Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

 S'wak ART progress: Premier TAK PUAS HATI, hydrogenized Kuching Public transport

views
     
Happy360V2
post Aug 4 2023, 08:58 PM

Getting Started
**
Junior Member
52 posts

Joined: May 2022

Aug 4 2023, 09:23 PM
This post has been deleted by g5sim because: one starrer semenanjung cybertrop promoting fake news insinuating sarawak leaders are corrupt

Happy360V2
post Aug 4 2023, 11:36 PM

Getting Started
**
Junior Member
52 posts

Joined: May 2022
QUOTE(g5sim @ Aug 4 2023, 09:20 PM)
so your semananjung financiers plan is to have 2mil people in kuching baru plan izit? what a brilliant ideal to kept borneo look like relic compared to Semenanjung kan!
*
Most of kuching is living above... Why need a white elephant....


Happy360V2
post Aug 4 2023, 11:41 PM

Getting Started
**
Junior Member
52 posts

Joined: May 2022
QUOTE(xkaizoku @ Aug 4 2023, 09:32 PM)
yeah, look at China. They built a whole subway system underground in the middle of nowhere, and a whole new city developed within few years because the transportation system was already ready underground.

but i still have doubts on ART on the road if it does not run underground or proper train tracks above the ground
*
Shanghai area hv 21 million people.... The whole "states" jiangsu hv 70mil.... Very pack.

With the retreat of western manufacturing/US embargo...
It is now a dead city..

Am not proud of china...
Happy360V2
post Aug 5 2023, 08:26 AM

Getting Started
**
Junior Member
52 posts

Joined: May 2022
QUOTE(moiskyrie @ Aug 5 2023, 07:58 AM)
No more space to expand the road liao....
Unless they want eat into those housing / side walk ......
*
Sarawak Minister CAN BE VERY CREATIVE FOR THE PEOPLE.. THEY CAN BUILT OVERPASS...

So, much BILLIONS SST being pocketed.. MUST SPEND MAH!!! brows.gif brows.gif brows.gif

BUT BUT STILL WITHOUT WATER, ELECTRICITY, EDU, HEALTH ... Cost is escalating!!

Happy360V2
post Aug 5 2023, 08:54 AM

Getting Started
**
Junior Member
52 posts

Joined: May 2022
QUOTE(g5sim @ Aug 5 2023, 08:30 AM)
You how internet internet got, can spread fake news in Lowyat net but, no water n no electricity? How you charge your Starlink? built own polar power station  ke?
*
Damn starlink can use mini solar panel...... They dont need MW of electricity...

Water, u are bless with rain and river.... Pls collect it since low population...
Happy360V2
post Aug 5 2023, 08:58 AM

Getting Started
**
Junior Member
52 posts

Joined: May 2022

Aug 5 2023, 09:01 AM
This post has been deleted by g5sim because: again insinuating corruption without proof. meets the definition of defamation. helping poster from getting sued. u r welcome

Happy360V2
post Aug 5 2023, 09:27 AM

Getting Started
**
Junior Member
52 posts

Joined: May 2022
QUOTE(moiskyrie @ Aug 5 2023, 09:25 AM)
Most important....
Potholes everywhere.......
Potholes not manage to repair....
No hope la if go korek lobang....
*
Sarawak minister are busy champaigning for semenanjung state elections....

Where got time to check potholes...

Tiong is busy at klia immigration... Monitor.
A. Jo busy kipas anwar...
Happy360V2
post Aug 5 2023, 10:17 AM

Getting Started
**
Junior Member
52 posts

Joined: May 2022

Aug 5 2023, 02:07 PM
This post has been deleted by g5sim because: another defaming post. insinuating corruption without proof. keep up the good work. I will continue to delete.

Happy360V2
post Aug 5 2023, 08:16 PM

Getting Started
**
Junior Member
52 posts

Joined: May 2022
QUOTE(haya @ Aug 5 2023, 08:10 PM)
Sarawak’s ART prototype to undergo 2-week assembly ahead of engineering run at Isthmus area

KUCHING, Aug 5: The assembly work for the three-car hydrogen-powered Autonomous Rapid Transit (ART) prototype vehicle, which has just arrived in Senari Port Terminal here today, will take two weeks to complete prior to an engineering run at Isthmus area starting Sept 1.

Sarawak Metro Sdn Bhd chairman Tan Sri Abdul Aziz Husain said the assembly work, including the fitting of the gangway, will be carried out by the technical crew from CRRC Zhuzhou Institute Co Ltd together with engineers and technicians from Sarawak Metro.

The work will be undertaken at a warehouse at the Senari Port Terminal.

“This engineering run is important for us to refine the specifications of the ART and also to identify any potential issues before we start with the Proof-of-Concept (POC) exercise.

“The POC exercise will be held in November, along a section of the Kuching Samarahan Expressway stretching three kilometres built between two roundabouts that have been converted into smart traffic light junctions,” he said in a press statement after witnessing the historic arrival of the ART vehicle at the Senari Port today.

The POC exercise is for Sarawak Metro to collect data to evaluate the feasibility of the prototype for the final design of the vehicle.

This 3km stretch will be part of the permanent dedicated lane built for the ART Blue Line alignment.

During both the engineering run and the POC exercise, the prototype ART hydrogen vehicle would not be open to the public for rides.

However, selected stakeholders will be invited to experience a ride on the ART, as part of the data collection efforts.

“During the engineering run and the POC exercise, the ART will mostly not carry any passengers. Rides on this prototype ART will only be held at certain times, and this is by invitation only and for selected stakeholders,” explained Abdul Aziz.

The arrival of this ART prototype vehicle signified that Sarawak is a step closer towards realising the Kuching Urban Transportation System (KUTS) project developed to modernise public transport.

The hydrogen-powered ART arrived at Senari Terminal on board the vessel HF Spirit and berthed at around 8am, after a journey of more than two weeks. The vessel set sail from Shanghai Port on July 15.

Abdul Aziz, who is also Sarawak Economic Development Corporation (SEDC) chairman, described this historic moment as another milestone for Sarawak Metro, especially the State government in its efforts to transform Sarawak into an advanced economy by 2030.

“A modern public transport system is vital for the Sarawak’s development.

“I’m confident that once the ART starts its operation in two years’ time, Kuching’s socio- economic landscape will be significantly transformed as envisioned by the Sarawak’s top leaders. This project will definitely be a game changer for the State’s economic landscape,” enthused Abdul Aziz.

Meanwhile, passenger service for the ART will commence in stages – starting in the fourth quarter of 2025, with the Blue Line that runs from Rembus in Kota Samarahan to Hikmah Exchange in the centre of Kuching city.

Apart from the Blue Line, two other lines will be built under Phase 1 of the KUTS project; the Red Line (from Kuching Sentral to Pending) and the Green Line (from Pending to Damai Central).

Phase 1 of the KUTS project is schedule to be completed by 2027.

To complement the ART service will be the feeder bus network that will provide the first mile and last mile connectivity for KUTS.

Both the ART vehicles and the feeder buses for the KUTS Project are zero-emission vehicles powered by hydrogen. The move is to support the government’s efforts to advance the hydrogen economy as well as the initiative to decarbonise the public transportation sector. — DayakDaily

Source: https://dayakdaily.com/sarawaks-art-prototy...t-isthmus-area/
*
Let see how many crrc engineer have to station in kuching....

Breakdown will be common as china made inferior products
Happy360V2
post Aug 5 2023, 08:29 PM

Getting Started
**
Junior Member
52 posts

Joined: May 2022
QUOTE(haya @ Aug 5 2023, 08:25 PM)
What used to be the STAR LRT in KL, now the Ampang and Sri Petaling lines in Rapid KL, has been using CRRC Zhuzhou LRV rolling stock for more than 25 years now. No idea how many CRRC Zhuzhou staff Rapid KL has on retainer, but they've been running quite well for the better part of almost a generation now.
*
Kl use bombardier tech......

Bombardier supervised CRRC....
If just CRRC, good luck... Look at jakarta, what happen, huh huh
Happy360V2
post Aug 5 2023, 08:56 PM

Getting Started
**
Junior Member
52 posts

Joined: May 2022
QUOTE(haya @ Aug 5 2023, 08:41 PM)
Depends on which line. The Ampang and Sri Petaling lines don't use Bombardier Tech.

KL Monorail uses Scomi monorail.

The Kajang line uses Siemens Inspiro rolling stock.

The Putrajaya line uses Hyundai Rotem EMU rolling stock.

Only what used to be called the Putra line, now called the Kelana Jaya line, use Bombardier Innovia rolling stock. And none of them have CRRC involvement.
*
Lucky kl never use.... Though CRRC hv centre in Malaysia.. 😅😅😅
Happy360V2
post Aug 25 2023, 09:17 AM

Getting Started
**
Junior Member
52 posts

Joined: May 2022
QUOTE(exclus1ve @ Aug 25 2023, 08:49 AM)
I bet u got not a single china made product in your house.
*
Tried to avoid as much... China made..

Most products made in china are by foreign manufacturer.
Those china made bynchina manufacturer are inferior...

Look at geely/proton.... if not for volvo tech... They are NOBODY.
Happy360V2
post Sep 7 2023, 06:30 PM

Getting Started
**
Junior Member
52 posts

Joined: May 2022

Sep 7 2023, 07:47 PM
This post has been deleted by g5sim because: talk nonsense again.


 

Change to:
| Lo-Fi Version
0.0240sec    1.42    7 queries    GZIP Disabled
Time is now: 23rd December 2025 - 01:12 AM