Welcome Guest ( Log In | Register )

198 Pages « < 63 64 65 66 67 > » Bottom

Outline · [ Standard ] · Linear+

 Mah Sing Group to launch new M Residence@Rawang, from the star

views
     
kelvin2080
post Sep 3 2012, 09:49 AM

Casual
***
Junior Member
358 posts

Joined: Jul 2011
QUOTE(iLoveSunday @ Sep 3 2012, 09:42 AM)
hmm.gif all the developer sucks but does it means we need to compromise?
so if all the developer made empty promises, I think we still need to raise our concerns to them and whether they take actions or not, it depends on how "sucks" they are....

hmm.gif The show units suppose to be a sample house, a sample that in best quality and nice nice interior design to attract buyers and build confidence right? I tot it suppose to show their capability and convince ppl to buy by giving potential buyers the best feeling about their product.... hmm.gif
*
All, i received some comment/ email/ message from those who bought the house in phase 2 (In my hand got more than 5 unit owner in phase 2 are not satisfied)... They suggest to send a formal complaint letter to Mahsing!!! However, i'm planning to do that...

Buyers, Please raise your concern on here


Complaint/ Dissatisfaction:-
1) Guard House too small and not secure and it's not as what Mahsing promote slogan"secure guarded community"
2) M-residence Sales Operator got attitude problem and not convey the information in professional way.
3) Show house workmanship not good.

Question (Please let us know if you got an answer):-
1) termites attack under warranty?
2) g and g as promised when purchase or f and g? access card? in and out control? security and safety issue.
3) toilet under the staircase, air circulation issue?

Phase 2 show unit only ready on 3rd week of september? can someone clarify?

This post has been edited by kelvin2080: Sep 3 2012, 09:52 AM
LEDlight7
post Sep 3 2012, 10:00 AM

New Member
*
Junior Member
10 posts

Joined: May 2012
QUOTE(kelvin2080 @ Sep 2 2012, 11:28 AM)
Kittyong, Thanks for comment. Unfortunately i bought phase 2 ... Last time i got chance to choose phase 2 and phase 3 but the sales operator highly recommend to choose Phase 2... reason as below:

(1) Phase 2 space => 2380 qf and phase 3 space => 2280qf
(2) Phase 2 got balcony
(3) phase 2 upper floor medium room got its own toilet.
(4) Phase 2 got show unit..

* However, the price in phase 2 are much more higher than phase 3..

In the end, Mahsing can deliver OK OK phase 3 but phase 2 disappointed the consumer like us... and phase 2 show unit are delay!!!
Personally i really dissatisfied the way this sub-contractor work!!!! RM 600k++ is not a small amount... i believe everybody have a same feeling here...

Kittyyong, we do saw a photo in phase 2 previously...!!!! really suck and a lot of things are not make sense...and we all are know.. however we hope that Mahsing can do somethings before the show unit are open... we will give them a chance before make an official complaint to mahsing or even multicasting company such as TV3 or newspaper... As what Mahsing promised in newspaper last time... with slogan "They will build a secure guarded community in rawang" ...If in the end, Mahsing deliver this kind of suck product and all consumer are unhappy. Did you think that M-residence 2 and M-residence 1 Semi-D sales can increase?

For this unsecure guard house in photo... i think we can discuss with Mahsing how to get a solution!!! remember, we need solution instead of excuse!!!  For term and condition , for sure we can discuss within Mahsing and consumer.... instead of blaming each other!!!!

For consumer, for sure we need a product that as what Mahsing got promised!!! we no need very luxury guard house!!! or material!!! but always remember what we give (RM 600k!!!), Mahsing should give back what it should deliver!!!. Agree?

We wait again the action from Mahsing and show unit phase 2!!!!

others, any comment? Thanks
*
I am a phase 2 buyer and shared the same feeling as kelvin2080... feeling that phase 2 is not worth the price tag after viewing the show unit.

Mah Sing, we trusted you for the reputation... pls don't ruin it with this project.


iLoveSunday
post Sep 3 2012, 10:02 AM

Getting Started
**
Junior Member
60 posts

Joined: May 2012
QUOTE(LEDlight7 @ Sep 3 2012, 10:00 AM)
I am a phase 2 buyer and shared the same feeling as kelvin2080... feeling that phase 2 is not worth the price tag after viewing the show unit.

Mah Sing, we trusted you for the reputation... pls don't ruin it with this project.
*
imagine potential buyers do some research before their purchase and found this post....
icon_question.gif
Jigjig
post Sep 3 2012, 10:21 AM

Getting Started
**
Junior Member
121 posts

Joined: Jan 2012
QUOTE(iLoveSunday @ Sep 3 2012, 10:02 AM)
imagine potential buyers do some research before their purchase and found this post....
icon_question.gif
*
Yesterday morning, i verbally highlight guard house issue to the sales operator. He say, MS mgmt is aware of this... but he did not disclose much.
Another blur saleman just say this could be negative agenda launched by their competitor. I guest he is still sleeping ...!
choong20
post Sep 3 2012, 11:24 AM

New Member
*
Newbie
4 posts

Joined: Sep 2012


hi, i am new here. has been followup this forum for quite some time. bought a phase 2 unit. this is my first house so not really sure what to expect. but i do think that the ground floor toilet is somewhere not in proper location without proper or no ventilation at all (i think thats why they change the design for phase 3??).
agree on any action to protect buyers interest from taiko and taiche here!!

kelvin2080
post Sep 3 2012, 11:36 AM

Casual
***
Junior Member
358 posts

Joined: Jul 2011
QUOTE(choong20 @ Sep 3 2012, 11:24 AM)
hi, i am new here. has been followup this forum for quite some time. bought a phase 2 unit. this is my first house so not really sure what to expect. but i do think that the ground floor toilet is somewhere not in proper location without proper or no ventilation at all (i think thats why they change the design for phase 3??).
agree on any action to protect buyers interest from taiko and taiche here!!
*
Appreciate the comment...


Complaint/ Dissatisfaction:-
1) Guard House too small and not secure and it's not as what Mahsing promote slogan"secure guarded community"
2) M-residence Sales Operator got attitude problem and not convey the information in professional way.
3) Show house workmanship not good.
4) Phase 2 Ground floor toilet is somewhere not in proper location and no ventilation.
5) Phase 2 unit window material used are no up to standard/ no quality.


Question (Please let us know if you got an answer):-
1) termites attack under warranty?
2) g and g as promised when purchase or f and g? access card? in and out control? security and safety issue.
3) toilet under the staircase, air circulation issue?

Others, please comment......
Andy998877
post Sep 3 2012, 12:07 PM

New Member
*
Newbie
2 posts

Joined: Sep 2012
hi, i am new here & i am also phase 1 buyer.
I feel that phase 3 design is much better than phase 1 & phase 2 design.
Phase 3 look more space compare to phase 1 & 2.
If Phase 1 ground floor design follow Phase 3 design, it would be nice thumbup.gif
I also feel regret to buy phase 1 unit sad.gif .
kelvin2080
post Sep 3 2012, 12:27 PM

Casual
***
Junior Member
358 posts

Joined: Jul 2011
All,
I think we should give an official complaint letter to Mahsing. At least can make them aware / concern on this..

Can please PM me your information as below ASAP:-
Your Name :
Unit number that you bought :
Which phase: phase 1, 2 or 3?

Please send me your email as well so that i can cc the letter to you all......


* Remember, Cooperation only will help on this matter... if you think it's no necessary then it's Ok....

Thanks.

This post has been edited by kelvin2080: Sep 6 2012, 08:25 PM
cescmy14
post Sep 3 2012, 01:04 PM

New Member
*
Junior Member
37 posts

Joined: Jan 2012
Would I buy M Residence if I come across these complaints first? 60% NO. 40% Yes because of MS reputation so I'm willing to consider & find out myself.

Anyway, will PM Kelvin my details. Can we start a list of owners & phase?
koigh
post Sep 3 2012, 01:40 PM

Getting Started
**
Junior Member
205 posts

Joined: Apr 2012
Design is very subjective....for me i like phase 2 more compare with phase 3.....there is something unique toilet under the staircase.yesterday went to show house n 100% confirmed got ventilation for the toilet.
The interior look narrow not like what i expect.

But i agreed with you all on guard house, small n look not efficient.

This post has been edited by koigh: Sep 3 2012, 03:38 PM


Attached thumbnail(s)
Attached Image
kelvin2080
post Sep 3 2012, 01:54 PM

Casual
***
Junior Member
358 posts

Joined: Jul 2011
QUOTE(koigh @ Sep 3 2012, 01:40 PM)
Design is very subjective....for me i like phase 2 more compare with phase 3.....there is something unique toilet under the staircase.yesterday went to show house n 100% confirmed got ventilation for the toilet.
The interior look narrow not like what i expect.

But i agreed with you all on guard house, small n look not efficient.
*
Thanks for comment..
Phase 2 and phase 3 interior design not same? I thought just upper floor toilet are different??any other are different? Can someone please clarify?

This post has been edited by kelvin2080: Sep 3 2012, 01:54 PM
kittyong
post Sep 3 2012, 02:25 PM

New Member
*
Junior Member
9 posts

Joined: Apr 2009
QUOTE(kelvin2080 @ Sep 3 2012, 01:54 PM)
Thanks for comment..
Phase 2 and phase 3 interior design not same? I thought just upper floor toilet are different??any other are different? Can someone please clarify?
*
phase 2 - 5 room 5 toilet

phase 3 - 4 room 3 toilet

phase 3 lower floor only 1 room 1 toilet
wsfun79
post Sep 3 2012, 02:43 PM

New Member
*
Newbie
3 posts

Joined: Sep 2012
hi, i am new here & i am also phase 2 buyer.
I am a phase 2 buyer and shared the same feeling as kelvin2080... feeling that phase 2 is not worth the price tag after viewing the show unit.


koigh
post Sep 3 2012, 02:52 PM

Getting Started
**
Junior Member
205 posts

Joined: Apr 2012
QUOTE(wsfun79 @ Sep 3 2012, 02:43 PM)
hi, i am new here & i am also phase 2 buyer.
I am a phase 2 buyer and shared the same feeling as kelvin2080... feeling that phase 2 is not worth the price tag after viewing the show unit.
*
Agreed
kelvin2080
post Sep 3 2012, 03:02 PM

Casual
***
Junior Member
358 posts

Joined: Jul 2011
QUOTE(wsfun79 @ Sep 3 2012, 02:43 PM)
hi, i am new here & i am also phase 2 buyer.
I am a phase 2 buyer and shared the same feeling as kelvin2080... feeling that phase 2 is not worth the price tag after viewing the show unit.
*
Okay, well, please give your comment which one you are dissatisfied on phase 2? so that we can gather the info and let mahsing know ....

Complaint/ Dissatisfaction:-
1) Guard House too small and not secure and it's not as what Mahsing promote slogan"secure guarded community"
2) M-residence Sales Operator got attitude problem and not convey the information in professional way.
3) Show house workmanship not good.
4) Phase 2 Ground floor toilet is somewhere not in proper location and no ventilation.
5) Phase 2 unit window material used are no up to standard/ no quality.


Question (Please let us know if you got an answer):-
1) termites attack under warranty?
2) g and g as promised when purchase or f and g? access card? in and out control? security and safety issue.
3) toilet under the staircase, air circulation issue?


Added on September 3, 2012, 3:05 pm
QUOTE(kelvin2080 @ Sep 3 2012, 12:27 PM)
All,
I think we should give an official complaint letter to Mahsing. At least can make them aware / concern on this..

Can please PM me your information as below ASAP:-
Your Name :
Unit number that you bought :
Which phase:  phase 1, 2 or 3?

Please send  me your email as well so that i can cc the letter to you all......
* Remember, Cooperation only will help on this matter... if you think it's no necessary then it's Ok....

Thanks.
*
Please take note on this if you think it's necessary!!!

This post has been edited by kelvin2080: Sep 6 2012, 08:25 PM
SNathan
post Sep 3 2012, 04:38 PM

New Member
*
Junior Member
14 posts

Joined: Feb 2012
QUOTE(kelvin2080 @ Sep 3 2012, 03:02 PM)
Okay, well, please give your comment which one you are dissatisfied on phase 2? so that we can gather the info and let mahsing know ....

Complaint/ Dissatisfaction:-
1) Guard House too small and not secure and it's not as what Mahsing promote slogan"secure guarded community"
2) M-residence Sales Operator got attitude problem and not convey the information in professional way.
3) Show house workmanship not good.
4) Phase 2 Ground floor toilet is somewhere not in proper location and no ventilation.
5) Phase 2 unit window material used are no up to standard/ no quality.
Question (Please let us know if you got an answer):-
1) termites attack under warranty?
2) g and g as promised when purchase or f and g? access card? in and out control? security and safety issue.
3) toilet under the staircase, air circulation issue?


Added on September 3, 2012, 3:05 pm

Please take note on this if you think it's necessary!!!
*
should I list my details here in the forum? Phase 1 22X80 buyer.
kelvin2080
post Sep 3 2012, 04:49 PM

Casual
***
Junior Member
358 posts

Joined: Jul 2011
QUOTE(SNathan @ Sep 3 2012, 04:38 PM)
should I list my details here in the forum? Phase 1 22X80 buyer.
*
please send me pm... in case your information are in confidential....
Jojo
post Sep 3 2012, 05:55 PM

Getting Started
**
Junior Member
204 posts

Joined: Jan 2003



QUOTE(koigh @ Sep 3 2012, 01:40 PM)
Design is very subjective....for me i like phase 2 more compare with phase 3.....there is something unique toilet under the staircase.yesterday went to show house n 100% confirmed got ventilation for the toilet.
The interior look narrow not like what i expect.

But i agreed with you all on guard house, small n look not efficient.
*
Hi,

Saw the photo of air ventilation for in the toilet. The question is:

1. Where the air to be flow to?

By logic. Maybe everyone here not aware about this. The toilet air cannot be flow out of your house. It still flow within the toilet ceiling and the smell still inside toilet.

This design is unacceptable even you had install air ventilation unit.
kelvin2080
post Sep 3 2012, 06:33 PM

Casual
***
Junior Member
358 posts

Joined: Jul 2011
QUOTE(Jojo @ Sep 3 2012, 05:55 PM)
Hi,

Saw the photo of air ventilation for in the toilet. The question is:

1. Where the air to be flow to?

By logic. Maybe everyone here not aware about this. The toilet air cannot be flow out of your house. It still flow within the toilet ceiling and the smell still inside toilet.

This design is unacceptable even you had install air ventilation unit.
*
jojo. you got good point and i think it's no make sense to have toilet there.... smile.gif
Design got problem!!!


This post has been edited by kelvin2080: Sep 3 2012, 06:34 PM
koigh
post Sep 3 2012, 08:20 PM

Getting Started
**
Junior Member
205 posts

Joined: Apr 2012
QUOTE(kelvin2080 @ Sep 3 2012, 06:33 PM)
jojo. you got good point and i think it's no make sense to have toilet there.... smile.gif
Design got problem!!!
*
I like the toilet there and plan to extend the kitchen so in future when my guest want use toilet at least no need pass thru my messy kitchen....

About the ventilation flow out, i will clarify further with MS

This post has been edited by koigh: Sep 3 2012, 08:22 PM

198 Pages « < 63 64 65 66 67 > » Top
 

Change to:
| Lo-Fi Version
0.0310sec    0.32    6 queries    GZIP Disabled
Time is now: 6th December 2025 - 10:34 PM