 Ask me anything abt Construction Industry!, Q&A

views
     
TSiwubpreve
post May 8 2018, 07:00 PM

Regular
******
Senior Member
1,829 posts

Joined: Mar 2013
QUOTE(topearn @ May 8 2018, 12:51 PM)
Y R U asking this ? I thought U R the construction expert ? U started this thread telling others to ask U anything about the construction industry.
*
coz here don't have. but I saw that forummer seems like a concrete expert. in his website.
henrytlh
post May 9 2018, 03:02 PM

Getting Started
**
Junior Member
110 posts

Joined: Nov 2008


QUOTE(topearn @ May 8 2018, 11:51 AM)
Y R U asking this ? I thought U R the construction expert ? U started this thread telling others to ask U anything about the construction industry.
*
c'mon construction itself is a field too big to master in, TS have some queries to ask regarding premix concrete and coincidentally there's a concrete expert here in the forum. Nothing wrong to it as long as we're learning from each other. thumbup.gif
topearn
post May 10 2018, 01:05 PM

Look at all my stars!!
*******
Senior Member
3,459 posts

Joined: Jan 2009
QUOTE(henrytlh @ May 9 2018, 03:02 PM)
c'mon construction itself is a field too big to master in, TS have some queries to ask regarding premix concrete and coincidentally there's a concrete expert here in the forum. Nothing wrong to it as long as we're learning from each other. thumbup.gif
*

Understood, dude, thanks !

Dudu123
post Jun 16 2018, 05:22 PM

New Member
*
Newbie
4 posts

Joined: Jun 2018
hi guys.. want to check if this will cause a health problem.? i have bought a unit at level 15th..around 7 car distance from my unit.. is this the radioactive??


Attached thumbnail(s)
Attached Image
topearn
post Jul 4 2018, 10:35 PM

Look at all my stars!!
*******
Senior Member
3,459 posts

Joined: Jan 2009
For renovation to extend back portion of house right to the end for both upstairs n downstairs under MPSJ, do they have ready plans that I can use ?
If not, can I just approach any MPSJ draftman's to get him to draft the reno plan ? Can I then submit the plan myself to MPSJ for approval to save some cost ? After reno done, wil lthis draftman need to go to the house to check that reno is done as per his draft plan so he can sign off the reno ?
zaFrOoNaLdO
post Jul 6 2018, 09:18 AM

FM fReaK!
******
Senior Member
1,508 posts

Joined: Feb 2007


anybody here used 'Architect Centre' before buying subsale property? If yes, any feedback?

For those who does not know, they are 'building inspectors'.

http://www.architectcentre.com.my/ac/p1.asp?id=1
captain_asia
post Jul 12 2018, 02:02 PM

Getting Started
**
Junior Member
160 posts

Joined: Mar 2015
Hi everyone..kinda urgent here. Does anyone know what standard do we use for cement bricks in malaysia? And what is the strength and water absorption?
captain_asia
post Jul 12 2018, 02:02 PM

Getting Started
**
Junior Member
160 posts

Joined: Mar 2015
Hi everyone..kinda urgent here. Does anyone know what standard do we use for cement bricks in malaysia? And what is the strength and water absorption?
Kieff
post Jul 22 2018, 09:59 AM

Getting Started
**
Junior Member
80 posts

Joined: Jun 2006


Hi there,
I bought a house in Bm Penang with a small river about 25' away on the right side of my fence. I think this land on the right is river reserve. Can I fence this land into my compound by providing gate and access when ever they want to maintain the river?? Thanks for your advises!
Quang1819
post Aug 8 2018, 12:06 PM

Look at all my stars!!
*******
Senior Member
2,604 posts

Joined: Dec 2012
Wiring and plumbing are part of this industry right lol

Just wondering hows the market for these two nowadays... Lesser people doing such labour work? Thinking to learn some wiring and plumbing job...
dccl1988
post Aug 15 2018, 07:00 PM

Getting Started
**
Junior Member
71 posts

Joined: Apr 2015
Hi, if our sub-contractor caused delay to our site progress due to shortage of material supply, can we charge them LAD ?
its still within completion date.
captain_asia
post Aug 17 2018, 01:22 PM

Getting Started
**
Junior Member
160 posts

Joined: Mar 2015
QUOTE(dccl1988 @ Aug 15 2018, 07:00 PM)
Hi, if our sub-contractor caused delay to our site progress due to shortage of material supply, can we charge them LAD ?
its still within completion date.
*
that depends on whether its stated in the contract. Correct me if i am wrong.
zhou.xingxing
post Sep 6 2018, 09:00 AM

:3
******
Senior Member
1,863 posts

Joined: Aug 2014
From: Soviet Sarawak - Dum Spiro Spero



any archi ppl here or have dealt with one? know what is the cost to pay for drawing plan, submission to council and monitoring? planning to have say 2500sf single storey detached.. what is the rate now? 10% of the cons cost?.
cheeweishan
post Sep 11 2018, 07:38 PM

New Member
*
Newbie
5 posts

Joined: Sep 2018
I'm from University of South Australia student currently doing a research project about the implication of BIM in Malaysia. could you please do me a favour to take part in this survey. your participating is greatly appreciated. here is the link https://www.surveymonkey.com/r/SESBIMMY
SejukCerita
post Oct 4 2018, 11:38 AM

Getting Started
**
Junior Member
53 posts

Joined: Jan 2010
Hi any sifu here familiar with DBKL requirement? i have an ongoing project (proposed multistorey wholesale hub) in KL apparently KM has been issued out few months ago but when the client went to sign SPA, DBKL dont accept and ask to resubmit because they don't allow the word "Perdagangan" instead they ask to change to "Retail". In results of this, we need to resubmit everything including building plan jkkp etc (anything with project title stated on it). icon_question.gif
echho
post Oct 21 2018, 07:52 PM

Getting Started
**
Junior Member
280 posts

Joined: Oct 2010
Hi all
Is there any government agency to assist us should a renovation contractor bail out on us without completing the agreed renovation?

This is a small timer whom is not registered after we check him out. We have paid 95% of the cost as he claimed he needs to purchase materials. Work has been slow and draggy with only 50% done. He is only working 1 day in 2 weeks but claimed he can finish up everything in 2 months. There are at least 10 unsatisfactory works which we wants him to change and improve due to poor calculation on his part.

Any sifu that points us to the rightful authority to hear our grievances and provide legal assistance is very much appreciated. Thanks.
newsongfashion
post Oct 25 2018, 04:10 PM

Casual
***
Junior Member
315 posts

Joined: Aug 2012
what's construction cost (harga pokok) for a high rise apartment in psf?
kimzee
post Oct 25 2018, 05:34 PM

Casual
***
Junior Member
411 posts

Joined: Jan 2018
QUOTE(Dudu123 @ Jun 16 2018, 05:22 PM)
hi guys.. want to check if this will cause a health problem.? i have bought a unit at level 15th..around 7 car distance from my unit.. is this the radioactive??
*
Certainly not radioactive, this is electromagnetic. nothing to worry about. you are surrounded by it everwhere.
kimzee
post Oct 25 2018, 05:36 PM

Casual
***
Junior Member
411 posts

Joined: Jan 2018
Dear TS,

I want to know for a 5 inch concrete slab, what is the maximum width i can have between the end-to-end piller. TIA.
cfc
post Nov 12 2018, 11:26 AM

Casual
***
Junior Member
440 posts

Joined: Apr 2005
QUOTE(iwubpreve @ Oct 17 2014, 01:30 PM)
hey guys, u may ask me anything about construction industry and i'll try my best to answer all ur question.
biggrin.gif

u can also ask me about construction law. I know a lot abt that too biggrin.gif
*
hi iwubpreve ...
have some question but i posted in another subthread, hope you can icon_question.gif
https://forum.lowyat.net/index.php?showtopi...60&p=90891925&#

thanks