 posts

Joined: Aug 2013
QUOTE(JonathanIB @ Feb 27 2017, 10:28 AM)
New unit release soon
Booking RM3k
*
Boss,

Are the new units the left-overs from the Sovo block or is the developer launching one of the serviced apartment blocks?

Where do I register?

Name of the payee for the RM3k cheque?

Thank you.

JonathanIB
post Mar 1 2017, 08:15 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(Better Life @ Mar 1 2017, 06:45 PM)
Boss,

Are the new units the left-overs from the Sovo block or is the developer launching one of the serviced apartment blocks?

Where do I register?

Name of the payee for the RM3k cheque?

Thank you.
*
Done
propertybbb
post Mar 1 2017, 11:21 PM

Look at all my stars!!
*******
Senior Member
2,663 posts

Joined: Feb 2013
QUOTE(JonathanIB @ Mar 1 2017, 09:15 PM)
Done
*
Wats the pricing this time?
JonathanIB
post Mar 2 2017, 12:01 AM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(propertybbb @ Mar 1 2017, 11:21 PM)
Wats the pricing this time?
*
To Be announce very soon!
resident
post Mar 2 2017, 04:18 AM

New Member
*
Junior Member
31 posts

Joined: Nov 2008


I'm interested in this project.

Agents who can help me secure a good unit, please PM me.

Thanks.
tcch
post Mar 13 2017, 12:38 AM

Getting Started
**
Junior Member
148 posts

Joined: Oct 2016


QUOTE(JonathanIB @ Mar 2 2017, 12:01 AM)
To Be announce very soon!
*
Please inform me when the units to be released.very interested in this project
Quang1819
post Mar 17 2017, 10:47 AM

Look at all my stars!!
*******
Senior Member
2,604 posts

Joined: Dec 2012
Anyone knows any banker that can finance 85% loan?
Quang1819
post Mar 19 2017, 03:49 PM

Look at all my stars!!
*******
Senior Member
2,604 posts

Joined: Dec 2012
QUOTE(JonathanIB @ Jan 12 2017, 09:54 PM)
Anyway I think it's quite too ambitious if u can get 299k. For me as long as after nett price is below 340k is fine and that's the right mindset. If got the better then its bonus
*
Do you know any banker that can loan up to 85-90% ah?
propertybbb
post Mar 19 2017, 06:48 PM

Look at all my stars!!
*******
Senior Member
2,663 posts

Joined: Feb 2013
QUOTE(Quang1819 @ Mar 17 2017, 11:47 AM)
Anyone knows any banker that can finance 85% loan?
*
It is office suites...so even u have more than 2 props..u still can get 85pc loan.
Quang1819
post Mar 19 2017, 06:53 PM

Look at all my stars!!
*******
Senior Member
2,604 posts

Joined: Dec 2012
QUOTE(propertybbb @ Mar 19 2017, 06:48 PM)
It is office suites...so even u have more than 2 props..u still can get 85pc loan.
*
So far all bankers only offered 80 max. You know anyone can do 85?

This post has been edited by Quang1819: Mar 19 2017, 06:53 PM
wnvoo
post Mar 20 2017, 11:52 PM

Getting Started
**
Junior Member
69 posts

Joined: Nov 2009


any unit below 300
JonathanIB
post Mar 21 2017, 03:09 AM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(wnvoo @ Mar 20 2017, 11:52 PM)
any unit below 300
*
It wont be anymore

QUOTE(Quang1819 @ Mar 19 2017, 03:49 PM)
Do you know any banker that can loan up to 85-90% ah?
*
If the agent tell u 90% can get... either ask him for it or forget about the agent.


QUOTE(Quang1819 @ Mar 17 2017, 10:47 AM)
Anyone knows any banker that can finance 85% loan?
*
Not at the moment. Now max 80%. still waiting banks further approval.
TSaccetera
post Mar 23 2017, 11:42 PM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


who are the panel banks?
JonathanIB
post Mar 25 2017, 01:03 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(accetera @ Mar 23 2017, 11:42 PM)
who are the panel banks?
*
UOB, RHB, PBB (Waiting Approval), CIMB and etc...
poilamixus
post Mar 25 2017, 02:59 PM

Getting Started
**
Junior Member
52 posts

Joined: Dec 2016
QUOTE(JonathanIB @ Mar 25 2017, 01:03 PM)
UOB, RHB, PBB (Waiting Approval), CIMB and etc...
*
RHB could get 85% for commercial loan
Quang1819
post Mar 26 2017, 09:46 AM

Look at all my stars!!
*******
Senior Member
2,604 posts

Joined: Dec 2012
QUOTE(poilamixus @ Mar 25 2017, 02:59 PM)
RHB could get 85% for commercial loan
*
How come when I asked they only offer 80 lol
lightbulk
post Mar 26 2017, 12:32 PM

On my way
****
Junior Member
599 posts

Joined: Jun 2013
Wow 1000++ unit sovo with near 3000++ rooms.
With no carpark provided means yr Target tenant shouldn't have car and I believe less than 10% buyer for own stay. So when completed u have to compete with 2000+ rooms.
Skip for me.
JonathanIB
post Mar 26 2017, 02:57 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(Quang1819 @ Mar 26 2017, 09:46 AM)
How come when I asked they only offer 80 lol
*
Our latest updates also 80%
Pken
post Apr 3 2017, 06:53 PM

New Member
*
Junior Member
6 posts

Joined: Mar 2010
QUOTE(JonathanIB @ Jan 14 2017, 12:46 AM)
Jonathan, seems like you are the expert here. When is the estimated completion date? I heard some say 2021 during phase 1. Now 2022 for those promoting phase 2. Phase 1 and 2 eventually same building, can't be CCC on different date. Any idea?
JonathanIB
post Apr 4 2017, 01:35 AM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(Pken @ Apr 3 2017, 06:53 PM)
Jonathan, seems like you are the expert here. When is the estimated completion date? I heard some say 2021 during phase 1. Now 2022 for those promoting phase 2. Phase 1 and 2 eventually same building, can't be CCC on different date. Any idea?
*
Estimation is 2021. TheEdge put 2022 and some more freehold. So some wrong info there.

Anywhere if it's from SPA will be 48 mths from signing

This post has been edited by JonathanIB: Apr 4 2017, 01:35 AM
Pken
post Apr 4 2017, 10:32 PM

New Member
*
Junior Member
6 posts

Joined: Mar 2010
QUOTE(JonathanIB @ Apr 4 2017, 01:35 AM)
Estimation is 2021. TheEdge put 2022 and some more freehold. So some wrong info there.

Anywhere if it's from SPA will be 48 mths from signing
*
Thank you Jonathan. Anytime in future we can catch up, lunch on me. Btw, I am William's colleague, kenneth chai. We have not met but you did me a favor already 😊
JonathanIB
post Apr 4 2017, 11:14 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(Pken @ Apr 4 2017, 10:32 PM)
Thank you Jonathan.  Anytime in future we can catch up, lunch on me. Btw, I am William's colleague, kenneth chai. We have not met but you did me a favor already 😊
*
Oh sure why not. Anytime we arrange earlier will do. Can ask William together as well
JonathanIB
post Apr 7 2017, 01:48 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(QQwen @ Apr 7 2017, 01:35 PM)
Any update from this project?
*
yes. There will be SPA signing soon for the buyers and new units will be releasing soon.
JonathanIB
post Apr 14 2017, 11:57 AM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(pasadena @ Apr 14 2017, 11:15 AM)
When is the signing of SPA?
*
Its your arrangement with developer lawyer.
It shall be start from 24th April onwards, You shall get the text from developer soon for appointment for SPA
logan_pires
post Apr 26 2017, 02:06 PM

New Member
*
Newbie
3 posts

Joined: Dec 2016


Anyone got 85% ?
santhir
post Apr 27 2017, 01:12 AM

New Member
*
Junior Member
7 posts

Joined: Apr 2017
parking

JonathanIB
post Apr 27 2017, 12:06 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


-

This post has been edited by JonathanIB: Apr 27 2017, 12:07 PM
JonathanIB
post Apr 27 2017, 12:06 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(logan_pires @ Apr 26 2017, 02:06 PM)
Anyone got 85% ?
*
yeah some my client got
Depends on cases
JonathanIB
post Apr 28 2017, 08:54 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


Buyer is started to sign SPA now and then. Will have unit release soon
logan_pires
post Apr 29 2017, 03:42 AM

New Member
*
Newbie
3 posts

Joined: Dec 2016


I only got 80%
But my agent told me she's trying for another 5% from the devoloper
Is this possible ?
nda1219
post Apr 29 2017, 03:53 AM

Getting Started
**
Junior Member
217 posts

Joined: Sep 2014
Hello sifus, when the phase 2 will be launching?
JonathanIB
post Apr 30 2017, 07:42 AM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(nda1219 @ Apr 29 2017, 03:53 AM)
Hello sifus, when the phase 2 will be launching?
*
As in service apartment or the new release of the unit?
Serv Apart no so fast. Probaly Year end (TBC). New release can ask already
Some of my client already book

This post has been edited by JonathanIB: Apr 30 2017, 07:43 AM
JonathanIB
post Jun 1 2017, 01:37 AM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


Now all new release unit is coming with one carpark. Still have some nice release unit
mpigforever
post Jun 1 2017, 04:52 AM

New Member
*
Junior Member
36 posts

Joined: Mar 2016
QUOTE(JonathanIB @ Jun 1 2017, 01:37 AM)
Now all new release unit is coming with one carpark. Still have some nice release unit
*
PM me details pls
michaelppty
post Jun 1 2017, 11:31 AM

Getting Started
**
Junior Member
187 posts

Joined: Jul 2011
pm pls
boonboon
post Jun 2 2017, 12:40 PM

Casual
***
Junior Member
323 posts

Joined: Sep 2004


send me details as well, thanks
JonathanIB
post Jun 2 2017, 03:20 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(boonboon @ Jun 2 2017, 12:40 PM)
send me details as well, thanks
*
QUOTE(michaelppty @ Jun 1 2017, 11:31 AM)
pm pls
*
QUOTE(mpigforever @ Jun 1 2017, 04:52 AM)
PM me details pls
*
Done
setandan
post Jun 2 2017, 06:23 PM

New Member
*
Junior Member
44 posts

Joined: Dec 2004
pm me details
JonathanIB
post Jun 2 2017, 06:32 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(setandan @ Jun 2 2017, 06:23 PM)
pm me details
*
Done
warrior3
post Jun 4 2017, 05:41 AM

New Member
*
Newbie
1 posts

Joined: Mar 2012
QUOTE(JonathanIB @ Jun 2 2017, 06:32 PM)
Done
*
Pm details please
JonathanIB
post Jun 4 2017, 09:49 AM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(warrior3 @ Jun 4 2017, 05:41 AM)
Pm details please
*
Done
rachel_xxx
post Jun 4 2017, 02:53 PM

Look at all my stars!!
*******
Senior Member
2,294 posts

Joined: Sep 2009
QUOTE(JonathanIB @ Jun 1 2017, 01:37 AM)
Now all new release unit is coming with one carpark. Still have some nice release unit
*
price same?
JonathanIB
post Jun 4 2017, 06:40 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(rachel_xxx @ Jun 4 2017, 02:53 PM)
price same?
*
Slight increase and with one Carpark price
budang
post Jun 7 2017, 04:20 PM

Enthusiast
*****
Junior Member
974 posts

Joined: Dec 2012


QUOTE(JonathanIB @ Jun 4 2017, 06:40 PM)
Slight increase and with one Carpark price
*
PM pls
frenzyguy
post Jun 19 2017, 03:59 PM

New Member
*
Junior Member
22 posts

Joined: Mar 2011


pm me pls
JonathanIB
post Jun 27 2017, 12:13 AM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(budang @ Jun 7 2017, 04:20 PM)
PM pls
*
QUOTE(frenzyguy @ Jun 19 2017, 03:59 PM)
pm me pls
*
Done
BaH2
post Jul 2 2017, 10:16 PM

New Member
*
Junior Member
23 posts

Joined: Oct 2007


Pm please
JonathanIB
post Jul 3 2017, 01:59 AM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(BaH2 @ Jul 2 2017, 10:16 PM)
Pm please
*
Done
michaelppty
post Jul 3 2017, 09:57 AM

Getting Started
**
Junior Member
187 posts

Joined: Jul 2011
pm
JonathanIB
post Jul 3 2017, 07:59 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(michaelppty @ Jul 3 2017, 09:57 AM)
pm
*
Done
MaydelynGE
post Jul 7 2017, 12:34 PM

New Member
*
Junior Member
37 posts

Joined: Apr 2013


PM please
musclemass
post Jul 20 2017, 12:29 PM

Enthusiast
*****
Senior Member
934 posts

Joined: Apr 2007
pm
JonathanIB
post Jul 20 2017, 02:50 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(musclemass @ Jul 20 2017, 12:29 PM)
pm
*
Done
JonathanIB
post Jul 20 2017, 02:51 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(MaydelynGE @ Jul 7 2017, 12:34 PM)
PM please
*
Done
boonboon
post Jul 28 2017, 12:05 AM

Casual
***
Junior Member
323 posts

Joined: Sep 2004


Any issue with this project after CREC out from Bandar Malaysia project?
JonathanIB
post Jul 31 2017, 01:33 AM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(boonboon @ Jul 28 2017, 12:05 AM)
Any issue with this project after CREC out from Bandar Malaysia project?
*
Not related smile.gif
It's different matter. Case by case, project by project
Learjet35
post Jul 31 2017, 07:12 AM

500hp
******
Senior Member
1,931 posts

Joined: Mar 2008


QUOTE(JonathanIB @ Jul 31 2017, 01:33 AM)
Not related smile.gif
It's different matter. Case by case, project by project
*
Pls PM the project details and any unit available.thanks

This post has been edited by Learjet35: Jul 31 2017, 07:13 AM
me02
post Aug 3 2017, 05:14 PM

New Member
*
Newbie
2 posts

Joined: Jul 2015
pm please
JonathanIB
post Aug 6 2017, 11:58 AM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(me02 @ Aug 3 2017, 05:14 PM)
pm please
*
Done
Quang1819
post Aug 16 2017, 11:14 PM

Look at all my stars!!
*******
Senior Member
2,604 posts

Joined: Dec 2012
QUOTE(JonathanIB @ Apr 27 2017, 12:06 PM)
yeah some my client got
Depends on cases
*
Wahhh I thought all 80 one last time. It's because of that got cancelled it off
JonathanIB
post Aug 16 2017, 11:36 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(Quang1819 @ Aug 16 2017, 11:14 PM)
Wahhh I thought all 80 one last time. It's because of that got cancelled it off
*
now have 85%. Bank starting not wanna take the risk ma. After one bank allow, many bank also will follow now.
Quang1819
post Aug 16 2017, 11:55 PM

Look at all my stars!!
*******
Senior Member
2,604 posts

Joined: Dec 2012
QUOTE(JonathanIB @ Aug 16 2017, 11:36 PM)
now have 85%. Bank starting not wanna take the risk ma. After one bank allow, many bank also will follow now.
*
will it ever be 90
JonathanIB
post Aug 17 2017, 12:33 AM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


Haha dont think about it
propertybbb
post Aug 19 2017, 09:07 AM

Look at all my stars!!
*******
Senior Member
2,663 posts

Joined: Feb 2013
the developer holds on the second block? heard many dropout units from the first block after bbb scene on launched day.
BEANCOUNTER
post Aug 19 2017, 09:52 AM

20k VIP Club
*********
All Stars
20,146 posts

Joined: May 2011
QUOTE(propertybbb @ Aug 19 2017, 09:07 AM)
the developer holds on the second block? heard many dropout units from the first block after bbb scene on launched day.
*
Why ppl dropped units? Better buy came out elsewhere?
JonathanIB
post Aug 19 2017, 12:57 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


As usual loan reject is the main reason. It's same for majority Prelaunch smile.gif
The only thing is they release out and let ppl see rather than hide it so looks good smile.gif
tcch
post Aug 28 2017, 11:44 AM

Getting Started
**
Junior Member
148 posts

Joined: Oct 2016


what is the selling price for neu suite 430sq ft?interested and someone here could pm me?
JonathanIB
post Aug 29 2017, 11:26 AM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(tcch @ Aug 28 2017, 11:44 AM)
what is the selling price for neu suite 430sq ft?interested and someone here could pm me?
*
e

This post has been edited by JonathanIB: Sep 1 2017, 01:00 PM
jasonkyc
post Aug 29 2017, 11:36 AM

New Member
*
Junior Member
12 posts

Joined: Jan 2012


when completion ?
JonathanIB
post Aug 29 2017, 11:04 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(jasonkyc @ Aug 29 2017, 11:36 AM)
when completion ?
*
2021
meadow87
post Aug 31 2017, 12:26 AM

New Member
*
Junior Member
40 posts

Joined: Mar 2009
QUOTE(JonathanIB @ Aug 29 2017, 11:26 AM)
Done
*
Please PM me too
Nikmon
post Aug 31 2017, 09:11 AM

Regular
******
Senior Member
1,780 posts

Joined: Nov 2010


QUOTE(JonathanIB @ Aug 19 2017, 12:57 PM)
As usual loan reject is the main reason. It's same for majority Prelaunch smile.gif
The only thing is they release out and let ppl see rather than hide it so looks good smile.gif
*
why always blame bank reject the loan, can't you just think

if they are so many buyer at the launch day, shouldn't the waiting list long enough to cover all the rejection, highly likely the first day BBB scene is just a show, stop blaming bank for the rejection as based on the statistic publish, the approval rate is high as 70%....
JonathanIB
post Sep 1 2017, 12:26 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(Nikmon @ Aug 31 2017, 09:11 AM)
why always blame bank reject the loan, can't you just think

if they are so many buyer at the launch day, shouldn't the waiting list long enough to cover all the rejection, highly likely the first day BBB scene is just a show, stop blaming bank for the rejection as based on the statistic publish, the approval rate is high as 70%....
*
Approval rate 70%? smile.gif
even approval rate 70% as u claim, believe still have 30% is reject right?

Anyway, its open thought. If u think its a show, then its a show.
JonathanIB
post Sep 1 2017, 12:55 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


3rdnvenue is strategically located opposite of Glenegale & Great Eastern Mall.

This is a Below Market Price Project as its around RM900psf comparing same spot project which is above RM1200psf.

There are only two size from 430sf and 601sf.

The lowest available unit is nett price from RM390,420 now.

This post has been edited by JonathanIB: Sep 1 2017, 12:55 PM
BEANCOUNTER
post Sep 1 2017, 03:08 PM

20k VIP Club
*********
All Stars
20,146 posts

Joined: May 2011
QUOTE(Nikmon @ Aug 31 2017, 09:11 AM)
why always blame bank reject the loan, can't you just think

if they are so many buyer at the launch day, shouldn't the waiting list long enough to cover all the rejection, highly likely the first day BBB scene is just a show, stop blaming bank for the rejection as based on the statistic publish, the approval rate is high as 70%....
*
I believe tis embassy row 1st phase is office...therefore migjt not be included in the official 70% as its deemed commercial loan.

The 70% is housing loan.
Nikmon
post Sep 1 2017, 04:44 PM

Regular
******
Senior Member
1,780 posts

Joined: Nov 2010


QUOTE(BEANCOUNTER @ Sep 1 2017, 03:08 PM)
I believe tis embassy row 1st phase is office...therefore migjt not be included in the official 70% as its deemed commercial loan.

The 70% is housing loan.
*
Are you suggesting that the rejection should be higher that, 50 or 60 rejection?

Bank is nothing but license loan shark, their income is come from your interest, they are more desperate to loan you than you want to loan from them.

If you are a genuie investor you should know that how easy to get approval.
JonathanIB
post Sep 2 2017, 10:43 AM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(Nikmon @ Sep 1 2017, 04:44 PM)
Are you suggesting that the rejection should be higher that, 50 or 60 rejection?

Bank is nothing but license loan shark, their income is come from your interest, they are more desperate to loan you than you want to loan from them.

If you are a genuie investor you should know that how easy to get approval.
*
Problem is a lot amateur investor or first time investor. Not everyone profile is as strong as season investor

Also bank do getting stricter every year
cyrus_evil89
post Sep 9 2017, 10:02 PM

Getting Started
**
Junior Member
133 posts

Joined: Sep 2015
pm neu suites pls
boonboon
post Sep 11 2017, 09:59 AM

Casual
***
Junior Member
323 posts

Joined: Sep 2004


Have any show room for take a look?
JonathanIB
post Nov 12 2017, 01:50 AM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


Still have low floor unit
hairi82
post Feb 20 2018, 04:39 PM

Getting Started
**
Junior Member
92 posts

Joined: Feb 2018
Hi, just got my loan approve today margin with 80%..very low entry for investment 3k only..hopefully it will be a success in 2021

This post has been edited by hairi82: Mar 5 2018, 04:27 PM
hairi82
post Mar 5 2018, 04:31 PM

Getting Started
**
Junior Member
92 posts

Joined: Feb 2018
QUOTE(JonathanIB @ Sep 1 2017, 12:55 PM)
3rdnvenue is strategically located opposite of Glenegale & Great Eastern Mall.

This is a Below Market Price Project as its around RM900psf comparing same spot project which is above RM1200psf.

There are only two size from 430sf and 601sf.

The lowest available unit is nett price from RM390,420 now.
*
anybody here already got claim by developer for progresive payment?

This post has been edited by hairi82: Mar 16 2018, 08:45 PM
hairi82
post Mar 14 2018, 08:54 AM

Getting Started
**
Junior Member
92 posts

Joined: Feb 2018
Hi, until 14th march 2018, my company, Titijaya Land Berhad is giving away a special Angpao rebate of rm8888 if you make a booking before this date..(agent send to me)

Today will be last day to get cny angpao..rebate will be paid during 2b stage completed.. rclxms.gif rclxms.gif

This post has been edited by hairi82: Mar 14 2018, 08:55 AM
mhafiz999
post Apr 7 2018, 04:47 PM

New Member
*
Newbie
4 posts

Joined: Apr 2018
QUOTE(hairi82 @ Mar 14 2018, 08:54 AM)
Hi, until 14th march 2018, my company, Titijaya Land Berhad is giving away a special Angpao rebate of rm8888 if you make a booking before this date..(agent send to me)

Today will be last day to get cny angpao..rebate will be paid during 2b stage completed.. rclxms.gif  rclxms.gif
*
can i know how much rebate u got ?
spa price ?
loan amount ?
net price ?
hairi82
post Apr 7 2018, 09:03 PM

Getting Started
**
Junior Member
92 posts

Joined: Feb 2018
QUOTE(mhafiz999 @ Apr 7 2018, 04:47 PM)
can i know how much rebate u got ?
spa price ?
loan amount ?
net price ?
*
today got talk about airbnb at showhouse..by 1 company name widebed..quite convincing to venture into airbnb for this property..my nett price around 343k after all rebate
propertybbb
post Apr 8 2018, 01:23 PM

Look at all my stars!!
*******
Senior Member
2,663 posts

Joined: Feb 2013
Airbnb heaven in this part of ampang...all aimed to be airbnb..massive supplies with same target and objective. Kaolat
mhafiz999
post Apr 8 2018, 06:52 PM

New Member
*
Newbie
4 posts

Joined: Apr 2018
QUOTE(hairi82 @ Apr 7 2018, 09:03 PM)
today got talk about airbnb at showhouse..by 1 company name widebed..quite convincing to venture into airbnb for this property..my nett price around 343k after all rebate
*
Which level your unit ?
Spa price how much ?

Sorry asking too much.
Hehe

hairi82
post Apr 9 2018, 12:53 AM

Getting Started
**
Junior Member
92 posts

Joined: Feb 2018
QUOTE(mhafiz999 @ Apr 8 2018, 06:52 PM)
Which level your unit ?
Spa price how much ?

Sorry asking too much.
Hehe
*
mine 6 floor 2r2b and 1cp..spa 441,200 including gst..got rebate gst+15%+8888

during talk day, developer said 1 man mr koh from penang bought 140 unit comprise about 5 level for this project..already paid booking..i dont know if dev goreng us..if true he must be very taikor and confident with this project..

This post has been edited by hairi82: Apr 9 2018, 01:04 AM
Quang1819
post Apr 9 2018, 01:34 AM

Look at all my stars!!
*******
Senior Member
2,604 posts

Joined: Dec 2012
QUOTE(propertybbb @ Apr 8 2018, 01:23 PM)
Airbnb heaven in this part of ampang...all aimed to be airbnb..massive supplies with same target and objective. Kaolat
*
Got a few thousands units there, all also either aim to rent to expat or Airbnb. Lets see how they compete lol
Quang1819
post Apr 9 2018, 01:36 AM

Look at all my stars!!
*******
Senior Member
2,604 posts

Joined: Dec 2012
QUOTE(hairi82 @ Apr 9 2018, 12:53 AM)
mine 6 floor 2r2b and 1cp..spa 441,200 including gst..got rebate gst+15%+8888

during talk day, developer said 1 man mr koh from penang bought 140 unit comprise about 5 level for this project..already paid booking..i dont know if dev goreng us..if true he must be very taikor and confident with this project..
*
One single bloke bought 140 units? LOL

And confident in Titijaya? laugh.gif
mhafiz999
post Apr 13 2018, 08:09 AM

New Member
*
Newbie
4 posts

Joined: Apr 2018
QUOTE(hairi82 @ Apr 9 2018, 12:53 AM)
mine 6 floor 2r2b and 1cp..spa 441,200 including gst..got rebate gst+15%+8888

during talk day, developer said 1 man mr koh from penang bought 140 unit comprise about 5 level for this project..already paid booking..i dont know if dev goreng us..if true he must be very taikor and confident with this project..
*
How To calculate net price from spa price ?

Seem like different from me.

U got 80% or 85% ltv/mof?

This post has been edited by mhafiz999: Apr 13 2018, 08:55 AM
hairi82
post Apr 14 2018, 12:17 AM

Getting Started
**
Junior Member
92 posts

Joined: Feb 2018
QUOTE(mhafiz999 @ Apr 13 2018, 08:09 AM)
How To calculate net price from spa price ?

Seem like different from me.

U got 80% or 85% ltv/mof?
*
my loan 80% from 441,200..maybank can give loan including gst..other bank seem deduct gst from their LTV..so for other bank have to get 85% LTV to get full loan after deduct 15% rebate
hairi82
post Apr 14 2018, 12:18 AM

Getting Started
**
Junior Member
92 posts

Joined: Feb 2018
QUOTE(mhafiz999 @ Apr 13 2018, 08:09 AM)
How To calculate net price from spa price ?

Seem like different from me.

U got 80% or 85% ltv/mof?
*
which floor u buy?
mhafiz999
post Apr 14 2018, 07:14 AM

New Member
*
Newbie
4 posts

Joined: Apr 2018
QUOTE(hairi82 @ Apr 14 2018, 12:18 AM)
which floor u buy?
*
18 floor
klqy
post Apr 25 2018, 05:36 PM

New Member
*
Junior Member
42 posts

Joined: Apr 2017
Went to take a look at the exact location. Bought 2016 october with little info since a friend recommended. Now only know the exact location.

Mine is a 430sqft 2Bed 1Bath layoug sad.gif

13th floor

This post has been edited by klqy: Apr 25 2018, 05:38 PM


Attached thumbnail(s)
Attached Image
hairi82
post Apr 25 2018, 10:20 PM

Getting Started
**
Junior Member
92 posts

Joined: Feb 2018
QUOTE(klqy @ Apr 25 2018, 05:36 PM)
Went to take a look at the exact location. Bought 2016 october with little info since a friend recommended. Now only know the exact location.

Mine is a 430sqft 2Bed 1Bath layoug sad.gif

13th floor
*
u must be early bird..that time no car park right..
klqy
post Apr 26 2018, 09:15 AM

New Member
*
Junior Member
42 posts

Joined: Apr 2017
QUOTE(hairi82 @ Apr 25 2018, 10:20 PM)
u must be early bird..that time no car park right..
*
they offered carpark, but i didnt opt to buy.
JonathanIB
post May 1 2018, 01:03 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(klqy @ Apr 25 2018, 05:36 PM)
Went to take a look at the exact location. Bought 2016 october with little info since a friend recommended. Now only know the exact location.

Mine is a 430sqft 2Bed 1Bath layoug sad.gif

13th floor
*
Wah u bought it without knowing the exact location. Geng le u
klqy
post May 2 2018, 09:20 AM

New Member
*
Junior Member
42 posts

Joined: Apr 2017
QUOTE(JonathanIB @ May 1 2018, 01:03 PM)
Wah u bought it without knowing the exact location. Geng le u
*
friend is a real estate agent. went to pullman hotel queue up for almost 12 hours only kaotim. naik kereta rclxm9.gif
HELLO HELLO
post May 2 2018, 01:35 PM

Look at all my stars!!
*******
Senior Member
5,436 posts

Joined: Jan 2011
This place sibeh manyak lelong units in highest record liao. Price keep cucuk water. Now this location is Number 1 lelong in kl. Nearby Mahsiao what m city and apa element apartment. Manyak Same same size 1 bed or 2 beds unit or studio unit. Mau invest got manyak cheap low price ready unit around. Why pay high price wait 3-4 years?

This post has been edited by HELLO HELLO: May 2 2018, 01:38 PM
hazwan_zohdi
post May 2 2018, 02:27 PM

Regular
******
Senior Member
1,078 posts

Joined: Jun 2007
From: Abu Dhabi, UAE


QUOTE(HELLO HELLO @ May 2 2018, 01:35 PM)
This place sibeh manyak lelong units in highest record liao. Price keep cucuk water. Now this location is Number 1 lelong in kl. Nearby Mahsiao what m city and apa element apartment. Manyak Same same size 1 bed or 2 beds unit or studio unit. Mau invest got manyak cheap low price ready unit around. Why pay high price wait 3-4 years?
*
They got money to waste leyyy...why you worry maaa?
HELLO HELLO
post May 2 2018, 03:08 PM

Look at all my stars!!
*******
Senior Member
5,436 posts

Joined: Jan 2011
QUOTE(hazwan_zohdi @ May 2 2018, 02:27 PM)
They got money to waste leyyy...why you worry maaa?
*
No worries 😜. Give more options only since plenty full lelong and fire sale at this area.
cardiprin
post Jun 7 2018, 04:06 AM

New Member
*
Newbie
5 posts

Joined: May 2006
From: Ampang, KL
Hi expert here,
need your kind advise and expertise..plan to bought this unit.
How about new government rules into this project?..since this project JV with china rail way. Is there any effect?
Expected ROI?
hairi82
post Jun 20 2018, 02:57 PM

Getting Started
**
Junior Member
92 posts

Joined: Feb 2018
QUOTE(cardiprin @ Jun 7 2018, 04:06 AM)
Hi expert here,
need your kind advise and expertise..plan to bought this unit.
How about new government rules into this project?..since this project JV with china rail way. Is there any effect?
Expected ROI?
*
hi, have u bought this project..we can share referral fee if u interested..
JonathanIB
post Jun 25 2018, 02:42 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


Taken when passing by today. So many lorry along the road...


Attached thumbnail(s)
Attached Image Attached Image
aaron1717
post Jun 25 2018, 02:46 PM

Chui Shui in Property Manyak Best!
********
All Stars
10,188 posts

Joined: Apr 2012
QUOTE(JonathanIB @ Jun 25 2018, 02:42 PM)
Taken when passing by today. So many lorry along the road...
*
pengsan loh boss... hahaha
JonathanIB
post Jun 25 2018, 02:54 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


Haha why pengsan? Good it’s moving project smile.gif haha
hazwan_zohdi
post Jun 25 2018, 03:26 PM

Regular
******
Senior Member
1,078 posts

Joined: Jun 2007
From: Abu Dhabi, UAE


QUOTE(JonathanIB @ Jun 25 2018, 02:42 PM)
Taken when passing by today. So many lorry along the road...
*
Have to turn my head upside down to see the pix...is this a good investment?
JonathanIB
post Jun 25 2018, 03:41 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


Haha no choice as from phone n laptop its looks ok
JonathanIB
post Jul 15 2018, 12:43 AM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


There is a great promo now
No money down with cash back and it’s Transit oriented with walking distance to LRT

This post has been edited by JonathanIB: Jul 15 2018, 12:43 AM
Quang1819
post Jul 15 2018, 01:23 AM

Look at all my stars!!
*******
Senior Member
2,604 posts

Joined: Dec 2012
QUOTE(hazwan_zohdi @ Jun 25 2018, 03:26 PM)
Have to turn my head upside down to see the pix...is this a good investment?
*
Good investment? For me its not, but different people has different perspective.

Is it cheap for a property in embassy row? Hell yes, but prices have been going up. Was one hell of a cheap property to get when it was first launched last year. But knowing you have thousands of units around you, you'll probably never get the pie. You can get the crumbs if you can and dare to bear with it.
Quang1819
post Jul 15 2018, 01:23 AM

Look at all my stars!!
*******
Senior Member
2,604 posts

Joined: Dec 2012
QUOTE(JonathanIB @ Jul 15 2018, 12:43 AM)
There is a great promo now
No money down with cash back and it’s Transit oriented with walking distance to LRT
*
But its the project progressing? hmm.gif
JonathanIB
post Jul 15 2018, 01:44 AM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(Quang1819 @ Jul 15 2018, 01:23 AM)
But its the project progressing? hmm.gif
*
Yes it is if u looking on the picture previously shown

Like u say different ppl different perspective smile.gif
HELLO HELLO
post Jul 15 2018, 12:16 PM

Look at all my stars!!
*******
Senior Member
5,436 posts

Joined: Jan 2011
This project macam sure die and mati wor. lagi it is from lousy titijaya developer... double die mati?

the building facade design very macam rumawip and Pr1ma. tongue.gif

This post has been edited by HELLO HELLO: Jul 15 2018, 12:18 PM
JonathanIB
post Jul 17 2018, 07:07 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


Hahaha funny comment. Sure die
hairi82
post Jul 19 2018, 09:29 AM

Getting Started
**
Junior Member
92 posts

Joined: Feb 2018
QUOTE(Quang1819 @ Jul 15 2018, 01:23 AM)
But its the project progressing? hmm.gif
*
Now developer already issue stage 2b payment..its a progress i think
hazwan_zohdi
post Jul 19 2018, 11:31 AM

Regular
******
Senior Member
1,078 posts

Joined: Jun 2007
From: Abu Dhabi, UAE


QUOTE(HELLO HELLO @ Jul 15 2018, 12:16 PM)
This project macam sure die and mati wor. lagi it is from lousy titijaya developer... double die mati?

the building facade design very macam rumawip and Pr1ma.  tongue.gif
*
So for those who terrrrbeli dis project sure bleed to death nia?
JonathanIB
post Jul 19 2018, 01:46 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(hairi82 @ Jul 19 2018, 09:29 AM)
Now developer already issue stage 2b payment..its a progress i think
*
yeap correct.
hairi82
post Jul 20 2018, 03:18 PM

Getting Started
**
Junior Member
92 posts

Joined: Feb 2018
My entry price is at 800 psf..now M city which is everybody said very terrible with high density going for lowest 900psf for smallest unit..so i still have quite a lot margin when neu suite VP in 2022..do u think in 4 years time M city still got 900psf..
forever1979
post Jul 20 2018, 04:57 PM

Look at all my stars!!
*******
Senior Member
2,854 posts

Joined: Jul 2013


QUOTE(hairi82 @ Jul 20 2018, 03:18 PM)
My entry price is at 800 psf..now M city which is everybody said very terrible with high density going for lowest 900psf for smallest unit..so i still have quite a lot margin when  neu suite VP in 2022..do u think in 4 years time M city still got 900psf..
*
have u check on the auction price on M city ?
kbandito
post Jul 20 2018, 05:43 PM

Regular
******
Senior Member
1,181 posts

Joined: May 2005


Imagine if our new FT Minister impose strict rules on the usage of office suites like this one. Crap like this will be wiped out, same goes to Exsim's.
hazwan_zohdi
post Jul 20 2018, 06:14 PM

Regular
******
Senior Member
1,078 posts

Joined: Jun 2007
From: Abu Dhabi, UAE


QUOTE(kbandito @ Jul 20 2018, 05:43 PM)
Imagine if our new FT Minister impose strict rules on the usage of office suites like this one. Crap like this will be wiped out, same goes to Exsim's.
*
In other words, it's not a wise investment?
JonathanIB
post Jul 20 2018, 09:55 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(hairi82 @ Jul 20 2018, 03:18 PM)
My entry price is at 800 psf..now M city which is everybody said very terrible with high density going for lowest 900psf for smallest unit..so i still have quite a lot margin when  neu suite VP in 2022..do u think in 4 years time M city still got 900psf..
*
Cannot compare like this oh. Totally different area and selling point. If u got time i can show u some interesting chart smile.gif

Good to hear u bought it. Dont worry, will be good deal. Bought one too

This post has been edited by JonathanIB: Jul 20 2018, 09:56 PM
hairi82
post Jul 20 2018, 11:31 PM

Getting Started
**
Junior Member
92 posts

Joined: Feb 2018
QUOTE(forever1979 @ Jul 20 2018, 04:57 PM)
have u check on the auction price on M city ?
*
its include auction price..
hairi82
post Jul 20 2018, 11:32 PM

Getting Started
**
Junior Member
92 posts

Joined: Feb 2018
QUOTE(JonathanIB @ Jul 20 2018, 09:55 PM)
Cannot compare like this oh. Totally different area and selling point. If u got time i can show u some interesting chart smile.gif

Good to hear u bought it. Dont worry, will be good deal. Bought one too
*
maybe im wrong..what chart ya..can u share..
Halim66
post Jul 29 2018, 09:50 PM

New Member
*
Newbie
1 posts

Joined: Jul 2018


QUOTE(hairi82 @ Jun 20 2018, 02:57 PM)
hi, have u bought this project..we can share referral fee if u interested..
*
How to contact u ?

Halim66
JohnLun
post Aug 7 2018, 11:33 PM

New Member
*
Newbie
4 posts

Joined: May 2017


😡😡😡 Titijaya lousy developer!!!Listed company but act like low class/debased developer.

Delay for 1 year to sign SPA after done booking & loan approved. Using 4 years to complete the project. After wait for 5 years...Asking for LAD but this so call listed company developer refuse to pay the LAD & give many lousy excuses.

Good luck for those people bought the unit from this irresponsible developer....
sara_2017
post Aug 15 2018, 12:05 AM

New Member
*
Newbie
5 posts

Joined: Aug 2017
Did some research and calculations, this project has huge potentials with low entry price.

GST Free period is ending this 31st Aug....must act fast

This post has been edited by sara_2017: Aug 15 2018, 12:21 AM
Quang1819
post Aug 31 2018, 12:46 AM

Look at all my stars!!
*******
Senior Member
2,604 posts

Joined: Dec 2012
QUOTE(JohnLun @ Aug 7 2018, 11:33 PM)
😡😡😡 Titijaya lousy developer!!!Listed company but act like low class/debased developer.

Delay for 1 year to sign SPA after done booking & loan approved. Using 4 years to complete the project. After wait for 5 years...Asking for LAD but this so call listed company developer refuse to pay the LAD & give many lousy excuses.

Good luck for those people bought the unit from this irresponsible developer....
*
First day knowing titijaya meh.

During their launching day I queued sibeh early in the morning, took a unit, then suddenly they change the price to extra few k higher for no reason, immediately dropped it.
Quang1819
post Aug 31 2018, 12:46 AM

Look at all my stars!!
*******
Senior Member
2,604 posts

Joined: Dec 2012
QUOTE(Gabriel.Realty @ Aug 31 2018, 12:32 AM)
This development most probably is just a project designed by Titijaya but build and financed by CREC, so the thing u all should look at is CREC profile instead of Titijaya. I am selling it by the way,many agency is splitting this cake *slap forehead*
*
You're one of the agent? Hows the situation now lol
ssmuhd84
post Sep 1 2018, 12:24 PM

Getting Started
**
Junior Member
60 posts

Joined: Dec 2008
Any updates for this project? In term of promotion..anyone knows?
JonathanIB
post Sep 3 2018, 09:03 AM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


Giving quite high rebates now with zero Downpayment etc. basically only pay booking fee
Darkmage12
post Sep 9 2018, 10:43 PM

shhhhhhhhh come i tell you something hehe
********
All Stars
17,053 posts

Joined: Jan 2003

What's the cheapest unit available now?
JonathanIB
post Sep 14 2018, 12:03 AM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


Nett around RM405k like that
ssmuhd84
post Sep 15 2018, 07:30 PM

Getting Started
**
Junior Member
60 posts

Joined: Dec 2008
As informed by the agent, abt 70% unit already sold. Promotion left with 18% rebate (no more up to 26% rebate).
They r in the midst of launching 2nd phase.
JonathanIB
post Sep 17 2018, 07:53 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


Yes correct
playrobot
post Sep 21 2018, 05:22 PM

Getting Started
**
Junior Member
51 posts

Joined: Sep 2018
late parking
playrobot
post Sep 24 2018, 09:15 AM

Getting Started
**
Junior Member
51 posts

Joined: Sep 2018
i want the 26% rebate still have? rclxms.gif
Idealism
post Oct 5 2018, 02:32 AM

New Member
*
Newbie
1 posts

Joined: Oct 2018


QUOTE(playrobot @ Sep 24 2018, 09:15 AM)
i want the 26% rebate still have?  rclxms.gif
*
yes, for non bumi maximum rebate is 23% , bumi maximum rebate is 28%.

This post has been edited by Idealism: Oct 5 2018, 02:36 AM
Ethan
post Oct 7 2018, 01:40 PM

On my way
****
Junior Member
525 posts

Joined: Jan 2003
From: 25.18.122.57

Was told the current promotion is rebate 10%, then 5%, then 2%... and then another RM10k.

Units on lower floors all taken; left with level 20+ and it's all above RM400k after rebate. 2R2B 430 sq.ft.
All in all, about RM990 psf. wink.gif

Anyone here knows any better deal for this project?


JonathanIB
post Oct 7 2018, 09:36 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


QUOTE(Ethan @ Oct 7 2018, 01:40 PM)
Was told the current promotion is rebate 10%, then 5%, then 2%... and then another RM10k.

Units on lower floors all taken; left with level 20+ and it's all above RM400k after rebate. 2R2B 430 sq.ft.
All in all, about RM990 psf.  wink.gif

Anyone here knows any better deal for this project?
*
The info given is bit wrong
It’s 10+5+3% initially
kh8668
post Oct 7 2018, 10:48 PM

Mamma Mia!
*******
Senior Member
5,488 posts

Joined: Jun 2008
QUOTE(JonathanIB @ Oct 7 2018, 09:36 PM)
The info given is bit wrong
It’s 10+5+3% initially
*
Deep discount meaning very overpriced products
Quang1819
post Oct 7 2018, 11:40 PM

Look at all my stars!!
*******
Senior Member
2,604 posts

Joined: Dec 2012
QUOTE(kh8668 @ Oct 7 2018, 10:48 PM)
Deep discount meaning very overpriced products
*
No shit. They even raised the price during their launching day. Now they know people are dropping it then they'll attract more prospects with discounts again.

Ttj is forever a shithole developer.
Pakmil
post Nov 25 2018, 09:04 PM

New Member
*
Newbie
10 posts

Joined: Aug 2015


Hello just come back from office show unit. Find this interesting project...can someone share referrel bonus? How much best price can get for bumi? Whatsapp 0133113930
marchome
post Dec 12 2018, 06:19 PM

Getting Started
**
Junior Member
59 posts

Joined: Apr 2014
From: London
Anyone knows the new block opening soon? With bigger size. Wonder what would be the price 🤷🏻‍♂️🤨
hairi82
post May 8 2019, 04:38 PM

Getting Started
**
Junior Member
92 posts

Joined: Feb 2018
QUOTE(marchome @ Dec 12 2018, 06:19 PM)
Anyone knows the new block opening soon? With bigger size. Wonder what would be the price 🤷🏻‍♂️🤨
*
seem like already in the developer website..its called newton..price start 780k..http://3nvenue.com.my/newton-tower.html

already no ads for neusuite in mudah from feb 19..dont know whether already sold out or not

This post has been edited by hairi82: May 8 2019, 04:46 PM
cce P
post Jun 30 2019, 07:16 PM

New Member
*
Probation
2 posts

Joined: Jun 2019
Hi..just wondering is the 430sqft 2b2b dual key still worth buying at 900/sq ft? with 1 carpark
cce P
post Jun 30 2019, 07:24 PM

New Member
*
Probation
2 posts

Joined: Jun 2019
QUOTE(JonathanIB @ Sep 14 2018, 12:03 AM)
Nett around RM405k like that
*
Hi..just wondering if the 430sq ft 2b2b dual key unit still worth buying at 900/sq ft? with 1 carpark.. any advice pls
..tia..
visionsjs18
post Jul 25 2019, 06:05 PM

New Member
*
Newbie
5 posts

Joined: Jul 2018
Why the development progress is so slow for this project?? Any insider news???
boonboon
post Aug 19 2019, 11:50 AM

Casual
***
Junior Member
323 posts

Joined: Sep 2004


Is there any owners group?
AfiqAziz P
post Aug 27 2019, 06:59 PM

New Member
*
Probation
4 posts

Joined: Aug 2019
Let's create one!

owner here too..
chrisw
post Aug 27 2019, 07:54 PM

Stay hungry, stay foolish
******
Senior Member
1,275 posts

Joined: Jan 2009


There’s another new project nearby coming soon, with 30-years instalment Free 😂
rastablank
post Aug 27 2019, 08:01 PM

Enthusiast
*****
Senior Member
951 posts

Joined: Nov 2005
From: Jager Bomb


QUOTE(chrisw @ Aug 27 2019, 07:54 PM)
There’s another new project nearby coming soon, with 30-years instalment Free 😂
*
Can you share more info? smile.gif
Quang1819
post Aug 27 2019, 08:39 PM

Look at all my stars!!
*******
Senior Member
2,604 posts

Joined: Dec 2012
QUOTE(chrisw @ Aug 27 2019, 07:54 PM)
There’s another new project nearby coming soon, with 30-years instalment Free 😂
*
lol what. Come spread it out
AfiqAziz P
post Sep 1 2019, 06:22 PM

New Member
*
Probation
4 posts

Joined: Aug 2019
Building progress as at 01/09/2019

user posted image
user posted image
user posted image
PTX
post Sep 10 2019, 01:35 AM

Getting Started
**
Junior Member
249 posts

Joined: Nov 2013
Smallest unit still available? Pls share me the sales package and price too. Thanks.
wesleyyim83
post Oct 19 2019, 04:16 PM

Getting Started
**
Junior Member
69 posts

Joined: Oct 2005
QUOTE(chrisw @ Aug 27 2019, 07:54 PM)
There’s another new project nearby coming soon, with 30-years instalment Free 😂
*
interested, please share more info or pm me, thanks.
RaineL
post Nov 8 2019, 10:12 AM

New Member
*
Junior Member
32 posts

Joined: Aug 2019
QUOTE(chrisw @ Aug 27 2019, 07:54 PM)
There’s another new project nearby coming soon, with 30-years instalment Free 😂
*
😂 I wanna know too.
visionsjs18
post Nov 8 2019, 02:33 PM

New Member
*
Newbie
5 posts

Joined: Jul 2018
hi...any owner fb / whatapps group?
AfiqAziz P
post Nov 14 2019, 10:59 PM

New Member
*
Probation
4 posts

Joined: Aug 2019
QUOTE(visionsjs18 @ Nov 8 2019, 02:33 PM)
hi...any owner fb / whatapps group?
*
Please join.
Owners only.

https://www.facebook.com/groups/2435590756714879/?flyingspaghettimonster=share
AfiqAziz P
post Nov 14 2019, 11:06 PM

New Member
*
Probation
4 posts

Joined: Aug 2019
Dear owners,
You are cordially invited to join the owner’s FB group.
Strictly for unit owners only. Link as follows:

https://www.facebook.com/groups/2435590756714879/?flyingspaghettimonster=share

user posted image
Matzhizhi P
post Dec 6 2019, 03:41 PM

New Member
*
Probation
3 posts

Joined: Dec 2019
Hi Newbie here, interested in this project... can anyone share more info for the 2nd phase unit? (price, size, early bird discount)
RaineL
post Dec 7 2019, 03:36 PM

New Member
*
Junior Member
32 posts

Joined: Aug 2019
Looking for SA for more details and pricing. Pls inbox me. Thank you!
.:zep:.
post Jan 19 2020, 01:49 PM

Regular
******
Senior Member
1,120 posts

Joined: Jan 2003
From: Dato' Keramat KL Status : Online





My drone view of 3rdNvenue.
budang
post Feb 11 2020, 09:14 PM

Enthusiast
*****
Junior Member
974 posts

Joined: Dec 2012


QUOTE(.:zep:. @ Jan 19 2020, 01:49 PM)


My drone view of 3rdNvenue.
*
thumbsup.gif thumbsup.gif
Babizz
post Sep 21 2020, 07:06 AM

10k Club
********
All Stars
12,522 posts

Joined: Feb 2013
QUOTE(accetera @ Jun 29 2015, 08:51 AM)
Block A - 48 storeys (420 units)

Block B - 44 storeys (676 units)

Block C - 46 storeys (304 units)

Block Office Tower - 40 storeys

Atop a 2-level retail floors.
Location: Jalan Nipah, off Jalan Ampang Gleneagles.

Expected Price: N/A

Target Launch: 2016

Developer: Titijaya Land

Status: DO submission

http://www.epbt.gov.my/osc/Proj1_Info.cfm?Name=591034&S=S
*
QUOTE(accetera @ Jan 27 2016, 10:22 AM)
They got another land opposite.

About 2.4k+ units in total.
*
Even if it's only 1400 units here, can't wait for the party after VP. Will be joining the lelong party soon.

When VP?
.:zep:.
post Oct 25 2020, 07:29 AM

Regular
******
Senior Member
1,120 posts

Joined: Jan 2003
From: Dato' Keramat KL Status : Online




JonathanIB
post Oct 27 2020, 11:03 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


limited unit available
mirmo88 P
post Nov 15 2020, 12:02 PM

New Member
*
Probation
15 posts

Joined: Nov 2020
QUOTE(Babizz @ Sep 21 2020, 07:06 AM)
Even if it's only 1400 units here, can't wait for the party after VP. Will be joining the lelong party soon.

When VP?
*
Hi. Can I ask why lelong ya?
mirmo88 P
post Nov 15 2020, 12:03 PM

New Member
*
Probation
15 posts

Joined: Nov 2020
QUOTE(AfiqAziz @ Aug 27 2019, 06:59 PM)
Let's create one!

owner here too..
*
Can add me also?
Babizz
post Nov 15 2020, 05:11 PM

10k Club
********
All Stars
12,522 posts

Joined: Feb 2013
QUOTE(mirmo88 @ Nov 14 2020, 10:02 PM)
Hi. Can I ask why lelong ya?
*
Think about the fundamentals of real estate. Does this tick any box??

900psf here???? U can get KLCC property walking distance to twin towers n LRT for less than 800psf. This project apa ada??


AskarPerang
post Nov 15 2020, 06:24 PM

~tUPaI...~
*********
All Stars
23,688 posts

Joined: Aug 2007
From: Outer Space



QUOTE(Babizz @ Nov 15 2020, 05:11 PM)
Think about the fundamentals of real estate. Does this tick any box??

900psf here???? U can get KLCC property walking distance to twin towers n LRT for less than 800psf. This project apa ada??
*
Walking distance to LRT Jelatek.
4 stations to KLCC.
Babizz
post Nov 15 2020, 06:29 PM

10k Club
********
All Stars
12,522 posts

Joined: Feb 2013
QUOTE(AskarPerang @ Nov 15 2020, 04:24 AM)
Walking distance to LRT Jelatek.
4 stations to KLCC.
*
800 metres. The other project I quoted is summer suites at less than 500metres.

2400 units 😊

panda@KL
post Nov 15 2020, 06:33 PM

Getting Started
**
Junior Member
129 posts

Joined: Nov 2020
Can compete with Datum Jelatek over Airbnb?
mirmo88 P
post Nov 16 2020, 01:25 AM

New Member
*
Probation
15 posts

Joined: Nov 2020
QUOTE(Babizz @ Nov 15 2020, 06:29 PM)
800 metres. The other project I quoted is summer suites at less than 500metres.

2400 units 😊
*
10 years ago I was still in school 😂 cannot buy also
mirmo88 P
post Nov 16 2020, 01:26 AM

New Member
*
Probation
15 posts

Joined: Nov 2020
QUOTE(panda@KL @ Nov 15 2020, 06:33 PM)
Can compete with Datum Jelatek over Airbnb?
*
I think for dual key posibly can.
mirmo88 P
post Nov 16 2020, 01:29 AM

New Member
*
Probation
15 posts

Joined: Nov 2020
QUOTE(Babizz @ Nov 15 2020, 05:11 PM)
Think about the fundamentals of real estate. Does this tick any box??

900psf here???? U can get KLCC property walking distance to twin towers n LRT for less than 800psf. This project apa ada??
*
Hi. Thanks for sharing. Can share the property 800psf ard KLCC?
What if the price within 700psf is it ok for jalan ampang?
Babizz
post Nov 16 2020, 07:19 AM

10k Club
********
All Stars
12,522 posts

Joined: Feb 2013
QUOTE(mirmo88 @ Nov 15 2020, 11:25 AM)
10 years ago I was still in school 😂 cannot buy also
*
I'm not talking about 10 years ago. I'm talking NOW. Just do a simple search on Iproperty n meet up with agents to find out more.

QUOTE(mirmo88 @ Nov 15 2020, 11:29 AM)
Hi. Thanks for sharing. Can share the property 800psf ard KLCC?
What if the price within 700psf is it ok for jalan ampang?
*
Summer suites.
.:zep:.
post Apr 12 2021, 06:55 PM

Regular
******
Senior Member
1,120 posts

Joined: Jan 2003
From: Dato' Keramat KL Status : Online




JonathanIB
post Apr 12 2021, 08:00 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


Great video
jorgsacul
post Apr 12 2021, 10:22 PM

Regular
******
Senior Member
1,377 posts

Joined: Aug 2009
QUOTE(Babizz @ Sep 21 2020, 07:06 AM)
Even if it's only 1400 units here, can't wait for the party after VP. Will be joining the lelong party soon.

When VP?
*
25% cash back
Another Robertson in the making
AskarPerang
post Mar 27 2022, 01:14 PM

~tUPaI...~
*********
All Stars
23,688 posts

Joined: Aug 2007
From: Outer Space





This Dr sifu mention VP in Apr 2022.
Rental 2.8k, Installment only 1.7k.
Positive cash flow.
AskarPerang
post Mar 27 2022, 06:57 PM

~tUPaI...~
*********
All Stars
23,688 posts

Joined: Aug 2007
From: Outer Space




kclee28 P
post Aug 21 2022, 03:12 PM

New Member
*
Probation
18 posts

Joined: Nov 2021
3rdnvenue is 99 years leasehold? When is this project VP?
klcc99
post Oct 30 2022, 04:05 PM

New Member
*
Junior Member
36 posts

Joined: Sep 2019
when is VP date

sll994
post Jan 27 2023, 05:48 PM

New Member
*
Junior Member
33 posts

Joined: Jan 2015


Is anyone get the VP letter and key already for the 3RDNVENUE @ EMBASSY ROW | NEU SUITES?
JonathanIB
post Feb 7 2023, 04:16 PM

KL PJ 100+project handling to find the best suit project for u.
******
Senior Member
1,646 posts

Joined: Jan 2017


Buyer shall be getting VP notice recently. My Uncle got it
AskarPerang
post Apr 10 2023, 12:41 PM

~tUPaI...~
*********
All Stars
23,688 posts

Joined: Aug 2007
From: Outer Space



QUOTE(JonathanIB @ Feb 7 2023, 04:16 PM)
Buyer shall be getting VP notice recently. My Uncle got it
*
Project VP.
First lelong unit check in.

Unit number: A-26-30
Size: 430sqft
Reserve price: 350K

Can wait for price drop?



jojolicia
post Apr 10 2023, 12:51 PM

Regular
******
Senior Member
1,910 posts

Joined: Feb 2016
QUOTE(AskarPerang @ Apr 10 2023, 12:41 PM)
Project VP.
First lelong unit check in.

Unit number: A-26-30
Size: 430sqft
Reserve price: 350K

Can wait for price drop?
*
That is fast.
4 rounds? 🤭

This post has been edited by jojolicia: Apr 10 2023, 12:51 PM
kswee
post Apr 10 2023, 07:18 PM

On my way
****
Junior Member
577 posts

Joined: May 2012




QUOTE(AskarPerang @ Apr 10 2023, 01:41 PM)
Project VP.
First lelong unit check in.

Unit number: A-26-30
Size: 430sqft
Reserve price: 350K

Can wait for price drop?
*
200k , because of astrum .


wro718
post May 5 2023, 05:17 PM

New Member
*
Junior Member
13 posts

Joined: Dec 2012
how much is this 3rdnvenue selling price now? i have 1 unit and intend to sell it le...
sll994
post May 10 2023, 07:58 PM

New Member
*
Junior Member
33 posts

Joined: Jan 2015


I advice not to buy this TitlJay@ developer developed projects. I'm one of the owners at Neu Suite @ Jalan Ampang. Developer themselves delayed the documents, but when VP that time ask us as buyers to pay the late interest advice because of the bank late release money to them.

Then the quality of the development are bad, during defect inspection, we notice a lot of defect on wall, windows, and bathroom.

Who wish to know more about this project can PM me, I will invite them to the Owners chat group. We share all the things there.
sll994
post May 10 2023, 08:11 PM

New Member
*
Junior Member
33 posts

Joined: Jan 2015


QUOTE(JohnLun @ Aug 8 2018, 12:33 AM)
😡😡😡 Titijaya lousy developer!!!Listed company but act like low class/debased developer.

Delay for 1 year to sign SPA after done booking & loan approved. Using 4 years to complete the project. After wait for 5 years...Asking for LAD but this so call listed company developer refuse to pay the LAD & give many lousy excuses.

Good luck for those people bought the unit from this irresponsible developer....
*
I'm in the WhatsApp Owner Chat Group, I saw some of buyers also facing this issue, they manage to get back very very little amount only. Titljay@ is the worst developer even, first time I bought from them at 2021, now VP, ask me to pay late interest fee, because my banker told me they changed the lawyer to another on 2021, caused the delay, then this cause the late issue of bank LO, and late release first payment to developer, then this was their fault, they charge me late interest during VP. They so far, refuse to waive the late interest for me, also in the chat group, many ppl only got little of the LAD like 2 digits to 3 digits amount only. But they charge us late interest is 3 digits to 4 digits. Worst developer even. Do NOT recommended.

This post has been edited by sll994: May 10 2023, 08:17 PM
AskarPerang
post May 27 2023, 10:01 PM

~tUPaI...~
*********
All Stars
23,688 posts

Joined: Aug 2007
From: Outer Space



Room rental aka "co living" is here. The usual bulk purchase group by Iconix under GC.
Refer this video:




Guess this 430sqft layout can convert into how many rooms?

user posted image



kswee
post May 27 2023, 10:57 PM

On my way
****
Junior Member
577 posts

Joined: May 2012




Stiff competition coming soon . Ms Renee/Jess interior design is much more superb

This post has been edited by kswee: Jun 6 2023, 06:43 PM
wro718
post May 29 2023, 01:31 PM

New Member
*
Junior Member
13 posts

Joined: Dec 2012
QUOTE(kswee @ May 27 2023, 10:57 PM)
Stiff competition coming soon . Ms Jess interior design is much more superb
*
hi, can provide me the contact no? i intend want to do renovation of my unit. tks.
kswee
post May 29 2023, 07:04 PM

On my way
****
Junior Member
577 posts

Joined: May 2012




QUOTE(wro718 @ May 29 2023, 02:31 PM)
hi, can provide me the contact no? i intend want to do renovation of my unit. tks.
*
I have revert to you by pm.
wro718
post May 30 2023, 07:44 AM

New Member
*
Junior Member
13 posts

Joined: Dec 2012
QUOTE(kswee @ May 29 2023, 07:04 PM)
I have revert to you by pm.
*
thank you so much~~~~
AskarPerang
post Jun 22 2023, 12:57 AM

~tUPaI...~
*********
All Stars
23,688 posts

Joined: Aug 2007
From: Outer Space




forever1979
post Jun 22 2023, 04:02 PM

Look at all my stars!!
*******
Senior Member
2,854 posts

Joined: Jul 2013


this is just the part 1 of the story.

wait until few more months and see

for investment, the most difficult is not getting loan, but how to generate cash flow to sustain the investment..

This post has been edited by forever1979: Jun 22 2023, 04:02 PM
AskarPerang
post Aug 23 2023, 11:20 PM

~tUPaI...~
*********
All Stars
23,688 posts

Joined: Aug 2007
From: Outer Space



QUOTE(AskarPerang @ Apr 10 2023, 12:41 PM)
Project VP.
First lelong unit check in.

Unit number: A-26-30
Size: 430sqft
Reserve price: 350K

Can wait for price drop?
*
QUOTE(jojolicia @ Apr 10 2023, 12:51 PM)
That is fast.
4 rounds? 🤭
*
QUOTE(kswee @ Apr 10 2023, 07:18 PM)
200k , because of astrum .
*
First lelong unit here drop price until reserve price of 227K today.
5th round re-auction.

Attracted 3 bidders fight.
Sold at 293K.
Last month at 255K only but nobody interested. As usual.

Good catch?



AskarPerang
post Jul 11 2024, 08:05 AM

~tUPaI...~
*********
All Stars
23,688 posts

Joined: Aug 2007
From: Outer Space



Lelong unit sold yesterday.
Size 430sqft.

From reserve price 237K.
Sold at 258K.

Good catch?


user posted image
AskarPerang
post Sep 25 2025, 12:27 PM

~tUPaI...~
*********
All Stars
23,688 posts

Joined: Aug 2007
From: Outer Space



Lelong unit sold just now.
430 sf unit.

From 219K, sold at 278K.
Good catch?


user posted image

 

Change to:
| Lo-Fi Version
0.1581sec    0.43    6 queries    GZIP Disabled
Time is now: 28th November 2025 - 02:32 AM