Penang water pipe burst again!, Pls dun come to Pg for this weekend?
|
LazadaGot
|
Jan 24 2024, 04:22 PM
|
New Member
|
Latest update from PBAPP facebook: Friday / Saturday will have water, Tuesday (30 Jan) cut again for connecting new temporary bypass pipe, 1st Feb should solve this issue temporary until the new 1350mm pipe is ready (at least half a year later) This post has been edited by LazadaGot: Jan 24 2024, 04:47 PM
|
|
|
|
|
|
LazadaGot
|
Jan 24 2024, 06:10 PM
|
New Member
|
QUOTE(LA773 @ Jan 24 2024, 05:53 PM) If official announcement Friday morning, Thursday night should have water already Plan A is not so easy bruh, dont put up too much hope, that river got almost zero visibility with buaya around, and need to see the river current as well.  Even if they weld it successfully on time, no guarantee that there wont be another crack appeared instantly once they turn on the water.
|
|
|
|
|
|
LazadaGot
|
Jan 24 2024, 08:47 PM
|
New Member
|
QUOTE(mushigen @ Jan 24 2024, 06:56 PM) It's the first time I see a work plan with only date, without time. I feel they cant be sure as Plan B is not planned to complete this early, most likely rushing like mad cow day & night and so they dare not to put the exact time, at least they got 24hours to buffer if only date available lol
|
|
|
|
|
|
LazadaGot
|
Jan 24 2024, 11:29 PM
|
New Member
|
Pray for the safety of divers This post has been edited by LazadaGot: Jan 24 2024, 11:41 PM
|
|
|
|
|
|
LazadaGot
|
Jan 25 2024, 10:44 AM
|
New Member
|
QUOTE(DarkNite @ Jan 25 2024, 08:37 AM) Water supply starts to be normal for many areas! i saw people reporting started to have water supply, but latest PBAPP fb post said they having trouble to reclamp the pipeline, wonder whats going on here.
|
|
|
|
|
|
LazadaGot
|
Jan 25 2024, 01:10 PM
|
New Member
|
QUOTE(LA773 @ Jan 25 2024, 10:48 AM) Possibly ppl in fb trying to create dissatisfaction among those who haven't get water? 1 h · Kerja-kerja di Sungai Perai. Plan A: Pengapit di bahagian atas telah dipasang dan adalah diharapkan pemasangan pengapit di bahagian bawah pada petang ini juga berjalan dengan lancar. Plan B: Sebanyak 70 peratus kerja telah disiapkan dan pemasangan paip kedua akan dibuat pada hari ini. Adalah diharapkan semua berjalan lancar dan siap pada tempoh lebih awal. Dalam pada itu, lori-lori tangki sedang dimobilisasi sepenuhnya demi keperluan mereka yang terjejas.
|
|
|
|
|
|
LazadaGot
|
Jan 25 2024, 01:20 PM
|
New Member
|
QUOTE(DarkNite @ Jan 25 2024, 01:14 PM) and PN/PuAS bots? Or many be those at EoL? As of 12noon many places on the Island have started to return to 80% normal. https://penang.chinapress.com.my/20240125/%...bf%a1%e8%8a%b1/» Click to show Spoiler - click again to hide... « 受断水影响的湖内及立信花园 今早10时左右恢复水供 2024年1月25日 112点阅
(槟城25日讯)截至今早10时左右,西南县的湖内及立信花园,有部分地区已恢复水供,但当地居民及小贩还是“怕怕”,继续储水。
《中国报》记者今早走访受断水影响的湖内及立信花园,当地居民及小贩皆指出,尽管已经恢复供水,但他们仍害怕会再次断水,因此还是会持续储水。 Relau and lip sin area already recovered according to news ================================================ but probably just temporary as they still need to weld the bottom part? This post has been edited by LazadaGot: Jan 25 2024, 01:22 PM
|
|
|
|
|
|
LazadaGot
|
Jan 25 2024, 01:41 PM
|
New Member
|
https://www.buletinmutiara.com/kebocoran-pa...nakan-serentak/Plan A status QUOTE ketika ini, kerja-kerja mengapit semula bahagian atas paip sepanjang 1,350 milimeter (mm) telah siap dijalankan.
“Walau bagaimanapun, kerja mengapit semula bahagian bawah paip yang bocor tidak dapat dijalankan pada malam tadi disebabkan berlakunya fenomena air pasang dan surut.
“Namun begitu, keadaan air sungai pada hari ini dilihat dalam keadaan baik dan membolehkan kerja mengapit semula bahagian paip bocor dimulakan dan dijangka siap pada petang ini juga.
“Sekiranya berjalan lancar, bekalan air kepada 84 peratus daripada 120,000 pengguna yang terkesan terutama di bahagian Barat Daya dan sebahagian Timur Laut dapat disalurkan semula seawal pagi esok (26 Januari). Plan B status QUOTE  kerja-kerja pemasangan dua paip lencongan 600mm merentasi Sungai Perai di bahagian permukaan sungai kini siap 70 peratus. “ Satu daripada dua paip berkenaan telah berjaya dipasang berdekatan jambatan Ampang Jajar, dan kita jangkakan kerja-kerja pemasangan kedua-dua paip lencongan akan siap pada 27 Januari (Sabtu) ini berbanding jangkaan awal, 29 Januari 2024. This post has been edited by LazadaGot: Jan 25 2024, 01:42 PM
|
|
|
|
|
|
LazadaGot
|
Jan 25 2024, 01:44 PM
|
New Member
|
QUOTE(DarkNite @ Jan 25 2024, 01:41 PM) Ya, you are right. Looks like we are now a head of schedule of number 2. seems like they able to get plan B done on 27th instead of 29th feb, not sure if they will still wait until 30Jan for the cut to connect new pipe, lets wait the official update from them
|
|
|
|
|
|
LazadaGot
|
Jan 25 2024, 01:44 PM
|
New Member
|
|
|
|
|
|
|
LazadaGot
|
Jan 25 2024, 05:03 PM
|
New Member
|
QUOTE(DarkNite @ Jan 25 2024, 04:57 PM) Dark storm clouds spotted in Bworth. Hopefully no hamper Sungai Perai repairs works!
|
|
|
|
|
|
LazadaGot
|
Jan 25 2024, 09:55 PM
|
New Member
|
Once again, pray for their safety, especially the divers Plan A Plan B This post has been edited by LazadaGot: Jan 25 2024, 09:57 PM
|
|
|
|
|
|
LazadaGot
|
Jan 26 2024, 10:10 AM
|
New Member
|
Seems like Plan B getting done earlier, they will connect the 2x600mm pipeline on Sunday 28th Jan instead This post has been edited by LazadaGot: Jan 26 2024, 10:42 AM
|
|
|
|
|
|
LazadaGot
|
Jan 26 2024, 10:14 AM
|
New Member
|
QUOTE(mushigen @ Jan 26 2024, 09:21 AM) I'm afraid I am with him this time. Think about it: 1) whole of DBD including the all important FTZ only depends on one WTP(from mainland some more) and one pipeline. Has PBA announced any backup plan? 2) undersea pipelines: any plan to run parallel/spare lines along first bridge in case the undersea line leaks? 3) 1350mm line leaks and they did not mention when it was last inspected and its mean time between failures (MTBF). What other potential failures should we expect to bite us in the ass suddenly? I get it that they inherit this legacy but a government cannot keep using "oh, we inherited it" as justification for doing nothing. If they already have a plan, announce it for goodness sake. All these water interruptions will have impact on manufacturing industry and investor's confidence. I found something in PBAPP website https://pba.com.my/3rd-ptsp/» Click to show Spoiler - click again to hide... « This post has been edited by LazadaGot: Jan 26 2024, 10:17 AM
|
|
|
|
|
|
LazadaGot
|
Jan 26 2024, 10:18 AM
|
New Member
|
Seems like this thread turned into politic talks, time to abandon thread
|
|
|
|
|
|
LazadaGot
|
Jan 26 2024, 10:25 AM
|
New Member
|
QUOTE(mushigen @ Jan 26 2024, 10:20 AM) Interesting find, tq. It's comforting to know. No issues when the 1st PTSP is eventually decommissioned (after 50 years of service).Is this first set supposed to be decommissioned last year, since it's built in 1973? So we're left with 2 sets? Now, are these 2 sets complementing each other or act as backup for one another? No idea, wish i have more time digging for more info, but im working right now  Anyway for penang lang who wish to see update from this thread, PBAPP WILL CONNECT NEW TEMPORARY PIPELINE ON 28th JAN (SUNDAY) This post has been edited by LazadaGot: Jan 26 2024, 10:41 AM
|
|
|
|
|
|
LazadaGot
|
Jan 26 2024, 10:42 AM
|
New Member
|
QUOTE(ssmui @ Jan 26 2024, 10:36 AM) sorry my fault, sudah gila akibat tak mandi
|
|
|
|
|
|
LazadaGot
|
Jan 26 2024, 06:43 PM
|
New Member
|
QUOTE(ipohps3 @ Jan 26 2024, 05:40 PM) yes i know. how long will it take for water to resume after (Plan B) Monday? For Plan B 11:30pm 29 Jan 2024 (Monday) Water Cut 3:30pm 30 Jan 2024 (Tuesday) Water resume for 84% affected resident 3:30pm 31 Jan 2024 (Wednesday) Remaining 16% EOL/high ground resident
|
|
|
|
|
|
LazadaGot
|
Jan 26 2024, 08:30 PM
|
New Member
|
QUOTE(Godsweirdson @ Jan 26 2024, 07:06 PM) Sad sg ara noises, I also very worried our window might not be long enough to store water, if at all. After water operations resume, we always take 1 extra day to reach us. And while water cuts at 1130pm monday, we can expect majority upstream users to panic store, so most likely our water will be cut off even earlier QUOTE(mushigen @ Jan 26 2024, 07:08 PM) Indeed. First to lose water pressure, last to get back supply. Pba fb latest update, Plan A clamping is done This post has been edited by LazadaGot: Jan 26 2024, 09:03 PM
|
|
|
|
|
|
LazadaGot
|
Jan 26 2024, 09:08 PM
|
New Member
|
QUOTE(mushigen @ Jan 26 2024, 07:01 PM) I see they have new isolation valves for the 600mm stubs where they will tie-in the new lines. With the valves in place, why is there a need to down the main line to connect?  most likely shutting down water supply for disconnecting the main line, and since they both already readily "connected", the down time should be shorter. Also, need to test rite? gradual increase pressure... inb4 kaboom once turn on because cant take the pressure or the welding is not done probably because of rushing LOL
|
|
|
|
|