QUOTE(haya @ Aug 5 2023, 01:37 PM)
Looks like the artist illustration.S'wak ART progress: Premier TAK PUAS HATI, hydrogenized Kuching Public transport
S'wak ART progress: Premier TAK PUAS HATI, hydrogenized Kuching Public transport
|
|
Aug 5 2023, 02:06 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,757 posts Joined: Jan 2003 From: Sri Kembangan |
|
|
|
|
|
|
Aug 5 2023, 02:08 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,757 posts Joined: Jan 2003 From: Sri Kembangan |
|
|
|
Aug 5 2023, 02:14 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,562 posts Joined: Jun 2009 From: Selangor / Sarawak / New York |
Hebat
|
|
|
Aug 5 2023, 08:10 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,067 posts Joined: Jan 2003 |
Sarawak’s ART prototype to undergo 2-week assembly ahead of engineering run at Isthmus area
KUCHING, Aug 5: The assembly work for the three-car hydrogen-powered Autonomous Rapid Transit (ART) prototype vehicle, which has just arrived in Senari Port Terminal here today, will take two weeks to complete prior to an engineering run at Isthmus area starting Sept 1. Sarawak Metro Sdn Bhd chairman Tan Sri Abdul Aziz Husain said the assembly work, including the fitting of the gangway, will be carried out by the technical crew from CRRC Zhuzhou Institute Co Ltd together with engineers and technicians from Sarawak Metro. The work will be undertaken at a warehouse at the Senari Port Terminal. “This engineering run is important for us to refine the specifications of the ART and also to identify any potential issues before we start with the Proof-of-Concept (POC) exercise. “The POC exercise will be held in November, along a section of the Kuching Samarahan Expressway stretching three kilometres built between two roundabouts that have been converted into smart traffic light junctions,” he said in a press statement after witnessing the historic arrival of the ART vehicle at the Senari Port today. The POC exercise is for Sarawak Metro to collect data to evaluate the feasibility of the prototype for the final design of the vehicle. This 3km stretch will be part of the permanent dedicated lane built for the ART Blue Line alignment. During both the engineering run and the POC exercise, the prototype ART hydrogen vehicle would not be open to the public for rides. However, selected stakeholders will be invited to experience a ride on the ART, as part of the data collection efforts. “During the engineering run and the POC exercise, the ART will mostly not carry any passengers. Rides on this prototype ART will only be held at certain times, and this is by invitation only and for selected stakeholders,” explained Abdul Aziz. The arrival of this ART prototype vehicle signified that Sarawak is a step closer towards realising the Kuching Urban Transportation System (KUTS) project developed to modernise public transport. The hydrogen-powered ART arrived at Senari Terminal on board the vessel HF Spirit and berthed at around 8am, after a journey of more than two weeks. The vessel set sail from Shanghai Port on July 15. Abdul Aziz, who is also Sarawak Economic Development Corporation (SEDC) chairman, described this historic moment as another milestone for Sarawak Metro, especially the State government in its efforts to transform Sarawak into an advanced economy by 2030. “A modern public transport system is vital for the Sarawak’s development. “I’m confident that once the ART starts its operation in two years’ time, Kuching’s socio- economic landscape will be significantly transformed as envisioned by the Sarawak’s top leaders. This project will definitely be a game changer for the State’s economic landscape,” enthused Abdul Aziz. Meanwhile, passenger service for the ART will commence in stages – starting in the fourth quarter of 2025, with the Blue Line that runs from Rembus in Kota Samarahan to Hikmah Exchange in the centre of Kuching city. Apart from the Blue Line, two other lines will be built under Phase 1 of the KUTS project; the Red Line (from Kuching Sentral to Pending) and the Green Line (from Pending to Damai Central). Phase 1 of the KUTS project is schedule to be completed by 2027. To complement the ART service will be the feeder bus network that will provide the first mile and last mile connectivity for KUTS. Both the ART vehicles and the feeder buses for the KUTS Project are zero-emission vehicles powered by hydrogen. The move is to support the government’s efforts to advance the hydrogen economy as well as the initiative to decarbonise the public transportation sector. — DayakDaily Source: https://dayakdaily.com/sarawaks-art-prototy...t-isthmus-area/ |
|
|
Aug 5 2023, 08:15 PM
Show posts by this member only | IPv6 | Post
#45
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,274 posts Joined: Jun 2008 |
|
|
|
Aug 5 2023, 08:16 PM
|
![]() ![]()
Junior Member
52 posts Joined: May 2022 |
QUOTE(haya @ Aug 5 2023, 08:10 PM) Sarawak’s ART prototype to undergo 2-week assembly ahead of engineering run at Isthmus area Let see how many crrc engineer have to station in kuching....KUCHING, Aug 5: The assembly work for the three-car hydrogen-powered Autonomous Rapid Transit (ART) prototype vehicle, which has just arrived in Senari Port Terminal here today, will take two weeks to complete prior to an engineering run at Isthmus area starting Sept 1. Sarawak Metro Sdn Bhd chairman Tan Sri Abdul Aziz Husain said the assembly work, including the fitting of the gangway, will be carried out by the technical crew from CRRC Zhuzhou Institute Co Ltd together with engineers and technicians from Sarawak Metro. The work will be undertaken at a warehouse at the Senari Port Terminal. “This engineering run is important for us to refine the specifications of the ART and also to identify any potential issues before we start with the Proof-of-Concept (POC) exercise. “The POC exercise will be held in November, along a section of the Kuching Samarahan Expressway stretching three kilometres built between two roundabouts that have been converted into smart traffic light junctions,” he said in a press statement after witnessing the historic arrival of the ART vehicle at the Senari Port today. The POC exercise is for Sarawak Metro to collect data to evaluate the feasibility of the prototype for the final design of the vehicle. This 3km stretch will be part of the permanent dedicated lane built for the ART Blue Line alignment. During both the engineering run and the POC exercise, the prototype ART hydrogen vehicle would not be open to the public for rides. However, selected stakeholders will be invited to experience a ride on the ART, as part of the data collection efforts. “During the engineering run and the POC exercise, the ART will mostly not carry any passengers. Rides on this prototype ART will only be held at certain times, and this is by invitation only and for selected stakeholders,” explained Abdul Aziz. The arrival of this ART prototype vehicle signified that Sarawak is a step closer towards realising the Kuching Urban Transportation System (KUTS) project developed to modernise public transport. The hydrogen-powered ART arrived at Senari Terminal on board the vessel HF Spirit and berthed at around 8am, after a journey of more than two weeks. The vessel set sail from Shanghai Port on July 15. Abdul Aziz, who is also Sarawak Economic Development Corporation (SEDC) chairman, described this historic moment as another milestone for Sarawak Metro, especially the State government in its efforts to transform Sarawak into an advanced economy by 2030. “A modern public transport system is vital for the Sarawak’s development. “I’m confident that once the ART starts its operation in two years’ time, Kuching’s socio- economic landscape will be significantly transformed as envisioned by the Sarawak’s top leaders. This project will definitely be a game changer for the State’s economic landscape,” enthused Abdul Aziz. Meanwhile, passenger service for the ART will commence in stages – starting in the fourth quarter of 2025, with the Blue Line that runs from Rembus in Kota Samarahan to Hikmah Exchange in the centre of Kuching city. Apart from the Blue Line, two other lines will be built under Phase 1 of the KUTS project; the Red Line (from Kuching Sentral to Pending) and the Green Line (from Pending to Damai Central). Phase 1 of the KUTS project is schedule to be completed by 2027. To complement the ART service will be the feeder bus network that will provide the first mile and last mile connectivity for KUTS. Both the ART vehicles and the feeder buses for the KUTS Project are zero-emission vehicles powered by hydrogen. The move is to support the government’s efforts to advance the hydrogen economy as well as the initiative to decarbonise the public transportation sector. — DayakDaily Source: https://dayakdaily.com/sarawaks-art-prototy...t-isthmus-area/ Breakdown will be common as china made inferior products |
|
|
|
|
|
Aug 5 2023, 08:18 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,067 posts Joined: Jan 2003 |
|
|
|
Aug 5 2023, 08:18 PM
Show posts by this member only | IPv6 | Post
#48
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,274 posts Joined: Jun 2008 |
|
|
|
Aug 5 2023, 08:25 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,067 posts Joined: Jan 2003 |
QUOTE(Happy360V2 @ Aug 5 2023, 08:16 PM) Let see how many crrc engineer have to station in kuching.... What used to be the STAR LRT in KL, now the Ampang and Sri Petaling lines in Rapid KL, has been using CRRC Zhuzhou LRV rolling stock for more than 25 years now. No idea how many CRRC Zhuzhou staff Rapid KL has on retainer, but they've been running quite well for the better part of almost a generation now.Breakdown will be common as china made inferior products |
|
|
Aug 5 2023, 08:29 PM
|
![]() ![]()
Junior Member
52 posts Joined: May 2022 |
QUOTE(haya @ Aug 5 2023, 08:25 PM) What used to be the STAR LRT in KL, now the Ampang and Sri Petaling lines in Rapid KL, has been using CRRC Zhuzhou LRV rolling stock for more than 25 years now. No idea how many CRRC Zhuzhou staff Rapid KL has on retainer, but they've been running quite well for the better part of almost a generation now. Kl use bombardier tech......Bombardier supervised CRRC.... If just CRRC, good luck... Look at jakarta, what happen, huh huh |
|
|
Aug 5 2023, 08:33 PM
|
![]() ![]()
Junior Member
230 posts Joined: Jun 2015 |
agaknye brapa lama akan scrap
|
|
|
Aug 5 2023, 08:41 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,067 posts Joined: Jan 2003 |
QUOTE(Happy360V2 @ Aug 5 2023, 08:29 PM) Kl use bombardier tech...... Depends on which line. The Ampang and Sri Petaling lines don't use Bombardier Tech. Bombardier supervised CRRC.... If just CRRC, good luck... Look at jakarta, what happen, huh huh KL Monorail uses Scomi monorail. The Kajang line uses Siemens Inspiro rolling stock. The Putrajaya line uses Hyundai Rotem EMU rolling stock. Only what used to be called the Putra line, now called the Kelana Jaya line, use Bombardier Innovia rolling stock. And none of them have CRRC involvement. |
|
|
Aug 5 2023, 08:53 PM
Show posts by this member only | IPv6 | Post
#53
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,176 posts Joined: May 2006 From: Memesia |
looks good eh.. hope not another white elephant project
|
|
|
|
|
|
Aug 5 2023, 08:56 PM
|
![]() ![]()
Junior Member
52 posts Joined: May 2022 |
QUOTE(haya @ Aug 5 2023, 08:41 PM) Depends on which line. The Ampang and Sri Petaling lines don't use Bombardier Tech. Lucky kl never use.... Though CRRC hv centre in Malaysia.. 😅😅😅KL Monorail uses Scomi monorail. The Kajang line uses Siemens Inspiro rolling stock. The Putrajaya line uses Hyundai Rotem EMU rolling stock. Only what used to be called the Putra line, now called the Kelana Jaya line, use Bombardier Innovia rolling stock. And none of them have CRRC involvement. |
|
|
Aug 5 2023, 10:31 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,757 posts Joined: Jan 2003 From: Sri Kembangan |
QUOTE(Avangelice @ Aug 5 2023, 08:18 PM) taktau. mental kot. kena hantar batu 7.5!![]() Dedicated ART lane to be built along Jalan Sultan Tengah, linking Kuching to Pantai Damai https://www.theborneopost.com/2023/08/05/de...o-pantai-damai/ |
|
|
Aug 5 2023, 10:36 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,757 posts Joined: Jan 2003 From: Sri Kembangan |
QUOTE According to Dr Abdul Rahman, the project is fully funded by the Sarawak government, adding that a new bridge would be built along the ART route, next to the existing Santubong Bridge. “With the ART service through the Green Line from Pending to Damai Sentral, it would facilitate the movement of Kuching residents to Damai and Santubong areas, which are quite famous as tourist destinations,” he said. fuyoh boleh pakai tram to Damai, Santubong, after2025 |
|
|
Aug 18 2023, 03:38 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,757 posts Joined: Jan 2003 From: Sri Kembangan |
Video of assembled vehicle in Kuching - https://www.veed.io/view/1621b9f1-0d0a-4db6...f2-77be57964576?
|
|
|
Aug 18 2023, 03:38 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,757 posts Joined: Jan 2003 From: Sri Kembangan |
QUOTE(Jasonist @ Aug 5 2023, 08:53 PM) Video of assembled vehicle in Kuching - https://www.veed.io/view/1621b9f1-0d0a-4db6...f2-77be57964576? |
|
|
Aug 24 2023, 09:37 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,757 posts Joined: Jan 2003 From: Sri Kembangan |
Updates - August 24
Work on ART tracks commences along Kuching-Samarahan Expressway after the arrival of Bulan that was seen running on the road heading to Pending few days back, the works for ART track has begun https://www.theborneopost.com/2023/08/24/wo...han-expressway/ video of the ART on the road - https://www.facebook.com/borneopost.online/...embed_video&t=4 This post has been edited by g5sim: Aug 24 2023, 09:38 PM |
|
|
Aug 24 2023, 09:41 PM
Show posts by this member only | IPv6 | Post
#60
|
![]() ![]()
Junior Member
190 posts Joined: Feb 2021 |
Fuuu....perabih duit orang Malaya...
|