QUOTE(0106127 @ Dec 11 2011, 08:22 PM)
dont forget that the final approval will take 3-6months after completion of construction.
Let us do some speculations and maths (maybe over simplified):
Each block have 17 floors, and Block B1 is at 9th floor, Block B3 at 7th floor and Block B5 at 11th floor. If the current speed is about 2 floors every month and remains constant, then the slower Block B3 should complete construction of the remaining 10 floors within 5 months ie by end May 2012. If you allow 2 weeks each for Chinese New Year and Hari Raya holidays, 2 weeks for raining seasons, 2 months for the remaining internal work (such as elevator, plastering, wiring, plumbing, painting and other M&E), we will still have 4 months to spare for CF inspection up to end Dec 2012. If you look at the pictures closely you may notice that a few internal walls were already plastered. Some work such as landscaping, road access, guard house, surau, etc can be done simultaneously. Barely enough time, but Phase 1 should be deliverable by end December 2012 or January 2013 - fingers crossed.
I daren't speculate on Blocks B5 & B7 - the developer will need to speed up for these 2 blocks if all are to deliver around the same time. The squatters really screwed up the momentum.