QUOTE(ssmui @ Jan 26 2024, 12:36 AM)
BUTTERWORTH: Work to fix the clamps to repair the leak in the 1,350-millimetre (mm) underwater pipe in Sungai Perai here is expected to be completed by 4 pm today, said Chief Minister Chow Kon Yeow.
This is despite the difficulties faced by the divers, who have to deal with the strong current at the bottom of the river.
https://thesun.my/local_news/chow-work-to-c...oday-IB12029346
Keyword: expectedThis is despite the difficulties faced by the divers, who have to deal with the strong current at the bottom of the river.
https://thesun.my/local_news/chow-work-to-c...oday-IB12029346
There was heavy rain & the fact that the leakage occurs below the river water surface complicated things by leaps.
This post has been edited by talexeh: Jan 26 2024, 12:47 AM
Jan 26 2024, 12:46 AM

Quote



0.0222sec
0.57
6 queries
GZIP Disabled