I'm finally back in town again..after away for almost 1 week....
Renovation progress has been steady but slightly slow as there were only 2 workers assigned for my site from the beginning. I've request more workers from the contractor so that things could be sped up, in order to meet the dateline of moving in latest by end of Nov. Hopefully I could get more work force soon.
Following are some updates as of the 20th day:
- BRC wire mesh is ready for the front porch footing. As you can see from picture below, the part for soil and planting has been made smaller so that the car porch has more width space especially when we park 2 cars side-by-side. It gives a wider walk space so that we do not need to step on the grass.

- Tiles has arrived but yet to see the tiler. Contractor said the tiling sifu has pretty tight schedule...
Hope he can secure a time slot for me very soon and I do hope he get me a good sifu with good workmanship coz i'm pretty particular on the tiling quality. I will definitely vomit blood till die if the tiling job is not good...

- leveling work for 1st floor and stairs was done. I don't plan to install any glass or railing for the staircase stepping down. Will just do the laminate (without riser).

- The old sliding door at courtyard has been taken away and the contractor suggested to hack the upper part, making the opening 1 foot higher, and it actually turns out better with such higher opening. Will do BRC roof slab for each opening to the courtyard to avoid splashing of rain..

- New opening at 1st floor family hall and master bedroom.


- The ceiling at 1st floor has been all removed to receive new plaster ceiling later.


- Kitchen wall has been hacked away. Can't wait for the kitchen extension work.