Welcome Guest ( Log In | Register )

46 Pages « < 34 35 36 37 38 > » Bottom

Outline · [ Standard ] · Linear+

 Lake Point @ Cyberjaya - Freehold 3 Storey G&G, New Developement Info sharing

views
     
jumalij23
post Aug 29 2016, 06:04 PM

Getting Started
**
Junior Member
243 posts

Joined: Sep 2008
QUOTE(QingBB @ Aug 29 2016, 04:12 PM)
Club house and fountain.
*
Thanks for the lovely photos!! rclxms.gif icon_idea.gif rclxm9.gif
anonymous552235
post Aug 29 2016, 07:59 PM

Getting Started
**
Junior Member
298 posts

Joined: Sep 2007
QUOTE(jumalij23 @ Aug 26 2016, 01:05 PM)
Units facing condo will have more parking spaces infront and wider backyard since no other house back and front. Plus easy to lookout for the kids playing at the playground bcoz not so far from their window. Some buyer prioritize those things before go for view and lighting.

Developer start to built the playground and the green area yet? Anybody can share playground progress..
*
The area still remained as a dumping/storage ground...


Gentle reminder to ur belongings in car..other projects bangla looks suspicious..

Attached Image
Attached Image
Attached Image
Attached Image
plankton
post Aug 29 2016, 11:56 PM

*Place Custom Member Title Here*
*****
Senior Member
809 posts

Joined: Dec 2004


Thanks for the pics!
nexona88
post Aug 30 2016, 12:37 AM

The Royal Club Member
*********
All Stars
48,446 posts

Joined: Sep 2014
From: REality
QUOTE(QingBB @ Aug 29 2016, 04:12 PM)
Club house and fountain.
*
Looking good rclxms.gif
wil-i-am
post Aug 30 2016, 07:24 AM

10k Club
********
Senior Member
10,001 posts

Joined: May 2013
When is d VP?
radiax
post Aug 30 2016, 11:03 AM

New Member
*
Junior Member
46 posts

Joined: Sep 2013


Club house looks good progress, too bad facilities only for condo residents right? Separate boom gate for terrace houses near the main guardhouse I suppose or the plan already scrapped off.
Magpies9
post Aug 30 2016, 09:30 PM

Getting Started
**
Junior Member
144 posts

Joined: Nov 2010


QUOTE(radiax @ Aug 30 2016, 11:03 AM)
Club house looks good progress, too bad facilities only for condo residents right? Separate boom gate for terrace houses near the main guardhouse I suppose or the plan already scrapped off.
*
The last I heard it's not been decided if club house just for condo or all Lake Point residence including the terrace owner.

The club house structure is like 5 storey high. Is there a viewing deck or some facility at the top or solely to give the club house a more commanding look?

This post has been edited by Magpies9: Aug 30 2016, 09:32 PM
jumalij23
post Sep 2 2016, 06:09 PM

Getting Started
**
Junior Member
243 posts

Joined: Sep 2008
Playground and green area construction still havent started? Mind to share anyone.
anonymous552235
post Sep 2 2016, 08:14 PM

Getting Started
**
Junior Member
298 posts

Joined: Sep 2007
QUOTE(jumalij23 @ Sep 2 2016, 06:09 PM)
Playground and green area construction still havent started? Mind to share anyone.
*
Not started ..still a dumping/temporary storage area ...can check previous pic taken from the corner..
Magpies9
post Sep 9 2016, 11:17 PM

Getting Started
**
Junior Member
144 posts

Joined: Nov 2010


Received invitation from developer for their mid-autumn festival event this sat evening. On site.
May go see see....check out construction progress at the same time.
nucleus1999
post Sep 15 2016, 05:05 PM

New Member
*
Junior Member
9 posts

Joined: Jul 2008
Some latest photos taken during the mid autumn open house.


Attached thumbnail(s)
Attached Image Attached Image Attached Image Attached Image Attached Image Attached Image Attached Image Attached Image
jumalij23
post Sep 20 2016, 08:44 PM

Getting Started
**
Junior Member
243 posts

Joined: Sep 2008
QUOTE(nucleus1999 @ Sep 15 2016, 05:05 PM)
Some latest photos taken during the mid autumn open house.
*
Looking good!! thanks for the pics:)
Magpies9
post Oct 3 2016, 03:14 AM

Getting Started
**
Junior Member
144 posts

Joined: Nov 2010


Construction looks rather advance and infact seems completed, way before it's targeted mid 2017 VP.

Any chance it could be VP by end of this year?

jumalij23
post Nov 14 2016, 10:29 PM

Getting Started
**
Junior Member
243 posts

Joined: Sep 2008
anybody receive email for connecting tnb and syabas?
anonymous552235
post Nov 16 2016, 06:37 PM

Getting Started
**
Junior Member
298 posts

Joined: Sep 2007
QUOTE(jumalij23 @ Nov 14 2016, 10:29 PM)
anybody receive email for connecting tnb and syabas?
*
Ya bro....collecting deposit now ....but they said vp about march
Rustyee
post Nov 26 2016, 08:50 PM

New Member
*
Junior Member
25 posts

Joined: Mar 2016
Hi guys, I passby lake point residence ("LPR") yesterday night as I was in cyberjaya for my friend's open house in setia eco glades. I noticed the road leading to our house namely "persiaran sepang" was slightly barricaded (but the gap was big enough for cars to drive through), the surrounding was pretty quiet since other projects are still on going and it's quite dark around LPR. My point is, if vp by march, how many of you will find it safe to move in?

Also I noticed the fence surrounding LPR is pretty low, and I was previously told that it should be a wall instead. I also expected the wall / fence to be higher for safety reasons (something similar to that when you turn into setia eco glades when driving from LPR's direction). Anyone have any idea if our developer plans to build a higher wall around LPR aside to the current fence? Any thoughts will be welcome, thanks!
michaelchang
post Nov 27 2016, 02:21 PM

Enthusiast
*****
Junior Member
916 posts

Joined: Sep 2016


With current crime rate in Malaysia, I believe all projects should come with at least 12 feet wall or fencing. If have high voltage fence on top of wall will be best..
BEANCOUNTER
post Nov 27 2016, 02:26 PM

20k VIP Club
*********
All Stars
20,146 posts

Joined: May 2011
If they can rob you in your house...
They will rob you outside your house loh...
anonymous552235
post Nov 27 2016, 02:53 PM

Getting Started
**
Junior Member
298 posts

Joined: Sep 2007
QUOTE(Rustyee @ Nov 26 2016, 08:50 PM)
Hi guys, I passby lake point residence ("LPR") yesterday night as I was in cyberjaya for my friend's open house in setia eco glades. I noticed the road leading to our house namely "persiaran sepang" was slightly barricaded (but the gap was big enough for cars to drive through), the surrounding was pretty quiet since other projects are still on going and it's quite dark around LPR. My point is, if vp by march, how many of you will find it safe to move in?

Also I noticed the fence surrounding LPR is pretty low, and I was previously told that it should be a wall instead. I also expected the wall / fence to be higher for safety reasons (something similar to that when you turn into setia eco glades when driving from LPR's direction). Anyone have any idea if our developer plans to build a higher wall around LPR aside to the current fence? Any thoughts will be welcome, thanks!
*
Was told the current fence is temporary...final fence/wall not sure yet..

radiax
post Nov 27 2016, 05:11 PM

New Member
*
Junior Member
46 posts

Joined: Sep 2013


QUOTE(Rustyee @ Nov 26 2016, 08:50 PM)
Hi guys, I passby lake point residence ("LPR") yesterday night as I was in cyberjaa for my friend's open house in setia eco glades. I noticed the road leading to our house namely "persiaran sepang" was slightly barricaded (but the gap was big enough for cars to drive through), the surrounding was pretty quiet since other projects are still on going and it's quite dark around LPR. My point is, if vp by march, how many of you will find it safe to move in?

Also I noticed the fence surrounding LPR is pretty low, and I was previously told that it should be a wall instead. I also expected the wall / fence to be higher for safety reasons (something similar to that when you turn into setia eco glades when driving from LPR's direction). Anyone have any idea if our developer plans to build a higher wall around LPR aside to the current fence? Any thoughts will be welcome, thanks!
*
***

-yerp, was previously told by SA initially to have at least 8 feet or so solid wall surrounding entire residency. not sure what transpired following that since current mesh fence now substantially shorter. If it's temporary, that will be great but isn't redundant/non cost effective to build it later? Nevertheless, security will be a major issue, as even in Mah Sing's Garden Residence gated community, break-ins tend to occur quite frequently now and then even with CCTV, 24-hr Guards, wall, fence and what not. These are all techniques to deter potential break-ins albeit not always necessary work. Can only hope to minimize the risk I guess. So, this is something worth to keep an eye out at the moment, although I don't think anything can be done currently, until JMB formed and next decisions made isn't it?

-Went to opposite Lake Front Open Day yesterday, SAs pretty sure the villas and most of the apartment blocks can be finished by June-July 2017. Targeted for ours will be sometime March - April 2017 right?

-Any idea what's going with the man road construction? not sure whether it is just routine work or workers are installing fibre optics cable underground. Hopefully can get TIME Broadband fibre optics internet connection tho' That will be fast and reliable.

-Our main road, Persiaran Sepang is a pretty long stretch, anyone knows whether there will be U-Turns towards Setia Eco Glades somewhere along that or only at traffic lights? Will make going to MEX highway via SEG a lot faster than making a big U-Turn passing through via Pangea, Cyberview and The ARC. Thinking with the many developments there, I'm sure this main road will be very busy during peak hours especially with Union opening soon plus futhermore Gov. District Hospital Cyberjaya in the plans as well. cheers.

46 Pages « < 34 35 36 37 38 > » Top
 

Change to:
| Lo-Fi Version
0.0332sec    0.29    6 queries    GZIP Disabled
Time is now: 6th December 2025 - 04:25 PM