Welcome Guest ( Log In | Register )

44 Pages « < 39 40 41 42 43 > » Bottom

Outline · [ Standard ] · Linear+

 Elvina, Bandar Seri Sendayan, Anyone buying ?

views
     
BSS30112015
post Nov 28 2016, 09:29 AM

Regular
******
Senior Member
1,028 posts

Joined: Nov 2015
QUOTE(propertysean @ Nov 27 2016, 12:50 PM)
Elvina show unit is not 9092, elvina show unit is PT8986 ,Price RM1,204,888
*
Is Suriaman 3 show unit PT 6733?,
https://2.bp.blogspot.com/-46Vp-lwlM5s/VnLV...3_site_plan.jpg

It was acquired recently by Matrix's box wife Datin Yong for RM1.21m & she also purchases Fellona's PT9597 for RM1.3m
http://disclosure.bursamalaysia.com/FileAc..._GA_ATTACHMENTS

https://forum.lowyat.net/uploads/attach-95/...-1451318734.jpg


propertysean
post Nov 28 2016, 11:22 AM

Getting Started
**
Junior Member
72 posts

Joined: Jan 2015
QUOTE(BSS30112015 @ Nov 28 2016, 09:29 AM)
Is Suriaman 3 show unit PT 6733?,
https://2.bp.blogspot.com/-46Vp-lwlM5s/VnLV...3_site_plan.jpg

It was acquired recently by Matrix's box wife Datin Yong for RM1.21m & she also purchases Fellona's PT9597 for RM1.3m
http://disclosure.bursamalaysia.com/FileAc..._GA_ATTACHMENTS

https://forum.lowyat.net/uploads/attach-95/...-1451318734.jpg
*
Yes suriaman 3 got two show unit.Elforix show unit is 6733 and Elfora show unit 6683. normally show unit is add on RM300K

This post has been edited by propertysean: Nov 28 2016, 11:25 AM
neonikson1
post Dec 1 2016, 12:12 AM

Look at all my stars!!
*******
Senior Member
2,086 posts

Joined: Feb 2011
QUOTE(alvinheng @ Apr 25 2016, 10:34 PM)
Hi BSS Neighbours, long time no see.
Matrix has resolved the low water pressure issue by changing the entire tap with larger water outlet. See picture below.
Water pressure improved from ~40% to 70%. Not too shabby. Usable.
As for shower head, nothing can be done, best to just use water heater with pump or install stand-alone water pump.
Imperfect tiles, crack lines were all rectified. Same goes to most Balista owners.
Cheers
[attachmentid=6486138]
*
Wonder if the developer is doing this for all the later built units.
neonikson1
post Dec 1 2016, 12:14 AM

Look at all my stars!!
*******
Senior Member
2,086 posts

Joined: Feb 2011
買進券商心頭好‧金群利集團前景亮眼 房產銷售料破10億
346点阅 2016年11月28日
◆券商:豐隆投銀研究
◆目標價:2.89令吉

金群利集團(MATRIX,5236,主要板房產)子公司 BSS發展截至目前的房產銷售達7億令吉,準備突破10億令吉的全年預測;加上有馬新高鐵計劃(HSR)作為長期催化劑,未來前景大好。

金群利集團旗下可負擔房產的價格大多低于60萬令吉,持續推動BSS發展的房產銷售。其中,將在2017財年首季推出的Suriaman 3已經取得76%的認購率;定價由62萬8000令吉起跳的Hijayu 3的認購率則超過65%。

同時,馬新高鐵計劃預計在2026年竣工,其中一站將設在芙蓉,這無疑將提高當地的土地價值,并使土地所有者如金群利集團受益。金群利集團在芙蓉擁有1200英畝的土地儲備,發展總值約50億令吉。

金群利集團擁有良好的產品定位,加上有馬新高鐵計劃作為長期催化劑,且該公司6%的股息回酬率是同行中最高的,因此我們維持該公司“買進”評級,目標價2.89令吉。

金群利集團週一(28日)閉市平盤報2.46令吉,全日共16萬9500股易手。

http://www.chinapress.com.my/20161128/%E8%...94%AE%E6%96%99/
BSS30112015
post Dec 1 2016, 09:51 AM

Regular
******
Senior Member
1,028 posts

Joined: Nov 2015
QUOTE(propertysean @ Nov 28 2016, 11:22 AM)
Yes suriaman 3 got two show unit.Elforix show unit is 6733 and Elfora show unit 6683. normally show unit is add on RM300K
*
Matrix's directors really confident with company's products, another purchases from family of the director announced yesterday rclxms.gif

1)
Purchasers:
Dato’ (Ir) Batumalai A/L Ramasamy and Kumaresh A/L Batumalai

Nature of relationship:
Kumaresh A/L Batumalai is the son of Dato’ (Ir) Batumalai A/L Ramasamy, the Independent Non Executive Director of MCHB

Description:
SPA dated 24 November 2015 for the sale of 1 unit of double storey semi-detached house known as Hijayu 2 – Resort Homes (Elymus 1) located on H.S.(D) 214082 PT11116, in Bandar Sri Sendayan, Negeri Sembilan measuring 5,000 sq ft.

Selling price:
RM1,408,888.00


2)
Purchasers:
Navin Kumar A/L Batumalai

Nature of relationship:
Navin Kumar A/L Batumalai is the son of Dato’ (Ir) Batumalai A/L Ramasamy, the Independent NonExecutive
Director of MCHB

Description:
SPA dated 30 November 2016 for the sale of 1 unit of shop office known as Sendayan Merchant Square located on H.S.(D) 209423 PT8317, in Bandar Sri Sendayan, Negeri Sembilan measuring 184 sq meter.

Selling price:
RM1,188,800.00

http://www.bursamalaysia.com/market/listed...cements/5277077
BSS30112015
post Dec 1 2016, 09:55 AM

Regular
******
Senior Member
1,028 posts

Joined: Nov 2015
QUOTE(neonikson1 @ Dec 1 2016, 12:14 AM)
買進券商心頭好‧金群利集團前景亮眼 房產銷售料破10億
346点阅  2016年11月28日
◆券商:豐隆投銀研究
◆目標價:2.89令吉

金群利集團(MATRIX,5236,主要板房產)子公司 BSS發展截至目前的房產銷售達7億令吉,準備突破10億令吉的全年預測;加上有馬新高鐵計劃(HSR)作為長期催化劑,未來前景大好。

金群利集團旗下可負擔房產的價格大多低于60萬令吉,持續推動BSS發展的房產銷售。其中,將在2017財年首季推出的Suriaman 3已經取得76%的認購率;定價由62萬8000令吉起跳的Hijayu 3的認購率則超過65%。

同時,馬新高鐵計劃預計在2026年竣工,其中一站將設在芙蓉,這無疑將提高當地的土地價值,并使土地所有者如金群利集團受益。金群利集團在芙蓉擁有1200英畝的土地儲備,發展總值約50億令吉。

金群利集團擁有良好的產品定位,加上有馬新高鐵計劃作為長期催化劑,且該公司6%的股息回酬率是同行中最高的,因此我們維持該公司“買進”評級,目標價2.89令吉。

金群利集團週一(28日)閉市平盤報2.46令吉,全日共16萬9500股易手。

http://www.chinapress.com.my/20161128/%E8%...94%AE%E6%96%99/
*
房產銷售達7億令吉 very misleading people thought this is revenue RM700 million

But this is unbilled sales. doh.gif

When Matrix talk about RM1 billion, they refer to revenue not unbilled sales
BSS30112015
post Dec 1 2016, 10:25 AM

Regular
******
Senior Member
1,028 posts

Joined: Nov 2015
QUOTE(BSS30112015 @ Dec 1 2016, 09:51 AM)
Matrix's directors really confident with company's products, another purchases from family of the director announced yesterday rclxms.gif

1)
Purchasers:
Dato’ (Ir) Batumalai A/L Ramasamy and Kumaresh A/L Batumalai

Nature of relationship:
Kumaresh A/L Batumalai is the son of Dato’ (Ir) Batumalai A/L Ramasamy, the Independent Non Executive Director of MCHB

Description:
SPA dated 24 November 2015 for the sale of 1 unit of double storey semi-detached house known as Hijayu 2 – Resort Homes (Elymus 1) located on H.S.(D) 214082 PT11116, in Bandar Sri Sendayan, Negeri Sembilan measuring 5,000 sq ft.

Selling price:
RM1,408,888.00


http://www.bursamalaysia.com/market/listed...cements/5277077
*
Hehe PT11116 is just next to the show house (PT 11117, 7,911 sft RM2.14m) which has been acquired by Dato Lee & his mother in Sept 2015.

http://www.bursamalaysia.com/market/listed...cements/4874561


CR.7
post Dec 3 2016, 12:00 PM

Getting Started
**
Junior Member
81 posts

Joined: Nov 2016
Hi all, want to enquiry residents here about TNB transmission nearby suriaman has been completely built up?
neonikson1
post Dec 5 2016, 11:25 PM

Look at all my stars!!
*******
Senior Member
2,086 posts

Joined: Feb 2011
Malaysia Can Move Into RM2 Trillion Economy In Seven Years


KUALA LUMPUR: Malaysia's economy now stands at RM1.3 trillion and has the potential to grow to a RM2 trillion economy.

Prime Minister and Umno president Datuk Seri Najib Razak said this potential is achievable in seven years if the country's growth remains at five per cent annually.

“Malaysia's economy today is the size of a RM1.3 trillion economy, and according to plans, I want this RM1.3 trillion economy to reach the level of a RM2 trillion economy.

“Calculations show that if growth is at five per cent a year, in seven years we will be a RM2 trillion economy. This is why we have initiated big projects, including the KL-Singapore High-Speed Rail link, the Mass Rapid Transit, Light Rail Transit, East Coast Rail Link, Pan Borneo Highway, Pengerang, Bandar Malaysia, Vision Valley and others," he said in his closing speech at the Umno general assembly today.

Najib said the people will naturally benefit from these mammoth projects as high-income jobs will be created.


- NST
BSS30112015
post Dec 6 2016, 10:08 AM

Regular
******
Senior Member
1,028 posts

Joined: Nov 2015
QUOTE(neonikson1 @ Dec 5 2016, 11:25 PM)
Malaysia Can Move Into RM2 Trillion Economy In Seven Years


KUALA LUMPUR: Malaysia's economy now stands at RM1.3 trillion and has the potential to grow to a RM2 trillion economy.

Prime Minister and Umno president Datuk Seri Najib Razak said this potential is achievable in seven years if the country's growth remains at five per cent annually.

“Malaysia's economy today is the size of a RM1.3 trillion economy, and according to plans, I want this RM1.3 trillion economy to reach the level of a RM2 trillion economy.

“Calculations show that if growth is at five per cent a year, in seven years we will be a RM2 trillion economy. This is why we have initiated big projects, including the KL-Singapore High-Speed Rail link, the Mass Rapid Transit, Light Rail Transit, East Coast Rail Link, Pan Borneo Highway, Pengerang, Bandar Malaysia, Vision Valley and others," he said in his closing speech at the Umno general assembly today.

Najib said the people will naturally benefit from these mammoth projects as high-income jobs will be created.
- NST
*
Apart from MRT which I believe MMC-Gamuda JV done a pretty good job, no delay and cost within budget, the others still not start hope the project execution is as good as their planning. Malaysia quite good on planning tongue.gif

Hope Sime Darby can start Malaysia Vision Valley fast, BSS shall benefit too.

Please no more delay to sign HSR agreement on 21/12/2016, any delay will diminish investor's confidence.

This post has been edited by BSS30112015: Dec 6 2016, 10:11 AM
kt4ever
post Dec 26 2016, 03:57 PM

New Member
*
Junior Member
7 posts

Joined: Jun 2016


hey guys any news when elvina can complete and hand over the key?
BSS30112015
post Dec 27 2016, 11:05 AM

Regular
******
Senior Member
1,028 posts

Joined: Nov 2015
QUOTE(kt4ever @ Dec 26 2016, 03:57 PM)
hey guys any news when elvina can complete and hand over the key?
*
Elvina expected to be completed on July 2017, the road leading to show unit also closed and fenced.

Elymus semiD heard that will be VPed in Feb 2017.
TSLCChoongproperty
post Dec 27 2016, 02:08 PM

Getting Started
**
Junior Member
117 posts

Joined: Oct 2014
QUOTE(BSS30112015 @ Dec 27 2016, 11:05 AM)
Elvina expected to be completed on July 2017, the road leading to show unit also closed and fenced.

Elymus semiD heard that will be VPed in Feb 2017.
*
July 2017 so late? I tot Early of 2017 ?
BSS30112015
post Dec 27 2016, 02:42 PM

Regular
******
Senior Member
1,028 posts

Joined: Nov 2015
QUOTE(LCChoongproperty @ Dec 27 2016, 02:08 PM)
July 2017 so late? I tot Early of 2017 ?
*
Based on Matrix, expected completion date is June 2017 tongue.gif

HIJAYU 3B - ELVINA

No. Lesen Pemaju: 10613-22/05-2017/0354(L)
Tempoh Sah: 06.05.2015 - 05.05.2017
No. Permit Iklan: 10613-22/05-2017/0354(P)
Tempoh Sah: 06.05.2015 - 05.05.2017
Hakmilik Tanah: Kekal
Bebanan Tanah: Tiada
Pelan Bangunan Diluluskan oleh: Majlis Perbandaran Nilai
No. Rujukan: MPN 431/1955/2014/2
Tarikh Dijangka Siap: June 2017
kt4ever
post Dec 28 2016, 04:46 PM

New Member
*
Junior Member
7 posts

Joined: Jun 2016


QUOTE(BSS30112015 @ Dec 27 2016, 11:05 AM)
Elvina expected to be completed on July 2017, the road leading to show unit also closed and fenced.

Elymus semiD heard that will be VPed in Feb 2017.
*
but my father told me the sales person say feb-mar 2017 will complete already... Based on their current progress it sound possible also hor blink.gif

Btw any Elvina fb or whatapps group or not? any neighbor here? rclxm9.gif
BSS30112015
post Dec 29 2016, 03:19 PM

Regular
******
Senior Member
1,028 posts

Joined: Nov 2015
QUOTE(kt4ever @ Dec 28 2016, 04:46 PM)
but my father told me the sales person say feb-mar 2017 will complete already... Based on their current progress it sound possible also hor  blink.gif

Btw any Elvina fb or whatapps group or not? any neighbor here?  rclxm9.gif
*
I c may be the project completion ahead of schedule, the expected completion date based on brochure is June 2017.

Besides Elvina, Elymus VP supposed to be May 2017, but according to SA they can deliver in Feb 2017.

If really so, may be VP for Elfora & Elforix (Sept 2017) & Fellona (Oct 2017) could be earlier too, good save some interest biggrin.gif

This post has been edited by BSS30112015: Dec 29 2016, 03:20 PM
TSLCChoongproperty
post Dec 29 2016, 04:56 PM

Getting Started
**
Junior Member
117 posts

Joined: Oct 2014
QUOTE(kt4ever @ Dec 28 2016, 04:46 PM)
but my father told me the sales person say feb-mar 2017 will complete already... Based on their current progress it sound possible also hor  blink.gif

Btw any Elvina fb or whatapps group or not? any neighbor here?  rclxm9.gif
*
Yes. Whats is your whatsapp number? We shall create one whatsapp only for Elvina Resident.
kt4ever
post Dec 30 2016, 04:34 PM

New Member
*
Junior Member
7 posts

Joined: Jun 2016


QUOTE(BSS30112015 @ Dec 29 2016, 03:19 PM)
I c may be the project completion ahead of schedule, the expected completion date based on brochure is June 2017.

Besides Elvina, Elymus VP supposed to be May 2017, but according to SA they can deliver in Feb 2017.

If really so, may be VP for Elfora & Elforix (Sept 2017) & Fellona (Oct 2017) could be earlier too, good save some interest biggrin.gif
*
Yeah, that can help us save a bit interest... thumbup.gif SA told us march can collect key ady dunno zun or not haha

kt4ever
post Dec 30 2016, 04:38 PM

New Member
*
Junior Member
7 posts

Joined: Jun 2016


QUOTE(LCChoongproperty @ Dec 29 2016, 04:56 PM)
Yes. Whats is your whatsapp number? We shall create one whatsapp only for Elvina Resident.
*
My number 012-6317716 Loong... I selling used lorry and car parts nice to meet u guys tongue.gif

I wonder how many here really will move in once delivered the key confused.gif
neonikson1
post Jan 2 2017, 05:04 PM

Look at all my stars!!
*******
Senior Member
2,086 posts

Joined: Feb 2011
QUOTE(kt4ever @ Dec 28 2016, 04:46 PM)
but my father told me the sales person say feb-mar 2017 will complete already... Based on their current progress it sound possible also hor  blink.gif

Btw any Elvina fb or whatapps group or not? any neighbor here?  rclxm9.gif
*
It is common that matrix handover the project earlier that due date. Yeah... Better to be earlier than later.

44 Pages « < 39 40 41 42 43 > » Top
 

Change to:
| Lo-Fi Version
0.0320sec    0.69    6 queries    GZIP Disabled
Time is now: 10th December 2025 - 08:09 AM