Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

 Legasi @ BK8 Kinrara, Freehold DST

views
     
lumdra
post Dec 9 2020, 11:39 AM

Casual
***
Junior Member
365 posts

Joined: Jul 2020
QUOTE(vayrence92 @ Dec 8 2020, 10:57 PM)
Have been receiving mixed views regarding the housing position especially from relatives' sides. Some say cars' light will shine at night and it is not good. Some say it doesn't matter because the opposite road is not directly connected to legasi 3. Nonetheless, we decided to go with it because if there is a problem, there will be solution haha. They say install auto-gate without hole then the problem can be mitigated. Im mind blown. Still I am uncertain about all this feng shui stuff. Hopefully got some pro feng shui sifu can enlight me.

Legasi 4 will be much lower than the road. Some may feel pantang about it. As for subsale, the price is relatively high even Irama 2 intermediate unit asking around 1.15-1.2m. After visiting so many times (day and night), I feel that even the LTAT is occupied, it would not be much of a problem because Legasi is facing the back of the LTAT. Well, I may be wrong and only time will tell.
*
Well, thanks for sharing the thoughts. Its indeed interesting because everyone has different view on fengshui! Its definitely the right choice to make because you are staying and not relatives. These days the only place to stay with best fengshui is maybe in the mountain with nothing around. haha

As for Legasi 4, i even heard people say lower than road is a good valley where good stuff often stay beneath. Haha.
I personally think LTAT will not be much of issue as its the back and no direct access road to safeguard its privacy but cant deny the congestion (hopefully they are on bikes?)

The subsale value here will sure rise higher than all DST in kinrara IMHO.

This post has been edited by lumdra: Dec 9 2020, 11:43 AM
surf-it
post Dec 9 2020, 01:30 PM

Landlord
******
Senior Member
1,747 posts

Joined: May 2005
From: Malaysia
fengshui is very subjective lah, if you don't feel comfortable, then don't commit. Btw I believe the diagram need to move to the right a bit to reflect on the exact position of the legasi 3
lumdra
post Dec 9 2020, 01:45 PM

Casual
***
Junior Member
365 posts

Joined: Jul 2020
To get the best measurement, i think on the site, they have already indicated the sewerage by house. Maybe that will help to obtain the accuracy
keane04
post Dec 14 2020, 09:15 PM

Regular
******
Senior Member
1,057 posts

Joined: Nov 2004


Got the progressive billing of the first 10% for legasi 2. What is the progress billed for legasi 1?
lumdra
post Dec 15 2020, 10:31 AM

Casual
***
Junior Member
365 posts

Joined: Jul 2020
QUOTE(keane04 @ Dec 14 2020, 09:15 PM)
Got the progressive billing of the first 10% for legasi 2. What is the progress billed for legasi 1?
*
I think its the 2nd 10%? as the first 10% is cleared during the purchase.
No idea for the billing progress for Legasi 1 however Legasi 2 seems to catch up, was asking the contractor the other day
47100
post Dec 15 2020, 10:51 PM

47170
****
Junior Member
559 posts

Joined: May 2006
From: 1,234


user posted image

hi. what is cooking beside legasi 1/2?

This post has been edited by 47100: Dec 15 2020, 10:51 PM
keane04
post Dec 16 2020, 01:06 AM

Regular
******
Senior Member
1,057 posts

Joined: Nov 2004


QUOTE(lumdra @ Dec 15 2020, 10:31 AM)
I think its the 2nd 10%? as the first 10% is cleared during the purchase.
No idea for the billing progress for Legasi 1 however Legasi 2 seems to catch up, was asking the contractor the other day
*
Just wondering where is legasi1 now so can gauge the subsequent billing time.
lumdra
post Dec 16 2020, 09:09 AM

Casual
***
Junior Member
365 posts

Joined: Jul 2020
QUOTE(47100 @ Dec 15 2020, 10:51 PM)
user posted image

hi. what is cooking beside legasi 1/2?
*
i enquire before, looking at the size, it was a semi d project but got abandoned and nothing progressed..
for now just one factory operating there producing large bricks? saw alot lorry in and out and i went and asked..

If anyone got more info do share! just glad its not high rise!
lumdra
post Dec 16 2020, 10:51 AM

Casual
***
Junior Member
365 posts

Joined: Jul 2020
QUOTE(keane04 @ Dec 16 2020, 01:06 AM)
Just wondering where is legasi1 now so can gauge the subsequent billing time.
*
Maybe developer office would know?
TSSpongebob roundpants
post Dec 16 2020, 01:59 PM

Getting Started
**
Junior Member
201 posts

Joined: Apr 2010
Does evryone have to get fire insurance for the unit under construction? Just wondering if its a necessity.
lumdra
post Dec 16 2020, 02:09 PM

Casual
***
Junior Member
365 posts

Joined: Jul 2020
QUOTE(Spongebob roundpants @ Dec 16 2020, 01:59 PM)
Does evryone have to get fire insurance for the unit under construction? Just wondering if its a necessity.
*
Isnt that covered by the bank?
TSSpongebob roundpants
post Dec 16 2020, 02:25 PM

Getting Started
**
Junior Member
201 posts

Joined: Apr 2010
QUOTE(lumdra @ Dec 16 2020, 02:09 PM)
Isnt that covered by the bank?
*
According to my maybank loan offer letter, the bank has the right to auto debit the premium amount from the account i gave them.

So, I don't think covered by the bank la. Anyone pls correct my understanding if its wrong.
lumdra
post Dec 16 2020, 05:11 PM

Casual
***
Junior Member
365 posts

Joined: Jul 2020
QUOTE(Spongebob roundpants @ Dec 16 2020, 02:25 PM)
According to my maybank loan offer letter, the bank has the right to auto debit the premium amount from the account i gave them.

So, I don't think covered by the bank la. Anyone pls correct my understanding if its wrong.
*
Well, just asked my loan officer and not the case for HSBC it seems.
lumdra
post Dec 16 2020, 05:11 PM

Casual
***
Junior Member
365 posts

Joined: Jul 2020
QUOTE(Spongebob roundpants @ Dec 16 2020, 02:25 PM)
According to my maybank loan offer letter, the bank has the right to auto debit the premium amount from the account i gave them.

So, I don't think covered by the bank la. Anyone pls correct my understanding if its wrong.
*
Well, just asked my loan officer and not the case for HSBC it seems.
TSSpongebob roundpants
post Dec 16 2020, 05:39 PM

Getting Started
**
Junior Member
201 posts

Joined: Apr 2010
QUOTE(lumdra @ Dec 16 2020, 05:11 PM)
Well, just asked my loan officer and not the case for HSBC it seems.
*
Oo good to know. I got to rmbr to check next time since diff bank got diff practice. Thanks.
keane04
post Dec 16 2020, 09:07 PM

Regular
******
Senior Member
1,057 posts

Joined: Nov 2004


QUOTE(lumdra @ Dec 16 2020, 10:51 AM)
Maybe developer office would know?
*
Not important. Just asking if any leg1 owner here.

lumdra
post Dec 17 2020, 01:45 PM

Casual
***
Junior Member
365 posts

Joined: Jul 2020
QUOTE(keane04 @ Dec 16 2020, 09:07 PM)
Not important. Just asking if any leg1 owner here.
*
So far in this chat i didnt hear anyone being a legasi 1 owner..
surf-it
post Dec 17 2020, 03:42 PM

Landlord
******
Senior Member
1,747 posts

Joined: May 2005
From: Malaysia
legasi 1 need to queue overnight one leh
lumdra
post Dec 18 2020, 09:54 AM

Casual
***
Junior Member
365 posts

Joined: Jul 2020
QUOTE(surf-it @ Dec 17 2020, 03:42 PM)
legasi 1 need to queue overnight one leh
*
I think legasi 2 queue overnight even longer lo
Legasi 1 queue was 3 days while Legasi 2 queue was 5 days
Victorjay88 P
post Jan 1 2021, 08:05 PM

New Member
*
Probation
2 posts

Joined: Aug 2020


QUOTE(lumdra @ Dec 18 2020, 09:54 AM)
I think legasi 2 queue overnight even longer lo
Legasi 1 queue was 3 days while Legasi 2 queue was 5 days
*
legasi 1 - q only 1 day . legasi 2 - q 5day


66 Pages « < 21 22 23 24 > » Top
 

Change to:
| Lo-Fi Version
0.0231sec    0.37    6 queries    GZIP Disabled
Time is now: 22nd December 2025 - 12:36 PM