Welcome Guest ( Log In | Register )

6 Pages < 1 2 3 4 5 > » Bottom

Outline · [ Standard ] · Linear+

 Bandar Sri Sendayan V2, Megatownship in the making

views
     
nazli19
post Jan 6 2019, 07:21 PM

Getting Started
**
Junior Member
111 posts

Joined: Sep 2018
QUOTE(ry8128 @ Jan 6 2019, 07:10 PM)
anyone staying in forest height? how's the quality of the house? the design is nice, but wonder why it does not get the hype of s2, bss or ainsdale..
*
s2, bss, ainsdale all under seremban west & nearer to KL, KLIA, putrajaya
nazli19
post Jan 15 2019, 05:00 PM

Getting Started
**
Junior Member
111 posts

Joined: Sep 2018
QUOTE(upmgunner @ Jan 15 2019, 01:13 PM)
hi guys.lunaria 1-2 ,is their behind got small hecka of land? because lunaria 3 suddenly change the floorplan and cancel the land behind the house,,,sad...so i thought to buy subsale of lunaria 1-2
*
Lunaria 1 dont have land at behind.

Lunaria 2 ada small land behind. If not mistaken 10*22 feet. Lunaria 2 is all bumi lot

Certain units Lunaria 3 ada small land behind. 5*22 feet.limited to those units which facing garden. Other units similar to Lunaria 1.

U can buy subsale lunaria 1/2/3 or register your name since matrix will launch Lunaria 4 (final phase of resort homes)

nazli19
post Jan 15 2019, 05:03 PM

Getting Started
**
Junior Member
111 posts

Joined: Sep 2018
QUOTE(upmgunner @ Jan 15 2019, 01:14 PM)
last time lunaria 1-2 ,they buy for how much ya?
*
Lunaria 2 around RM550k.

Lunaria 1 should be higher because of non bumi status & bigger build up vs lunaria 2.
nazli19
post Jan 16 2019, 08:01 AM

Getting Started
**
Junior Member
111 posts

Joined: Sep 2018
QUOTE(upmgunner @ Jan 15 2019, 11:56 PM)
im also hairan..means lunaria 2 all is for bumi only?
*
Lunaria 1 - all non bumi. Sold out
Lunaria 2 - all bumi. Sold out
Lunaria 3 - 30% bumi, 70% non bumi. All bumi sold out.

SemiD Elymus - non bumi. Sold out
SemiD Allysum - non bumi. Sold out except show house.
nazli19
post Jan 16 2019, 08:05 AM

Getting Started
**
Junior Member
111 posts

Joined: Sep 2018
QUOTE(upmgunner @ Jan 15 2019, 11:52 PM)
yalo
last week i go to see,
lunaria 3  tiba tiba dia cancel land behind excpet facing lake garden unit@@

oh,lunaria 2 all bumi lot ah?like that i dont have chances buy ady@@..sad
i like the land behind...

lunaria 4 bukan saying is 250k condo ke?
*
Lunaria 4 is dst, size 24*70. Construction already begin, as u can see it beside allysum semiD.
nazli19
post Jan 17 2019, 10:52 AM

Getting Started
**
Junior Member
111 posts

Joined: Sep 2018
Matrix staff told icon park is sure but management do not want to start yet as they afraid this will affect housing price.


nazli19
post Jan 21 2019, 10:08 PM

Getting Started
**
Junior Member
111 posts

Joined: Sep 2018
This afternoon, i managed to drive thru the newly build road between eka matahari & kualiti alam. 2 lanes for each direction, very convenient. Not advisable to drive at night because no lampu jalan yet
nazli19
post Jan 22 2019, 03:17 PM

Getting Started
**
Junior Member
111 posts

Joined: Sep 2018
QUOTE(ron4 @ Jan 22 2019, 11:25 AM)
The new road heading to where actually?
*
Connecting sendayan tech valley to the 3 way junction before kellogs factory. The road pass thru eka matahari residence
nazli19
post Jan 22 2019, 03:20 PM

Getting Started
**
Junior Member
111 posts

Joined: Sep 2018
QUOTE(Patricksenal84 @ Jan 22 2019, 12:03 PM)
Hi guys, I bought a unit at Lunaria3 mid last year. Currently working at bandar puteri puchong, thinking to move there next year once completion.

Agent claimed the time when I bought the house there will be a new highway link sendayan to KLIA and then MEXX 2 is under construction and this will shortened duration.

ANy idea about this highway? Are they due completion soon?
*
That highway actually senawang - KLIA (SKLIA). Im not sure the status either construction has commenced or not.

p/s : me also bought lunaria3


nazli19
post Jan 22 2019, 07:26 PM

Getting Started
**
Junior Member
111 posts

Joined: Sep 2018
QUOTE(enkil @ Jan 22 2019, 06:07 PM)
What is the price range and sizes for this phase?  Next year completion right
*
22*85
Yup 2020 complete

This post has been edited by nazli19: Jan 22 2019, 07:27 PM
nazli19
post Jan 27 2019, 11:45 AM

Getting Started
**
Junior Member
111 posts

Joined: Sep 2018
QUOTE(hidayah31 @ Jan 27 2019, 10:02 AM)
Open at sendayan metropark right

A bit far for me, if at SMS then good.
nazli19
post Jan 27 2019, 12:04 PM

Getting Started
**
Junior Member
111 posts

Joined: Sep 2018
Passing thru Hijayu 3, wondering why house owner still prefer installing window/door grills

Those area are gated & guarded and have well fence security


nazli19
post Jan 28 2019, 01:09 PM

Getting Started
**
Junior Member
111 posts

Joined: Sep 2018
as the report says "the last in BSS"

meaning that after Ara sendayan, Hijayu Aman & Hijayu 2 completely developed, then matrix will do this mega project

perhaps 4-5 years from now..
nazli19
post Jan 28 2019, 06:44 PM

Getting Started
**
Junior Member
111 posts

Joined: Sep 2018
QUOTE(braderizwan @ Jan 28 2019, 04:47 PM)
I saw one sign close to Petronas going to dTempat saying the land belong to KKM for KKM development. What are they building up there? A clinic?

And what is next to TUDM, on the road currently under expansion to two lane from SMS to Gadong?
*
Yes, that land belongs to KKM to build klinik kesihatan (KK)

The clear land beside the road is where CBD @ Icon Park will be developed
nazli19
post Jan 28 2019, 09:29 PM

Getting Started
**
Junior Member
111 posts

Joined: Sep 2018
QUOTE(braderizwan @ Jan 28 2019, 07:37 PM)
Any news when the KK will start dev?
Can ask my wife to move here closer to house. haha
*
Thing only can go faster if matrix willingly to pump in their own money


nazli19
post Jan 28 2019, 09:38 PM

Getting Started
**
Junior Member
111 posts

Joined: Sep 2018
QUOTE(ron4 @ Jan 28 2019, 08:11 PM)
Not yet, but heard below 530K, but size a bit small 20X75
*
wait & hold first

DST @ resort homes will be launched very soon.
This is final phase, project name Crisantha. Build up 24*70
Pricing not yet out.


Attached thumbnail(s)
Attached Image Attached Image Attached Image
nazli19
post Jan 29 2019, 10:14 AM

Getting Started
**
Junior Member
111 posts

Joined: Sep 2018
QUOTE(BSS30112015 @ Jan 29 2019, 09:14 AM)
Which part in the map that land belong to KKM for klinik kesihatan?

There is no land reserved for Kesihatan in the plan, wonder why change suddenly, anyway this is pleasant surprise.

Those in light green reserved for schools (why so many plots, already got few in the town), blue is for commercial activities, pink is normally earmarked for Dewan Orang Ramai etc, red for Keselamatan ie police station/fire fighter department (I tot already got one near by Hijayu Aman/opposite TUDM)
[attachmentid=10174359][attachmentid=10174360]
*
Designated land for KKM
Top left - in pink colour. Legend shown as KEMUDAHAN AWAM

This post has been edited by nazli19: Jan 29 2019, 10:16 AM
nazli19
post Jan 29 2019, 10:22 AM

Getting Started
**
Junior Member
111 posts

Joined: Sep 2018
QUOTE(hidayah31 @ Jan 29 2019, 10:19 AM)
i think klinik included under kemudahan awam, since no other legend indicate that. anyway what is KT?
*
Just guessing
KT = kerajaan tempatan

Attached Image

I heard this piece of land recently bought by matrix.

The land span from Sri Maha mariamman temple to SKJT.

if correct BSS boundary will become bigger

This post has been edited by nazli19: Jan 29 2019, 10:29 AM
nazli19
post Jan 30 2019, 02:02 PM

Getting Started
**
Junior Member
111 posts

Joined: Sep 2018
QUOTE(^pomen_GTR^ @ Jan 30 2019, 12:40 PM)
many still rent.. but crammed 1 house got 8girls living in it...

at night can hear many giggles/laughing and joy  brows.gif  brows.gif  brows.gif
new house developed across road of kalista apartment...dammmm construction method using ibs/lightweight casting... no brick on the wall...  rclxub.gif  but price not really ibs price  doh.gif
*
Construction across kalista apartment is ara impian DST right?

I see developer use sand bricks. Matrix use clay bricks for tiara sendayan
nazli19
post Jan 30 2019, 07:36 PM

Getting Started
**
Junior Member
111 posts

Joined: Sep 2018
Facility under construction

1) Masjid @ Nusari Aman 2
2) SK Bandar Sri Sendayan (adjacent to SMK)




Attached thumbnail(s)
Attached Image Attached Image

6 Pages < 1 2 3 4 5 > » Top
 

Change to:
| Lo-Fi Version
0.0214sec    0.49    7 queries    GZIP Disabled
Time is now: 12th December 2025 - 06:21 PM