Welcome Guest ( Log In | Register )

88 Pages « < 48 49 50 51 52 > » Bottom

Outline · [ Standard ] · Linear+

 Emerald Hills Alam Damai Cheras, Garden Terraces & Lakefront Condos

views
     
kennethkee93
post May 24 2019, 11:42 AM

Wooooo!
******
Senior Member
1,522 posts

Joined: Sep 2008
From: Everywhere.


QUOTE(WL9009 @ May 24 2019, 11:36 AM)
Emerald Hill block C,D ,got 1 side facing to Eiffel Tower la.
Frech Lifestyle.
*
Eiffel on top of hill some more, with cables on top. Lol. TBH, I wonder how agents would promote Block C & D.
khieni
post May 24 2019, 02:28 PM

Getting Started
**
Junior Member
290 posts

Joined: Nov 2011
QUOTE(kennethkee93 @ May 24 2019, 11:42 AM)
Eiffel on top of hill some more, with cables on top. Lol. TBH, I wonder how agents would promote Block C & D.
*
If I am developer, I will plant more tree to cover it.... It was not obvious before my booking but it starts obvious after I placed the booking and down-payment... Hehe

BTW, I am not that concern at the end of PMU... Because as we studied last time, induction and EM are generated when the current is flowing... The current is terminated at the PMU and step-down to smaller voltage and distribute to PPU... Not like the tower to tower... Current still flowing...

This post has been edited by khieni: May 24 2019, 02:31 PM
khieni
post May 24 2019, 02:29 PM

Getting Started
**
Junior Member
290 posts

Joined: Nov 2011
QUOTE(WL9009 @ May 24 2019, 11:36 AM)
Emerald Hill block C,D ,got 1 side facing to Eiffel Tower la.
Frech Lifestyle.
*
Yes, at night very nice...
BTW, what is HTC meant?
diners
post May 24 2019, 02:31 PM

Young Dipertuan
******
Senior Member
1,484 posts

Joined: Jan 2007
QUOTE(khieni @ May 24 2019, 02:29 PM)
Yes, at night very nice...
BTW, what is HTC meant?
*
HTC = high tension cable blush.gif
khieni
post May 24 2019, 02:34 PM

Getting Started
**
Junior Member
290 posts

Joined: Nov 2011
QUOTE(diners @ May 24 2019, 02:31 PM)
HTC = high tension cable  blush.gif
*
Thanks... Oooo.... HTC......

user posted image

As you can see... At night actually PMU and HTC got lighting geh...
KSHKK
post May 24 2019, 05:45 PM

Getting Started
**
Junior Member
88 posts

Joined: Apr 2019


QUOTE(pluto168 @ May 22 2019, 02:37 PM)
user posted image
*
nice to see that.. Not sure when can complete? last time saying completion at May.
danielwoo8
post May 24 2019, 05:53 PM

Getting Started
**
Junior Member
59 posts

Joined: Oct 2018
QUOTE(khieni @ May 22 2019, 06:35 PM)
Looks great.. Thanks!
*
The roof is too big and steep. A lot of space will be wasted internally and the ceiling height is confined, otherwise externally looks good.
khieni
post May 24 2019, 06:00 PM

Getting Started
**
Junior Member
290 posts

Joined: Nov 2011
QUOTE(danielwoo8 @ May 24 2019, 05:53 PM)
The roof is too big and steep.  A lot of space will be wasted internally and the ceiling height is confined, otherwise externally looks good.
*
Will big and steep roof cause internal better ventilation and cooler?
khieni
post May 24 2019, 06:02 PM

Getting Started
**
Junior Member
290 posts

Joined: Nov 2011
QUOTE(KSHKK @ May 24 2019, 05:45 PM)
nice to see that.. Not sure when can complete? last time saying completion at May.
*
Slowly do, better quality, and bank disbursement slower... No need pay more interest... My personal philosophy
aaron1717
post May 24 2019, 06:22 PM

Chui Shui in Property Manyak Best!
********
All Stars
10,188 posts

Joined: Apr 2012
QUOTE(khieni @ May 24 2019, 06:02 PM)
Slowly do, better quality, and bank disbursement slower... No need pay more interest... My personal philosophy
*
faster completion only save more interest in absolute amount bro... mana ada slow2 disbursement... later they claim til stage 2(b) already and never move... u will be paying that small amount of interest like forever eventually it became more expensive in total... sweat.gif sweat.gif
pluto168
post May 24 2019, 06:28 PM

New Member
*
Newbie
16 posts

Joined: Jan 2019
QUOTE(danielwoo8 @ May 24 2019, 05:53 PM)
The roof is too big and steep.  A lot of space will be wasted internally and the ceiling height is confined, otherwise externally looks good.
*
i think the sharp roof is only applicable for corner or end lot
danielwoo8
post May 24 2019, 06:34 PM

Getting Started
**
Junior Member
59 posts

Joined: Oct 2018
QUOTE(pluto168 @ May 24 2019, 07:28 PM)
i think the sharp roof is only applicable for corner or end lot
*
Correct. It seems the intermediate houses are better option.
danielwoo8
post May 24 2019, 06:37 PM

Getting Started
**
Junior Member
59 posts

Joined: Oct 2018
QUOTE(khieni @ May 24 2019, 07:00 PM)
Will big and steep roof cause internal better ventilation and cooler?
*
Not necessary so. Modern design houses now come with flat roofs. If the developers install layers of cooling materials inside the roofs, it would be cooler.
diners
post May 24 2019, 06:38 PM

Young Dipertuan
******
Senior Member
1,484 posts

Joined: Jan 2007
QUOTE(aaron1717 @ May 24 2019, 06:22 PM)
faster completion only save more interest in absolute amount bro... mana ada slow2 disbursement... later they claim til stage 2(b) already and never move... u will be paying that small amount of interest like forever eventually it became more expensive in total...  sweat.gif  sweat.gif
*
I just hope they can VP by Jun2022 so my progressive interest Budget won’t run too far/as budgeted 😂
aaron1717
post May 24 2019, 06:44 PM

Chui Shui in Property Manyak Best!
********
All Stars
10,188 posts

Joined: Apr 2012
QUOTE(diners @ May 24 2019, 06:38 PM)
I just hope they can VP by Jun2022 so my progressive interest Budget won’t run too far/as budgeted 😂
*
not a problem for Guocoland... at least the major general areas are ready already... they just need focus on landscaping within the taman....
kennethkee93
post May 24 2019, 06:52 PM

Wooooo!
******
Senior Member
1,522 posts

Joined: Sep 2008
From: Everywhere.


QUOTE(danielwoo8 @ May 24 2019, 06:37 PM)
Not necessary so.  Modern design houses now come with flat roofs. If the developers install layers of cooling materials inside the roofs, it would be cooler.
*
Flat roof is harder to maintain, requires waterproofing, and regular maintenance to keep it clean which are added cost, however, brings contemporary design to a building. Sloped roof with roof tiles is easier cheaper and easier to maintain, typical roof insulation like Rockwool is effective in heat and sound insulation, it's more cost-effective to maintain in the long run.
khieni
post May 24 2019, 07:21 PM

Getting Started
**
Junior Member
290 posts

Joined: Nov 2011
QUOTE(kennethkee93 @ May 24 2019, 06:52 PM)
Flat roof is harder to maintain, requires waterproofing, and regular maintenance to keep it clean which are added cost, however, brings contemporary design to a building. Sloped roof with roof tiles is easier cheaper and easier to maintain, typical roof insulation like Rockwool is effective in heat and sound insulation, it's more cost-effective to maintain in the long run.
*
Nice.... I hope the SA know this thing and explain... Or the designer stands at sale gallery to explain his design? Or train the SA about the design...
khieni
post May 24 2019, 07:26 PM

Getting Started
**
Junior Member
290 posts

Joined: Nov 2011
QUOTE(aaron1717 @ May 24 2019, 06:22 PM)
faster completion only save more interest in absolute amount bro... mana ada slow2 disbursement... later they claim til stage 2(b) already and never move... u will be paying that small amount of interest like forever eventually it became more expensive in total...  sweat.gif  sweat.gif
*
Ooo... Haha... Correct... Then I also hope they can complete on time...
khieni
post May 24 2019, 07:27 PM

Getting Started
**
Junior Member
290 posts

Joined: Nov 2011
QUOTE(danielwoo8 @ May 24 2019, 06:34 PM)
Correct.  It seems the intermediate houses are better option.
*
If not because of budget constraints... I will go for corner.... Dreaming...
ytl24
post May 25 2019, 11:07 AM

New Member
*
Newbie
13 posts

Joined: Aug 2011
QUOTE(KSHKK @ May 24 2019, 05:45 PM)
nice to see that.. Not sure when can complete? last time saying completion at May.
*
SA told my friend that Dato Edmund went to site but bo song some interior and exterior design elements and wanted to improve those areas. Mainly for better lighting and air ventilation. So show house will be delayed a few weeks.

88 Pages « < 48 49 50 51 52 > » Top
 

Change to:
| Lo-Fi Version
0.0267sec    0.60    6 queries    GZIP Disabled
Time is now: 20th December 2025 - 01:59 AM