Welcome Guest ( Log In | Register )

Bump Topic Topic Closed RSS Feed
168 Pages « < 85 86 87 88 89 > » Bottom

Outline · [ Standard ] · Linear+

Investment KINRARA RESIDENCE [OWNERS' THREAD], Lifestyle landed homes from Mah Sing

views
     
ckwong111
post Oct 12 2011, 09:59 PM

New Member
*
Junior Member
38 posts

Joined: Sep 2011


QUOTE(noswear @ Oct 12 2011, 08:37 PM)
ahaha body good but look not ok? Still sapu? lol
*
chinese saying "can eat, don't waste mah" biggrin.gif

He he to be honest, for all companies got sales & marketing dept one (as I am a sales guy myself), hiring sales staff (esp. ladies) sure all decent looking one, where got pork steak or aunties ones... smile.gif

Ok ok maybe for guys got exception, me for example tongue.gif

On a more serious note, the banks agents that contacted me on the spot or thru phone are:-

1. HLBB
2. PBB
3. MBB
4. HSBC
5. CIMB
6. CITI

All claimed they are panel banks. 3SSL got waiver on most stuff except disbursement & loan stamping duty (abt RM5K+)...

Good question hmm.gif , I wonder whether 3SSL have DIBS or not, but I remember one the loan officers tell me need to pay interest of abt RM10K+ from now to hand-over in July 2013...

Maybe from Vevex post, 3SSL not entitled for DIBS, so maybe can bargain with the banks to see maybe they can offer or not (no harm trying right? Worse is they say NO lor, no need to die one mah)


Added on October 12, 2011, 10:05 pm
QUOTE(Antzfield @ Oct 12 2011, 12:13 PM)
I do have the indicated rate from banks, i can pm you if you want it for reference only. I am not too sure if everyone will be having the same rate, but for reference, ok la.

my phase do entitle dibs from HSBC, perhaps need to double confirm with TMS which banks.
*
No harm, pls PM me. That's the reason for forum like this right? To share info and fight for the best as future residence of our taman...future sharing hopefully includes reno tips, pricing from ID/construction co., feng shui, etc etc etc biggrin.gif

This post has been edited by ckwong111: Oct 12 2011, 10:05 PM
Antzfield
post Oct 12 2011, 10:27 PM

Casual
***
Junior Member
496 posts

Joined: Aug 2011
QUOTE(ckwong111 @ Oct 12 2011, 09:59 PM)
chinese saying "can eat, don't waste mah"  biggrin.gif

He he to be honest, for all companies got sales & marketing dept one (as I am a sales guy myself), hiring sales staff (esp. ladies) sure all decent looking one, where got pork steak or aunties ones...  smile.gif

Ok ok maybe for guys got exception, me for example  tongue.gif

On a more serious note, the banks agents that contacted me on the spot or thru phone are:-

1. HLBB
2. PBB
3. MBB
4. HSBC
5. CIMB
6. CITI

All claimed they are panel banks. 3SSL got waiver on most stuff except disbursement & loan stamping duty (abt RM5K+)...

Good question  hmm.gif , I wonder whether 3SSL have DIBS or not, but I remember one the loan officers tell me need to pay interest of abt RM10K+ from now to hand-over in July 2013...

Maybe from Vevex post, 3SSL not entitled for DIBS, so maybe can bargain with the banks to see maybe they can offer or not (no harm trying right? Worse is they say NO lor, no need to die one mah)


Added on October 12, 2011, 10:05 pm

No harm, pls PM me. That's the reason for forum like this right? To share info and fight for the best as future residence of our taman...future sharing hopefully includes reno tips, pricing from ID/construction co., feng shui, etc etc etc  biggrin.gif
*
I pm you already. Pls let me know if you need to share anything else. brows.gif
CyrusChang
post Oct 13 2011, 12:09 AM

Enthusiast
*****
Senior Member
722 posts

Joined: Nov 2010
There is new shop office approx 1KM from Kinrara Residence. Developing area and close to interchange of new highway!!!

PM me for Enquiry!Refer Buyer & Get Paid!!!
ckwong111
post Oct 13 2011, 12:24 AM

New Member
*
Junior Member
38 posts

Joined: Sep 2011


QUOTE(Antzfield @ Oct 12 2011, 10:27 PM)
I pm you already. Pls let me know if you need to share anything else.  brows.gif
*
Thank you neighbor for sharing, good points to take note. If I have the chance to meet you face to face, hopefully you allow me to buy you a good lunch/dinner notworthy.gif

Don't feel guilty on taking up my offer, coz probably becoz of your tips, I could be $aving tons of $$$ on interest during my loan tenure rclxms.gif

Maybe enough to buy you 100 lunches/dinners thumbup.gif (mamak style or 5***** style makan to be known later when debt all cleared)
lupjoeq
post Oct 13 2011, 02:05 PM

New Member
*
Junior Member
47 posts

Joined: Jul 2010


So 3SSL entitled for DIBS?i got my loan from MBB..but the SA told me no DIBS for all??
SUSUFO-ET
post Oct 13 2011, 02:35 PM

Look at all my stars!!
*******
Senior Member
6,747 posts

Joined: Sep 2010


QUOTE(lupjoeq @ Oct 13 2011, 02:05 PM)
So 3SSL entitled for DIBS?i got my loan from MBB..but the SA  told me no DIBS for all??
*
No DIBS for all link houses
Antzfield
post Oct 13 2011, 09:53 PM

Casual
***
Junior Member
496 posts

Joined: Aug 2011
QUOTE(ckwong111 @ Oct 13 2011, 12:24 AM)
Thank you neighbor for sharing, good points to take note. If I have the chance to meet you face to face, hopefully you allow me to buy you a good lunch/dinner  notworthy.gif

Don't feel guilty on taking up my offer, coz probably becoz of your tips, I could be $aving tons of $$$ on interest during my loan tenure  rclxms.gif 

Maybe enough to buy you 100 lunches/dinners  thumbup.gif (mamak style or 5***** style makan to be known later when debt all cleared)
*
No problem. Hope these help and will assist you of getting the best deal.

Hmmmm, 1 good teh tarik with nasi lemak, tambah mata kebau will be good drool.gif

What deal did you get so far? similar to mine?
Covillea
post Oct 14 2011, 10:06 AM

Enthusiast
*****
Senior Member
986 posts

Joined: Dec 2009
http://www.sunwayproperty.com/pd/scpdd_Sunway_Eastwood.aspx

sunway eastwood indicative semi-d price is rm2.5m to rm2.8m - can someone confirm?

this is only 5 mins from kinrara residence.

mah sing really has to buck-up man!!!

in any case mah sing's semi-d is below market price.

btw,

Cabinet approves access road to Mex
http://thestar.com.my/metro/story.asp?file...398&sec=central

this highway is just 5-8 mins from kinrara residence from the back road - hence direct access to jalan tun razak klcc town centre in 25 mins from kinrara residence doorstep!!!

This post has been edited by Covillea: Oct 14 2011, 10:20 AM
liang7524
post Oct 14 2011, 07:45 PM

Getting Started
**
Junior Member
57 posts

Joined: Apr 2011


guys, just confirmed with one of the sales agent that the initially amended date of signing the S&P of the semids is postponed again. They couldn't make it to late October, promising November but i seriously doubt its credibility.

noswear
post Oct 14 2011, 08:26 PM

Regular
******
Senior Member
1,050 posts

Joined: Jan 2011
QUOTE(Covillea @ Oct 14 2011, 10:06 AM)
http://www.sunwayproperty.com/pd/scpdd_Sunway_Eastwood.aspx

sunway eastwood indicative semi-d price is rm2.5m to rm2.8m - can someone confirm?

this is only 5 mins from kinrara residence.

mah sing really has to buck-up man!!!

in any case mah sing's semi-d is below market price.

btw,

Cabinet approves access road to Mex
http://thestar.com.my/metro/story.asp?file...398&sec=central

this highway is just 5-8 mins from kinrara residence from the back road - hence direct access to jalan tun razak klcc town centre in 25 mins from kinrara residence doorstep!!!
*
hahaha..all this assumption is based on travelling speed of 120kmph? and no car at all ie during cny or hari raya??


SUSUFO-ET
post Oct 14 2011, 08:37 PM

Look at all my stars!!
*******
Senior Member
6,747 posts

Joined: Sep 2010


QUOTE(noswear @ Oct 14 2011, 08:26 PM)
hahaha..all this assumption is based on travelling speed of 120kmph? and no car at all ie during cny or hari raya??
*
this highway is just 5-8 mins from kinrara residence from the back road - hence direct access to jalan tun razak klcc town centre in 25 mins from kinrara residence doorstep!!!

The above time is reasonable, if the interchange fr Taman Puncak Jalil Phase 1 to MEX highway is connnected, then 25 mins is possible. I timed fr Tmn Esplanad Aked to RHB is bout 9 mins 30 sec (in normal speed) only.
The access to MEX is a great relief to those who stay in Putra Permai, property prices are expected to rise another 10%-20% in vicinity area. wink.gif

slackinux
post Oct 14 2011, 11:08 PM

Casual
***
Junior Member
407 posts

Joined: Dec 2008
QUOTE(UFO-ET @ Oct 14 2011, 08:37 PM)
this highway is just 5-8 mins from kinrara residence from the back road - hence direct access to jalan tun razak klcc town centre in 25 mins from kinrara residence doorstep!!!

The above time is reasonable, if the interchange fr Taman Puncak Jalil Phase 1 to MEX highway is connnected, then 25 mins is possible. I timed fr Tmn Esplanad Aked to RHB is bout 9 mins 30 sec (in normal speed) only.
The access to MEX is a great relief to those who stay in Putra Permai, property prices are expected to rise another 10%-20% in vicinity area. wink.gif
*
Guys, too early to make the conclusion now. See below,

"Serdang Barisan Nasional chairman Datuk Liew Yuen Keong said the Cabinet had agreed in principle to build the link."

They agreed verbally only. Doesn't mean they must build it for you guys. It is just a tactics used to capture your heart before the 13th General Election.
Antzfield
post Oct 15 2011, 07:31 AM

Casual
***
Junior Member
496 posts

Joined: Aug 2011
QUOTE(slackinux @ Oct 14 2011, 11:08 PM)
Guys, too early to make the conclusion now. See below,

"Serdang Barisan Nasional chairman Datuk Liew Yuen Keong said the Cabinet had agreed in principle to build the link."

They agreed verbally only. Doesn't mean they must build it for you guys. It is just a tactics used to capture your heart before the 13th General Election.
*
What about SKIP? another GE tactics? anyone know the status?


Added on October 15, 2011, 7:36 am
QUOTE(liang7524 @ Oct 14 2011, 07:45 PM)
guys, just confirmed with one of the sales agent that the initially amended date of signing the S&P of the semids is postponed again. They couldn't make it to late October, promising November but i seriously doubt its credibility.
*
I was told by the sales agent that the delay for semi-ds and bungalows are due to delay from transferring of land title to TMS. not sure how true it is. this has been the excuse given for the past few months.

However, if TMS had started the construction notwithstanding of the delay of the title issue/ signing of S&P, they should be completed within 2 or 3 years from now instead of the S&P date. anyone been to the construction side lately on any progress on Palmiera and Ambrosia?

This post has been edited by Antzfield: Oct 15 2011, 07:36 AM
logen33
post Oct 15 2011, 12:12 PM

Getting Started
**
Junior Member
59 posts

Joined: May 2011
QUOTE(Antzfield @ Oct 15 2011, 07:31 AM)
What about SKIP? another GE tactics? anyone know the status?


Added on October 15, 2011, 7:36 am

I was told by the sales agent that the delay for semi-ds and bungalows are due to delay from transferring of land title to TMS. not sure how true it is. this has been the excuse given for the past few months.

However, if TMS had started the construction notwithstanding of the delay of the title issue/ signing of S&P, they should be completed within 2 or 3 years from now instead of the S&P date. anyone been to the construction side lately on any progress on Palmiera and Ambrosia?
*
Base on the work-progress on site: 2s Semi-d already started brickwork & 3s Semi-d structure in-progress, i think this project will be handed over earlier sometime mid 2013, less than 3yrs...!

Whoever buy for investment & loan lock-in for 3yrs, selling within 3yrs have to pay heavy penalty or have to start paying installment must earlier...!

Bad impact to investor!!!

This post has been edited by logen33: Oct 15 2011, 12:15 PM


Attached thumbnail(s)
Attached Image Attached Image
Karas Otoha
post Oct 15 2011, 10:34 PM

New Member
*
Junior Member
45 posts

Joined: Jul 2008
QUOTE(UFO-ET @ Oct 14 2011, 08:37 PM)
this highway is just 5-8 mins from kinrara residence from the back road - hence direct access to jalan tun razak klcc town centre in 25 mins from kinrara residence doorstep!!!

The above time is reasonable, if the interchange fr Taman Puncak Jalil Phase 1 to MEX highway is connnected, then 25 mins is possible. I timed fr Tmn Esplanad Aked to RHB is bout 9 mins 30 sec (in normal speed) only.
The access to MEX is a great relief to those who stay in Putra Permai, property prices are expected to rise another 10%-20% in vicinity area. wink.gif
*
I heard there also another new highway connect from Kinrara to Damansara too.. I'm worry the traffic condition will become worst.. JAMMMMMM!
Antzfield
post Oct 15 2011, 11:06 PM

Casual
***
Junior Member
496 posts

Joined: Aug 2011
QUOTE(logen33 @ Oct 15 2011, 12:12 PM)
Base on the work-progress on site: 2s Semi-d already started brickwork & 3s Semi-d structure in-progress, i think this project will be handed over earlier sometime mid 2013, less than 3yrs...!

Whoever buy for investment & loan lock-in for 3yrs, selling within 3yrs have to pay heavy penalty or have to start paying installment must earlier...!

Bad impact to investor!!!
*
Cool!! nice photos. Not bad as you can sneak in to take those photos.

It seems it is well on-going despite delay in the title transfer. the photos as shown is of 2 or 3s?

did you able to observe the progress on the Ambrosia side? the hill is being levelling now?
SUSUFO-ET
post Oct 16 2011, 08:35 PM

Look at all my stars!!
*******
Senior Member
6,747 posts

Joined: Sep 2010


QUOTE(Karas Otoha @ Oct 15 2011, 10:34 PM)
I heard there also another new highway connect from Kinrara to Damansara too.. I'm worry the traffic condition will become worst.. JAMMMMMM!
*
Highway is very important, to ease traffic jam. I welcome all new highways
We can't stop urbanization, car numbers will keep increasing every day

Kinrara - Damansara highway
Kinrara & Damansara area might have more traffic,
But, it helps to reduce traffic in LDP, especially Puchong to PJ and vice versa. The burden for Pantai Expressway and KESAS may be reduced.

SKIP
Kinrara and Putra Permai & Serdang may has more traffic,
But, LDP jam will be reduced, the traffic in Seremban-KL highway may reduced
Most importantly, the jam inside Seri Kembangan, Putra Permai & Puncak Jalil will reduce significantly

IMO, the more the highway is built, the better is the road system,
KESAS reduces Old Klang Road, Subang Jaya main road traffic
New Pantai Highway ease Old Klang Road, Sunway & Bangsar jam
MEX highway clearly helps to reduce traffic flows in Seremban Highway, Jlan Loke Yew & Jln Cheras
DUKE highway reduces the jam in Segambut, Sentul and Mon't Kiara a lot, Federal Highway does benefit
Middle link road.....the nightmare for Pandan Jaya area, Cheras, Ampang, Batu Caves & Selayang residents shd be gone
SILK highway has reduced the traffic in Balakong, Kajang, Sg Long & Cheras a lotttt, property development in vicinity areas have increased since the inception of SILK

I am hoping that an elevated highway for LDP is proposed. cool2.gif

This post has been edited by UFO-ET: Oct 16 2011, 08:41 PM
noswear
post Oct 17 2011, 09:44 AM

Regular
******
Senior Member
1,050 posts

Joined: Jan 2011
QUOTE(UFO-ET @ Oct 14 2011, 08:37 PM)
this highway is just 5-8 mins from kinrara residence from the back road - hence direct access to jalan tun razak klcc town centre in 25 mins from kinrara residence doorstep!!!

The above time is reasonable, if the interchange fr Taman Puncak Jalil Phase 1 to MEX highway is connnected, then 25 mins is possible. I timed fr Tmn Esplanad Aked to RHB is bout 9 mins 30 sec (in normal speed) only.
The access to MEX is a great relief to those who stay in Putra Permai, property prices are expected to rise another 10%-20% in vicinity area. wink.gif
*
yeah....from bandar kinrara to klcc via MEX....normal day..ie non peak is 25 - 35 min.....

CNY ....no ppl in town = 20 - 25 min journey.,...

but other than tat...i believe most ppl spend most their time in peak hours.....ie travel to work n back (a 9 - 5 job) we are looking at 45 min - 60 min to reach klcc......

cause i been travelling everyday ...to kl....

anyway.,....traffic in malaysia never reduced even with more highway build.........malaysia boleh!!!

i support LRT / MRT........direct to klcc!!!! from bandar kinrara!!! thumbup.gif
Covillea
post Oct 17 2011, 03:02 PM

Enthusiast
*****
Senior Member
986 posts

Joined: Dec 2009
good news!

saw this:

http://alamsanctuary.77forum.com/t176-near...i-kembangan#434
SUSUFO-ET
post Oct 17 2011, 03:34 PM

Look at all my stars!!
*******
Senior Member
6,747 posts

Joined: Sep 2010


QUOTE(noswear @ Oct 17 2011, 09:44 AM)
yeah....from bandar kinrara to klcc via MEX....normal day..ie non peak is 25 - 35 min.....

CNY ....no ppl in town = 20 - 25 min journey.,...

but other than tat...i believe most ppl spend most their time in peak hours.....ie travel to work n back  (a 9 - 5 job) we are looking at 45 min - 60 min to reach klcc......

cause i been travelling everyday ...to kl....

anyway.,....traffic in malaysia never reduced even with more highway build.........malaysia boleh!!!

i support LRT / MRT........direct to klcc!!!! from bandar kinrara!!!  thumbup.gif
*
Although the volume of vehicles has increased a lot fr those days, I experienced the worst jam at Jln Cheras (Kajang - KL) fr 1990-1995, Setapak to PJ in 1995-1998, Subang jam b4 1998 are really considered a MEGA jam!! For me, I am please to see that KV traffic has improved a lot. The LDP jam in Kelana Jaya & Puchong is nothing compare to those days. doh.gif
However the ultimate solution is a complete & efficient transportation network throughout (MRT, LRT, Commuter Train, bullet train (if), shuttle bus & taxi, pedestrian street and designated lane for cyclist)

This post has been edited by UFO-ET: Oct 17 2011, 03:53 PM

168 Pages « < 85 86 87 88 89 > » Top
Topic ClosedOptions
 

Change to:
| Lo-Fi Version
0.1033sec    1.29    6 queries    GZIP Disabled
Time is now: 19th December 2025 - 11:35 AM