Welcome Guest ( Log In | Register )

9 Pages  1 2 3 > » Bottom

Outline · [ Standard ] · Linear+

 S'wak ART con'tion in full force aims at 2026 to, hydrogenized Kuching Public transport

views
     
TSg5sim
post Aug 4 2023, 07:12 PM, updated 3d ago

Look at all my stars!!
*******
Senior Member
5,756 posts

Joined: Jan 2003
From: Sri Kembangan


The Premier (not the tissue brand) has announced that the hydrogen powered Kuching Urban Transportation System (sorry no BM name for this) KUTS prototype tram (long buses what ever you prefer to call it) is here in Kuching.

Revelation should be as soon as tomorrow, hopefully it will look like the artist illustration below. I saw the pics of the China test runs but die die also couldnt find it

https://www.theborneopost.com/2023/08/04/wo...-port-tomorrow/

https://www.theborneopost.com/2023/08/04/ab...sses-to-use-it/

QUOTE
The state’s ART system comes under Sarawak Metro, a wholly-owned subsidiary of the Sarawak Economic Development Corporation (SEDC).

The prototype will undergo a two-month engineering run at The Isthmus in September and October before beginning its Stage 2 proof of concept (POC) exercise along a short stretch of the Blue Line in Samarahan this November.

QUOTE
“It has been upgraded through intelligent design, which is in line with the needs of Malaysia in achieving a zero-emission and intelligent public transport system,” the company said in a Xinhua report last month.

The smart tram can travel up to 245km in a single charge of hydrogen.

QUOTE
“With this ART, it will change our lives. This transportation will focus on our students in Universiti Malaysia Sarawak (Unimas) and Universiti Teknologi Mara (UiTM) in Samarahan first.

“The students will use the ART, and the payment is through Sarawak Pay, which will give discounts or special fares for our students,” he said.
QUOTE
Abang Johari later told reporters that the smart tram would first be test-run at the Kuching Isthmus, followed by testing it along the Kuching-Samarahan route.

Either it is through our new lane or on the road itself, if its own lane is not ready yet. We will try it first and manage the traffic flow,” he said.
Updated pic with the actual pic of Sarawak ART

user posted image

Updated August 5 10.33PM


Dedicated ART lane to be built along Jalan Sultan Tengah, linking Kuching to Pantai Damai

https://www.theborneopost.com/2023/08/05/de...o-pantai-damai/

Video of assembled vehicle in Kuching - https://www.veed.io/view/1621b9f1-0d0a-4db6...f2-77be57964576?





Updates - August 24

Work on ART tracks commences along Kuching-Samarahan Expressway

video of the ART on the road - https://www.facebook.com/borneopost.online/...embed_video&t=4

https://www.theborneopost.com/2023/08/24/wo...han-expressway/

Updates - September 6


https://www.theborneopost.com/2023/09/06/pr...es-for-kuching/

Sarawak orders 38 more ART vehicles for Kuching

important note:

QUOTE
To a question, he said the ART tram can be extended from the normal three carriages to a maximum five per vehicle if there is demand.


November 20 updates

Proof of concept starts

video - dunno how to embed fesbuk video https://www.facebook.com/watch/?v=754532796508221




July 23 update - watch the blue line video



Sep 10 update - Lee: First 2 units of ART hydrogen vehicles delivered to Kuching by year-end

https://www.theborneopost.com/2024/09/10/le...ng-by-year-end/

Updated pic with the actual pic of Sarawak ART

user posted image

update 25 Oct 2024

JV company (SKS Coachbuilders and Sun Credit) beat 5 others to win the Hydrogen feeder bus contract to deliver 55 units within 43 months with options.

We wait see got sounds why >100mil contract was given to a Malaya JV (again they beat 5 others lol) and does sarawak even have bus builders?

Sarawak Metro awards contract for hydrogen-powered feeder buses

https://www.newsarawaktribune.com.my/sarawa...d-feeder-buses/

user posted image

» Click to show Spoiler - click again to hide... «


Update - March 9, 2025

The Sarawak government is still aiming at starting the first phase operation of ART Kuching in 2026. At the same time, this will fully hydrogenized Kuching's Public Transport. the ART feeder buses are also hydrogen buses.

take note that the trial for the ART was completed last year and final specs of the ART trains submitted to Manufacturer. The rolling stock trains are the newer/upgraded version of the Trial ART train bearing the Swak government logo in the earlier post. The ART vehicles/trains will also be equipped with dedicated areas for luggage, wheelchairs, and foldable bicycles, enhancing their user-friendliness.

For transparency, there were few articles citing the transport minister that the first two trains would arrive end of last year but that did not happen. Good to hear that they are still confident to start the operation in 2026. The actual aim is to complete the full lines in time for the SEA Games in 2027. Take note the trains connect to Multiple tourist attractions running all the way to Damai/Santubong/Cultural village area. It also being planned to connect the planned deep sea port and the new Kuching state of the art Airport within close proximity of the new deep sea port (that can allow the docking of cruise ships)

personal note - I still think they need to connect the new airport with the current Kuching Internation Airport with a speedy 20-30 train ride). a >1hr ART ride stopping at multiple stations will not cut it.


Kuching’s public transport to be fully hydrogen-powered by 2026, says Abg Jo
QUOTE
KUCHING (Feb 25): Public transportation in Kuching will be fully powered by hydrogen through the Kuching Urban Transportation System (KUTS) initiative by next year, said Premier Datuk Patinggi Tan Sri Abang Johari Tun Openg.

He said this is featured in the hydrogen buses and upcoming autonomous rail transit (ART) and is done to encourage and promote domestic offtake of clean hydrogen.

“Forging ahead, Sarawak is actively exploring Power-to-X projects and leveraging our abundant renewable energy resources to generate clean hydrogen.

“By combining hydrogen with carbon dioxide, we can produce a range of synthetic fuels and chemicals, including green methanol, sustainable aviation fuel, green ammonia and even polyesters.

“These polyesters can be processed into various forms such as green fibres, bottles or films — contributing to a more sustainable future,” he said when officiating the EIC Connect Energy Borneo 2025 at the Hikmah Exchange Convention Centre here today.

» Click to show Spoiler - click again to hide... «


ART Blue Line to ease traffic by 2025

Sarawak Metro: Month-long partial closure at Jalan Canna for Blue Line project

Rembus hydrogen plant S’wak’s first step towards clean public transport industry, says deputy minister

Updates - May 28, 2025

Sarawak Metro is proud to officially secure the ISO 37001:2016 Anti-Bribery Management System (ABMS) Certification, which was presented by Ts. Shahrizan Mohammad Sahmoni, Regional Director of SIRIM Sarawak.

The presentation of the ISO 37001:2016 ABMS certificate took place during the recent Course on Governance, Integrity and Anti-Corruption, organised by Sarawak Economic Development Corporation (SEDC) in collaboration with the Malaysian Anti-Corruption Commission (MACC) for SEDC’s top management team as well as the leaders of its subsidiaries.

This milestone reflects Sarawak Metro’s ongoing commitment in upholding integrity, transparency, and accountability in our day-to-day operations.

Attached Image
Attached Image
Attached Image

Updated 10/31/2025 first ARTs are ready

Attached Image

This post has been edited by g5sim: Oct 31 2025, 11:40 PM
TSg5sim
post Aug 4 2023, 07:20 PM

Look at all my stars!!
*******
Senior Member
5,756 posts

Joined: Jan 2003
From: Sri Kembangan


QUOTE(Sha91 @ Aug 4 2023, 07:17 PM)
Real photo mana.
*
Besok ah girl.
TSg5sim
post Aug 4 2023, 07:51 PM

Look at all my stars!!
*******
Senior Member
5,756 posts

Joined: Jan 2003
From: Sri Kembangan


QUOTE(Happy360V2 @ Aug 4 2023, 07:49 PM)
Yahoo, finally no need to swing from one tree to another...
Aarawak hv a ART train... 😅😅😅😅
*
swinging still much more fun than taking a boring train though.
TSg5sim
post Aug 4 2023, 09:20 PM

Look at all my stars!!
*******
Senior Member
5,756 posts

Joined: Jan 2003
From: Sri Kembangan


QUOTE(Happy360V2 @ Aug 4 2023, 08:58 PM)
Separate lane .. more construction to plunder.... 😁😁😁.

Another white elephant project...
Imagine kuching only hv 800k people... 😥😥..
*
so your semananjung financiers plan is to have 2mil people in kuching baru plan izit? what a brilliant ideal to kept borneo look like relic compared to Semenanjung kan!

TSg5sim
post Aug 4 2023, 09:46 PM

Look at all my stars!!
*******
Senior Member
5,756 posts

Joined: Jan 2003
From: Sri Kembangan


QUOTE(xkaizoku @ Aug 4 2023, 09:32 PM)
yeah, look at China. They built a whole subway system underground in the middle of nowhere, and a whole new city developed within few years because the transportation system was already ready underground.

but i still have doubts on ART on the road if it does not run underground or proper train tracks above the ground
*
they practice kukuciau besi with zero resistance. what you mentioned sounds like forest city Johore. Roads and parking are underground. up there you cycle lah. What happened to it?
Atuk kata we sold out to CCP, creating all sorts of cibai problem buyers also takut. now turning into ghost town?
TSg5sim
post Aug 5 2023, 08:28 AM

Look at all my stars!!
*******
Senior Member
5,756 posts

Joined: Jan 2003
From: Sri Kembangan


QUOTE(moiskyrie @ Aug 5 2023, 07:58 AM)
No more space to expand the road liao....
Unless they want eat into those housing / side walk ......
*
Can. Got three plans. Same level with existing road, overhead track or underground tunnel. So it's up to planner. We cross fingers n hope for the best. Cuz we know Sarawak lands no free hold all like 66 years or something. Not even 99y like in semenanjung
TSg5sim
post Aug 5 2023, 08:30 AM

Look at all my stars!!
*******
Senior Member
5,756 posts

Joined: Jan 2003
From: Sri Kembangan


QUOTE(Happy360V2 @ Aug 5 2023, 08:26 AM)
Sarawak Minister CAN BE VERY CREATIVE FOR THE PEOPLE..  THEY CAN BUILT OVERPASS...

So, much BILLIONS SST being pocketed..  MUST SPEND MAH!!! brows.gif  brows.gif  brows.gif

BUT BUT STILL WITHOUT WATER, ELECTRICITY, EDU, HEALTH ...  Cost is escalating!!
*
You how internet internet got, can spread fake news in Lowyat net but, no water n no electricity? How you charge your Starlink? built own polar power station ke?
TSg5sim
post Aug 5 2023, 08:59 AM

Look at all my stars!!
*******
Senior Member
5,756 posts

Joined: Jan 2003
From: Sri Kembangan


QUOTE(Happy360V2 @ Aug 5 2023, 08:54 AM)
Damn starlink can use mini solar panel...... They dont need MW of electricity...

Water, u are bless with rain and river.... Pls collect it since low population...
*
U still need to charge your device to work as cybertrop lor.
TSg5sim
post Aug 5 2023, 02:03 PM

Look at all my stars!!
*******
Senior Member
5,756 posts

Joined: Jan 2003
From: Sri Kembangan


QUOTE(Happy360V2 @ Aug 5 2023, 09:27 AM)
Sarawak minister are busy champaigning for semenanjung state elections....

Where got time to check potholes...

Tiong is busy at klia immigration... Monitor.
A. Jo busy kipas anwar...
*
U so pandai next election do put up your nice election poster here. Don't talk cock only pandai ya .
TSg5sim
post Aug 5 2023, 02:06 PM

Look at all my stars!!
*******
Senior Member
5,756 posts

Joined: Jan 2003
From: Sri Kembangan


QUOTE(haya @ Aug 5 2023, 01:37 PM)

*
Looks like the artist illustration.
TSg5sim
post Aug 5 2023, 02:08 PM

Look at all my stars!!
*******
Senior Member
5,756 posts

Joined: Jan 2003
From: Sri Kembangan


QUOTE(knazlee @ Aug 5 2023, 12:10 PM)
All your post sounds so bitter.
*
One starer joined for PRN only n will go missing after PRN.
TSg5sim
post Aug 5 2023, 10:31 PM

Look at all my stars!!
*******
Senior Member
5,756 posts

Joined: Jan 2003
From: Sri Kembangan


QUOTE(Avangelice @ Aug 5 2023, 08:18 PM)
The thing is.. Sarawak no PRN so what tree is he barking up?
*
taktau. mental kot. kena hantar batu 7.5!

user posted image

Dedicated ART lane to be built along Jalan Sultan Tengah, linking Kuching to Pantai Damai

https://www.theborneopost.com/2023/08/05/de...o-pantai-damai/
TSg5sim
post Aug 5 2023, 10:36 PM

Look at all my stars!!
*******
Senior Member
5,756 posts

Joined: Jan 2003
From: Sri Kembangan


QUOTE
According to Dr Abdul Rahman, the project is fully funded by the Sarawak government, adding that a new bridge would be built along the ART route, next to the existing Santubong Bridge.

“With the ART service through the Green Line from Pending to Damai Sentral, it would facilitate the movement of Kuching residents to Damai and Santubong areas, which are quite famous as tourist destinations,” he said.


fuyoh boleh pakai tram to Damai, Santubong, after2025 tongue.gif console.gif
TSg5sim
post Aug 18 2023, 03:38 PM

Look at all my stars!!
*******
Senior Member
5,756 posts

Joined: Jan 2003
From: Sri Kembangan


Video of assembled vehicle in Kuching - https://www.veed.io/view/1621b9f1-0d0a-4db6...f2-77be57964576?




TSg5sim
post Aug 18 2023, 03:38 PM

Look at all my stars!!
*******
Senior Member
5,756 posts

Joined: Jan 2003
From: Sri Kembangan


QUOTE(Jasonist @ Aug 5 2023, 08:53 PM)
looks good eh.. hope not another white elephant project


*
Video of assembled vehicle in Kuching - https://www.veed.io/view/1621b9f1-0d0a-4db6...f2-77be57964576?


TSg5sim
post Aug 24 2023, 09:37 PM

Look at all my stars!!
*******
Senior Member
5,756 posts

Joined: Jan 2003
From: Sri Kembangan


Updates - August 24

Work on ART tracks commences along Kuching-Samarahan Expressway

after the arrival of Bulan that was seen running on the road heading to Pending few days back, the works for ART track has begun

https://www.theborneopost.com/2023/08/24/wo...han-expressway/

video of the ART on the road - https://www.facebook.com/borneopost.online/...embed_video&t=4

This post has been edited by g5sim: Aug 24 2023, 09:38 PM
TSg5sim
post Aug 25 2023, 06:01 PM

Look at all my stars!!
*******
Senior Member
5,756 posts

Joined: Jan 2003
From: Sri Kembangan


QUOTE(berzerk @ Aug 25 2023, 10:47 AM)
The tissue paper said some sections will be on regular roads. If they start building dedicated lanes after the ART arrives the equipment could be obsolete by the time the roads are ready.
*
Bang, ni referring to testing POC period. Metro strictly mentioned in their website Art will run on dedicated lanes. Stop equating Sarawak DUN with likes of Rapini, Fahmi, Syed Saddick, n LGE.
TSg5sim
post Aug 25 2023, 06:03 PM

Look at all my stars!!
*******
Senior Member
5,756 posts

Joined: Jan 2003
From: Sri Kembangan


QUOTE(Chowda @ Aug 25 2023, 11:53 AM)
I think Samarahan Road entire stretch got acquired, my family land located near the roundabout after Summer Mall.

The payout process haven't finish. We just know how much we going to be compensated.
*
Gi demand family lifetime Art pass lolol
TSg5sim
post Aug 26 2023, 12:48 PM

Look at all my stars!!
*******
Senior Member
5,756 posts

Joined: Jan 2003
From: Sri Kembangan


QUOTE(TreyLey @ Aug 26 2023, 12:18 PM)
everyone knows it will not solve the problem long term but doesnt mean that u will never build one for the benefit of the people

imho, born and raised in kuching i know very well the mindset and sentiment of the people, die die will still use own transport, at least a motorbike or axia rahmah

i dont think they will even bother to use public transport, even RM1 subsidized bus also empty, people rather buy RM1.90/L petrol no matter how efficient the public transport is
*
This is likely cuz buses also stuck on jam.with ART, no jam. Every journey time is set in accordance to ART frequency.

Hopefully this will change city folks mindset.

This post has been edited by g5sim: Aug 26 2023, 03:26 PM
TSg5sim
post Aug 28 2023, 02:05 PM

Look at all my stars!!
*******
Senior Member
5,756 posts

Joined: Jan 2003
From: Sri Kembangan


QUOTE(haya @ Aug 28 2023, 10:27 AM)
As a general statement, farebox revenue doesn't pay for the running of public transport.

Look at Singapore, KL, their fare pricing is below cost recovery.

The reasonableness of the fares for KUTS will be what the (B40) population can pay, not how much it costs to run.
*
KL MRT LRT cheap cheap Nia. If use the month ly pass even cheaper liao lor.

9 Pages  1 2 3 > » Top
 

Change to:
| Lo-Fi Version
0.0286sec    0.53    7 queries    GZIP Disabled
Time is now: 18th December 2025 - 06:42 PM