 Renovation Secret & Tips Revealed, Secret&Tips contractor wont tell you

views
     
creativespikes
post Nov 21 2012, 10:20 PM

Getting Started
**
Junior Member
188 posts

Joined: Sep 2004
I also wan can u pm
monodevil
post Nov 21 2012, 11:18 PM

On my way
****
Junior Member
681 posts

Joined: Sep 2008


dear sifu TomJason..could u please pm me the secret formula too?

wanna do a minor reno to my apartment
1. full plaster ceiling with down light + fan + aircond
2. minor wall hacking + wiring

sorry sifu..just noted u had stop giving the formula..btw could u guide me about house renovation..totally noob here doh.gif

This post has been edited by monodevil: Nov 22 2012, 12:14 AM
madcow1
post Nov 21 2012, 11:26 PM

Getting Started
**
Junior Member
281 posts

Joined: May 2008
Can share for hacking the tiles and dismantle bathroom and reinstalling tiles/wares ? TQ
kyoshooo
post Nov 22 2012, 12:17 AM

Casual
***
Junior Member
382 posts

Joined: Jan 2003
Please PM me the calculation too. Thanks smile.gif
TStomjason
post Nov 22 2012, 08:07 AM

Enthusiast
*****
Senior Member
866 posts

Joined: Oct 2011
QUOTE(momiloco @ Nov 21 2012, 03:04 PM)
Hi Bro!

I am so impressed with Tomjason layan all the forumer.
Become a consultant without pay. And to layan all the poster asking for the secret formula even until today.

I am not doing major work, just basic work before moving to a new house, but i learnt a lot here.

Bravo bro!

P/s: TomJason stop giving out the secret formula long time ago already.
Hopefully some people read this.
*
hi bro,

TQ bro... biggrin.gif

now i m busy with my work..will layan selectively to forumer...since you have the effort to read all..i will feedback to you...please inform me by post or PM me what you want to know.


Added on November 22, 2012, 8:08 am
QUOTE(apissharif @ Nov 21 2012, 04:58 PM)
hi tomjason,

sorry i don't know that you've stopped giving the formula.
i'm start reading from page 1 and until page 13 then realized about that.

i want to know what is different between BRC A7 and Y12? i thought it is a same steel?
*
hi bro,


now i m busy with my work..will layan selectively to forumer...since you have the effort to read all..i will feedback to you...please inform me by post or PM me what you want to know.

BRC is net steel to lay for floor while Y12 is rebar bar or concrete bar for beam and pillar.


==============================================================================================
==============================================================================================


i m passion about reno..nowadays if i got free time, my favorite hang place (near to my house) are the big 3 hardware shop, ACE hardware (bukit jelutong) and Mr DIY (Space U8). whether i bought things,tools or just window shopping. biggrin.gif

i sorry cannot so active in lowyat nowadays cause very busy...


just to show my 4 months old outdoor water filter (my DIY) .... smile.gif ...this filter is good worth money can buy.not so expensive compare to others brand

Attached Image


=============================================================================================

just want to caution you all, this is article 28/10/2012...be careful to select contractor...

Attached Image

Attached Image








This post has been edited by tomjason: Nov 22 2012, 08:18 AM
icekelvin
post Dec 10 2012, 12:10 PM

Getting Started
**
Junior Member
138 posts

Joined: Aug 2008
Hi Tomjason,

i would like to extend my kicthen to my yard. Would you mind calculate the cost for me? to remove the door and frame all together, but the beam above the frame is not allow to be removed.Also to remove the tiles and retile 2' x 2' tile. The yard is 6' x 7'. Thank you. Please see attachment.

This post has been edited by icekelvin: Dec 12 2012, 01:09 PM


Attached thumbnail(s)
Attached Image
takashinzy
post Dec 10 2012, 09:16 PM

New Member
*
Junior Member
7 posts

Joined: Oct 2011
Hi can please PM me the formula too? tq very much..!

QUOTE(aspacothr @ Apr 13 2012, 06:06 PM)
Hi tomjason, can u also pm me the formula? Thnks in advance!
*
wannajmi
post Dec 11 2012, 09:27 AM

New Member
*
Newbie
4 posts

Joined: May 2008


Dear Bro Tomjason

Can I have the formula too ???

Thanks
chaitk
post Dec 11 2012, 01:50 PM

New Member
*
Newbie
1 posts

Joined: Dec 2012
Bro Tom Jason,

Planning my renovation soon. Can share the formula with me?
Many thanks!
icekelvin
post Dec 12 2012, 02:47 PM

Getting Started
**
Junior Member
138 posts

Joined: Aug 2008
QUOTE(icekelvin @ Dec 10 2012, 12:10 PM)
Hi Tomjason,

i would like to extend my kicthen to my yard. Would you mind calculate the cost for me? to remove the door and frame all together, but the beam above the frame is not allow to be removed.Also to remove the tiles and retile 2' x 2' tile. The yard is 6' x 7'. Thank you. Please see attachment.
*
Hi Tomjason,

I need help on this, please.
TStomjason
post Dec 12 2012, 02:57 PM

Enthusiast
*****
Senior Member
866 posts

Joined: Oct 2011
QUOTE(icekelvin @ Dec 12 2012, 02:47 PM)
Hi Tomjason,

I need help on this, please.
*
sorry bro, did not notice your post...


does your backyard now had roof or not?? and does your backyard has tile now??

TQ


icekelvin
post Dec 12 2012, 03:18 PM

Getting Started
**
Junior Member
138 posts

Joined: Aug 2008
QUOTE(tomjason @ Dec 12 2012, 02:57 PM)
sorry bro, did not notice your post...
does your backyard now had roof or not?? and does your backyard has tile now??

TQ
*
mine is condo. the yard has tiles need to be removed.

I need to install about 30feets cooper pipe which need to drill 2 holes, any idea how much this will cost me?

This post has been edited by icekelvin: Dec 12 2012, 03:38 PM
TStomjason
post Dec 12 2012, 04:08 PM

Enthusiast
*****
Senior Member
866 posts

Joined: Oct 2011
QUOTE(icekelvin @ Dec 12 2012, 03:18 PM)
mine is condo. the yard has tiles need to be removed.

I need to install about 30feets cooper pipe which need to drill 2 holes, any idea how much this will cost me?
*
PMed you already.


========================================================================

tip:

i notice many forumer had problem repairing the leaking roof. Actually the are reason why roof leaking and source of leaking and there are techniques to resolve the problem.

This post has been edited by tomjason: Dec 12 2012, 04:22 PM
fionfion
post Dec 13 2012, 02:12 PM

New Member
*
Newbie
1 posts

Joined: Sep 2012
Hi sifus, I plan to do some minor reno which include:

1) grills for whole house windows and main door,
2) cracks in the rooms. The previous owner said it crack because they did renovation last time.
3) table top
4) wiring to fix air con in study room
5) fence outside the house-both sides ( which material is good?)
6)water heater points
8) toilet door
8) painting for the whole house (20x70). is it include paints?
9) water leaking at 2 rooms.

may i know rough expenses for these minor reno? Thanks in advance!

smwah
post Dec 15 2012, 10:26 PM

Glad to be Here
Group Icon
Elite
1,701 posts

Joined: Jan 2003
From: Setia Alam


Hi TOM,

Need advice again. Ok, after measuring my vacant land, size is at 20 x 10.

Got contractor advice go for concrete piling and go for 5 points, 3 at the front and 2 at back. But he never mention the footing size and the depth for the piling.
I understand that concrete piling required some heavy machine to do the job and the cost could be high.
So any advice on the cost of concrete piling, it is 5 point of footing is too much or 4 will do. My intention is just simple single story extension never go for double.

Now my one side neighbour had done his extension, so meaning I will need to do the front and one side. What will be the estimate cost, if

1) One security door.
2) 4 panels aluminum window.
3) Laying floor tiles only.
4) Hack wall with door and window frame, size bout 8 x 7.
5) Standard roof tiles with standard ceiling.
6) one drainage for kichen sink and 2 paip points.

Thx
West Wing
post Dec 20 2012, 05:43 PM

Regular
******
Senior Member
1,397 posts

Joined: Jun 2008


Hi All Sifu,

I want to build a house on my land and the contractor quote me Rm1.2M and he told me that only the house and not even include piling and just today, he provided me with the piling quotation.

I want to ask Sifu here is the 7ins. Piling quotation below reasonable or not.

1. Mobilisation, installation and demobilisation og piling equipments Rm8,000
2. Setting out of piling points @ Rm8 x124= Rm744
3. 6m starter points @ Rm160x124= Rm19,840
4, 6 m extentiong points @Rm172x124=Rm21,328
5.Handle, transport and pich @Rm10x248=Rm2480
6.Driving of 175mmx175mm r.c piles Rm8x1488= Rm11904
7.Extention joints(bult weld) to piles Rm20x124= Rm2480
8.Cut off piles head Rm28x123= Rm3472
9.PDA test on 1st. Rm1750
10. PDA test on Subsequence Rm 1200

Total Rm68,240 and I am surprised and can someone here enlighten me on the above....

This post has been edited by West Wing: Dec 20 2012, 05:47 PM
sovietmah
post Dec 20 2012, 05:46 PM

Look at all my stars!!
*******
Senior Member
2,243 posts

Joined: Nov 2005
QUOTE(West Wing @ Dec 20 2012, 05:43 PM)
Hi All Sifu,

I want to build a house on my land and the contractor quote me Rm1.2M and he told me that only the house and not even include piling and just today, he provided me with the piling quotation.

I want to ask Sifu here is the Piling quotation below reasonable or not.

1. Mobilisation, installation and demobilisation og piling equipments Rm8,000
2. Setting out of piling points @ Rm8 x124= Rm744
3. 6m starter points @ Rm160x124= Rm19,840
4, 6 m  extentiong points @Rm172x124=Rm21,328
5.Handle, transport and pich @Rm10x248=Rm2480
6.Driving of 175mmx175mm r.c piles Rm8x1488= Rm11904
7.Extention joints(bult weld) to piles Rm20x124= Rm2480
8.Cut off piles head Rm28x123= Rm3472
9.PDA test on 1st.  Rm1750
10. PDA test on Subsequence  Rm 1200

Total Rm68,240 and I am surprised and can someone here enlighten me on the above....
*
RICHMAN!
ontrack builders
post Dec 20 2012, 11:15 PM

New Member
*
Junior Member
36 posts

Joined: Nov 2012


QUOTE(West Wing @ Dec 20 2012, 05:43 PM)
Hi All Sifu,

I want to build a house on my land and the contractor quote me Rm1.2M and he told me that only the house and not even include piling and just today, he provided me with the piling quotation.

I want to ask Sifu here is the 7ins. Piling quotation below reasonable or not.

1. Mobilisation, installation and demobilisation og piling equipments Rm8,000
2. Setting out of piling points @ Rm8 x124= Rm744
3. 6m starter points @ Rm160x124= Rm19,840
4, 6 m  extentiong points @Rm172x124=Rm21,328
5.Handle, transport and pich @Rm10x248=Rm2480
6.Driving of 175mmx175mm r.c piles Rm8x1488= Rm11904
7.Extention joints(bult weld) to piles Rm20x124= Rm2480
8.Cut off piles head Rm28x123= Rm3472
9.PDA test on 1st.  Rm1750
10. PDA test on Subsequence  Rm 1200

Total Rm68,240 and I am surprised and can someone here enlighten me on the above....
*
Do u really need 124 points for the piling works?? That is quite a huge amount.Initial pile and extension pile should have been of the same rate.However the price to supply the piles (175mm x 175mm) is quite cheap.Usually people would quote handle,transport,pitch and drive as a same rate.

Please ask your contractor whether this work will be remeasured as provisional quantity because if it is,then the amount of RM 68k isn't a fixed amount.

Cheers!
soyuzz
post Dec 21 2012, 09:11 PM

New Member
*
Junior Member
17 posts

Joined: Dec 2012
Hi tomjason...

I read this thread and found it very helpful..thank to u which is still loyal here and answer the almost all question with no interest..

Mind share the formula with me?..pls pm me..tq bro..
ah_yee
post Dec 21 2012, 09:57 PM

New Member
*
Junior Member
28 posts

Joined: Sep 2012
QUOTE(tomjason @ Feb 22 2012, 09:47 AM)
my previous post under topic 'good contractor'....

...i m new in lowyat....silap sikit..sorry...

about renovation..i had experienced for my house renovation...i had just completed my house renovation..this month.....big renovation...it took me one year to complete my house (slow and steady) after kena tipu...i do it from A to Z (until kitchen cabinet)...

the story like this...first quotation by my contractor was about RM75K (started 23/11/2010) but after took my money about RM60K (workmanship just 50% completed)..then tak boleh siap....2-3 minggu sekali dtg tgk project....i myselft yg monitor the project.....at last i completed my house renovation myself (i became my own contractor...smile.gif)...to be frank..i can claim myself contractor smile.gif...the money i lost i would considered a good lesson for me (bukan rezeki)...about the selok belok susah senang to complete my house...i do studied and research (from internet,tanya member, tanya contractor lain etc) quite a lot about renovation....now i have completed list off all contact person for renovation.

For renovation, if you want satisfaction (and budget pun cukup2 ....unless you are orang kaya2) , do not hire lump sum to one contractor but have a list of persons in specializing t in one thing example, tiling one specialist, ceiling another specialist..this is what i do...

i aslo tau mane mau cari barang contoh..kedai pintu mane bagus, kedai pintu toilet mane bagus..kedai jual sink , org wiring, org tile,air cond man.. dll....

my previsous contractor is Zakaria from Puchong HP 0123537084..soft spoken, big guy...give cheap quotation...be carefull with him..

if you all want my advised and contact person to do things for renovation...... do PM me...one more thing if want to do renovation, you must spare your own time to quality control or monitoring...

Added on February 17, 2012, 8:29 amFIRST LESSON to know....many thing i can share about construction...if you want to make renovation..at least you must know basis things..else your contrator will cheat you.......Fist lesson ....there are 2 types of steel iron for construction..i believe 99% do not know this..only contractor know...

First type is BS type of steel iron for concrete...BS means British Standard. Second is CQ type. If you go to hardware shop selling construction material.. normally they will ask..BS or CQ...if you want to know what is CQ stand for...do ask me..smile.gif...

1.the differences between BS and CQ is the quality and percentage of pure iron inside...the BS steel iron is so hard..compare to CQ (CQ steel iron is a bit 'lembik' and BS steel iron is bigger size...if you want your house stronger and lasting and do not want to crack beam later after a few years....then.....insisted your contractor to use BS steel iron...i m sure they will surprise when you mention BS and CQ...the price of BS steel is higher about RM4-RM5 per pieces. That why contractor do not want to use BS..they want to lower the price with lower quality of steel.

2. I can know by looking at the steel whether it is BS or CQ and what size the steel iron....there are many size of steel iron the lowest and smallest is size 8. There are sizes 8,10,12,16..etc....Make sure for beam and foundation..at least use size 12...do not used size 10...some contractor used size 10...later many years your house will crack..

i share to you all many things that i learn...later....if i m free...

secondly...for foundation of pillar...make sure the hole they dig at spec level...for single storey house...min hole size for pillar foundation is size 3X3 feets...deep about min 3 feets...if your house is use to be swap area like puchong etc...ensure the 'tanam' 'kayu bakau' 5 batang...that why you see some house after few years ...crack here and there...the contractor want to safe money...for double stroey house..the foundation size is at least 5X5 feets...deep about 5 feets...for double storey house..ensure 'tanam kayu bakau'....
if some body want to know mane kedai lampu dan fan murah...go to puchong kedai corner sebelah tesco..nama kedai is TEN TEN...for electrical shop yg murah is at Bandar baru sg buloh..cheaper eg..i bought new freege and air cond.....RM 200 cheaper..
Added on February 17, 2012, 2:57 pmjust to share...actually most contractor use formula to calculate the estimation of you renovation..else..how can they can give quotation between 2,3 days...if somebody want to know the formula..do PM me..

TQ..
after the selection of the steel iron, observe also for the sand type they use...the best sand for renovation is from 'mine/lombong'..usually the mine sand is white in color....the.....second is from river..or we call pasir sungai....normally river sand in yellowish or redish in color.....for pasir sungai or river sand..make sure that the river sand is 'wash' type...else....there is mud inside the sand..causing your concrete not strong enough....
for brick selection....if you got budget..use red brick 'tanah merah'....this brick is good and strong..it also..make your house cooler..compared to sand brick....for sand brick..the price..last time is about 0.23 sen ...else..the red brick is about 0.37 sen..price already gone up...for the red brick..the fully bake brick is good...how to recognized this brick?...there is some black color or line on the brick...
about the price to calculate the price is simple..so that when you want to make renovation..you can know the range price....afraid to share openly...afraid there is contractor here...cannot cari makan...what techmc mention is right....but actually/generally contractor has one figure for calculation for all the works.....when quote the initial price..they dont break the price....they give lump sum price...do PM if you want to know..
*
Hey, bro Tomjason, can u pm me ur own formula to estimate to renovation cost. I m interested bcoz I will goin to renovate my new hse after CNY. Thanks in advance.