 Renovation Secret & Tips Revealed, Secret&Tips contractor wont tell you

views
     
West Wing
post Dec 23 2012, 08:06 PM

Regular
******
Senior Member
1,397 posts

Joined: Jun 2008


QUOTE(ontrack builders @ Dec 20 2012, 11:15 PM)
Do u really need 124 points for the piling works?? That is quite a huge amount.Initial pile and extension pile should have been of the same rate.However the price to supply the piles (175mm x 175mm) is quite cheap.Usually people would quote handle,transport,pitch and drive as a same rate.

Please ask your contractor whether this work will be remeasured as provisional quantity because if it is,then the amount of RM 68k isn't a fixed amount.

Cheers!
*
TQ for you reply. The numbers are as per Engineer's plan and all I need to know whether these are standardized or normal quote for piling.

The contractor told me that it will be lesser if the requirement reduce but as a layman, I find it very expensive and what you think.

Appreciate and thank again.
michaelck1838
post Dec 24 2012, 10:09 AM

Getting Started
**
Junior Member
83 posts

Joined: Nov 2009


QUOTE(tomjason @ Mar 14 2012, 09:56 AM)
i design wiring for my house like this......more stable....and save my bill..i m waiting for fews bill to monitor..

[attachmentid=2736921]
*
Hi Tom Jason,

Since you used 16mm2 Cable size, your house incoming supply is 60A 3 phase supply, armoured or PVC cable?

Can you share or PM me your buying list in excel sheet (if you have) for my own purpose house rennovation?

Thanks


ontrack builders
post Dec 24 2012, 04:55 PM

New Member
*
Junior Member
36 posts

Joined: Nov 2012


QUOTE(West Wing @ Dec 23 2012, 08:06 PM)
TQ for you reply. The numbers are as per Engineer's plan and all I need to know whether these are standardized or normal quote for piling.

The contractor told me that it will be lesser if the requirement reduce but as a layman, I find it very expensive and what you think.

Appreciate and thank again.
*
If the engineer's plan said so then there's no argument there.I used to build an elevated water tank and we only need 60 something points.Your house must be very big then and your soil is soft hence the needs for numerous amount of piles point.

Other than the things I've mentioned the rate seemed reasonable enough for me.However please bear in mind,it's in provisional quantity meaning that the more they do the work,they more u'll have to pay.If the number of piles used reduce,then it will be below 68k and vice versa.

Cheers!
xoxo1943
post Dec 25 2012, 01:52 PM

New Member
*
Junior Member
19 posts

Joined: May 2010
hi tomjason,

Can u pm the formula to estimate the renovation cost. I am planning to start my renovation in a month or two.

Thanks
skng03
post Dec 25 2012, 02:50 PM

Regular
******
Senior Member
1,450 posts

Joined: Oct 2008


QUOTE(West Wing @ Dec 20 2012, 05:43 PM)
Hi All Sifu,

I want to build a house on my land and the contractor quote me Rm1.2M and he told me that only the house and not even include piling and just today, he provided me with the piling quotation.

I want to ask Sifu here is the 7ins. Piling quotation below reasonable or not.

1. Mobilisation, installation and demobilisation og piling equipments Rm8,000
2. Setting out of piling points @ Rm8 x124= Rm744
3. 6m starter points @ Rm160x124= Rm19,840
4, 6 m  extentiong points @Rm172x124=Rm21,328
5.Handle, transport and pich @Rm10x248=Rm2480
6.Driving of 175mmx175mm r.c piles Rm8x1488= Rm11904
7.Extention joints(bult weld) to piles Rm20x124= Rm2480
8.Cut off piles head Rm28x123= Rm3472
9.PDA test on 1st.  Rm1750
10. PDA test on Subsequence   Rm 1200

Total Rm68,240 and I am surprised and can someone here enlighten me on the above....
*
item
1. high, normally <5k in klang valley for 1st rig, 3k for 2nd rig
2. reasonable
3&4 . normally started pile with shoe more expensive than extension pile +-rm10
5. reasonable
6. market rate
7. on high side, weld joint for 7" <rm15
8. cut off pile above ground or cut off after excavate for pilecap? request for diamond cutting after excavation..no double handling
9. PDA market rate 1st rm1200, subsequence rm800-1000 depend on nos


Added on December 25, 2012, 2:54 pm
QUOTE(ontrack builders @ Dec 24 2012, 04:55 PM)
If the engineer's plan said so then there's no argument there.I used to build an elevated water tank and we only need 60 something points.Your house must be very big then and your soil is soft hence the needs for numerous amount of piles point.

Other than the things I've mentioned the rate seemed reasonable enough for me.However please bear in mind,it's in provisional quantity meaning that the more they do the work,they more u'll have to pay.If the number of piles used reduce,then it will be below 68k and vice versa.

Cheers!
*
by looking at the quantities allowed, i doubt the soil is soft, 124 point and only allow 124 starter & 124 extension, meaning only max 12m per point, sometime the engineer just simply taruk as much point one doh.gif

This post has been edited by skng03: Dec 25 2012, 02:54 PM
ANNRealtee
post Dec 26 2012, 11:23 AM

New Member
*
Newbie
1 posts

Joined: Nov 2012
Hello TomJason

I would be very grateful if you could PM me the formula, please?

Great discussion and information, by the way. Thanks a million.







QUOTE(tomjason @ Feb 17 2012, 02:51 PM)
just to share...actually most contractor use formula to calculate the estimation of you renovation..else..how can they can give quotation between 2,3 days...if somebody want to know the formula..do PM me..

TQ..
after the selection of the steel iron, observe also for the sand type they use...the best sand for renovation is from 'mine/lombong'..usually the mine sand is white in color....the.....second is from river..or we call pasir sungai....normally river sand in yellowish or redish in color.....for pasir sungai or river sand..make sure that the river sand is 'wash' type...else....there is mud inside the sand..causing your concrete not strong enough....


for brick selection....if you got budget..use red brick 'tanah merah'....this brick is good and strong..it also..make your house cooler..compared to sand brick....for sand brick..the price..last time is about 0.23 sen ...else..the red brick is about 0.37 sen..price already gone up...for the red brick..the fully bake brick is good...how to recognized this brick?...there is some black color or line on the brick....
*

Added on December 26, 2012, 1:14 pm
QUOTE(ANNRealtee @ Dec 26 2012, 11:23 AM)
Hello TomJason

I would be very grateful if you could PM me the formula, please?

Great discussion and information, by the way. Thanks a million.
*
Ooops, just realised that the formula is off the market. Will come back with queries when the time comes.

Thanks.

This post has been edited by ANNRealtee: Dec 26 2012, 01:14 PM
yooworld
post Jan 2 2013, 09:42 AM

New Member
*
Junior Member
19 posts

Joined: Jun 2006
Hi Brother,

I wanna ask 1 simple question, my house is MPKJ control. For the small road from outside my main gate until main road, now is tar road (except the 3 feet after gate i olede change to tiles), can i make it to simen floor? Coz my contractor told me since i had draw plan and summit to MPKJ, when they come to check, i will kena saman.

Please comment as i do not trust fully my contractor, TQ. smile.gif
West Wing
post Jan 2 2013, 11:01 AM

Regular
******
Senior Member
1,397 posts

Joined: Jun 2008


[quote=skng03,Dec 25 2012, 02:50 PM]
item
1. high, normally <5k in klang valley for 1st rig, 3k for 2nd rig
2. reasonable
3&4 . normally started pile with shoe more expensive than extension pile +-rm10
5. reasonable
6. market rate
7. on high side, weld joint for 7" <rm15
8. cut off pile above ground or cut off after excavate for pilecap? request for diamond cutting after excavation..no double handling
9. PDA market rate 1st rm1200, subsequence rm800-1000 depend on nos


Added on December 25, 2012, 2:54 pm


Appreciated and TQ
TStomjason
post Jan 3 2013, 02:17 PM

Enthusiast
*****
Senior Member
866 posts

Joined: Oct 2011
QUOTE(West Wing @ Dec 20 2012, 05:43 PM)
Hi All Sifu,

I want to build a house on my land and the contractor quote me Rm1.2M and he told me that only the house and not even include piling and just today, he provided me with the piling quotation.

I want to ask Sifu here is the 7ins. Piling quotation below reasonable or not.

1. Mobilisation, installation and demobilisation og piling equipments Rm8,000
2. Setting out of piling points @ Rm8 x124= Rm744
3. 6m starter points @ Rm160x124= Rm19,840
4, 6 m  extentiong points @Rm172x124=Rm21,328
5.Handle, transport and pich @Rm10x248=Rm2480
6.Driving of 175mmx175mm r.c piles Rm8x1488= Rm11904
7.Extention joints(bult weld) to piles Rm20x124= Rm2480
8.Cut off piles head Rm28x123= Rm3472
9.PDA test on 1st.  Rm1750
10. PDA test on Subsequence   Rm 1200

Total Rm68,240 and I am surprised and can someone here enlighten me on the above....
*
sorry for late reply very busy now...

bro,

what is your reno size and land size?


Added on January 3, 2013, 2:18 pm
QUOTE(soyuzz @ Dec 21 2012, 09:11 PM)
Hi tomjason...

I read this thread and found it very helpful..thank to u which is still loyal here and answer the almost all question with no interest..

Mind share the formula with me?..pls pm me..tq bro..
*
hi bro,

what reno you want to do?


Added on January 3, 2013, 2:19 pm
QUOTE(ah_yee @ Dec 21 2012, 09:57 PM)
Hey, bro Tomjason, can u pm me ur own formula to estimate to renovation cost. I m interested bcoz I will goin to renovate my new hse after CNY. Thanks in advance.
*
what reno you want to do?


Added on January 3, 2013, 2:29 pm
QUOTE(michaelck1838 @ Dec 24 2012, 10:09 AM)
Hi Tom Jason,

Since you used 16mm2 Cable size, your house incoming supply is 60A 3 phase supply, armoured or PVC cable?

Can you share or PM me your buying list in excel sheet (if you have) for my own purpose house rennovation?

Thanks
*
sure armoured cable..my 16 mm cable is Mega brand..

i hv almost 90% of the receipt buying list..i kept all...some i hv already put in excel....for my reno i update detail every day in excel the progress...

inform me what price you want to know?


Added on January 3, 2013, 2:29 pm
QUOTE(ANNRealtee @ Dec 26 2012, 11:23 AM)
Hello TomJason

I would be very grateful if you could PM me the formula, please?

Great discussion and information, by the way. Thanks a million.

Added on December 26, 2012, 1:14 pm
Ooops, just realised that the formula is off the market. Will come back with queries when the time comes.

Thanks.
*
what reno you want to do??


Added on January 3, 2013, 2:35 pm
QUOTE(yooworld @ Jan 2 2013, 09:42 AM)
Hi Brother,

I wanna ask 1 simple question, my house is MPKJ control. For the small road from outside my main gate until main road, now is tar road (except the 3 feet after gate i olede change to tiles), can i make it to simen floor? Coz my contractor told me since i had draw plan and summit to MPKJ, when they come to check, i will kena saman.

Please comment as i do not trust fully my contractor, TQ. smile.gif
*
hi bro,


it depend on Majlis... i hv just finish cement all my pavement infront on my house near the road and shifted the 'tong sampah' area near the road side...hope you can image..or later i can post the pic

i suppose your case to cement the pavement should be no problem unless you wan the shift the tong sampah like mine...

This post has been edited by tomjason: Jan 3 2013, 02:37 PM
cp liew
post Jan 3 2013, 04:18 PM

New Member
*
Junior Member
13 posts

Joined: Nov 2011
QUOTE(West Wing @ Dec 20 2012, 05:43 PM)
Hi All Sifu,

I want to build a house on my land and the contractor quote me Rm1.2M and he told me that only the house and not even include piling and just today, he provided me with the piling quotation.

I want to ask Sifu here is the 7ins. Piling quotation below reasonable or not.

1. Mobilisation, installation and demobilisation og piling equipments Rm8,000
2. Setting out of piling points @ Rm8 x124= Rm744
3. 6m starter points @ Rm160x124= Rm19,840
4, 6 m  extentiong points @Rm172x124=Rm21,328
5.Handle, transport and pich @Rm10x248=Rm2480
6.Driving of 175mmx175mm r.c piles Rm8x1488= Rm11904
7.Extention joints(bult weld) to piles Rm20x124= Rm2480
8.Cut off piles head Rm28x123= Rm3472
9.PDA test on 1st.  Rm1750
10. PDA test on Subsequence  Rm 1200

Total Rm68,240 and I am surprised and can someone here enlighten me on the above....
*
good info. smile.gif
DemonKnight
post Jan 4 2013, 03:14 PM

Getting Started
**
Junior Member
238 posts

Joined: Jun 2008
can somebody quote for conversion from tnb to solar panel ?
aviecena2020
post Jan 9 2013, 12:32 AM

Getting Started
**
Junior Member
210 posts

Joined: Apr 2010
anyone know thickness of 2nd floor concrete slab?
yooworld
post Jan 9 2013, 08:53 AM

New Member
*
Junior Member
19 posts

Joined: Jun 2006
QUOTE(tomjason @ Jan 3 2013, 02:17 PM)



Added on January 3, 2013, 2:35 pm
hi bro,
it depend on Majlis... i hv just finish cement all my pavement infront on my house near the road and shifted the 'tong sampah' area near the road side...hope you can image..or later i can post the pic

i suppose your case to cement the pavement should be no problem unless you wan the shift the tong sampah like mine...
*
Thanks brother, my house no tong sampah area, even no built in tong sampah. So tong sampah will just put outside oni...anyway, thx for your advice!
TStomjason
post Jan 9 2013, 09:11 AM

Enthusiast
*****
Senior Member
866 posts

Joined: Oct 2011
QUOTE(yooworld @ Jan 9 2013, 08:53 AM)
Thanks brother, my house no tong sampah area, even no built in tong sampah. So tong sampah will just put outside oni...anyway, thx for your advice!
*
u r welcomed bro...



-------------------------------------------------------------------------------------------------------------------------------------------------------


i not an expert but just help what ever i know to you all....i hv many requests for consultancy and i did gave..but easier if you can call me cause i hv limited time to typing...i still give free consultancy but i also willing to give site visit to serious house owner that want to reno but for site visit i hv to charge a little 'duit minyak' or 'duit penat' and for site visit i will bring indon worker...ialah..i hv to pay the car fuel and duit minum teh tarik to the indon worker.... biggrin.gif you can call me at 0137440012 but Not at Night pls...that my rest time with family...for site visit only near to my house shah alam such as subang bistari,subang perdana,setia alam, kota damansara, shah alam sek1 - sek 30 etc near to shah alam....for site visit at saturday or sunday...

during the site visit i will give consultantcy, proposal and quotation. If you want then you can direct deal with the indon contractor/worker that i brought along or you can take other contractor. In that basis, if you wan to take other contractor, then when you deal with other contractor you will not be cheated.

This post has been edited by tomjason: Jan 9 2013, 01:48 PM
smwah
post Jan 9 2013, 05:52 PM

Glad to be Here
Group Icon
Elite
1,701 posts

Joined: Jan 2003
From: Setia Alam


Hi intention to convert my back lane area into dry area for keeping barang.
Make a concreate cement with 6 feet wall brick the put awining and grill.

1) Convert the grass soil to concreate cement with Y12. 10 x 20, thickness of 5 inch

2) Brick wall with plaster. 6 x 20

3) Grill with powder coating. 3 x 20

4) Steel awning 20 x 10

5) Create a 2 paip outle plus one drainage for sink.

Do you have any 'reliable' electrician? I need to do some rewiring for air con and oven.
aviecena2020
post Jan 9 2013, 07:05 PM

Getting Started
**
Junior Member
210 posts

Joined: Apr 2010
QUOTE(aviecena2020 @ Jan 9 2013, 12:32 AM)
anyone know thickness of 2nd floor concrete slab?
*
need help here?
TStomjason
post Jan 10 2013, 09:30 AM

Enthusiast
*****
Senior Member
866 posts

Joined: Oct 2011
QUOTE(aviecena2020 @ Jan 9 2013, 07:05 PM)
need help here?
*
between 5 inches to 6 inches less than that has strength issue. depend also on the contractor method of makin slab, the highest strength is using rebar bar Y10/Y12 compared to BRC.


qaf1010
post Jan 10 2013, 12:02 PM

New Member
*
Junior Member
24 posts

Joined: Sep 2006
From: Kuching, Sarawak


any recommendation for skim coat material & sealer to remove hairlines / cracks?
kenstarlw
post Jan 12 2013, 12:06 PM

New Member
*
Newbie
2 posts

Joined: Dec 2011
Hi! Bro, can pm me the formula ? Much appreciated..

This post has been edited by kenstarlw: Jan 12 2013, 12:06 PM
qaf1010
post Jan 12 2013, 11:56 PM

New Member
*
Junior Member
24 posts

Joined: Sep 2006
From: Kuching, Sarawak


A quick question.. Which one is to be done first? Sealer to remove hairlines on walls then skim coat or the other way round?