QUOTE(zba @ Apr 15 2009, 05:44 PM)
Hallo, long time not log in. Thanks lyn for the info. But i want to share with you regarding that answer from MPS. Actually if the status of CF application if still like that, so there long way to go. Thru my experience as engineering consultant, what MPS wait is the recommendation letter from external department such a TNB, Syabas, Bomba etc. which is beyond their control. This department especially Syabas (For water supply) very hard one. Developer have to follow a lot of condition set by them before any recommendation can be issue. No wonder until today developer cannot install water meter. All of this work should be done earlier by developer's C&S Consultant (For Syabas & IWK). Now is not the MPS delayed it, but 100% is coz by developer.
So, we have to continue sabar le, until when? dun no la
Zba since u got experience on it can u please guide us more ,we need u.can u pls provide your detail to fern fang to join our group.So, we have to continue sabar le, until when? dun no la
Apr 15 2009, 07:11 PM

Quote
0.0262sec
0.33
6 queries
GZIP Disabled