Crystal2
post Dec 13 2011, 12:39 PM

Casual
***
Junior Member
450 posts

Joined: Mar 2011
QUOTE(106127 @ Dec 12 2011, 11:46 PM)
Bx-17-xx means 18 storey as the ground floor is G
*
Ya loh, silly me. Thanks for pointing out my mistakes - owe you a teh tarik.

I am now staying in an apartment complex of which its ground floor units start at A-1-xx or B-1-xx and I thought all along (until now) that 1120 PA has the same naming convention. Well, like they always said, it is never too late to learn.

Personally, I am still quite confident that the Phase 1 will complete as scheduled provided those pesky squatters don't cause further problems. One more floor adds another 2 weeks to the construction time in my computation. Luckily for us it is DIBS - we don't bear the bank interests during construction and can still claim for LAD for delay in VP - the only major setback is the opportunity loss in having to continue renting the present abode or not getting rental income if owned.

This post has been edited by Crystal2: Dec 13 2011, 12:51 PM
0106127
post Dec 13 2011, 08:29 PM

Enthusiast
*****
Senior Member
864 posts

Joined: Apr 2006
QUOTE(Crystal2 @ Dec 13 2011, 12:39 PM)
Ya loh, silly me. Thanks for pointing out my mistakes - owe you a teh tarik.

I am now staying in an apartment complex of which its ground floor units start at A-1-xx or B-1-xx and I thought all along (until now) that 1120 PA has the same naming convention. Well, like they always said, it is never too late to learn.

Personally, I am still quite confident that the Phase 1 will complete as scheduled provided those pesky squatters don't cause further problems. One more floor adds another 2 weeks to the construction time in my computation. Luckily for us it is DIBS - we don't bear the bank interests during construction and can still claim for LAD for delay in VP - the only major setback is the opportunity loss in having to continue renting the present abode or not getting rental income if owned.
*
phase 1 should ready in time. my only worry is the final approval from relevant authority.it takes time and "connection"
and phase 1 and 2 is develop as 1 single project. will be possible that approval are granted when the whole project is completed. and for 1120 if not mistaken some units only starts from 2/3 floor as there is some amenities located on ground floor.

this project is DIBS and we can claim for LAD, but its not worth it. Its better to get VP ASAP than to claim LAD n DIBS. furthermore there is 7.5% rebate for 18 months after VP.
Crystal2
post Dec 18 2011, 05:52 PM

Casual
***
Junior Member
450 posts

Joined: Mar 2011
I drove past 1120 PA (on the way to check out the River Ville site) and peeped in through the gate at Damai Senja Apartments. If I were not mistaken, the construction of Block B9 is only at the 1st floor. With less than 13 months to go for Phase 2, I am doubtful that Phase 2 as a whole can be completed on time. I hope the developer will hand over vacant possession based on the phases rather than as a whole project so that I can shift into my unit earlier.

By the way, with regard to the yet-to-be launched River Ville, I am not impressed with its location at all. 1120 PA is so much better.
0106127
post Dec 18 2011, 11:52 PM

Enthusiast
*****
Senior Member
864 posts

Joined: Apr 2006
QUOTE(Crystal2 @ Dec 18 2011, 05:52 PM)
I drove past 1120 PA (on the way to check out the River Ville site) and peeped in through the gate at Damai Senja Apartments. If I were not mistaken, the construction of Block B9 is only at the 1st floor. With less than 13 months to go for Phase 2, I am doubtful that Phase 2 as a whole can be completed on time. I hope the developer will hand over vacant possession based on the phases rather than as a whole project so that I can shift into my unit earlier.

By the way, with regard to the yet-to-be launched River Ville, I am not impressed with its location at all. 1120 PA is so much better.
*
yup 1120 location is much better.
HUJIUNEN
post Dec 28 2011, 06:38 PM

Getting Started
**
Junior Member
93 posts

Joined: Oct 2010


yalo. by the way, i heard the b5 is faster 13 floor if compare with b9. how peter will handing over the key since the progress is too much differ
3m3
post Dec 29 2011, 10:36 AM

New Member
*
Junior Member
6 posts

Joined: Aug 2011



How bout other block?B9 is constructed till which floor?


QUOTE(HUJIUNEN @ Dec 28 2011, 06:38 PM)
yalo. by the way, i heard the b5 is faster 13 floor if compare with b9. how peter will handing over the key since the progress is too much differ
*
lamode
post Dec 29 2011, 02:05 PM

anything could happen!
*******
Senior Member
3,904 posts

Joined: Jul 2007
QUOTE(3m3 @ Dec 29 2011, 10:36 AM)
How bout other block?B9 is constructed till which floor?
*
+1

any sifu can advice on this? unsure.gif
hornbill_78
post Dec 29 2011, 02:28 PM

Regular
******
Senior Member
1,145 posts

Joined: Jun 2011
everyday i drive pass thru the project side so far the progress is very fast i think one month they can finish up to 3 floor..



This post has been edited by hornbill_78: Dec 29 2011, 02:29 PM
NEO.rage
post Jan 3 2012, 12:26 PM

I got Unifi. Do you?
*****
Senior Member
798 posts

Joined: Jan 2003
From: Cheras <-> Bangsar


QUOTE(hornbill_78 @ Dec 29 2011, 02:28 PM)
everyday i drive pass thru the project side so far the progress is very fast i think one month they can finish up to 3 floor..
*
take some pics laa.... tongue.gif
ArticFir3
post Jan 5 2012, 09:32 AM

Getting Started
**
Junior Member
203 posts

Joined: Jan 2008
From: Shah Alam



Yeah, some picture would be nice. Occasionally I go there during weekends too.....purposely take NPE road back tongue.gif
Befair
post Jan 7 2012, 10:27 AM

New Member
*
Junior Member
17 posts

Joined: Nov 2010


Vincemy, are you still there? I love the pictures you posted in V1 edition of this forum. They were beautifully captured from different angles and and gave true indication of the latest situation. Some of your shots were from the nearby high buildings and they were truely great. If possible, give us one more round of the latest pictures.

Thank you in advance.
alittleboy
post Jan 7 2012, 01:05 PM

New Member
*
Junior Member
10 posts

Joined: Aug 2005
Deleted

This post has been edited by alittleboy: Jul 16 2013, 06:44 PM
douchbag
post Jan 8 2012, 09:18 PM

New Member
*
Junior Member
17 posts

Joined: Mar 2010
Today's shot taken from in front of B9.

Attached Image
spiinl
post Jan 9 2012, 09:22 AM

Getting Started
**
Junior Member
101 posts

Joined: Oct 2011
Nice pano
QUOTE(douchbag @ Jan 8 2012, 09:18 PM)
Today's shot taken from in front of B9.

Attached Image
*
HUJIUNEN
post Jan 11 2012, 06:29 PM

Getting Started
**
Junior Member
93 posts

Joined: Oct 2010


the progress for this 5 block seem a lot of differ. start worried how the cf distibuted. block by block or phase by phase.
NEO.rage
post Jan 13 2012, 10:47 AM

I got Unifi. Do you?
*****
Senior Member
798 posts

Joined: Jan 2003
From: Cheras <-> Bangsar


QUOTE(douchbag @ Jan 8 2012, 09:18 PM)
Today's shot taken from in front of B9.

Attached Image
*
WoW~ thumbup.gif

the highest block is how many floor completed already? looks like almost 18~20th?
douchbag
post Jan 24 2012, 07:10 PM

New Member
*
Junior Member
17 posts

Joined: Mar 2010
QUOTE(NEO.rage @ Jan 13 2012, 10:47 AM)
WoW~  thumbup.gif

the highest block is how many floor completed already? looks like almost 18~20th?
Tower 2 is at 9th floor. Not sure about Tower 3 but it's definitely the highest right now.

TeannaLim
post Jan 27 2012, 03:05 PM

Getting Started
**
Junior Member
102 posts

Joined: Jun 2011
G. Vinod of FMT reports today: ‘Give us houses as promised’ , see the weblink: http://www.freemalaysiatoday.com/2012/01/2...es-as-promised/

Yesterday, I passed by the site at Jalan PJS 1/52 and saw a row of houses (which look like squatters ) made of hollow cement sand bricks being built on the empty land between the Senja Apartments and the Chinese School. I hope the authorities will act fast before the squatters again seek compensation (read, extortion) in future when asked to vacate. Sometimes I do pity the land owners who are held ransom by these squatters.


ArticFir3
post Jan 27 2012, 03:13 PM

Getting Started
**
Junior Member
203 posts

Joined: Jan 2008
From: Shah Alam



Reading the article, I felt that the squatters are demanding way more than what they should. In the first place, they're just squatters. They don't pay tax, they squat on other people's land (pun intended), and now they're asking for things as if the whole world is doing something wrong towards them.

Sorry, just felt like ranting.....
lamode
post Jan 30 2012, 10:14 AM

anything could happen!
*******
Senior Member
3,904 posts

Joined: Jul 2007
QUOTE(ArticFir3 @ Jan 27 2012, 03:13 PM)
Reading the article, I felt that the squatters are demanding way more than what they should. In the first place, they're just squatters. They don't pay tax, they squat on other people's land (pun intended), and now they're asking for things as if the whole world is doing something wrong towards them.

Sorry, just felt like ranting.....
*
they have the media attention, wat to do doh.gif