Welcome Guest ( Log In | Register )

161 Pages « < 53 54 55 56 57 > » Bottom

Outline · [ Standard ] · Linear+

 Bandar Sri Sendayan V2, Megatownship in the making

views
     
nexona88
post Sep 19 2018, 03:22 PM

The Royal Club Member
*********
All Stars
48,500 posts

Joined: Sep 2014
From: REality
QUOTE(hidayah31 @ Sep 19 2018, 01:22 PM)
Lee said Matrix Concepts was targeting to open four more KFC outlets in Bandar Sri Sendayan as the population in the modern township was expected to reach 120,000 people.

https://www.nst.com.my/business/2018/09/412...r-seri-sendayan

News yesterday mention more KFC soon, haha
*
Wah more KFC outlets...
Not bad... Just hope the service quality is okay.. Not slow 😖
nexona88
post Sep 19 2018, 03:23 PM

The Royal Club Member
*********
All Stars
48,500 posts

Joined: Sep 2014
From: REality
QUOTE(alvinX @ Sep 19 2018, 02:46 PM)
Based on the statistic released by national statistic  department, Negeri Sembilan consistently outpace the national inflation rate in recent years.

I wonder why is that, what does it means? If this is the sign of rapid development and urbanization? But in terms of GDP, NS is still lacking behind compared to our neighbor.
*
Cost of living higher (same level as KL) but salary is kampung level 😎😎
hidayah31
post Sep 19 2018, 04:44 PM

Getting Started
**
Junior Member
166 posts

Joined: Sep 2017
From: Malaysia

QUOTE
Aminuddin said his administration will work with the federal government to carry out the construction of several projects in the MVV.

Among these are to upgrade the Nilai-Pajam stretch to the Kajang-Seremban highway, construct a new road from Sendayan to Tanah Merah Site A, build the Senawang-KLIA expressway and KLIA-Labu-Seremban-Port Dickson rail link.


Read more at https://www.thestar.com.my/news/nation/2018...bwDbvErPZHmF.99


New update for MVV, it's still on then.
ron4
post Sep 19 2018, 04:47 PM

Regular
******
Senior Member
1,123 posts

Joined: Jun 2006
From: KL



QUOTE(hidayah31 @ Sep 19 2018, 04:44 PM)
New update for MVV, it's still on then.
*
Yeah but without Sendayan this time, it s tweak MVV

QUOTE
It will be divided into five clusters:

- Central Business District which will cover Seremban, Ampangan and Rasah

- Nature City (Pantai and Lenggeng)

- Edu-Tech Valley (Labu and Setul)

- Wellness, Eco and Agro Tourism (Port Dickson, Linggi, Sirusa)

- New Liveable Township (Jimah).
QUOTE
Mentri Besar Aminuddin Harun said his administration will steer away from the priorities of the previous state Barisan Nasional state government which was to build more houses and focus on the construction of the high speed rail (HSR) project.
What does it mean??


QUOTE
Among these are to upgrade the Nilai-Pajam stretch to the Kajang-Seremban highway, construct a new road from Sendayan to Tanah Merah Site A, build the Senawang-KLIA expressway and KLIA-Labu-Seremban-Port Dickson rail link.
Atleast sendayan got benefit with highway to Tanah Merah Site A?


LOCATION INFORMATION
Item Description
Location Tanah Merah Site A
Post Office Sepang
State Selangor
Postcode 43900


KLIA-Labu-Seremban-Port Dickson rail link.? is it current KTM?

This post has been edited by ron4: Sep 19 2018, 05:15 PM
TSBSS30112015
post Sep 19 2018, 05:24 PM

Regular
******
Senior Member
1,028 posts

Joined: Nov 2015
QUOTE(ron4 @ Sep 19 2018, 04:47 PM)
Yeah but without Sendayan this time, it s tweak MVV
What does it mean??
Atleast sendayan got benefit with highway to Tanah Merah Site A?
LOCATION INFORMATION
Item Description
Location Tanah Merah Site A
Post Office Sepang
State Selangor
Postcode 43900
KLIA-Labu-Seremban-Port Dickson rail link.? is it current KTM?
*
BSS is located in two clusters:
- Central Business District which will cover Seremban, Ampangan and Rasah
- Edu-Tech Valley (Labu and Setul)

https://forum.lowyat.net/uploads/attach-95/...-1496193453.jpg

This post has been edited by BSS30112015: Sep 19 2018, 05:29 PM
hidayah31
post Sep 20 2018, 08:10 AM

Getting Started
**
Junior Member
166 posts

Joined: Sep 2017
From: Malaysia

QUOTE(BSS30112015 @ Sep 19 2018, 05:24 PM)
BSS is located in two clusters:
- Central Business District which will cover Seremban, Ampangan and Rasah
- Edu-Tech Valley (Labu and Setul)

https://forum.lowyat.net/uploads/attach-95/...-1496193453.jpg
*
Agree with u, eventhough sendayan not really mentioned but it will become big part, same as seremban 2 and enstek.

Its good that there is movement finally, hoping that our Transport Minister from Seremban will smooth out the construction of road and railway facilities to enhance MVV.
TSBSS30112015
post Sep 20 2018, 10:18 AM

Regular
******
Senior Member
1,028 posts

Joined: Nov 2015
Existing road between d'Tempat Country Club to SJKC Kampung Baru Tanah Merah Site A

17.6km with 27 minutes
https://www.google.com/maps/dir/d'Tempa...6778038!3e0


The club house to Bandar Baru Enstek 18.7km, 21 minutes
https://www.google.com/maps/dir/d'Tempa....751391!3e0

Let check how much time and distance has been shortened after the new connecting roads are built.
TSBSS30112015
post Sep 20 2018, 12:30 PM

Regular
******
Senior Member
1,028 posts

Joined: Nov 2015
QUOTE(hidayah31 @ Sep 20 2018, 08:10 AM)
Agree with u, eventhough sendayan not really mentioned but it will become big part, same as seremban 2 and enstek.

Its good that there is movement finally, hoping that our Transport Minister from Seremban will smooth out the construction of road and railway facilities to enhance MVV.
*
Hope our Transport Minister from Seremban will move Kualiti Alam as what he advocated when he was in Opposition, but seem no action so far tongue.gif
nexona88
post Sep 20 2018, 02:24 PM

The Royal Club Member
*********
All Stars
48,500 posts

Joined: Sep 2014
From: REality
QUOTE(hidayah31 @ Sep 19 2018, 04:44 PM)
New update for MVV, it's still on then.
*
KLIA-Labu-Seremban-Port Dickson rail link??

meaning extending the ERL line ahh hmm.gif hmm.gif



hidayah31
post Sep 20 2018, 03:18 PM

Getting Started
**
Junior Member
166 posts

Joined: Sep 2017
From: Malaysia

QUOTE
KUALA LUMPUR - Kajian Rancangan Induk Pengangkutan Awam Darat (Ripad) bagi Wilayah Selatan telah memasuki fasa laporan akhir yang dijadual siap pada 31 Oktober ini, persidangan Dewan Rakyat diberitahu hari ini.

Timbalan Menteri Pengangkutan Datuk Kamaruddin Jaafar berkata kajian di peringkat laporan akhir ini akan menimbang semula keperluan untuk membina semula atau menaik taraf rangkaian laluan landasan kereta api dari Seremban ke Port Dickson


LINK

I think it is related to this, so have to wait for RIPAD report first before any confirmation.
hidayah31
post Sep 24 2018, 01:20 PM

Getting Started
**
Junior Member
166 posts

Joined: Sep 2017
From: Malaysia

QUOTE
SEREMBAN - Kerajaan negeri akan membangunkan sebuah kawasan riadah dan sukan di atas tanah seluas 23 hektar di Gadong Jaya, Labu, dekat sini, kata Menteri Besar Negeri Sembilan, Datuk Seri Mohamad Hasan.

Beliau berkata kawasan itu akan mempunyai lima padang bola sepak, tiga padang ragbi serta sebuah mini stadium yang mempunyai kemudahan trek dan padang selain kawasan lapang.

http://www.sinarharian.com.my/edisi/melaka...-sukan-1.788584
Anybody know where is this and whether it will proceed? this is from Tok Mat administration
nazli19
post Sep 24 2018, 07:44 PM

Getting Started
**
Junior Member
111 posts

Joined: Sep 2018
anyone purchased house before at BSS experienced whereby his/her completed unit not follow exactly the house elevation drawing plan?
enkil
post Sep 26 2018, 12:21 AM

Regular
******
Senior Member
1,752 posts

Joined: Dec 2013


Nice..
enkil
post Sep 26 2018, 12:23 AM

Regular
******
Senior Member
1,752 posts

Joined: Dec 2013


Nice..
^pomen_GTR^
post Sep 26 2018, 12:13 PM

Regular
******
Senior Member
1,077 posts

Joined: Jan 2013
QUOTE(hidayah31 @ Sep 24 2018, 01:20 PM)
Anybody know where is this and whether it will proceed? this is from Tok Mat administration
*
back under review from new admin...

but if not mistaken, location is around the shell petrol station there
^pomen_GTR^
post Sep 26 2018, 12:14 PM

Regular
******
Senior Member
1,077 posts

Joined: Jan 2013
QUOTE(nazli19 @ Sep 24 2018, 07:44 PM)
anyone purchased house before at BSS experienced whereby his/her completed unit not follow exactly the house elevation drawing plan?
*
so far all according to the plan and design...

just some of it suffer insufficient waterproofing material hence leaking roof issue...

probably on newer batch house all good so far
nazli19
post Sep 26 2018, 02:30 PM

Getting Started
**
Junior Member
111 posts

Joined: Sep 2018
my matrix sales agent sent me few photos on current progress at lunaria resort homes

I noticed there is a difference between the floor plan (SPA doc) and the actual ie photo i received.

--- Drawing plan/SPA doc : it should be fully brick wall at the edge of staircase.

--- Photo sent from agent : matrix/contractor has changed the brick wall to staircase hand railing.


I wondering how come matrix allow this to happen by simply changed and not to follow the floor plan. They have built thousand house here and for sure this is not acceptable to the buyers.










Attached thumbnail(s)
Attached Image
^pomen_GTR^
post Sep 26 2018, 02:42 PM

Regular
******
Senior Member
1,077 posts

Joined: Jan 2013
QUOTE(nazli19 @ Sep 26 2018, 02:30 PM)
my matrix sales agent sent me few photos on current progress at lunaria resort homes

I noticed there is a difference between the floor plan (SPA doc) and the actual ie photo i received.

--- Drawing plan/SPA doc  : it should be fully brick wall at the edge of staircase.

--- Photo sent from agent : matrix/contractor has changed the brick wall to staircase hand railing.
I wondering how come matrix allow this to happen by simply changed and not to follow the floor plan. They have built thousand house here and for sure this is not acceptable to the buyers.
*
*in context of fully brick wall at the edge of staircase... does it mean for the storage room underneath the staircase?

if u dont mind, sharing the floor plan dwg?
nazli19
post Sep 26 2018, 03:10 PM

Getting Started
**
Junior Member
111 posts

Joined: Sep 2018
QUOTE(^pomen_GTR^ @ Sep 26 2018, 02:42 PM)
*in context of fully brick wall at the edge of staircase... does it mean for the storage room underneath the staircase?

if u dont mind, sharing the floor plan dwg?
*
Not underneath staircase. Fully brick wall should be constructed at the stair case hand railing


Attached thumbnail(s)
Attached Image
^pomen_GTR^
post Sep 26 2018, 05:39 PM

Regular
******
Senior Member
1,077 posts

Joined: Jan 2013
QUOTE(nazli19 @ Sep 26 2018, 03:10 PM)
Not underneath staircase. Fully brick wall should be constructed at the stair case hand railing
*
im not sure if any section drawing shows the wall location...

but if from that plan drawing... my understanding that wall is meant for the storage underneath the staircase...



and additionally...i never encounter any closed side to side wall for staircase at home... (shophouses is different coz staircase meant for different unit lot)...

but i could be wrong...


maybe u can go to matrix office to get direct detail from them?

161 Pages « < 53 54 55 56 57 > » Top
 

Change to:
| Lo-Fi Version
0.0254sec    0.71    6 queries    GZIP Disabled
Time is now: 12th December 2025 - 03:15 PM