Outline ·
[ Standard ] ·
Linear+
Amara Service Residence V2, by Jaya Megah
|
hey_there
|
Mar 29 2015, 01:56 PM
|
|
QUOTE(rachel_xxx @ Mar 29 2015, 07:38 AM) Give and take lo, how much you can get for amara with 2cp? The amount you save can be used to rent extra cp or even buy another car. No? Have experienced in renting a few places with parkng issue. Rental in open for draw every 6 months. U lucky u'll get. I'm ok with buying another parking lot. But don't think they have any extra for sale.
|
|
|
|
|
|
Levin92
|
Mar 31 2015, 11:16 PM
|
Getting Started

|
QUOTE(hey_there @ Mar 28 2015, 01:55 AM) What about defects like this? Is the developer going to fix it?  I am planning to buy one unit for own stay and I doubt for awhile after looking at the defects especially this one. Is that an issue or am I worrying too much? Sorry for my paranoid as this is my first property and I plan to stay there for long. Omg.. this is which part of the building?
|
|
|
|
|
|
hey_there
|
Apr 1 2015, 12:36 AM
|
|
QUOTE(Levin92 @ Mar 31 2015, 11:16 PM) Omg.. this is which part of the building? I'm not sure. Got this pic from amara' fb page. There r more defects pic but I think this is the scariest This post has been edited by hey_there: Apr 1 2015, 12:36 AM
|
|
|
|
|
|
brensek
|
Apr 1 2015, 06:27 AM
|
|
QUOTE(hey_there @ Mar 28 2015, 01:55 AM) What about defects like this? Is the developer going to fix it?  I am planning to buy one unit for own stay and I doubt for awhile after looking at the defects especially this one. Is that an issue or am I worrying too much? Sorry for my paranoid as this is my first property and I plan to stay there for long. this 1 susah ready.. consider the main core outer building... the best way is do building demolition, then start new construction again
|
|
|
|
|
|
kochin
|
Apr 1 2015, 08:14 AM
|
|
QUOTE(brensek @ Apr 1 2015, 06:27 AM) this 1 susah ready.. consider the main core outer building... the best way is do building demolition, then start new construction again  it's obvious that you are no building expert. while i agree that it is indeed extremely poor workmanship and causes a concern on safety, nevertheless, it is actually quite easy to 'conceal' it. just some scaffolding and plastering with wire mesh ought to do the trick to give it back a straight vertical line. it's the column integrity and ability to transfer the loads effectively and safely from the top to the foundation which is more alarming. cheers!
|
|
|
|
|
|
brensek
|
Apr 1 2015, 08:46 AM
|
|
QUOTE(kochin @ Apr 1 2015, 08:14 AM) it's obvious that you are no building expert. while i agree that it is indeed extremely poor workmanship and causes a concern on safety, nevertheless, it is actually quite easy to 'conceal' it. just some scaffolding and plastering with wire mesh ought to do the trick to give it back a straight vertical line. it's the column integrity and ability to transfer the loads effectively and safely from the top to the foundation which is more alarming. cheers! I know..I just jocking only ...dont be serious in the early morning latter cepat tua....keep smiling
|
|
|
|
|
|
hey_there
|
Apr 1 2015, 11:10 AM
|
|
I don't know anything about construction la. But my logic tells me the put in more bricks around it or make a few more vertical beams to support incase it collapse. But it might look ugly but that's ok. As long as it's safe
|
|
|
|
|
|
satellitegadget
|
Apr 1 2015, 12:34 PM
|
Getting Started

|
QUOTE(brensek @ Apr 1 2015, 06:27 AM) this 1 susah ready.. consider the main core outer building... the best way is do building demolition, then start new construction again  This is the Fennel design
|
|
|
|
|
|
WannaGetBuffed
|
Apr 1 2015, 04:02 PM
|
|
QUOTE(satellitegadget @ Apr 1 2015, 12:34 PM) This is the Fennel design  this one should win more awards than fennel. #sarcasm on second thought, can vote this developer to be the most paria for year 2015. ethics close to none. at least MCT also not so bad offer discounted price on the spot rather than offer stupid 50% and 70% LAD.
|
|
|
|
|
|
hey_there
|
Apr 2 2015, 03:19 AM
|
|
QUOTE(WannaGetBuffed @ Apr 1 2015, 04:02 PM) this one should win more awards than fennel. #sarcasm on second thought, can vote this developer to be the most paria for year 2015. ethics close to none. at least MCT also not so bad offer discounted price on the spot rather than offer stupid 50% and 70% LAD. Are u one of the owner? I heard that owners are having issue with LAD
|
|
|
|
|
|
Veron83
|
Apr 5 2015, 03:31 AM
|
|
my 857sf for sales...PM me... thanks...
|
|
|
|
|
|
SilverSpoon
|
Apr 6 2015, 12:26 AM
|
|
Any owner moved in yet? Does the YTL cement packing plant is a concern to you? I mean safety wise.
|
|
|
|
|
|
laubh
|
Apr 6 2015, 03:51 PM
|
New Member
|
Anyone know does Amara got Internet coverage eg: UNIFI or Maxis HomeFibre?
|
|
|
|
|
|
boyboy3663
|
Apr 7 2015, 03:06 PM
|
Getting Started

|
QUOTE(SilverSpoon @ Apr 6 2015, 12:26 AM) Any owner moved in yet? Does the YTL cement packing plant is a concern to you? I mean safety wise. I just move in last Saturday so far ok la but need pay extra alert if take lift from parking to house alone it's really quiet at night, day time should be ok coz still ppl doing reno I have walk from amara to ktm and there's ppl walking from raintree there, if manage to back before 8.30pm then still ok. a lot car moving in and out along roadside also, should be no problem
|
|
|
|
|
|
shyhhua
|
Apr 7 2015, 06:16 PM
|
Getting Started

|
What about the traffic condition in and out along the road during weekday peak period?
|
|
|
|
|
|
mayleou
|
Apr 7 2015, 07:01 PM
|
Getting Started

|
Hi, anyone knows who to contact regarding LAD claim? I have not heard anything from developer regarding my LAD.
Thank you in advance.
This post has been edited by mayleou: Apr 7 2015, 07:04 PM
|
|
|
|
|
|
boyboy3663
|
Apr 8 2015, 09:49 AM
|
Getting Started

|
QUOTE(shyhhua @ Apr 7 2015, 06:16 PM) What about the traffic condition in and out along the road during weekday peak period? I have drive once from amara and take mrr2 to wangsa maju at 7.20am and it only takes me 20min++ to reach
|
|
|
|
|
|
shyhhua
|
Apr 8 2015, 01:42 PM
|
Getting Started

|
QUOTE(mayleou @ Apr 7 2015, 07:01 PM) Hi, anyone knows who to contact regarding LAD claim? I have not heard anything from developer regarding my LAD. Thank you in advance. You may call to JM office 03-7788 2228, look for Mr. Wong and ask for the update.
|
|
|
|
|
|
shyhhua
|
Apr 8 2015, 01:50 PM
|
Getting Started

|
QUOTE(boyboy3663 @ Apr 8 2015, 09:49 AM) I have drive once from amara and take mrr2 to wangsa maju at 7.20am and it only takes me 20min++ to reach 20 mins is not bad.. even now i check on google map also need 18 minutes to travel from Amara to Alpha Angle Wangsa Maju.
|
|
|
|
|