iltizam III quality is rubbish. crap-like workmanship
This post has been edited by miaopurr: Jan 2 2014, 09:20 AM
Alam Sari Bangi, Is it worth to buy terrace for RM350k?
Alam Sari Bangi, Is it worth to buy terrace for RM350k?
|
|
Jan 2 2014, 09:19 AM
|
![]() ![]() ![]() ![]()
Junior Member
587 posts Joined: Feb 2010 |
iltizam III quality is rubbish. crap-like workmanship
This post has been edited by miaopurr: Jan 2 2014, 09:20 AM |
|
|
|
|
|
Jan 2 2014, 09:42 AM
|
![]() ![]()
Junior Member
157 posts Joined: Sep 2013 |
QUOTE(miaopurr @ Jan 2 2014, 09:19 AM) Sorry to hear that bro.. Care to elaborate further on the subpar quality of workmanship?On another note, i think ilmu 2 semi d not so expensive after visiting tropicana heights.. 900++k can get semi d in alam sari whereas in TH can only fetch 3 storey link.. Of course, TH had got the "lifestyle" factor going for it :-) |
|
|
Jan 2 2014, 09:46 AM
|
![]() ![]()
Junior Member
115 posts Joined: Jul 2011 |
QUOTE(guilty25 @ Jan 2 2014, 09:42 AM) Sorry to hear that bro.. Care to elaborate further on the subpar quality of workmanship? Ilmu2 still available meh?On another note, i think ilmu 2 semi d not so expensive after visiting tropicana heights.. 900++k can get semi d in alam sari whereas in TH can only fetch 3 storey link.. Of course, TH had got the "lifestyle" factor going for it :-) |
|
|
Jan 2 2014, 09:49 AM
|
![]() ![]()
Junior Member
157 posts Joined: Sep 2013 |
|
|
|
Jan 2 2014, 09:52 AM
|
![]() ![]() ![]() ![]()
Junior Member
587 posts Joined: Feb 2010 |
hollow tiles, plaster chipped everywhere, no power @ some of the 15A points, leaking piping, incorrect sloping of the kithcen floor, gaps and holes @ window/door frame plaster, no water at some of the bathrooms, no water at kitchen tap despite direct connection, cement marks everywhere on the porch/patio/gutter, etc...
dunno if all lighting points got power or not |
|
|
Jan 2 2014, 09:54 AM
|
![]() ![]() ![]() ![]()
Junior Member
587 posts Joined: Feb 2010 |
oh and who was the genius that put the lawn doors hinges outside???
|
|
|
|
|
|
Jan 2 2014, 10:35 AM
|
![]() ![]()
Junior Member
157 posts Joined: Sep 2013 |
QUOTE(miaopurr @ Jan 2 2014, 09:52 AM) hollow tiles, plaster chipped everywhere, no power @ some of the 15A points, leaking piping, incorrect sloping of the kithcen floor, gaps and holes @ window/door frame plaster, no water at some of the bathrooms, no water at kitchen tap despite direct connection, cement marks everywhere on the porch/patio/gutter, etc... Walao really bad leh... Hope inp will make all this right for u bro.. Anyways, happy new year to u!dunno if all lighting points got power or not |
|
|
Jan 2 2014, 11:25 AM
|
![]() ![]() ![]()
Junior Member
437 posts Joined: Nov 2013 |
QUOTE(miaopurr @ Jan 2 2014, 09:52 AM) hollow tiles, plaster chipped everywhere, no power @ some of the 15A points, leaking piping, incorrect sloping of the kithcen floor, gaps and holes @ window/door frame plaster, no water at some of the bathrooms, no water at kitchen tap despite direct connection, cement marks everywhere on the porch/patio/gutter, etc... No water in some taps and not all mebe caused by airlock bro. You hv to open I.e. Use the wrench, the stop cork in the toilet(usually it's there) so that the air can be pushed out from ur pipes by the water. Once water comes out from the stop cork, then fix it back...shoddy work indeed...so complain/fill in the defects kaw kawdunno if all lighting points got power or not |
|
|
Jan 2 2014, 11:32 AM
|
![]() ![]() ![]() ![]()
Junior Member
587 posts Joined: Feb 2010 |
main contractor = aik bee construction sdn bhd
|
|
|
Jan 2 2014, 11:35 AM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
958 posts Joined: Nov 2007 From: Klang |
Cannot believe I&P will provide such quality house. This incident will definitely ruin its reputation. Complain to them, I am sure they will work their best to rectify it for you to protect their reputation.
It is clear this main contractor tak boleh pakai. |
|
|
Jan 2 2014, 11:38 AM
|
![]() ![]() ![]()
Junior Member
437 posts Joined: Nov 2013 |
|
|
|
Jan 2 2014, 11:40 AM
|
![]() ![]() ![]()
Junior Member
437 posts Joined: Nov 2013 |
|
|
|
Jan 2 2014, 11:43 AM
|
![]() ![]() ![]() ![]()
Junior Member
587 posts Joined: Feb 2010 |
QUOTE(Screwu829 @ Jan 2 2014, 11:38 AM) not sure about other houses/phases. i will put it as one of my complaints.for the bathrooms/toilets, they use flimsy aluminum louvres for ventilation. on the first day, i&p staff had the cheek to ask one of the customers to remove the louvres and close it with brickworks. |
|
|
|
|
|
Jan 2 2014, 12:12 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,170 posts Joined: Mar 2013 |
In other words I&P standard down oledi woh
|
|
|
Jan 2 2014, 12:17 PM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
958 posts Joined: Nov 2007 From: Klang |
QUOTE(kamilnu @ Jan 2 2014, 12:12 PM) I believe this is case to case basis, still cannot judge per 1 incident only. It should be the main contractor that deliver such low quality work. Sure blacklisted by I&P if owner complain further up to HQ.Frankly, i still have strong confident with I&P quality. This post has been edited by sycluap: Jan 2 2014, 12:18 PM |
|
|
Jan 2 2014, 12:27 PM
|
![]() ![]()
Junior Member
115 posts Joined: Jul 2011 |
QUOTE(sycluap @ Jan 2 2014, 12:17 PM) I believe this is case to case basis, still cannot judge per 1 incident only. It should be the main contractor that deliver such low quality work. Sure blacklisted by I&P if owner complain further up to HQ. QC should also come from InP rite? They should be held responsible as well.Frankly, i still have strong confident with I&P quality. |
|
|
Jan 2 2014, 12:42 PM
|
![]() ![]() ![]() ![]()
Junior Member
587 posts Joined: Feb 2010 |
QUOTE(abuhanif81 @ Jan 2 2014, 12:27 PM) another owner of different phase, came back home one day only to find his bedroom was flooded from faulty piping. my iltizam III neighbour found some major defects too. rude maintence staff just add salt to the wound. don't want to honour warranty for cracks in living room front wall, because reno rear kitchen wall. sigh... what a way to start 2014 This post has been edited by miaopurr: Jan 2 2014, 12:47 PM |
|
|
Jan 2 2014, 12:48 PM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
958 posts Joined: Nov 2007 From: Klang |
|
|
|
Jan 2 2014, 01:00 PM
|
![]() ![]() ![]() ![]()
Junior Member
587 posts Joined: Feb 2010 |
what's the difference between complaint form VS customer inspection form which need to be submitted within 14 days after vp?
This post has been edited by miaopurr: Jan 2 2014, 01:01 PM |
|
|
Jan 2 2014, 01:35 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,170 posts Joined: Mar 2013 |
Some people still got high hopes from I&P. Time to face the music bro. This is what future expectations of the great I&P will be.
|
| Change to: | 0.0541sec
0.83
6 queries
GZIP Disabled
Time is now: 15th December 2025 - 10:35 PM |