Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

Investment EKOCHERAS @ JALAN CHERAS (V4) [MRT PROPERTY] [OT], Where Cheras becomes Mont'Jiulai

views
     
gks
post Feb 13 2019, 08:00 PM

Look at all my stars!!
*******
Senior Member
3,836 posts

Joined: May 2008
Raw design is not everyone cup of tea or coffee.

A lot of ppl they missed what is the bigger picture.

As property buyer I would rather have MRT station with elevated covered walkway just a short distant away.
As property buyer i would rather have a vibrant retail at ground rather than "dead" retail for all the conveniences.
If Ekovest going to pass the saving in the form cheaper rental rate to retailers to encourage them to open the shop earlier so that the retails can be occupied soonest possible. Retailers have stronger holding power as well while waiting for the footfall to build up.
I would also rather have a VP on residential property where all components such as retails and office are completed at same time rather than in phases.
I would also rather Ekovest honor the full LAD.

Then again, cannot stop anyone commenting about the raw concept. To be honest it is not my cup of tea as well however other matters are more pressing concern in my book.

This post has been edited by gks: Feb 13 2019, 08:05 PM
selinix
post Feb 13 2019, 09:19 PM

Look at all my stars!!
*******
Senior Member
7,343 posts

Joined: May 2005

https://ekovest.com.my/wp-content/uploads/2...pdf-small-1.pdf

Perhaps some of you have read this, sharing this here for those who wants to understand the concept behind the design.

"As raw as sushi"
"Leftover construction materials"
"Minimal plastering"
"Bare finishes"

I guess the approach is very drastic as people who put their money in to a development expect to be able to quantify their investment but when the developer go with a sustainability concept with the keywords use above, is as though they are sending a message they they are using a heavy cost cutting measure
icemanfx
post Feb 13 2019, 09:31 PM

20k VIP Club
*********
All Stars
21,459 posts

Joined: Jul 2012


QUOTE(selinix @ Feb 13 2019, 09:19 PM)
https://ekovest.com.my/wp-content/uploads/2...pdf-small-1.pdf

Perhaps some of you have read this, sharing this here for those who wants to understand the concept behind the design.

"As raw as sushi"
"Leftover construction materials"
"Minimal plastering"
"Bare finishes"

I guess the approach is very drastic as people who put their money in to a development expect to be able to quantify their investment but when the developer go with a sustainability concept with the keywords use above, is as though they are sending a message they they are using a heavy cost cutting measure
*
Those need to walk through "unfinished construction site" to reach home will certainly appreciate their well appointed home.

gks
post Feb 13 2019, 09:44 PM

Look at all my stars!!
*******
Senior Member
3,836 posts

Joined: May 2008
QUOTE(icemanfx @ Feb 13 2019, 09:31 PM)
Those need to walk through "unfinished construction site" to reach home will certainly appreciate their well appointed home.
*
Which project you refer to?

Babizz
post Feb 14 2019, 08:37 AM

10k Club
********
All Stars
12,532 posts

Joined: Feb 2013
comment by propkopi fb page: Seriously, this will be one of the most talk residential project in town! Already saw some gen y posing and taking photos there😄


pinkdm
post Feb 14 2019, 10:00 AM

Regular
******
Senior Member
1,039 posts

Joined: Jun 2017


QUOTE(Babizz @ Feb 14 2019, 08:37 AM)
comment by propkopi fb page: Seriously, this will be one of the most talk residential project in town! Already saw some gen y posing and taking photos there😄
*


Attached thumbnail(s)
Attached Image Attached Image Attached Image
selinix
post Feb 14 2019, 11:16 AM

Look at all my stars!!
*******
Senior Member
7,343 posts

Joined: May 2005

My only issue with their approach is they took the bare concept literally to the point that all the wires dangling, walls and pillars with rough cement patches, nails sticking out. I hope it is just unfinished work and they will put in effort to smooth this out
propertybbb
post Feb 14 2019, 12:36 PM

Look at all my stars!!
*******
Senior Member
2,663 posts

Joined: Feb 2013
It is not VP yet. Propcafe just update the latest info to share. All like jump the gun haha...maybe the lift would be painted like in the pic above eventually? Personally, i felt tat the cyberworld is so critical to ekc developer. They are trying to come out something different..good try. Just let them finish their job and we will see n shoot if really not feasible to live. Sa far it looks ok and the mall doesnt feel dusty becoz of the raw design.

This post has been edited by propertybbb: Feb 14 2019, 12:37 PM
BEANCOUNTER
post Feb 14 2019, 01:13 PM

20k VIP Club
*********
All Stars
20,146 posts

Joined: May 2011
honestly if you run your hand over some of the exposed wall, you will get dust on your hand de...…

they didn't even bother to put sealant if they decided not to tile them up. this part I really cant accept.
propertybbb
post Feb 14 2019, 01:24 PM

Look at all my stars!!
*******
Senior Member
2,663 posts

Joined: Feb 2013
Tiles up or normal wall with paint also with dusts on hand if you touch on it. Matter of more or less. Raw wall may attract more dust becoz of the raw surface. Sealant it will be a good idea. Developer if read here..pls consider it ha
BEANCOUNTER
post Feb 14 2019, 01:37 PM

20k VIP Club
*********
All Stars
20,146 posts

Joined: May 2011
QUOTE(propertybbb @ Feb 14 2019, 01:24 PM)
Tiles up or normal wall with paint also with dusts on hand if you touch on it. Matter of more or less. Raw wall may attract more dust becoz of the raw surface. Sealant it will be a good idea. Developer if read here..pls consider it ha
*
when I said dust, it doesn't mean the dust from outside that stick to the wall.

its the residual from raw cement. next time you are there, just swap your hand over the exposed wall, yr whole palm will stick with white powder.
selinix
post Feb 14 2019, 01:44 PM

Look at all my stars!!
*******
Senior Member
7,343 posts

Joined: May 2005

QUOTE(propertybbb @ Feb 14 2019, 12:36 PM)
It is not VP yet. Propcafe just update the latest info to share. All like jump the gun haha...maybe the lift would be painted like in the pic above eventually? Personally, i felt tat the cyberworld is so critical to ekc developer. They are trying to come out something different..good try. Just let them finish their job and we will see n shoot if really not feasible to live. Sa far it looks ok and the mall doesnt feel dusty becoz of the raw design.
*
Btw, my comment is not base on propcafe pictures. It was on the mall that has been open for months..
loutze
post Feb 14 2019, 05:36 PM

Getting Started
****
Junior Member
660 posts

Joined: Apr 2012
same thing if goes into parking early in the morning, very dusty.... as if there is ongoing construction within

QUOTE(BEANCOUNTER @ Feb 14 2019, 01:37 PM)
when I said dust, it doesn't mean the dust from outside that stick to the wall.

its the residual from raw cement. next time you are there, just swap your hand over the exposed wall, yr whole palm will stick with white powder.
*
Jagalat
post Feb 14 2019, 07:22 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,949 posts

Joined: Oct 2013
TSaccetera, would you like to consider V5? smile.gif
V4 is now about the same amount of pages as V3 ....

This post has been edited by Jagalat: Feb 14 2019, 07:44 PM
seongmeng
post Feb 18 2019, 04:20 PM

On my way
****
Senior Member
570 posts

Joined: Jul 2005
still have developer unit? interested to invest
selinix
post Feb 18 2019, 07:39 PM

Look at all my stars!!
*******
Senior Member
7,343 posts

Joined: May 2005

QUOTE(seongmeng @ Feb 18 2019, 04:20 PM)
still have developer unit? interested to invest
*
Might as well you call developer straight rather than asking here.
soon9913
post Feb 27 2019, 11:54 PM

Enthusiast
*****
Senior Member
918 posts

Joined: Jan 2012
QUOTE(seongmeng @ Feb 18 2019, 04:20 PM)
still have developer unit? interested to invest
*
So called developer already?
sosobear
post Feb 28 2019, 09:58 AM

Casual
***
Junior Member
405 posts

Joined: Aug 2013
anyone attended the cny luncheon ? Did dev mention when getting keys?
Jagalat
post Mar 7 2019, 10:40 PM

(J)et L(ag) Ji(alat)
*******
Senior Member
5,949 posts

Joined: Oct 2013
QUOTE(sosobear @ Feb 28 2019, 10:58 AM)
anyone attended the cny luncheon ? Did dev mention when getting keys?
*
I didn't attend. So no direct answer for you.
If no one else answered, try calling the developer. Each building is having its VP schedule.

It's count down time to me compared to those snail pace of construction progress. Cheers.
BEANCOUNTER
post Mar 8 2019, 09:55 AM

20k VIP Club
*********
All Stars
20,146 posts

Joined: May 2011
eko taiko also didn't know when vped meh??????

wassup group so many buyers, no one even utter a word??????

berry strange leh…….

 

Change to:
| Lo-Fi Version
0.0209sec    1.55    6 queries    GZIP Disabled
Time is now: 25th December 2025 - 01:24 AM