Investment DAMANSARA FORESTA, A new development near Desa ParkCity
|
GangHo
|
May 5 2014, 04:17 PM
|
|
QUOTE(fongozic @ May 4 2014, 01:06 PM) In snp they mention that owner can request to some simple wall change during the constriction when need to your floor, mean certain wall we can amend abit ? Serious? Let me check. If you could specify which clause, that would be even better.
|
|
|
|
|
|
eddychstu
|
May 5 2014, 04:40 PM
|
|
If you refer to the showroom they build (1426 sqft), they sort of remove the wall + door of the smaller room and make it a secondary living space.
Probably that's what you can request to customize.
|
|
|
|
|
|
fongozic
|
May 6 2014, 07:35 AM
|
|
Currently oversea , will send when I back . Ya my wife saw it ... Or if anyone found pls share out
|
|
|
|
|
|
GangHo
|
May 6 2014, 09:37 AM
|
|
QUOTE(GangHo @ May 5 2014, 05:17 PM) Serious? Let me check. If you could specify which clause, that would be even better. Have a quick browsing yesterday night. The contract states that if you wish to make any amendment, you have to inform the developer and the developer will charge you according to what you need to change if there is any extra cost. However, it is subjected to the approved building plan. I have also checked my VP condition. Contract signed on Feb 2013. VP would be 42 months from the contract signing date which means the developer handing over date would be Aug 2016. This is according to Contract. However, I believe they should be able to handover earlier than this date. This post has been edited by GangHo: May 6 2014, 09:39 AM
|
|
|
|
|
|
cheahcw2003
|
May 11 2014, 08:54 PM
|
|
QUOTE(GangHo @ May 6 2014, 09:37 AM) I have also checked my VP condition. Contract signed on Feb 2013. VP would be 42 months from the contract signing date which means the developer handing over date would be Aug 2016. This is according to Contract. However, I believe they should be able to handover earlier than this date. My SPA was signed on Jun 2012 (Block A). 42 months construction time means Block A should be VP by Dec 2015. If the developer deliver in 2016, means got LAD. All blocks should be Vp at the same time, because all sharing the same common facilities, entrance, car park, swimming pool, gym (which is in between Block B+C).
|
|
|
|
|
|
CMW123
|
May 11 2014, 10:28 PM
|
|
SA said expected vp is dec 2015, provided no delay
|
|
|
|
|
|
fongozic
|
May 12 2014, 08:56 AM
|
|
dec is what mention since 1st day.. but i dont think it will be on time... hopefully before 2016 CNY
|
|
|
|
|
|
GangHo
|
May 12 2014, 04:12 PM
|
|
QUOTE(cheahcw2003 @ May 11 2014, 09:54 PM) My SPA was signed on Jun 2012 (Block A). 42 months construction time means Block A should be VP by Dec 2015. If the developer deliver in 2016, means got LAD. All blocks should be Vp at the same time, because all sharing the same common facilities, entrance, car park, swimming pool, gym (which is in between Block B+C). Anybody signed the S&P earlier than June 2012?
|
|
|
|
|
|
cheahcw2003
|
May 12 2014, 04:24 PM
|
|
QUOTE(tangent88 @ May 12 2014, 10:30 AM) Congrats to blk A owner. It seem structure is almost complete. They hav stop increase the tower crane height. Luckily under DIBS, otherwise Block A purchasers need to pay longer and higher progressive interest
|
|
|
|
|
|
CMW123
|
May 12 2014, 05:47 PM
|
|
QUOTE(tangent88 @ May 12 2014, 10:30 AM) Congrats to blk A owner. It seem structure is almost complete. They hav stop increase the tower crane height.
From the first picture if block A has reach top floor, looks like no units will be higher than the hill...is that assumption correct?
|
|
|
|
|
|
GangHo
|
May 12 2014, 06:10 PM
|
|
QUOTE(CMW123 @ May 12 2014, 06:47 PM) From the first picture if block A has reach top floor, looks like no units will be higher than the hill...is that assumption correct? yes, it has been calculated last time. One member also did a wonderful simulation. Check back the old treads and you will be able to find it.
|
|
|
|
|
|
calvinyeap
|
May 12 2014, 06:19 PM
|
Getting Started

|
QUOTE(GangHo @ May 12 2014, 04:12 PM) Anybody signed the S&P earlier than June 2012? I'm also Block A buyer, bought my unit on the day they launch, I sign the s&p much earlier jus that the s&p is dated June... I doubt there would be any earlier date...
|
|
|
|
|
|
cheahcw2003
|
May 12 2014, 07:13 PM
|
|
QUOTE(calvinyeap @ May 12 2014, 06:19 PM) I'm also Block A buyer, bought my unit on the day they launch, I sign the s&p much earlier jus that the s&p is dated June... I doubt there would be any earlier date... Yeah same here, i signed in Apr 2012 but only stamped in June 28 2012.
|
|
|
|
|
|
tangent88
|
May 12 2014, 08:02 PM
|
|
QUOTE(cheahcw2003 @ May 12 2014, 04:24 PM) Luckily under DIBS, otherwise Block A purchasers need to pay longer and higher progressive interest Yap, without DIBS will hav to serve interest for 2yrs 2014-2016. Damn jailat.
|
|
|
|
|
|
fongozic
|
May 14 2014, 12:02 PM
|
|
mean block a will VP 1st ? block C still very low.. how about the comment area and pool famicilites? will follow block A or C?
|
|
|
|
|
|
GangHo
|
May 14 2014, 12:46 PM
|
|
QUOTE(fongozic @ May 14 2014, 01:02 PM) mean block a will VP 1st ? block C still very low.. how about the comment area and pool famicilites? will follow block A or C? It all depending on the performance of the contractor. Based on the contract with the buyer, they need to put priority in all of the contractual items. The podium construction could be a critical item to be completed for block A and when it is completed it could be cordoned off so that works at block C could be continue. By that time, works at block C should be completed substantially leaving maybe the touching up, minor installation testing & commissioning and etc.
|
|
|
|
|
|
CMW123
|
May 14 2014, 06:48 PM
|
|
My SPA for block B was dated n stamped in July 2012 so 42 months will be due in jan 2016
|
|
|
|
|
|
cheahcw2003
|
May 14 2014, 09:39 PM
|
|
QUOTE(GangHo @ May 14 2014, 12:46 PM) It all depending on the performance of the contractor. Based on the contract with the buyer, they need to put priority in all of the contractual items. The podium construction could be a critical item to be completed for block A and when it is completed it could be cordoned off so that works at block C could be continue. By that time, works at block C should be completed substantially leaving maybe the touching up, minor installation testing & commissioning and etc. Block A and B launched within the same week/month. Podium are all shared, The Gym is bridging the Block B and C, so Block C need to be completed before the handover of Block A.
|
|
|
|
|