QUOTE(Jagalat @ Nov 12 2017, 06:42 PM)
Taken afternoon today..
BlkJ(right)....Started slab/cement work on lower floor of L23
BlkH(left)...
More cement work done on upper floor of L13
Already started painting white here

At the front ie mall facing Jln Cheras (not shown in this picture), the wall is painted orange/yellow.
Wonder how are they going to built the “garden” on 9th floor? On top of 8th floor does not seem accessible...BlkJ(right)....Started slab/cement work on lower floor of L23
BlkH(left)...
More cement work done on upper floor of L13
Already started painting white here

At the front ie mall facing Jln Cheras (not shown in this picture), the wall is painted orange/yellow.
Nov 13 2017, 09:54 PM

Quote
0.0266sec
0.86
7 queries
GZIP Disabled