Outline ·
[ Standard ] ·
Linear+
Garden Plaza @ Cyberjaya [Owners' Thread], Lifestyle Suites & Shops
|
mataharih
|
Feb 7 2015, 06:47 PM
|
|
QUOTE(PeterSpring @ Feb 7 2015, 01:15 PM) What floor are you? Oxford 450sfq Max is 19th floor, facing cambrige (21th floor) so depends on what floor you are lor... 25th floor, mine is the 700 sq ft Private suite or smart suite. actually I'm not sure what's the difference between the private suite and smart suite.
|
|
|
|
|
|
TSgu~wak_zhai
|
Feb 7 2015, 09:56 PM
|
|
QUOTE(mataharih @ Feb 6 2015, 08:31 PM) >_> facing the inside or swimming pool view. The sales agent told me I'll have a view of Putrajaya instead of the direct view of the opposite tower so I hope he didn't lie to me!  QUOTE(mataharih @ Feb 7 2015, 06:47 PM) 25th floor, mine is the 700 sq ft Private suite or smart suite. actually I'm not sure what's the difference between the private suite and smart suite. If facing inside then the SA didn't lie, since Cambridge top is only at 21st floor.  If ur unit is facing swimming pool (unit 12 to 20), Cambridge may block ur front view a little bit, while Harvard may block ur view on the right side. Refer this:  QUOTE(PeterSpring @ Feb 7 2015, 01:15 PM) What floor are you? Oxford 450sfq Max is 19th floor, facing cambrige (21th floor) so depends on what floor you are lor... Yes but Oxford's top is at 28th floor, whereas Harvard is 29th floor, since he's at 25th floor, so Harvard tower may block his view.
|
|
|
|
|
|
mataharih
|
Feb 7 2015, 10:58 PM
|
|
QUOTE(gu~wak_zhai @ Feb 7 2015, 09:56 PM) If facing inside then the SA didn't lie, since Cambridge top is only at 21st floor.  If ur unit is facing swimming pool (unit 12 to 20), Cambridge may block ur front view a little bit, while Harvard may block ur view on the right side. Refer this:  Yes but Oxford's top is at 28th floor, whereas Harvard is 29th floor, since he's at 25th floor, so Harvard tower may block his view. Haha, I'm female. Oh, I got the two towers mixed up! I thought Harvard was Cambridge and vice versa. I'm facing Cambridge so I have some view of Putrajaya. Yay!
|
|
|
|
|
|
TSgu~wak_zhai
|
Feb 8 2015, 05:05 PM
|
|
QUOTE(mataharih @ Feb 7 2015, 10:58 PM) Haha, I'm female. Oh, I got the two towers mixed up! I thought Harvard was Cambridge and vice versa. I'm facing Cambridge so I have some view of Putrajaya. Yay!  Are u buying this for own stay or investment?
|
|
|
|
|
|
mataharih
|
Feb 8 2015, 11:05 PM
|
|
QUOTE(gu~wak_zhai @ Feb 8 2015, 05:05 PM)  Are u buying this for own stay or investment? My own stay. I chose this place because I'm used to area and like this location. GP is very close to Presint 11 (where I used to live), Alamanda, Putrajaya Sentral and now IOI City Mall. Oh and I frequent Shaftsbury Square a lot lol so I hope the shop tenants will be promising. Good to know there'll be another path to the Mex Hwy.
|
|
|
|
|
|
TSgu~wak_zhai
|
Feb 9 2015, 12:47 PM
|
|
QUOTE(mataharih @ Feb 8 2015, 11:05 PM) My own stay. I chose this place because I'm used to area and like this location. GP is very close to Presint 11 (where I used to live), Alamanda, Putrajaya Sentral and now IOI City Mall. Oh and I frequent Shaftsbury Square a lot lol so I hope the shop tenants will be promising. Good to know there'll be another path to the Mex Hwy.  Good to hear! I hope more owners will get to know about this thread / FB page, in the future we can unite to get things done. Shaftsbury is a very good example on good management, their rental yield is by far most promising in Cbj and the quality of the building is tip top! Let's work together to achieve this in GP
|
|
|
|
|
|
hungerybaby
|
Feb 15 2015, 01:42 AM
|
Getting Started

|
Mah Sing Group Bhd recently held a topping-up ceremony marking the completion of the structure of Garden Plaza, an integrated development in Cyberjaya offering both residential and commercial properties with an estimated gross development value (GDV) of RM436mil.
The project is expected to be completed by March this year.
Chief executive officer Ng Chai Yong, chief operating officer Teh Heng Chong, general manager for group strategic development Lionel Leong, and deputy chief operating officer Gan Guan Chye were in attendance at the event on Tuesday.
“We are pleased to share that the residential components at Garden Plaza are fully sold.
“We are confident that the final release of Garden Boulevard Retail Shops will also be quickly taken up, as buyers would want to tap onto the potentials offered by the development,” chief executive officer Ng said.
“Garden Boulevard is set to be a great investment for retailers as the development has the advantage of tapping into the ready catchment within Garden Plaza and Garden Residence’s enclave. With these advantages, investors can be assured of two-year guaranteed returns,” he added.
The commercial component of Garden Plaza comprises premier retail shops and SoFo (Small office Flexible office) units. Garden Boulevard has 58 units of retail and SoFo units stretched over two towers, namely the Cambridge and Oxford Towers. Built-up area for the individual units are from l,824 sq ft to l,833 sq ft.
The prime retail and SoFo units will have high ceiling, allowing natural ventilation and lighting to the units.
Large windows will also ensure the maximum amount of natural daylight streaming into the premises, minimising the need for artificial lighting and reducing energy usage.
Upon completion, Garden Plaza is estimated to have a population of approximately 7,000.
According to Mah Sing, the nearby Garden Residence enclave has an estimated catchment of 58,000 people, which is expected to increase to 250,000 in five years’ time. And there are more than 17,000 students from nearby universities with an additional workforce of 35,000 from over 800 business entities in Cyberjaya,
Buyers of Garden Plaza will also benefit from Mah Sing’s M Care Services, a one-stop professional service for Mah Sing property owners that provide myriad services, including renovation and interior design consultations, relocation services, butler or concierge services for owner-occupied units, as well as leasing and sub-sale services.
The adjacent Garden Residence, also a Mah Sing project, is a gated enclave that hosts both landed and high-rise properties, a clubhouse and communal retail amenities.
So bullish is the developer on the area’s prospects that it has further acquired a parcel of land nearby for its next project, Clover@Garden Residence, to tap the spillover demand for Garden Residence’s landed residential homes.
|
|
|
|
|
|
mataharih
|
Feb 15 2015, 12:03 PM
|
|
Completed by March? Hmm, that's a little optimistic lol. Anyways, I've been looking at the future LRT map for Putrajaya. I recall the SA telling me there are plans to develop a lrt station near Lim Kok Wing in a few years time. If that truly happens, then this location would be ideal.
|
|
|
|
|
|
lamode
|
Feb 15 2015, 12:32 PM
|
|
QUOTE(mataharih @ Feb 15 2015, 12:03 PM) Completed by March? Hmm, that's a little optimistic lol. Anyways, I've been looking at the future LRT map for Putrajaya. I recall the SA telling me there are plans to develop a lrt station near Lim Kok Wing in a few years time. If that truly happens, then this location would be ideal. i believe recently official has confirmed a station at LKW under MRT 2 plan.
|
|
|
|
|
|
chiefy
|
Feb 15 2015, 04:28 PM
|
Getting Started

|
QUOTE(chiefy @ Dec 23 2014, 03:14 PM) Good/Bad News! It looks like GP will give VP (come with furnishing) on time in March 2015! Ngam Ngam before I claim LAD. They are already decorating some of the units.. apparently. This come from the Manager in charge. Back in Dec I mention that the project will be ready in march 2015.. Now that the star have quoted again March 2015, why you guys still don't want to believe? Anyway am looking forward to getting my keys finally after 4 years of waiting. . Sigh
|
|
|
|
|
|
TSgu~wak_zhai
|
Feb 15 2015, 05:08 PM
|
|
QUOTE(hungerybaby @ Feb 15 2015, 01:42 AM) Good news indeed! Hope to vp soon! QUOTE(chiefy @ Feb 15 2015, 04:28 PM) Back in Dec I mention that the project will be ready in march 2015.. Now that the star have quoted again March 2015, why you guys still don't want to believe? Anyway am looking forward to getting my keys finally after 4 years of waiting. . Sigh Haha this is called lower down expectation haha.. 4 years wow! Urs is Cambridge tower? Harvard tower will be the latest 1 to VP I guess
|
|
|
|
|
|
PeterSpring
|
Feb 16 2015, 11:39 AM
|
|
QUOTE(chiefy @ Feb 15 2015, 04:28 PM) Back in Dec I mention that the project will be ready in march 2015.. Now that the star have quoted again March 2015, why you guys still don't want to believe? Anyway am looking forward to getting my keys finally after 4 years of waiting. . Sigh Maybe complete in Mar, but wait CF another 3-6 months.. Just like the place at LKW, my friend Wait until forgetting already...
|
|
|
|
|
|
max_cavalera
|
Feb 16 2015, 07:34 PM
|
|
Sure march can fully complete ar the building looks far from ready...
Once complete still kena tunggu CF come out another 2-3-4 months...
This post has been edited by max_cavalera: Feb 16 2015, 07:37 PM
|
|
|
|
|
|
tehoice
|
Feb 19 2015, 11:53 PM
|
|
glad to hear that, every time also need to refer to the documents for reference. haha.
|
|
|
|
|
|
PeterSpring
|
Feb 24 2015, 02:02 PM
|
|
Happy CNY everyone !!!!
|
|
|
|
|
|
yunalesca
|
Feb 24 2015, 05:33 PM
|
|
|
|
|
|
|
|
mataharih
|
Feb 24 2015, 06:22 PM
|
|
QUOTE(yunalesca @ Feb 24 2015, 05:33 PM) Thanks for the pics! Drove there today and noticed some units in Oxford already have curtains installed.
|
|
|
|
|
|
juniorsia
|
Feb 24 2015, 06:31 PM
|
Getting Started

|
QUOTE(mataharih @ Feb 24 2015, 06:22 PM) Thanks for the pics! Drove there today and noticed some units in Oxford already have curtains installed.  Curtains included?
|
|
|
|
|
|
mataharih
|
Feb 24 2015, 06:45 PM
|
|
QUOTE(juniorsia @ Feb 24 2015, 06:31 PM) Curtains included?  Looked like curtains and blinds. Hope I'm not mistaken.
|
|
|
|
|