EMPIRE CITY @ Damansara Perdana/Mutiara Damansara, Mixed Development Project in Damasara KL
|
HELLO HELLO
|
Feb 17 2016, 08:57 AM
|
|
QUOTE(sheilaram @ Feb 16 2016, 11:26 PM) Hollysh*t. curi Ayam short ceilling. Developer Shorter ceiling height can cut manyak cost. Jumping head very can hit the ceiling. No need jump put up the hand also can touch. Ini macam Sibeh dangerous to put ceiling fan liao. Stand up only Head also kena potong half. Toilet door also looks cheap pluk cacat. This post has been edited by HELLO HELLO: Feb 17 2016, 09:02 AM
|
|
|
|
|
|
chinaapek
|
Feb 17 2016, 09:11 AM
|
New Member
|
I went there personally last sunday and HOLY SHIT. Is like a construction area and they VPed the unit to the owner. Base on naked eye, is about 80% completion and they VPed.
Good luck to the owners. They are paying maintenance and installment every month without able to rent out. burning cash every month. No CCC yet.
Avoid this project until the mall is up.
|
|
|
|
|
|
satrianeo-x
|
Feb 17 2016, 09:38 AM
|
|
QUOTE(sheilaram @ Feb 16 2016, 11:26 PM) is that plaster ceiling or ??? quite low eh
|
|
|
|
|
|
satrianeo-x
|
Feb 17 2016, 09:40 AM
|
|
QUOTE(chinaapek @ Feb 17 2016, 09:11 AM) I went there personally last sunday and HOLY SHIT. Is like a construction area and they VPed the unit to the owner. Base on naked eye, is about 80% completion and they VPed. Good luck to the owners. They are paying maintenance and installment every month without able to rent out. burning cash every month. No CCC yet. Avoid this project until the mall is up. Maybe they start maintenance ASAP, so that When access cards (parking, door etc) ready they force them to pay up to get those access cards etc.
|
|
|
|
|
|
gks
|
Feb 17 2016, 10:22 AM
|
|
I believe the previous photos posted was not for actual VP unit and the forumner just randomly snap photo units he saw and not the actual VP-ed unit.
the units are delivered in batches and since EC already delayed, I believe developer completed units that purchasers is collecting key.
|
|
|
|
|
|
gks
|
Feb 17 2016, 10:24 AM
|
|
QUOTE(HELLO HELLO @ Feb 17 2016, 08:57 AM) Hollysh*t. curi Ayam short ceilling. Developer Shorter ceiling height can cut manyak cost. Jumping head very can hit the ceiling. No need jump put up the hand also can touch. Ini macam Sibeh dangerous to put ceiling fan liao. Stand up only Head also kena potong half. Toilet door also looks cheap pluk cacat. I believe Colonial is duplex SOHO and similar to Empire Damansara SOHO, the total height is 18ft. so nett height for each level should be 8ft++
|
|
|
|
|
|
shadow_walker
|
Feb 17 2016, 10:52 AM
|
|
QUOTE(8sg9ft @ Feb 16 2016, 05:49 PM) CCC issued by local council, isn't it? In this case, MBPJ? I'm wondering too if Architect got certify the main contractors' works or not. actually got 21 forms liao to certify by the consultants before can get CCC...architect only 4 form if not mistaken..bomba..building..landscape i dunno which architect in the right mind will certify this...unless EC got inhouse architect dunno lor civil engineer, structure engineer, mechanical, electrical, firefighting system engineer all need certify liao before can keluar CCC dunno EC gave how big an angpao to them lorr
|
|
|
|
|
|
kinnasai
|
Feb 17 2016, 12:19 PM
|
|
QUOTE(shadow_walker @ Feb 17 2016, 10:52 AM) actually got 21 forms liao to certify by the consultants before can get CCC...architect only 4 form if not mistaken..bomba..building..landscape i dunno which architect in the right mind will certify this...unless EC got inhouse architect dunno lor civil engineer, structure engineer, mechanical, electrical, firefighting system engineer all need certify liao before can keluar CCC dunno EC gave how big an angpao to them lorr  Inhouse architect, inhouse engineer, EC is practising this.... Just like our AG appointed by our PM.... haha... Boss tell you A, will you do B?
|
|
|
|
|
|
shadow_walker
|
Feb 17 2016, 02:11 PM
|
|
QUOTE(kinnasai @ Feb 17 2016, 12:19 PM) Inhouse architect, inhouse engineer, EC is practising this.... Just like our AG appointed by our PM.... haha... Boss tell you A, will you do B? fuuuu no wonder can approve liddis..gila liaooo need to sue malpractice if this is true...sumbody report to lembaga arkitek, lembaga jurutera..all lembaga la..hahaha
|
|
|
|
|
|
cynthusc
|
Feb 17 2016, 03:26 PM
|
|
How much is the entry price for Colonial? 200-300K is it? The pic that Sheilaram showed also does not look very good especially when you see close up.
|
|
|
|
|
|
axis_lua
|
Feb 17 2016, 04:20 PM
|
|
300k-400k = entry price.
|
|
|
|
|
|
cynthusc
|
Feb 17 2016, 05:16 PM
|
|
300-400K entry price and the delivery is so poor. A lot of people who took loans for 30 years will eventually be paying double the price.
|
|
|
|
|
|
Minolta
|
Feb 17 2016, 11:06 PM
|
|
So when got fire sale? Owners all betta sell fast fast before price crash.
|
|
|
|
|
|
HarpArtist
|
Feb 18 2016, 06:48 AM
|
|
QUOTE(shadow_walker @ Feb 17 2016, 02:11 PM) fuuuu no wonder can approve liddis..gila liaooo need to sue malpractice if this is true...sumbody report to lembaga arkitek, lembaga jurutera..all lembaga la..hahaha empire stuff memang all in house. even the shops inside the upcoming mall. thats how they fill up to the current...i dunno, last time i checked was 70%? u be suprised later this non hda stuff, the lembaga also inhouse i forsee when mall open these soxo will mainly be used as foreign worker hostel where 6 or so ppl in 1 room in bunk beds. i confirm this is happening in puteri palma for ioi city and main place resi. see who want to stay la then...
|
|
|
|
|
|
kinnasai
|
Feb 18 2016, 11:34 AM
|
|
QUOTE(shadow_walker @ Feb 17 2016, 02:11 PM) fuuuu no wonder can approve liddis..gila liaooo need to sue malpractice if this is true...sumbody report to lembaga arkitek, lembaga jurutera..all lembaga la..hahaha Their Engineer inhouse, but not registered with Lembaga. They just engage 1 old man who registered with Lembaga, use his rubber stamp, chop chop what ever by inhouse engineer.....
|
|
|
|
|
|
propertybbb
|
Feb 18 2016, 11:16 PM
|
|
QUOTE(sheilaram @ Feb 17 2016, 12:22 AM) The colonial unit I witnessed was not that bad. Any photo for common area likecorridor and lobby?
|
|
|
|
|
|
PropLoV3R
|
Feb 18 2016, 11:30 PM
|
New Member
|
|
|
|
|
|
|
Informationiac
|
Feb 19 2016, 12:01 AM
|
Getting Started

|
QUOTE(sheilaram @ Feb 16 2016, 11:22 PM) The colonial unit I witnessed was not that bad. This is not bad, need a bit of touch up and cleaning.
|
|
|
|
|
|
myproblem
|
Feb 19 2016, 04:20 PM
|
|
QUOTE(PropLoV3R @ Feb 18 2016, 11:30 PM) Warao.. what is that Electric box doing inside the water piping room? Any leaks how?
|
|
|
|
|
|
Giant
|
Feb 19 2016, 04:56 PM
|
|
corridor look alot like a hourly motel
|
|
|
|
|