Welcome Guest ( Log In | Register )

Bump Topic Topic Closed RSS Feed
133 Pages « < 113 114 115 116 117 > » Bottom

Outline · [ Standard ] · Linear+

 1120 Park Avenue - PJ South, any comments?

views
     
lyky82
post Mar 15 2011, 01:54 PM

New Member
*
Junior Member
5 posts

Joined: Oct 2010


Worried... will this effect us buyer?
http://www.freemalaysiatoday.com/2011/03/1...-out-residents/
vincemy
post Mar 16 2011, 09:24 PM

Getting Started
**
Junior Member
78 posts

Joined: May 2010
QUOTE(lyky82 @ Mar 15 2011, 01:54 PM)
I think these are the 'squatters' staying just beside the Damai Senja Apartment and the PJS1/52 road can't connect so long they don't shift out from there. Hope their problem is resolved before our 1120 PA is ready for vacant possession.
ArticFir3
post Mar 17 2011, 10:44 AM

Getting Started
**
Junior Member
203 posts

Joined: Jan 2008
From: Shah Alam



Yeah, their houses are the one that you can see on Google map.......but according to the news, Peter Brickworks are supposedly to build a low cost flats for them first, right?
ch_leong
post Mar 17 2011, 06:31 PM

Casual
***
Junior Member
439 posts

Joined: Jan 2003


probably need to compensate them and ask them move out.
leekc
post Mar 19 2011, 09:17 AM

New Member
*
Newbie
1 posts

Joined: Mar 2011
Dear 1120 property developer,

Can i know what is the status of Tower 5 now?
vincemy
post Mar 19 2011, 05:41 PM

Getting Started
**
Junior Member
78 posts

Joined: May 2010
Attached are some pictures taken today (19/03/2011). I think I have made a mistake (my apology) on the progress of Block #2 as the last picture shows that the floor beams are not even concreted yet. The progress of Block #1 is however progressing quite fast as more wall formworks have been erected. Cheers.


Attached thumbnail(s)
Attached Image Attached Image Attached Image Attached Image Attached Image Attached Image Attached Image Attached Image Attached Image Attached Image Attached Image Attached Image Attached Image
satellitegadget
post Mar 19 2011, 09:07 PM

Getting Started
**
Junior Member
218 posts

Joined: Oct 2008
QUOTE(vincemy @ Mar 19 2011, 05:41 PM)
Attached are some pictures taken today (19/03/2011). I think I have made a mistake (my apology) on the progress of Block #2 as the last picture shows that the floor beams are not even concreted yet. The progress of Block #1 is however progressing quite fast as more wall formworks have been erected. Cheers.
*
Tks bro thumbup.gif thumbup.gif
lamode
post Mar 19 2011, 10:06 PM

anything could happen!
*******
Senior Member
3,904 posts

Joined: Jul 2007
QUOTE(leekc @ Mar 19 2011, 09:17 AM)
Dear 1120 property developer,

Can i know what is the status of Tower 5 now?
*
nothing much we can do other than wait sweat.gif
20yrsinsrisentosa
post Mar 20 2011, 02:56 PM

Getting Started
**
Junior Member
221 posts

Joined: Dec 2009
QUOTE(lyky82 @ Mar 15 2011, 01:54 PM)
Attached Image

Attached Image

Attached Image

Attached Image

Attached Image

Attached Image

Attached Image




This post has been edited by 20yrsinsrisentosa: Mar 20 2011, 03:03 PM
vincemy
post Mar 20 2011, 05:48 PM

Getting Started
**
Junior Member
78 posts

Joined: May 2010
intersting, where are these graffiti photos taken?
doomdoom
post Mar 20 2011, 06:13 PM

Look at all my stars!!
*******
Senior Member
4,973 posts

Joined: Dec 2010
wow, developer better resolve this issue or else the residents at there are not happy with PA1120 project....
20yrsinsrisentosa
post Mar 20 2011, 06:50 PM

Getting Started
**
Junior Member
221 posts

Joined: Dec 2009
QUOTE(vincemy @ Mar 20 2011, 05:48 PM)
intersting, where are these graffiti photos taken?
*
opposite the main entrance of srjk © yuk chyun.
vincemy
post Mar 20 2011, 07:31 PM

Getting Started
**
Junior Member
78 posts

Joined: May 2010
QUOTE(20yrsinsrisentosa @ Mar 20 2011, 06:50 PM)
opposite the main entrance of srjk © yuk chyun.
*
Thanks, I will go and take a look next weekend.
limyusiong
post Mar 20 2011, 08:38 PM

Look at all my stars!!
*******
Senior Member
2,815 posts

Joined: Feb 2006


Jus wanna check again, mine is phase I block B3,so it is block 1 or 2 mention by vincemey in de post?
vincemy
post Mar 20 2011, 10:01 PM

Getting Started
**
Junior Member
78 posts

Joined: May 2010
QUOTE(limyusiong @ Mar 20 2011, 08:38 PM)
Jus wanna check again, mine is phase I block B3,so it is block 1 or 2 mention by vincemey in de post?
*
Block B3 is Block #2 which is also where my unit is.
limyusiong
post Mar 21 2011, 08:50 AM

Look at all my stars!!
*******
Senior Member
2,815 posts

Joined: Feb 2006


oh, tq..but according to ur pic, B2 is apa pun belum, B1 is damn fast...
vincemy
post Mar 21 2011, 11:58 AM

Getting Started
**
Junior Member
78 posts

Joined: May 2010
QUOTE(limyusiong @ Mar 21 2011, 08:50 AM)
oh, tq..but according to ur pic, B2 is apa pun belum, B1 is damn fast...
*
It looks that way but it is actually very hard to tell for sure from the pictures taken so far. One of the weekends, I will go and take some photos from the top floor of the neighbouring apartments and then we will be able to see the progress better.

This post has been edited by vincemy: Mar 21 2011, 03:34 PM
20yrsinsrisentosa
post Mar 21 2011, 12:00 PM

Getting Started
**
Junior Member
221 posts

Joined: Dec 2009
QUOTE(limyusiong @ Mar 21 2011, 08:50 AM)
oh, tq..but according to ur pic, B2 is apa pun belum, B1 is damn fast...
*
i had impression someone has posted in this thread said each of the blocks are in charged by 5 respective contractors. most probably answered your question if that is the case.
vincemy
post Mar 21 2011, 01:29 PM

Getting Started
**
Junior Member
78 posts

Joined: May 2010
QUOTE(20yrsinsrisentosa @ Mar 21 2011, 12:00 PM)
i had impression someone has posted in this thread said each of the blocks are in charged by 5 respective contractors. most probably answered your question if that is the case.
*
I think it was mentioned by tzemania post #1777 about 5 contractors .... and you also mentioned in your post #1762 that Ms Choo said that phase 1 may be delayed or something to that effect.
20yrsinsrisentosa
post Mar 21 2011, 01:52 PM

Getting Started
**
Junior Member
221 posts

Joined: Dec 2009
QUOTE(limyusiong @ Mar 21 2011, 08:50 AM)
oh, tq..but according to ur pic, B2 is apa pun belum, B1 is damn fast...
*
seems Ms Choo is not tell the truth which also implied my post #1762 is no longer valid. please check with tzemania refer to tzemania post #1777 about 5 contractors for respective blocks which could be the answer for your question.

This post has been edited by 20yrsinsrisentosa: Mar 21 2011, 01:52 PM

133 Pages « < 113 114 115 116 117 > » Top
Topic ClosedOptions
 

Change to:
| Lo-Fi Version
0.0348sec    1.38    6 queries    GZIP Disabled
Time is now: 17th December 2025 - 12:24 PM