Outline ·
[ Standard ] ·
Linear+
Mirage By The Lake, Cyberjaya, By OSK
|
Mandm66
|
Mar 18 2015, 09:24 PM
|
New Member
|
QUOTE(gnonairda @ Mar 18 2015, 05:17 PM) The management guys told me MBTL will be under TIMES as all the core fiber cable was lay by them and there will be no UNIFI. But when I went to the management office, I can see them using UNIFI.  I got reply call from Time.com after dropping email to them. Mirage is fiber optic ready. For those who are interested, get the form from management office, fill in and submit to Time.com. Check it out from Time.com, you have the option for 100Mps for RM 179 per month (** cap at 100GB). The fastest speed in areas by Unify backbone is only at 30Mps. Mirage is really more cyber-ed. Btw, i think management office uses streamyx which dials up from telephone port.
|
|
|
|
|
|
max_cavalera
|
Mar 19 2015, 07:56 AM
|
|
Wow time masuk fibre, tm cannot use?
Maxis leech tm backbone fibre...so kalau tm xboleh maxis confirm xboleh
|
|
|
|
|
|
blowwater101
|
Mar 19 2015, 12:16 PM
|
|
anyone know how is the occupancy rate of the condo ? when I pass by, I saw around 10units got lights on only....
|
|
|
|
|
|
chloelingeelin
|
Apr 8 2015, 07:21 AM
|
Getting Started

|
hi all owners, anybody wish to rent out your car park? just one car park will do. Need a car park near block A5. Please contact me asap, will pay you 6 months in advance. 016-3236825
|
|
|
|
|
|
Frytsz
|
Apr 10 2015, 12:18 PM
|
New Member
|
Hi All,
should we have facebook page for the owners? I'm looking for a squash sparring partner. haha
|
|
|
|
|
|
gnonairda
|
Apr 10 2015, 05:24 PM
|
New Member
|
QUOTE(chloelingeelin @ Apr 8 2015, 07:21 AM) hi all owners, anybody wish to rent out your car park? just one car park will do. Need a car park near block A5. Please contact me asap, will pay you 6 months in advance. 016-3236825 Is the carpark in the Basement ready? It was flooded the last round due to some pipe leakage. I also heard that MBTL management is looking to reshuffle all the parking space initially located to the owners.
|
|
|
|
|
|
chloelingeelin
|
Apr 11 2015, 02:30 PM
|
Getting Started

|
QUOTE(Frytsz @ Apr 10 2015, 12:18 PM) Hi All, should we have facebook page for the owners? I'm looking for a squash sparring partner. haha Ya we should, i have another property which has a closed group for all the owners to discuss/ask/share information which i think it's very informative and helpful
|
|
|
|
|
|
shisham
|
Apr 11 2015, 11:33 PM
|
New Member
|
Doesn't look good.. QUOTE(sc@pj @ Apr 11 2015, 07:39 PM) Heavy rain today, extremely strong wind n thunder! Rain water seeped thru the sliding doors.. flooding the floor. Lift lobby flooded to. .Water running into lift shaft. .
|
|
|
|
|
|
shisham
|
Apr 11 2015, 11:45 PM
|
New Member
|
I'm still struggling with hairline cracks within the 2nd room of my unit.. quite surpirse that no other unit experiencing the same.. is it..?? at least, this what been told by the project team.. everytime they hack and re-do skimming and painting - the crack will be visible again after few days.. tired waiting.. and did anyone know that Setiakon is using cement bricks for the outer wall..?? is this a common thing for high-rise building..?? seperately - still working for the design on the unit.. did anyone move the A/C to differenct location..?? referring to master bedroom and 2nd bedroom.. Thanks..
|
|
|
|
|
|
sc@pj
|
Apr 13 2015, 05:06 PM
|
Getting Started

|
Anyone with Unit facing the lake want to install glass panel with window at utility area near kitchen? Cost RM1,300 (full glass from floor to ceiling plus double leaf window, tinted). Mine will be installed in two weeks time. Maybe can get cheaper if got more orders :-)
|
|
|
|
|
|
sc@pj
|
Apr 13 2015, 05:11 PM
|
Getting Started

|
QUOTE(shisham @ Apr 11 2015, 11:45 PM) I'm still struggling with hairline cracks within the 2nd room of my unit.. quite surpirse that no other unit experiencing the same.. is it..?? at least, this what been told by the project team.. everytime they hack and re-do skimming and painting - the crack will be visible again after few days.. tired waiting.. and did anyone know that Setiakon is using cement bricks for the outer wall..?? is this a common thing for high-rise building..?? seperately - still working for the design on the unit.. did anyone move the A/C to differenct location..?? referring to master bedroom and 2nd bedroom.. Thanks.. Hmmm. my unit doesn't has much repair works actually. But now the AC is giving problem. DO you know that there are two compressors with 5 blowers (3 rooms, 2 in living). The monster compressor with 3 blowers always giving problem, sometime 1 blower blowing only air. In future if any of these compressors break down, all respective blowers cannot be used. Don't know why the developer chose this kind equipment
|
|
|
|
|
|
angrysnail
|
Apr 13 2015, 06:34 PM
|
|
QUOTE(sc@pj @ Apr 13 2015, 05:11 PM) Hmmm. my unit doesn't has much repair works actually. But now the AC is giving problem. DO you know that there are two compressors with 5 blowers (3 rooms, 2 in living). The monster compressor with 3 blowers always giving problem, sometime 1 blower blowing only air. In future if any of these compressors break down, all respective blowers cannot be used. Don't know why the developer chose this kind equipment  May i know what brand of your A/C they provided?
|
|
|
|
|
|
sc@pj
|
Apr 13 2015, 07:10 PM
|
Getting Started

|
QUOTE(angrysnail @ Apr 13 2015, 06:34 PM) May i know what brand of your A/C they provided? They using YORK brand.
|
|
|
|
|
|
angrysnail
|
Apr 13 2015, 08:21 PM
|
|
QUOTE(sc@pj @ Apr 13 2015, 07:10 PM) ok then,i bet that will be the same brand they use for the pangaea project as well..
|
|
|
|
|
|
shisham
|
Apr 16 2015, 08:02 PM
|
New Member
|
QUOTE(sc@pj @ Apr 13 2015, 05:11 PM) Hmmm. my unit doesn't has much repair works actually. But now the AC is giving problem. DO you know that there are two compressors with 5 blowers (3 rooms, 2 in living). The monster compressor with 3 blowers always giving problem, sometime 1 blower blowing only air. In future if any of these compressors break down, all respective blowers cannot be used. Don't know why the developer chose this kind equipment  Yes - only 2 compressor for 4 units of A/C for my unit. It's kinda crazy.. I have not tried to crank up the A/C to max yet.. Something i might try tomorrow when having that joint site inspection.. Yet again..
|
|
|
|
|
|
shisham
|
Apr 16 2015, 08:02 PM
|
New Member
|
QUOTE(sc@pj @ Apr 13 2015, 05:11 PM) Hmmm. my unit doesn't has much repair works actually. But now the AC is giving problem. DO you know that there are two compressors with 5 blowers (3 rooms, 2 in living). The monster compressor with 3 blowers always giving problem, sometime 1 blower blowing only air. In future if any of these compressors break down, all respective blowers cannot be used. Don't know why the developer chose this kind equipment  Yes - only 2 compressor for 4 units of A/C for my unit. It's kinda crazy.. I have not tried to crank up the A/C to max yet.. Something i might try tomorrow when having that joint site inspection.. Yet again..
|
|
|
|
|
|
Miwqa
|
Apr 19 2015, 09:32 PM
|
New Member
|
Does anyone know when is phase 2 completiom date? Early this month they said in 2 months time.
|
|
|
|
|
|
shisham
|
Apr 28 2015, 04:56 PM
|
New Member
|
QUOTE(Miwqa @ Apr 19 2015, 09:32 PM) Does anyone know when is phase 2 completiom date? Early this month they said in 2 months time. said to be in June..
|
|
|
|
|
|
Latio
|
Apr 28 2015, 05:21 PM
|
|
how is the latest occupacy rate in MBTL now?
|
|
|
|
|