 Questions in regards to Amansiara II @ Jalan Ipoh, Question on Amansiara II @ Jalan Ipoh

views
     
you'll never walk alone
post Mar 3 2009, 05:34 PM

New Member
*
Junior Member
17 posts

Joined: May 2008
Kokiegigit.. pls email me kenny_lfc@hotmail.com
kokiegigit
post Mar 3 2009, 05:56 PM

Getting Started
**
Junior Member
136 posts

Joined: Sep 2008



QUOTE(kelvinchin @ Mar 3 2009, 05:06 PM)
mad.gif  i until now havent get the key yet... i sign my SnP on May, if they just pass me the key on May, then I already rugi for half year maintenance even not yet step into the area for one time.. ??


Added on March 3, 2009, 5:12 pmkokiegigit, i have go through the quotation u get. if im no wrong, is it we need to follow developer grill pattern if we want to install grill on outside, etc: front door, master and 2nd room door. So the price is for those developer pattern? Is it really we need to follow their pattern?
*
we need only to follow the front door grill. the dev has given us the design. for the other grills since the dev did not mention and since the grills are either inside or behind i presume we could do whatever we like.


Added on March 3, 2009, 6:07 pm
QUOTE(faizal_nayan @ Mar 3 2009, 05:30 PM)
hi kokiegigit,

mind to share wif me the quoatations? my mail is faizal_nayan@yahoo.com
This is in relation to the grill via developer contracter rite? what dou think is it expensive than the market price or it is on par"?
Thanks


Added on March 3, 2009, 5:33 pmHi, anyone would like to share the latest phase III pics? especially the parking pouch...last post was only the phase II...try to climb to the housing area but the guard was not allow me... sad.gif
*
faizal

the quotations that i hav are from outside contractors. i have not gotten from dev contractors. well, couldnt be bothered to ask for one since dev has not given us the CF yet. Logically presumed, I think they are not interested to give us the contractor details yet until they settled the CF issues.

but if u r still interested to have the quotes i am more than willing to share it with u.

This post has been edited by kokiegigit: Mar 3 2009, 06:08 PM
petehor
post Mar 3 2009, 06:23 PM

New Member
*
Junior Member
17 posts

Joined: Feb 2009


Here some photo of the housing area.....it look more clearly rolleyes.gif rolleyes.gif rolleyes.gif rolleyes.gif rolleyes.gif

http://picasaweb.google.com/Encik.Firdaus/...835458005921650
kokiegigit
post Mar 3 2009, 06:27 PM

Getting Started
**
Junior Member
136 posts

Joined: Sep 2008



opps ... i hav forgotten that there r owners on L2-L4 ... that one you have to check with developer on the grill design. since your unit r facing the open space. i am on the ground floor.

This post has been edited by kokiegigit: Mar 3 2009, 06:29 PM
faizal_nayan
post Mar 3 2009, 06:27 PM

New Member
*
Junior Member
25 posts

Joined: Dec 2008
QUOTE(kokiegigit @ Mar 3 2009, 05:56 PM)
we need only to follow the front door grill. the dev has given us the design. for the other grills since the dev did not mention and since the grills are either inside or behind i presume we could do whatever we like.


Added on March 3, 2009, 6:07 pm

faizal

the quotations that i hav are from outside contractors. i have not gotten from dev contractors. well, couldnt be bothered to ask for one since dev has not given us the CF yet. Logically presumed, I think they are not interested to give us the contractor details yet until they settled the CF issues.

but if u r still interested to have the quotes i am more than willing to share it with u.
*
hi,

yup, pls2 share wif me the quotation...i don bother also to use dev contracter...thanks ya

kelvinchin
post Mar 3 2009, 07:19 PM

New Member
*
Junior Member
46 posts

Joined: Aug 2008


QUOTE(petehor @ Mar 3 2009, 07:23 PM)
Here some photo of the housing area.....it look more clearly rolleyes.gif  rolleyes.gif  rolleyes.gif  rolleyes.gif  rolleyes.gif

http://picasaweb.google.com/Encik.Firdaus/...835458005921650
*
Thanks for sharing so much photos!! rclxms.gif
kokiegigit
post Mar 3 2009, 08:30 PM

Getting Started
**
Junior Member
136 posts

Joined: Sep 2008



anyone has quotation for kitchen cab ...
bluesky_king
post Mar 3 2009, 08:36 PM

Getting Started
**
Junior Member
273 posts

Joined: Oct 2008
QUOTE(tsohtan @ Mar 3 2009, 05:28 PM)
Hi All,

I had drafted out the letter and see anyone got comment and needed update or change anything.
ANd now i not sure should we go by one by one send the letter or send one letter with all signature, cause i heard commitee need to be register. So anyone can tell on the right way to do it?

Before we ask for assembly, i probably ask advice from the HBA. So may be i will visit them on this sat.
*
thank for draft the formal letter, so what about the LAD claims and CF delay, this point not in the complaints letter .
kokiegigit
post Mar 3 2009, 08:36 PM

Getting Started
**
Junior Member
136 posts

Joined: Sep 2008



what about electrical wiring ... i brought contractor to my house but thats it ... he never quote ...

This post has been edited by kokiegigit: Mar 3 2009, 08:46 PM
tsohtan
post Mar 3 2009, 09:14 PM

Getting Started
**
Junior Member
83 posts

Joined: Jan 2005
QUOTE(bluesky_king @ Mar 3 2009, 08:36 PM)
thank for draft the formal letter, so what about the LAD claims and CF delay, this point not in the complaints letter .
*
I not sure whether this point should include in, as we only can claim only when the CF is ready. and not sure what to mention in complain letter. And this should be ask advice from HBA on how to procceed on it at this moment.

Beside the complaint is more on design and the charges. : blush.gif
And i think now basically we're need to wait for CF received only mention about LAD.

This post has been edited by tsohtan: Mar 3 2009, 09:25 PM
bluesky_king
post Mar 3 2009, 09:50 PM

Getting Started
**
Junior Member
273 posts

Joined: Oct 2008
QUOTE(tsohtan @ Mar 3 2009, 09:14 PM)
I not sure whether this point should include in, as we only can claim only when the CF is ready. and not sure what to mention in complain letter. And this should be ask advice from HBA on how to procceed on it at this moment.

Beside the complaint is more on design and the charges. : blush.gif
And i think now basically we're need to wait for CF received only mention about LAD.
*
you are right also.


Added on March 3, 2009, 9:50 pm
QUOTE(tsohtan @ Mar 3 2009, 09:14 PM)
I not sure whether this point should include in, as we only can claim only when the CF is ready. and not sure what to mention in complain letter. And this should be ask advice from HBA on how to procceed on it at this moment.

Beside the complaint is more on design and the charges. : blush.gif
And i think now basically we're need to wait for CF received only mention about LAD.
*
you are right also.

This post has been edited by bluesky_king: Mar 3 2009, 09:50 PM
yeh.babe
post Mar 4 2009, 09:34 AM

Getting Started
**
Junior Member
55 posts

Joined: Nov 2008
QUOTE(tsohtan @ Mar 3 2009, 05:44 PM)
Hi Yeh.babe

May i know for your case, did you guys form up a committee, and do you register the committee, because someone told me we need to regiter it, and it not register is considered a illegal assembly!!! ohmy.gif .....

So may you shared your experience?

And i had prepared letter, and the letter is going to sign by all resident (if possible).

Thank you for your sharing first.
*
well, tan, our case in balakong no committee formed, we did our complaint individually, that is why not effective. to form up a committee, let me check around and update you how to do it, at this moment, i have no idea and experience. if you are seeking advise from HBA, maybe they can provide you the info as how to do it.


fwmun
post Mar 4 2009, 10:27 AM

New Member
*
Junior Member
30 posts

Joined: Mar 2009
[FONT=Courier]
QUOTE(tsohtan @ Mar 3 2009, 05:28 PM)
Hi All,

I had drafted out the letter and see anyone got comment and needed update or change anything.
ANd now i not sure should we go by one by one send the letter or send one letter with all signature, cause i heard commitee need to be register. So anyone can tell on the right way to do it?

Before we ask for assembly, i probably ask advice from the HBA. So may be i will visit them on this sat.
*
Hi, my house is @ Jln Amansiara 1/5, address no is 109-1 & 109-2, unfortunately mine is with the narrow road of 28 feet only. Anyone in the same row as me gotten key already ? I haven't got my key yet, S&P dated 13-Feb. I don't know how would the developer can rectify the narrow road.
Should we include this in the complaint letter or we should deal with the developer separately. icon_question.gif
suiteng
post Mar 4 2009, 10:39 AM

Hopeless President
*******
Senior Member
3,589 posts

Joined: Nov 2004


Erm.. I think you guys should open a V2 for this thread. Already passed the 125 pages mark sweat.gif
augustinetan
post Mar 4 2009, 10:43 AM

Getting Started
**
Junior Member
196 posts

Joined: Dec 2008


QUOTE(fwmun @ Mar 4 2009, 11:27 AM)
[FONT=Courier]

Hi, my house is @ Jln Amansiara 1/5, address no is 109-1 & 109-2, unfortunately mine is with the narrow road of 28 feet only. Anyone in the same row as me gotten key already ?  I haven't got my key yet, S&P dated 13-Feb. I don't know how would the developer can rectify the narrow road.
Should we include this in the complaint letter or we should deal with the developer separately.  icon_question.gif
*
you have the right to complaint in the complain letter or deal with the developer separately,but according to plan if it a small road,cannot sue developer,further more lot 109-1 and 109-2 opposite site no more empty space,how to widen the road? rclxub.gif
alanyuppie
post Mar 4 2009, 10:44 AM

Look at all my stars!!
*******
Senior Member
2,834 posts

Joined: Jul 2006
From: here


QUOTE(suiteng @ Mar 4 2009, 11:39 AM)
Erm.. I think you guys should open a V2 for this thread. Already passed the 125 pages mark sweat.gif
*
Thanks. yeah its pretty hard to navigate now. And seems like many new members didnt realise there are many goodies (like photos of their phases) tucked inside these 120++ pages.

FELLAS.. proceed to v2 topic please
augustinetan
post Mar 4 2009, 11:05 AM

Getting Started
**
Junior Member
196 posts

Joined: Dec 2008


QUOTE(yeh.babe @ Mar 4 2009, 10:34 AM)
well, tan, our case in balakong no committee formed, we did our complaint individually, that is why not effective. to form up a committee, let me check around and update you how to do it, at this moment, i have no idea and experience. if you are seeking advise from HBA, maybe they can provide you the info as how to do it.
*
to be volunteer or committee is no easy job,thank all for the effort put in. rclxms.gif


Added on March 4, 2009, 11:14 amfor those plan renovation,any try using ikea home planner software?




http://www.ikea.com.my/complete_kitchen_2009/homeplanner.zip

This post has been edited by augustinetan: Mar 4 2009, 11:14 AM
fwmun
post Mar 4 2009, 11:42 AM

New Member
*
Junior Member
30 posts

Joined: Mar 2009
QUOTE(kokiegigit @ Mar 3 2009, 06:27 PM)
opps ... i hav forgotten that there r owners on L2-L4 ... that one you have to check with developer on the grill design. since your unit r facing the open space. i am on the ground floor.
*
Hi kokiegigit, if u don't mind send to me as well vivian-wm.foo@aig.com biggrin.gif
tsohtan
post Mar 4 2009, 12:17 PM

Getting Started
**
Junior Member
83 posts

Joined: Jan 2005
QUOTE(augustinetan @ Mar 2 2009, 10:11 AM)

*
Hi All,

I think we got no point to call MPS and WIRAMA ask for CF Status.
As i just called to S&P laywer, girl name Nor, had answer me with the expect asnwer as we know. -->You got to wait.She told me we have to wait until end of this month (Mar). Another Month!!! sad.gif .

And some more this is really out of our control, and what we can do is act as a "dog" non-stop barking the developer hope to get the CF sooner.


bluesky_king
post Mar 4 2009, 12:24 PM

Getting Started
**
Junior Member
273 posts

Joined: Oct 2008
QUOTE(tsohtan @ Mar 4 2009, 12:17 PM)
Hi All,

I think we got no point to call MPS and WIRAMA ask for CF Status.
As i just called to S&P laywer, girl name Nor, had answer me with the expect asnwer as we know. -->You got to wait.She told me we have to wait until end of this month (Mar). Another Month!!!  sad.gif .

And some more this is really out of our control, and what we can do is act as  a "dog" non-stop barking the developer hope to get the CF sooner.
*
Y need to wait until end of this March? what its mean for? It is CF will issue tis month???