Oil & Gas Careers V12 - Upstream & Downstream, Market still slump, slow, snail pace...
Oil & Gas Careers V12 - Upstream & Downstream, Market still slump, slow, snail pace...
|
|
Nov 16 2017, 08:51 AM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,597 posts Joined: Apr 2009 |
Nine more Norse additions to Borr's jackup pantheon SINGAPORE/INTERNATIONAL: Borr Drilling has named the nine jackups it acquired from PPL Shipyard after more Norse deities. The first unit, to be delivered this month, will be called Galar (ex-Vastus, hull P2041). In 2018, Borr is set to take delivery of seven units: Gerd (ex-Perisai Pacific 102, hull P2043) in January, Gersemi (ex-Animus, hull 2045) in February, Grid (ex-Supremus, hull 2046) in April, Gunnlod (hull 2053) in June, Groa (ex-Perisai Pacific 103, hull 2049) in July, Gyme (hull 2047) in September and Natt (hull 2048) in October. Finally, in January 2019, PPL is set to hand over the ninth and final unit, Njord (ex-Iron V, hull 2052). 15-Nov-2017 Hess looks at other rig options for Malaysia HPHT campaign MALAYSIA: It is understood Hess is reviewing its rig options related to a HPHT (high-pressure high-temperature) requirement on the North Malay Basin Full Field Development (FFD)'s Phase 1B drilling campaign, off Peninsular Malaysia. Currently, Hess has jackup UMW Naga 8 on contract until May 2018, with a one-year option outstanding. It is understood the operator is looking at extending the rig's charter to cover the HPHT campaign. Hess had issued a market survey for a jackup to undertake the project. It has had plans to charter the rig under a two-year contract, commencing between 1 April and 30 June, 2018. The unit will cover a two part work scope, for three deep wells as Part 1, plus two separate campaigns of four and five wells each in Part 2. Hess's requests included a rig with usable leg below hull of 410 ft (125 m), 3,000 hp drawworks, three cranes, cantilever envelope of 15 by 60 ft (4.6 by 18.3 m), three mud pumps as well as accommodation for 150 people. Water depths in the area range between 60-70 m (196-230 ft). 15-Nov-2017 Petronas Carigali needs jackup for Business of Margin scope MALAYSIA: Petronas Carigali plans to use the jackup it is seeking through an ongoing market survey for a development concept called Business of Margin (BoM) project offshore Peninsular Malaysia. The BoM concept involves a development via surface or subsea wellhead in water depths of between 35-75 m (115-248 ft) with measured well depth of up to 3,000 m (9,842 ft), and downhole pressure and temperature of 5,000 psi and below 120 degree C, respectively. The rig for the subsea BoM project will be required to drill and complete, and re-entry for plug-and-abandonment (P&A). Rig utilisation will be short, excluding a four to six-month break between wells, with commencement in first quarter 2019. The surface BoM scope will require the rig to be on standby for four to six months to support extended well testing for each well plus P&A thereafter. This campaign will occupy the rig for up to two years, including the standby period, commencing third quarter 2018. Both projects will involve the drilling and completing of three wells, known as BoM wells, lasting around 45 days each. 15-Nov-2017 |
|
|
|
|
|
Nov 16 2017, 09:21 AM
|
|
Moderator
4,765 posts Joined: Jan 2003 From: Kuala Lumpur |
|
|
|
Nov 16 2017, 10:40 AM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
787 posts Joined: Aug 2009 From: Kuala Lumpur, Malaysia |
QUOTE(meonkutu11 @ Nov 16 2017, 08:51 AM) Nine more Norse additions to Borr's jackup pantheon lebiu bos meon! SINGAPORE/INTERNATIONAL: Borr Drilling has named the nine jackups it acquired from PPL Shipyard after more Norse deities. The first unit, to be delivered this month, will be called Galar (ex-Vastus, hull P2041). In 2018, Borr is set to take delivery of seven units: Gerd (ex-Perisai Pacific 102, hull P2043) in January, Gersemi (ex-Animus, hull 2045) in February, Grid (ex-Supremus, hull 2046) in April, Gunnlod (hull 2053) in June, Groa (ex-Perisai Pacific 103, hull 2049) in July, Gyme (hull 2047) in September and Natt (hull 2048) in October. Finally, in January 2019, PPL is set to hand over the ninth and final unit, Njord (ex-Iron V, hull 2052). 15-Nov-2017 Hess looks at other rig options for Malaysia HPHT campaign MALAYSIA: It is understood Hess is reviewing its rig options related to a HPHT (high-pressure high-temperature) requirement on the North Malay Basin Full Field Development (FFD)'s Phase 1B drilling campaign, off Peninsular Malaysia. Currently, Hess has jackup UMW Naga 8 on contract until May 2018, with a one-year option outstanding. It is understood the operator is looking at extending the rig's charter to cover the HPHT campaign. Hess had issued a market survey for a jackup to undertake the project. It has had plans to charter the rig under a two-year contract, commencing between 1 April and 30 June, 2018. The unit will cover a two part work scope, for three deep wells as Part 1, plus two separate campaigns of four and five wells each in Part 2. Hess's requests included a rig with usable leg below hull of 410 ft (125 m), 3,000 hp drawworks, three cranes, cantilever envelope of 15 by 60 ft (4.6 by 18.3 m), three mud pumps as well as accommodation for 150 people. Water depths in the area range between 60-70 m (196-230 ft). 15-Nov-2017 Petronas Carigali needs jackup for Business of Margin scope MALAYSIA: Petronas Carigali plans to use the jackup it is seeking through an ongoing market survey for a development concept called Business of Margin (BoM) project offshore Peninsular Malaysia. The BoM concept involves a development via surface or subsea wellhead in water depths of between 35-75 m (115-248 ft) with measured well depth of up to 3,000 m (9,842 ft), and downhole pressure and temperature of 5,000 psi and below 120 degree C, respectively. The rig for the subsea BoM project will be required to drill and complete, and re-entry for plug-and-abandonment (P&A). Rig utilisation will be short, excluding a four to six-month break between wells, with commencement in first quarter 2019. The surface BoM scope will require the rig to be on standby for four to six months to support extended well testing for each well plus P&A thereafter. This campaign will occupy the rig for up to two years, including the standby period, commencing third quarter 2018. Both projects will involve the drilling and completing of three wells, known as BoM wells, lasting around 45 days each. 15-Nov-2017 |
|
|
Nov 16 2017, 10:57 AM
|
![]() ![]() ![]()
Junior Member
319 posts Joined: May 2012 |
QUOTE(echobrainproject @ Nov 16 2017, 09:21 AM) good luck. at least u did landed ur foot at the door. Even with my first class degree and diploma also I didnt get in and have been on the contractor side for years. Poor me... ive been jobless since graduated. didnt manage to get a job btw, do malaysian fresh grads have a shot at Middle East jobs? This post has been edited by steel52: Nov 16 2017, 11:41 AM |
|
|
Nov 16 2017, 12:06 PM
|
![]() ![]()
Junior Member
117 posts Joined: May 2016 |
QUOTE(steel52 @ Nov 16 2017, 10:57 AM) at least u did landed ur foot at the door. relax brother. Ive waited for almost 9 months to get my first job yo. Still not able to land job that related to my preference and education. ayamsadPoor me... ive been jobless since graduated. didnt manage to get a job btw, do malaysian fresh grads have a shot at Middle East jobs? |
|
|
Nov 16 2017, 12:48 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,356 posts Joined: Feb 2007 From: somewhere in Perak... |
Heard there is pipeline project from Pengerang till North region which will start soon.
(^__^) |
|
|
|
|
|
Nov 16 2017, 06:22 PM
Show posts by this member only | IPv6 | Post
#507
|
![]() ![]() ![]()
Junior Member
429 posts Joined: Apr 2008 |
|
|
|
Nov 16 2017, 06:42 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,351 posts Joined: Oct 2009 From: Bintulu, Sarawak |
|
|
|
Nov 16 2017, 07:56 PM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
787 posts Joined: Aug 2009 From: Kuala Lumpur, Malaysia |
|
|
|
Nov 16 2017, 10:08 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,356 posts Joined: Feb 2007 From: somewhere in Perak... |
|
|
|
Nov 16 2017, 11:10 PM
|
![]() ![]() ![]()
Junior Member
319 posts Joined: May 2012 |
|
|
|
Nov 17 2017, 01:22 AM
Show posts by this member only | IPv6 | Post
#512
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,351 posts Joined: Oct 2009 From: Bintulu, Sarawak |
QUOTE(nash9701 @ Nov 16 2017, 10:08 PM) Guess what, they fund the project as well, the local company just come to discuss about JV in the project, CPPB has a lot of cash. A lottttt.(^__^) But pay little salary. Kecewa. I pernah tebiu last year with them for Contract Manager roles. Diorang punya salary offer makes me huhuhuhuhuhu |
|
|
Nov 17 2017, 09:53 AM
|
![]() ![]()
Junior Member
252 posts Joined: Dec 2009 From: Ahmadi,kuwait |
QUOTE(mohdyakup @ Nov 15 2017, 06:53 PM) Keep trying to other places. Like ExxonMobil Malaysia for example. Their EMRE and EMCE is hiring quite a lot. But none from EMPC and EMDC. exxon only hire top level graduate,plus overseas graduate,truestory.Buttttttttttttttt ExxonMobil only hire top graduates otak with menangis punya CGPA wa cakap lu bro. Very very high CGPA diorang nak. But hey dont stop trying. Who am I to stop you to try. Kasi bikin deal sampai jadi bruv. So chill bruv. Its not the end of the world bruv. |
|
|
|
|
|
Nov 17 2017, 10:39 AM
|
|
Moderator
4,765 posts Joined: Jan 2003 From: Kuala Lumpur |
QUOTE(steel52 @ Nov 16 2017, 10:57 AM) at least u did landed ur foot at the door. i worked another job for 8+ months (my scholarship company)....Poor me... ive been jobless since graduated. didnt manage to get a job btw, do malaysian fresh grads have a shot at Middle East jobs? until one day Yakup posted a role and i responded. |
|
|
Nov 17 2017, 11:11 AM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
787 posts Joined: Aug 2009 From: Kuala Lumpur, Malaysia |
|
|
|
Nov 17 2017, 11:14 AM
|
![]() ![]() ![]()
Junior Member
319 posts Joined: May 2012 |
|
|
|
Nov 17 2017, 12:23 PM
|
![]() ![]()
Junior Member
199 posts Joined: Jan 2011 |
|
|
|
Nov 17 2017, 12:25 PM
|
![]() ![]() ![]()
Junior Member
319 posts Joined: May 2012 |
|
|
|
Nov 17 2017, 01:05 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,351 posts Joined: Oct 2009 From: Bintulu, Sarawak |
|
|
|
Nov 17 2017, 01:07 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,351 posts Joined: Oct 2009 From: Bintulu, Sarawak |
Nak sangat kena suap kan. Haa sini aku bagi. Hewhewhew.
Previous Ver.1 thread can be found here - https://forum.lowyat.net/topic/255573 Previous Ver.2 thread can be found here - https://forum.lowyat.net/topic/1665446 Previous Ver.3 thread can be found here - https://forum.lowyat.net/topic/2257119 Previous Ver.4 thread can be found here - https://forum.lowyat.net/topic/2485295 Previous Ver.5 thread can be found here - https://forum.lowyat.net/topic/2861882 Previous Ver.6 thread can be found here - https://forum.lowyat.net/topic/3213881 Previous Ver.7 thread can be found here - https://forum.lowyat.net/topic/3494287 Previous Ver.8 thread can be found here - https://forum.lowyat.net/topic/3577252 Previous Ver.9 thread can be found here cry.gif - https://forum.lowyat.net/topic/3840859 Previous Ver. 10 thread can be found here - https://forum.lowyat.net/topic/3851812 Previous Ver. 11 thread can be found here - https://forum.lowyat.net/topic/4005317 For O&G Job Classified, please refer to the following link - https://forum.lowyat.net/index.php?showtopic=3557497&hl= |
|
Topic ClosedOptions
|
| Change to: | 0.0383sec
0.67
6 queries
GZIP Disabled
Time is now: 30th November 2025 - 04:11 PM |