This post has been edited by Darenloh: Oct 27 2025, 05:35 PM
Attached thumbnail(s)
Extension, Wet Works and ID, Discussion for Wet Works and ID works
|
|
Oct 8 2018, 01:25 PM, updated 4w ago
Show posts by this member only | IPv6 | Post
#1
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
Hi guys, pls leave a comment regrading Extension and ID. Here are some photos of on-going project :thumbsup: . From bare unit to fully extend with ID works This post has been edited by Darenloh: Oct 27 2025, 05:35 PM Attached thumbnail(s) VIVI_Puddin, hoilok, and 1 other liked this post
|
|
|
|
|
|
Oct 8 2018, 03:44 PM
Show posts by this member only | Post
#2
|
![]() ![]()
Junior Member
154 posts Joined: Mar 2015 |
Darenloh, this is in pj ?
Saw got 2 columns in the house, if 1 column cannot ? For extension side, how much space must leave at the garden ya ? |
|
|
Oct 8 2018, 09:46 PM
Show posts by this member only | IPv6 | Post
#3
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(brapa? @ Oct 8 2018, 03:44 PM) Darenloh, this is in pj ? Nope bro, this is in ampang.Saw got 2 columns in the house, if 1 column cannot ? For extension side, how much space must leave at the garden ya ? On the left is existing column and on the right is extended area so need another 1. The existing can't be remove. For the side, it's only left 5ft space. |
|
|
Oct 9 2018, 11:27 AM
Show posts by this member only | Post
#4
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Oct 11 2018, 09:10 PM
Show posts by this member only | IPv6 | Post
#5
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Oct 12 2018, 10:49 PM
Show posts by this member only | Post
#6
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,913 posts Joined: Nov 2004 |
Looks nice man
|
|
|
|
|
|
Oct 12 2018, 11:36 PM
Show posts by this member only | IPv6 | Post
#7
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Oct 13 2018, 10:46 AM
Show posts by this member only | Post
#8
|
![]() ![]() ![]()
Junior Member
327 posts Joined: Oct 2007 |
|
|
|
Oct 13 2018, 01:41 PM
Show posts by this member only | IPv6 | Post
#9
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Oct 15 2018, 08:32 PM
Show posts by this member only | IPv6 | Post
#10
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Oct 20 2018, 12:37 PM
Show posts by this member only | IPv6 | Post
#11
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Nov 1 2018, 07:22 PM
|
![]()
Newbie
3 posts Joined: Nov 2018 |
Contact number pls. Looking for tiling contractor for reno in Bdr. Tun Hussien Onn
|
|
|
Nov 3 2018, 12:33 PM
Show posts by this member only | IPv6 | Post
#13
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
|
|
|
Dec 17 2018, 03:37 PM
Show posts by this member only | IPv6 | Post
#14
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Dec 17 2018, 03:39 PM
Show posts by this member only | IPv6 | Post
#15
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Dec 17 2018, 07:41 PM
|
![]() ![]()
Junior Member
135 posts Joined: Oct 2007 |
|
|
|
Dec 18 2018, 10:17 AM
|
![]() ![]()
Junior Member
185 posts Joined: May 2007 |
QUOTE(Darenloh @ Oct 8 2018, 01:25 PM) Hi guys, pls leave a comment regrading Extension and ID. Here are some photos of on-going project :thumbsup: . From bare unit to fully extend with ID works Pm cost estimates for similar renovation work. I plan to do something similar reno. |
|
|
Dec 26 2018, 08:02 PM
Show posts by this member only | IPv6 | Post
#18
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Dec 26 2018, 08:04 PM
Show posts by this member only | IPv6 | Post
#19
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Feb 24 2019, 07:00 PM
Show posts by this member only | IPv6 | Post
#20
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Mar 14 2019, 10:52 PM
Show posts by this member only | IPv6 | Post
#21
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Mar 18 2019, 12:00 PM
|
![]()
Junior Member
24 posts Joined: Feb 2011 |
PM please, am looking for renovation for my house, ID and extension needed. 20 x 70.
|
|
|
Mar 18 2019, 01:43 PM
|
![]() ![]()
Junior Member
270 posts Joined: Jan 2003 |
need ID and reno works. how u start? with S&P drawings?
|
|
|
Mar 20 2019, 04:24 PM
Show posts by this member only | IPv6 | Post
#24
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Mar 20 2019, 10:19 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Mar 26 2019, 05:45 AM
|
![]()
Newbie
1 posts Joined: Dec 2013 |
Looking for ID design. Please PM. Tq
|
|
|
Mar 26 2019, 04:51 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Mar 28 2019, 01:56 AM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Apr 7 2019, 04:12 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Apr 8 2019, 07:19 PM
Show posts by this member only | IPv6 | Post
#30
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Apr 9 2019, 01:45 PM
Show posts by this member only | IPv6 | Post
#31
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Apr 10 2019, 11:53 AM
|
![]() ![]()
Junior Member
185 posts Joined: May 2007 |
|
|
|
Apr 10 2019, 01:36 PM
|
![]() ![]()
Junior Member
186 posts Joined: Mar 2011 |
Hi ! please pm the renovation fees & contact.
|
|
|
Apr 10 2019, 09:11 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Apr 10 2019, 09:11 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Apr 11 2019, 08:08 PM
Show posts by this member only | IPv6 | Post
#36
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Apr 17 2019, 03:46 PM
Show posts by this member only | IPv6 | Post
#37
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Apr 18 2019, 07:55 AM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,133 posts Joined: Aug 2007 From: KL |
PM contact pls
|
|
|
Apr 18 2019, 11:09 AM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Apr 18 2019, 04:14 PM
|
![]() ![]()
Junior Member
164 posts Joined: Mar 2012 |
QUOTE(Darenloh @ Oct 8 2018, 01:25 PM) Hi guys, pls leave a comment regrading Extension and ID. Here are some photos of on-going project :thumbsup: . From bare unit to fully extend with ID works Bro, can pm your cost of doing all this? Thanks! |
|
|
Apr 19 2019, 01:57 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Apr 20 2019, 01:07 PM
|
![]() ![]() ![]()
Junior Member
446 posts Joined: Feb 2009 From: kg tradisi...uni10... |
bro..pm contact no.. u got office? wanna do full reno of roof and kitchen with modern design
|
|
|
Apr 20 2019, 01:08 PM
|
![]() ![]() ![]()
Junior Member
446 posts Joined: Feb 2009 From: kg tradisi...uni10... |
bro..pm contact no.. u got office? wanna do full reno of roof and kitchen with modern design
|
|
|
Apr 20 2019, 06:04 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Apr 23 2019, 06:32 AM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Apr 23 2019, 11:55 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,024 posts Joined: Jan 2003 |
|
|
|
Apr 23 2019, 12:17 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Apr 23 2019, 03:50 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Apr 24 2019, 04:29 PM
|
![]() ![]() ![]()
Junior Member
334 posts Joined: Dec 2004 |
QUOTE(Darenloh @ Oct 8 2018, 01:25 PM) Hi guys, pls leave a comment regrading Extension and ID. Here are some photos of on-going project Hi, i saw the first pic related front renovation with balcony and washroom at the front.May i know how much to do this with an area about eg 13ft x 22ft. I am particularly concern about the roof after front renovation. The existing roof can be extended to cover the balcony? Thank you. |
|
|
Apr 25 2019, 02:56 PM
Show posts by this member only | IPv6 | Post
#50
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(dav668 @ Apr 24 2019, 04:29 PM) Hi, i saw the first pic related front renovation with balcony and washroom at the front. Pls check your inbox May i know how much to do this with an area about eg 13ft x 22ft. I am particularly concern about the roof after front renovation. The existing roof can be extended to cover the balcony? Thank you. |
|
|
Apr 25 2019, 03:12 PM
Show posts by this member only | IPv6 | Post
#51
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Apr 27 2019, 01:40 PM
Show posts by this member only | IPv6 | Post
#52
|
![]() ![]()
Junior Member
163 posts Joined: Jul 2009 |
|
|
|
Apr 28 2019, 03:16 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
May 3 2019, 10:51 AM
|
![]()
Junior Member
31 posts Joined: Aug 2014 |
QUOTE(Darenloh @ Oct 8 2018, 01:25 PM) Hi guys, pls leave a comment regrading Extension and ID. Here are some photos of on-going project hi Bro , can u giv a rough cost (involves Demolition, Extension, Plaster ceiling, Tiling, Piping)on extend back and front of a double storey , size is 22 * 75. and contact as well. thanks. |
|
|
May 3 2019, 02:45 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
May 6 2019, 10:27 PM
Show posts by this member only | IPv6 | Post
#56
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
May 6 2019, 10:33 PM
Show posts by this member only | IPv6 | Post
#57
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
May 9 2019, 03:44 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
May 12 2019, 06:20 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
May 14 2019, 01:38 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
May 14 2019, 01:38 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
May 16 2019, 12:10 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
May 20 2019, 01:22 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
May 25 2019, 04:00 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jun 12 2019, 03:26 PM
Show posts by this member only | IPv6 | Post
#65
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jun 13 2019, 01:44 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,508 posts Joined: Jun 2009 |
How much roughly for the upper master room extension?
Dimension for the extensions are about 27' x 10' |
|
|
Jun 16 2019, 08:29 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jun 19 2019, 01:01 PM
|
![]()
Newbie
11 posts Joined: Aug 2017 |
Hi, what is the estimated cost of kitchen extension? to extend new structure RC, roughly ab 345sqf.
|
|
|
Jun 19 2019, 03:45 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jun 24 2019, 02:37 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jul 1 2019, 02:51 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jul 1 2019, 02:53 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jul 9 2019, 12:33 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jul 15 2019, 09:07 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jul 17 2019, 07:23 PM
Show posts by this member only | IPv6 | Post
#75
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jul 23 2019, 09:29 AM
|
![]()
Probation
18 posts Joined: Jun 2019 |
Hi sifus. I am in the midst of choosing my renovation contractor and I would like to make a site visit on the prospective contractors to assess the quality of their work. Can someone share with me what are the indicators of good workmanship on the work site? Thanks a lot!
|
|
|
Jul 23 2019, 04:07 PM
|
![]() ![]()
Junior Member
287 posts Joined: Feb 2009 |
Looking for ID bro pm
|
|
|
Jul 25 2019, 12:31 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(ryanwong92 @ Jul 23 2019, 09:29 AM) Hi sifus. I am in the midst of choosing my renovation contractor and I would like to make a site visit on the prospective contractors to assess the quality of their work. Can someone share with me what are the indicators of good workmanship on the work site? Thanks a lot! pls check ur inbox 😊 |
|
|
Jul 25 2019, 12:32 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Aug 5 2019, 10:24 AM
|
![]()
Probation
3 posts Joined: Aug 2019 |
Hi , am looking for contractors to extend my backyard , measurements is around 15 ft x 30 ft .
|
|
|
Aug 10 2019, 08:29 AM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Aug 10 2019, 10:55 AM
Show posts by this member only | IPv6 | Post
#82
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,133 posts Joined: Jan 2003 From: Cameron Highlands Rank: Amateur |
Can pm me more on back extension around 20x7 for concrete slab?
|
|
|
Aug 13 2019, 05:56 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Nov 13 2019, 03:31 PM
|
![]() ![]() ![]()
Junior Member
334 posts Joined: Dec 2004 |
I m here to write a feedback regarding on his work. I contacted him here and he was trying his very best to contact and follow up with me. At that time, i was surveying the cost of renovation for my house, extending the front part with balcony.
The construction was delayed due to some unexpected incidents however he was trying his best to make the renovation work in progress. I m not the one familiar with all the concrete and construction stuffs but he is trying to communicate with me from time to time. Of course we started with his drawing by referring to some photos/ design i have taken from other similar houses. All in all, i m happy with his working attitude (not a calculative person but most of the time trying his best to accommodating the client's budget, being flexible for some minor works). No one is perfect but he did his job well. Some minor touch up needed but he kept his promises and completed his work. One thing i am very particular and he is good is- he used quality materials. this is indeed impressive as most of the times the material quality are not something client able to see. He was thoughtful to build thick pillars for my balcony expecting i may need to extend the master room later. i think this is something to compliment. His quotation is reasonable. His job quality is above average. The material he used is standard (or could be better than standard). Most importantly, his personality to work together with client to ensure the job is done happily. I would recommend him to those who look for contractor committed to his work, and quality first. |
|
|
Nov 13 2019, 03:37 PM
Show posts by this member only | IPv6 | Post
#85
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,124 posts Joined: Oct 2004 |
If reno 12feet x 10feet for extend kitchen.. Awning already have
|
|
|
Nov 14 2019, 01:38 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(dav668 @ Nov 13 2019, 03:31 PM) I m here to write a feedback regarding on his work. I contacted him here and he was trying his very best to contact and follow up with me. At that time, i was surveying the cost of renovation for my house, extending the front part with balcony. Thanks for giving me a chance to serve you and thanks for sharing with me your working and life experience The construction was delayed due to some unexpected incidents however he was trying his best to make the renovation work in progress. I m not the one familiar with all the concrete and construction stuffs but he is trying to communicate with me from time to time. Of course we started with his drawing by referring to some photos/ design i have taken from other similar houses. All in all, i m happy with his working attitude (not a calculative person but most of the time trying his best to accommodating the client's budget, being flexible for some minor works). No one is perfect but he did his job well. Some minor touch up needed but he kept his promises and completed his work. One thing i am very particular and he is good is- he used quality materials. this is indeed impressive as most of the times the material quality are not something client able to see. He was thoughtful to build thick pillars for my balcony expecting i may need to extend the master room later. i think this is something to compliment. His quotation is reasonable. His job quality is above average. The material he used is standard (or could be better than standard). Most importantly, his personality to work together with client to ensure the job is done happily. I would recommend him to those who look for contractor committed to his work, and quality first. |
|
|
Nov 14 2019, 01:40 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Nov 14 2019, 03:22 PM
Show posts by this member only | IPv6 | Post
#88
|
![]()
Probation
1 posts Joined: Nov 2019 |
Pm me for ID and house extension 10x22 located at bukit jalil. thanks
|
|
|
Nov 14 2019, 07:26 PM
|
![]() ![]()
Junior Member
196 posts Joined: Mar 2018 |
PM for ID and house extension for 3 x 20 located at Kota Kemuning. Thanks
|
|
|
Nov 14 2019, 08:00 PM
Show posts by this member only | IPv6 | Post
#90
|
![]() ![]()
Junior Member
85 posts Joined: Aug 2019 |
Would like to do renovation. Please message
|
|
|
Nov 15 2019, 12:54 PM
Show posts by this member only | IPv6 | Post
#91
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Nov 15 2019, 01:03 PM
Show posts by this member only | IPv6 | Post
#92
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Nov 15 2019, 01:03 PM
Show posts by this member only | IPv6 | Post
#93
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Nov 16 2019, 06:20 AM
Show posts by this member only | IPv6 | Post
#94
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Nov 17 2019, 05:00 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Nov 24 2019, 06:50 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Nov 30 2019, 12:41 AM
Show posts by this member only | IPv6 | Post
#97
|
![]()
Junior Member
35 posts Joined: Sep 2005 |
Bro how much to add on a toilet in a double story room? currently is a shared toilet
|
|
|
Nov 30 2019, 05:31 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Dec 5 2019, 03:35 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Dec 5 2019, 05:11 PM
|
![]() ![]() ![]() ![]() ![]()
Junior Member
711 posts Joined: Mar 2008 |
how much to widen front door fence.
remove/ relocate pillar of car porch and change the wooden stair into concrete stair This post has been edited by wailing81: Dec 5 2019, 05:12 PM |
|
|
Dec 6 2019, 01:52 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
11,058 posts Joined: Jun 2008 |
|
|
|
Dec 6 2019, 04:12 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Dec 6 2019, 04:14 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Dec 6 2019, 08:58 PM
Show posts by this member only | IPv6 | Post
#104
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,050 posts Joined: Oct 2008 |
hi boss, hows business? alot projects going on ? maybe will engage u for quotation later
|
|
|
Dec 7 2019, 08:01 AM
Show posts by this member only | IPv6 | Post
#105
|
![]() ![]()
Junior Member
89 posts Joined: Mar 2012 |
|
|
|
Dec 7 2019, 10:53 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
11,058 posts Joined: Jun 2008 |
|
|
|
Dec 9 2019, 01:40 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Dec 9 2019, 01:42 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Dec 9 2019, 01:43 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Dec 17 2019, 06:26 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jan 12 2020, 05:11 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jan 13 2020, 10:57 AM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,203 posts Joined: Jan 2003 |
Yo bro, where is your location?
I'm in the midst of looking for contractor to work for kitchen and master room extension in February. Would like to get your contact. |
|
|
Jan 13 2020, 10:53 PM
Show posts by this member only | IPv6 | Post
#113
|
![]() ![]()
Junior Member
76 posts Joined: Apr 2006 |
Bro, looking for ID and renovation services... can PM me your contact?
Thanks |
|
|
Jan 15 2020, 06:20 PM
Show posts by this member only | IPv6 | Post
#114
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jan 15 2020, 06:21 PM
Show posts by this member only | IPv6 | Post
#115
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Feb 6 2020, 04:45 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
Here to share some sneak peek ID for KLCC area condo. Selling RM5.5mil and rental price RM17k This post has been edited by Darenloh: Feb 6 2020, 04:47 PM |
|
|
Feb 10 2020, 05:24 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
upper floor entertainment area with 100 inches TV |
|
|
Feb 12 2020, 05:25 PM
|
![]()
Probation
1 posts Joined: Feb 2020 |
I'm searching for contractor for renovate my house. Kindly send me details.
|
|
|
Feb 13 2020, 12:54 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Feb 14 2020, 10:44 AM
Show posts by this member only | IPv6 | Post
#120
|
![]() ![]() ![]() ![]()
Junior Member
647 posts Joined: Jun 2016 |
I live in a 3 bedroom condominium around 1200sq f.
I have a indoor cooking station with Hood installed properly(non ducted) .however,I don't like the poor ventilation.how to get rid of this?Or can I transform my dry kitchen into wet kitchen by doing some renovation? |
|
|
Feb 14 2020, 04:41 PM
Show posts by this member only | IPv6 | Post
#121
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(peigeng @ Feb 14 2020, 10:44 AM) I live in a 3 bedroom condominium around 1200sq f. if possible can you attach some pictures of your current kitchen and the floor plan? I have a indoor cooking station with Hood installed properly(non ducted) .however,I don't like the poor ventilation.how to get rid of this?Or can I transform my dry kitchen into wet kitchen by doing some renovation? |
|
|
Feb 20 2020, 07:13 PM
Show posts by this member only | IPv6 | Post
#122
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Feb 24 2020, 08:47 AM
Show posts by this member only | IPv6 | Post
#123
|
![]()
Junior Member
14 posts Joined: Jan 2009 |
()
This post has been edited by shuenray: Aug 26 2023, 02:34 AM |
|
|
Feb 26 2020, 02:41 PM
Show posts by this member only | IPv6 | Post
#124
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Mar 1 2020, 11:25 PM
Show posts by this member only | IPv6 | Post
#125
|
![]() ![]()
Junior Member
128 posts Joined: Jul 2010 |
Hi bro. Can PM your contact details, want to renovate my condo unit. Thanks
|
|
|
Mar 2 2020, 02:27 PM
Show posts by this member only | IPv6 | Post
#126
|
![]() ![]() ![]() ![]()
Junior Member
500 posts Joined: Aug 2014 |
I plan to do minor extension, my house is 24 x 64 but the living room wide only 20. Want to extend to 24. PM cost pls
|
|
|
Mar 2 2020, 08:29 PM
Show posts by this member only | IPv6 | Post
#127
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Mar 2 2020, 08:30 PM
Show posts by this member only | IPv6 | Post
#128
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Mar 3 2020, 08:37 AM
Show posts by this member only | IPv6 | Post
#129
|
![]() ![]()
Junior Member
114 posts Joined: Jan 2015 |
Hi bro, please PM contact. Looking to do some minor renovation for my condo in Wangsa Maju. Thanks!
|
|
|
Mar 4 2020, 12:12 AM
|
![]() ![]() ![]() ![]()
Junior Member
500 posts Joined: Aug 2014 |
My land area is 1540 and built up is only around 1650, double storey.
The house is old and need to do everything from scratch including wiring and piping. And also do extension around 200 sqf for both floor. Balcony need to do as well as currently the balcony is small,unable to cover whole car porch area. Any guys got experience roughly how much needed? I just met a contractor and he told me near a million, seriously? |
|
|
Mar 4 2020, 11:16 AM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Mar 4 2020, 11:21 AM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(mavistan89 @ Mar 4 2020, 12:12 AM) My land area is 1540 and built up is only around 1650, double storey. A million is quite too much. For extension part i think within 100k can be done. piping and wiring ard 20k. painting 7k and tiling after extension ard 20k. so within 150k can be done.The house is old and need to do everything from scratch including wiring and piping. And also do extension around 200 sqf for both floor. Balcony need to do as well as currently the balcony is small,unable to cover whole car porch area. Any guys got experience roughly how much needed? I just met a contractor and he told me near a million, seriously? |
|
|
Mar 6 2020, 05:13 PM
|
![]() ![]()
Junior Member
103 posts Joined: Dec 2006 |
Hi, would like to know pricing for extension upstair master bedroom, whole house renovation. ID separate pricing? Pls pm me thx.
This post has been edited by dh007014: Mar 6 2020, 05:16 PM |
|
|
Mar 7 2020, 05:00 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Mar 20 2020, 10:59 AM
Show posts by this member only | IPv6 | Post
#135
|
![]()
Newbie
8 posts Joined: Jan 2019 |
Hi, mind pm me your number as well? Thanks.
|
|
|
Mar 21 2020, 08:32 PM
Show posts by this member only | IPv6 | Post
#136
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Apr 11 2020, 08:03 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
Our build services are temporarily closed due to MCO announced by the government. However, our design and space planning service are still operating as usual. Our designers are working hard to ensure every design and space planning meets our clients' expectations. Please contact us for more info on the design pricing. #StaySafe #StayHome #StayCool
![]() This post has been edited by Darenloh: Apr 11 2020, 08:04 PM |
|
|
Apr 12 2020, 08:46 PM
|
![]()
Probation
17 posts Joined: Jul 2019 |
PM contact please
|
|
|
Apr 13 2020, 10:24 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Apr 17 2020, 08:02 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Apr 17 2020, 08:10 PM
|
![]() ![]() ![]() ![]() ![]()
Junior Member
723 posts Joined: Jul 2008 |
Black look cooler short term, but I will goes for blue for long term.
|
|
|
Apr 17 2020, 08:15 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,269 posts Joined: Dec 2019 |
|
|
|
May 17 2020, 08:06 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
May 17 2020, 08:07 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
May 17 2020, 08:13 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
Tumpang topic sikit.. Who's interested to buy or get more details for this property pls pm me. U may click this link for some basic details of this property https://forum.lowyat.net/topic/4963290
![]() |
|
|
May 19 2020, 12:54 PM
|
![]() ![]()
Junior Member
124 posts Joined: Jul 2013 |
Have u experience on lighting design (without plaster ceiling) of the house ? Because I am looking for lighting specialist to design the ambience of the house only and include the lighting installation as well. Need some advise for the particular place with the light design. Like using the tracklight, pendant light, down light or spotlight) need how many of them so make sure the light is enuf in particular area ?
|
|
|
May 24 2020, 05:46 AM
Show posts by this member only | IPv6 | Post
#147
|
![]() ![]() ![]() ![]() ![]()
Senior Member
717 posts Joined: Jun 2011 |
hi bro Daren, can pm me your contact? i'm looking for someone to help out with a new house on renovation.
|
|
|
May 25 2020, 10:18 AM
|
![]() ![]()
Junior Member
107 posts Joined: Jan 2003 From: Cheras |
Hi Daren, pls pm me your contact. would like to do a major reno on my double storey house. Thanks.
|
|
|
May 25 2020, 02:17 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(kim0112 @ May 19 2020, 12:54 PM) Have u experience on lighting design (without plaster ceiling) of the house ? Because I am looking for lighting specialist to design the ambience of the house only and include the lighting installation as well. Need some advise for the particular place with the light design. Like using the tracklight, pendant light, down light or spotlight) need how many of them so make sure the light is enuf in particular area ? Hi, I'm not a so-called pro in lighting but i can share with you some ideas of lighting. To make a room that is not too bright or too dark the first thing you need to know is the area size. Each light between distance needs 5ft and distance from the wall is at least 3ft (check the attachment below). Secondly the track light purpose is to highlight some features. Eg. for wall features, drawing or painting, and display rack. For what I've seen now in KLCC condo they mainly use eyeball instead of downlight. The eyeball can create warmth and cozy environment. The uses of the eyeball are recommended in the condo and for Landed property should use both eyeball and the downlight(4" or 6") in order to create good lighting. Here is my 2 cents on lighting. ![]() |
|
|
May 25 2020, 02:20 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
May 25 2020, 02:20 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jun 2 2020, 08:20 PM
Show posts by this member only | IPv6 | Post
#152
|
![]()
Probation
13 posts Joined: May 2020 |
Pm contact. I need to do some extension.
|
|
|
Jun 4 2020, 02:15 PM
Show posts by this member only | IPv6 | Post
#153
|
![]() ![]() ![]()
Junior Member
406 posts Joined: May 2006 From: :) |
Hi please pm, need some ball park figure for double storey landed major facelift and renovation
|
|
|
Jun 5 2020, 12:51 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jun 5 2020, 12:53 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jun 5 2020, 02:13 PM
|
![]()
Newbie
16 posts Joined: May 2016 |
Planning to extend my wet kitchen (5 x 22 feet, ground floor only, premises at bandar puchong jaya) with conventional tile roof. Work to include wet works, tiling, plumbing & electrical installation. pm quotation pls. Thanks in advance.
|
|
|
Jun 6 2020, 04:38 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jun 9 2020, 07:19 PM
Show posts by this member only | IPv6 | Post
#158
|
![]()
Newbie
16 posts Joined: May 2016 |
|
|
|
Jun 10 2020, 01:24 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jun 10 2020, 02:16 PM
|
![]() ![]()
Junior Member
72 posts Joined: Feb 2008 |
Hi Daren,
Plse PM me. I need some ID for my living. Thanks |
|
|
Jun 11 2020, 06:11 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jun 21 2020, 04:44 PM
Show posts by this member only | IPv6 | Post
#162
|
![]()
Probation
13 posts Joined: May 2020 |
Hi Daren, I'm confusing about some building material that you've explained to me in PM. Since its fall under extension and wet works, can you share some knowledge on how to differentiate BS and CQ for steel bar? I hope it can help other former that wanted to do extension soon or in progress. Sorry for being troublesome cause we are not in the construction field. tqvm
|
|
|
Jun 21 2020, 07:00 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(adrianlim2323 @ Jun 21 2020, 04:44 PM) Hi Daren, I'm confusing about some building material that you've explained to me in PM. Since its fall under extension and wet works, can you share some knowledge on how to differentiate BS and CQ for steel bar? I hope it can help other former that wanted to do extension soon or in progress. Sorry for being troublesome cause we are not in the construction field. tqvm Hi Mr. Lim, no need to sorry, I'm happy to share some details of it, and hopefully it can help other people too without charging any consultation fees The other point is the marking that u can find on the steel. Each company has a different marking. Eg. Alliance steel it will be written, "AS 12 500N". "AS" is company/manufacturer, "12" is the diameter size and "500N" is the grade and strength. Secondly is the BRC. For physically it is the same with the high tensile deformed steel bar which is (Y bar) that I've mentioned just now. The size is slightly different. It has BRC A4-A13 (square mesh), BRC B5-B13(rectangular mesh), BRC C5-C13(long rectangular mesh), BRC DA4-DA13(small square mesh). The alphabet after the letter of BRC represents the shape and the number represents the diameter size. Last but not least, is ® round steel bar. The (Y) and ® bar many of people are confusing. The (Y) bar is with groove line and the ® is without groove line and it's a smooth rounded shape. So what is the uses of (Y) and ® is (Y) usually is the long straight steel in column or beam and ® is the ring of the (Y). This will be confused but i will attach some drawing to explain it shortly. If u guys experienced in submission to majlis it will have archi and engineer plan, From the plan it will written 6Y12/150cc which means your column or beam should consist of 6 units of Y12 and the ring gap between is 150mm. So here is my explanation of the steel bar. Pls correct me if I'm wrong. Thanks OoiTY, JasonTheGreat, and 1 other liked this post
|
|
|
Jun 21 2020, 08:08 PM
|
![]() ![]()
Junior Member
148 posts Joined: Jan 2011 |
QUOTE(Darenloh @ Jun 21 2020, 07:00 PM) Hi Mr. Lim, no need to sorry, I'm happy to share some details of it, and hopefully it can help other people too without charging any consultation fees Good explanation bro. Salute! The other point is the marking that u can find on the steel. Each company has a different marking. Eg. Alliance steel it will be written, "AS 12 500N". "AS" is company/manufacturer, "12" is the diameter size and "500N" is the grade and strength. Secondly is the BRC. For physically it is the same with the high tensile deformed steel bar which is (Y bar) that I've mentioned just now. The size is slightly different. It has BRC A4-A13 (square mesh), BRC B5-B13(rectangular mesh), BRC C5-C13(long rectangular mesh), BRC DA4-DA13(small square mesh). The alphabet after the letter of BRC represents the shape and the number represents the diameter size. Last but not least, is ® round steel bar. The (Y) and ® bar many of people are confusing. The (Y) bar is with groove line and the ® is without groove line and it's a smooth rounded shape. So what is the uses of (Y) and ® is (Y) usually is the long straight steel in column or beam and ® is the ring of the (Y). This will be confused but i will attach some drawing to explain it shortly. If u guys experienced in submission to majlis it will have archi and engineer plan, From the plan it will written 6Y12/150cc which means your column or beam should consist of 6 units of Y12 and the ring gap between is 150mm. So here is my explanation of the steel bar. Pls correct me if I'm wrong. Thanks |
|
|
Jun 22 2020, 01:46 PM
|
![]()
Junior Member
37 posts Joined: Nov 2019 |
QUOTE(Darenloh @ Jun 21 2020, 07:00 PM) Hi Mr. Lim, no need to sorry, I'm happy to share some details of it, and hopefully it can help other people too without charging any consultation fees Hmm, great explanation there. I think I can chip in a bit. The other point is the marking that u can find on the steel. Each company has a different marking. Eg. Alliance steel it will be written, "AS 12 500N". "AS" is company/manufacturer, "12" is the diameter size and "500N" is the grade and strength. Secondly is the BRC. For physically it is the same with the high tensile deformed steel bar which is (Y bar) that I've mentioned just now. The size is slightly different. It has BRC A4-A13 (square mesh), BRC B5-B13(rectangular mesh), BRC C5-C13(long rectangular mesh), BRC DA4-DA13(small square mesh). The alphabet after the letter of BRC represents the shape and the number represents the diameter size. Last but not least, is ® round steel bar. The (Y) and ® bar many of people are confusing. The (Y) bar is with groove line and the ® is without groove line and it's a smooth rounded shape. So what is the uses of (Y) and ® is (Y) usually is the long straight steel in column or beam and ® is the ring of the (Y). This will be confused but i will attach some drawing to explain it shortly. If u guys experienced in submission to majlis it will have archi and engineer plan, From the plan it will written 6Y12/150cc which means your column or beam should consist of 6 units of Y12 and the ring gap between is 150mm. So here is my explanation of the steel bar. Pls correct me if I'm wrong. Thanks To put it simply: -B.S stands for British Standard. BS rebar means it is British Standard compliance in terms of size and strength. And each batch of the rebar comes with proper mill certs showing its strength, actual size, composition, bend and rebend test result. -C.Q stands for commercial quality. CQ bar is usually undersized and without proper certification as said. So avoid using it for main structural works. |
|
|
Jun 22 2020, 02:50 PM
|
![]()
Probation
13 posts Joined: May 2020 |
QUOTE(Darenloh @ Jun 21 2020, 07:00 PM) Hi Mr. Lim, no need to sorry, I'm happy to share some details of it, and hopefully it can help other people too without charging any consultation fees Thank for the explanation braderr.. Learned lots of things from you The other point is the marking that u can find on the steel. Each company has a different marking. Eg. Alliance steel it will be written, "AS 12 500N". "AS" is company/manufacturer, "12" is the diameter size and "500N" is the grade and strength. Secondly is the BRC. For physically it is the same with the high tensile deformed steel bar which is (Y bar) that I've mentioned just now. The size is slightly different. It has BRC A4-A13 (square mesh), BRC B5-B13(rectangular mesh), BRC C5-C13(long rectangular mesh), BRC DA4-DA13(small square mesh). The alphabet after the letter of BRC represents the shape and the number represents the diameter size. Last but not least, is ® round steel bar. The (Y) and ® bar many of people are confusing. The (Y) bar is with groove line and the ® is without groove line and it's a smooth rounded shape. So what is the uses of (Y) and ® is (Y) usually is the long straight steel in column or beam and ® is the ring of the (Y). This will be confused but i will attach some drawing to explain it shortly. If u guys experienced in submission to majlis it will have archi and engineer plan, From the plan it will written 6Y12/150cc which means your column or beam should consist of 6 units of Y12 and the ring gap between is 150mm. So here is my explanation of the steel bar. Pls correct me if I'm wrong. Thanks |
|
|
Jun 23 2020, 01:59 PM
Show posts by this member only | IPv6 | Post
#167
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jun 23 2020, 02:01 PM
Show posts by this member only | IPv6 | Post
#168
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(littleants @ Jun 22 2020, 01:46 PM) Hmm, great explanation there. I think I can chip in a bit. Thanks for the input To put it simply: -B.S stands for British Standard. BS rebar means it is British Standard compliance in terms of size and strength. And each batch of the rebar comes with proper mill certs showing its strength, actual size, composition, bend and rebend test result. -C.Q stands for commercial quality. CQ bar is usually undersized and without proper certification as said. So avoid using it for main structural works. |
|
|
Jun 23 2020, 02:02 PM
Show posts by this member only | IPv6 | Post
#169
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jul 1 2020, 09:00 PM
Show posts by this member only | IPv6 | Post
#170
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jul 20 2020, 01:59 PM
Show posts by this member only | IPv6 | Post
#171
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jul 22 2020, 06:34 PM
Show posts by this member only | IPv6 | Post
#172
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jul 23 2020, 02:16 PM
Show posts by this member only | IPv6 | Post
#173
|
![]()
Junior Member
9 posts Joined: Aug 2014 |
Hi, can pm me ? I'm looking for contractor to do renovation mostly on wet works
|
|
|
Jul 24 2020, 02:58 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jul 26 2020, 01:24 PM
|
![]()
Newbie
2 posts Joined: Mar 2012 |
Hi, can PM me your contact number please? Got plans to renovate my house, thanks!
|
|
|
Jul 26 2020, 04:34 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jul 26 2020, 11:38 PM
|
![]() ![]()
Junior Member
95 posts Joined: Oct 2005 |
Hi Im looking for contractor to renovate single storey:
- rewiring - piping - roof painting - house painting - car porch tiling - awning - autogate - change front windows and door - change toilet 1 from squat to sit - retile toilet 2 and dig a hole for water to flow (existing don't have) Please PM me contacts and quotation for the above. Thanks. |
|
|
Jul 29 2020, 10:48 AM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(smile888 @ Jul 26 2020, 11:38 PM) Hi Im looking for contractor to renovate single storey: Done! pls check your inbox 😁- rewiring - piping - roof painting - house painting - car porch tiling - awning - autogate - change front windows and door - change toilet 1 from squat to sit - retile toilet 2 and dig a hole for water to flow (existing don't have) Please PM me contacts and quotation for the above. Thanks. |
|
|
Aug 7 2020, 05:08 PM
Show posts by this member only | IPv6 | Post
#179
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Aug 16 2020, 09:31 AM
Show posts by this member only | IPv6 | Post
#180
|
![]()
Junior Member
8 posts Joined: Nov 2010 |
Hi Daren, please PM me your contact, plan to do renovation for my house in Rimbayu.
|
|
|
Aug 16 2020, 10:32 PM
Show posts by this member only | IPv6 | Post
#181
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Aug 17 2020, 09:36 AM
|
![]()
Probation
2 posts Joined: Jun 2020 |
Pls pm me your contact no.
|
|
|
Aug 18 2020, 01:54 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Aug 19 2020, 10:34 AM
|
![]() ![]() ![]()
Junior Member
349 posts Joined: Apr 2009 From: USJ/Subang Jaya |
pm
|
|
|
Aug 20 2020, 02:22 PM
Show posts by this member only | IPv6 | Post
#185
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Aug 20 2020, 10:08 PM
Show posts by this member only | IPv6 | Post
#186
|
![]() ![]()
Junior Member
61 posts Joined: Dec 2009 |
Hi , may i know how much if doing something similar ?
|
|
|
Aug 22 2020, 12:28 PM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
859 posts Joined: Jun 2007 |
Hi guys, wanted to know based on your experience, how long is the lead time required to complete a semi-major renovation?
I am planning to hack & re-tile my bathroom (3x bathroom), tiling the porch & backyard, and some minor works (change doors/window grille/adding plug point/repair leakage), but no extension for the house or whatsoever I’ve asked 3 contractors & all of them said it’s gonna be between 45-90 days, is it standard? My house is a 2 1/2 storey terrace house This post has been edited by kapalterbang_737: Aug 22 2020, 12:29 PM |
|
|
Aug 23 2020, 09:08 AM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(kapalterbang_737 @ Aug 22 2020, 12:28 PM) Hi guys, wanted to know based on your experience, how long is the lead time required to complete a semi-major renovation? -Re-tile 3 bathroom with waterproofing and change the sanitary wares estimated 12-15 daysI am planning to hack & re-tile my bathroom (3x bathroom), tiling the porch & backyard, and some minor works (change doors/window grille/adding plug point/repair leakage), but no extension for the house or whatsoever I’ve asked 3 contractors & all of them said it’s gonna be between 45-90 days, is it standard? My house is a 2 1/2 storey terrace house -Tiling the porch and backyard depends on the size. estimated 8-10 days - change door, adding plug point with hack and plaster back, repair leaking estimated 7-10 days - repaint House estimated 7-10 days - window grille depend on the manufacturer workload This post has been edited by Darenloh: Aug 23 2020, 09:12 AM |
|
|
Aug 23 2020, 12:31 PM
|
![]() ![]()
Junior Member
72 posts Joined: Feb 2008 |
QUOTE(Darenloh @ Aug 23 2020, 09:08 AM) -Re-tile 3 bathroom with waterproofing and change the sanitary wares estimated 12-15 days Hi,-Tiling the porch and backyard depends on the size. estimated 8-10 days - change door, adding plug point with hack and plaster back, repair leaking estimated 7-10 days - repaint House estimated 7-10 days - window grille depend on the manufacturer workload Re-tile 3 bathroom will takes 12-15 days?? I guess if 1 bathroom will take shorter days, right? My bathroom took 16 days for the waterproofing and retiling. hacking only 1 day. I plan to retiling my downstairs bathroom. |
|
|
Aug 23 2020, 03:52 PM
Show posts by this member only | IPv6 | Post
#190
|
![]() ![]()
Junior Member
54 posts Joined: Feb 2015 |
Hi Daren,
Need your advice. I'm looking at back house extension for both floor approximately 8f by 24f. 1.Looking to extend the kitchen and room. 2.Relocation of toilets to optimize the space. 3. Redoing the wiring and plumbing. 4. Fixing few leaking areas. 5.Need some advice for on how to have more natural lighting 6. Why and when roof needs to be changed. 7. Currently i am living there with family and how it will impact the renovation? 8. We can move out for short while but what bout the stuffs at home? 9. Please share estimated price. Thanks. |
|
|
Aug 23 2020, 04:31 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(merci @ Aug 23 2020, 12:31 PM) Hi, Hi Merci,Re-tile 3 bathroom will takes 12-15 days?? I guess if 1 bathroom will take shorter days, right? My bathroom took 16 days for the waterproofing and retiling. hacking only 1 day. I plan to retiling my downstairs bathroom. The duration of retiling depends on the size, height and the complexity. I'm using standard bathroom size with 4' x 8' x 5'(H) bathroom without bathtub and shower screen as reference. Let me breakdown the job scope with 2 workers per bathroom and using 2' x 1' tiles. - 1 day for hacking and floor screed (for condo it may take up to 2 days cuz need to discard the debris to loading bay) - 1 and half day to do wall tiling and another half day for waterproofing - 1 day to do floor tiles - 1 day to do installation of sanitary wares For your bathroom it takes 16 days to complete 1 bathroom? what's the size of the bathroom and what's size of tiles u using? I've seen some people using hexagon tiles 😁 |
|
|
Aug 23 2020, 04:34 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(kermit21 @ Aug 23 2020, 03:52 PM) Hi Daren, Pls check your inbox 😁Need your advice. I'm looking at back house extension for both floor approximately 8f by 24f. 1.Looking to extend the kitchen and room. 2.Relocation of toilets to optimize the space. 3. Redoing the wiring and plumbing. 4. Fixing few leaking areas. 5.Need some advice for on how to have more natural lighting 6. Why and when roof needs to be changed. 7. Currently i am living there with family and how it will impact the renovation? 8. We can move out for short while but what bout the stuffs at home? 9. Please share estimated price. Thanks. |
|
|
Aug 23 2020, 04:44 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Aug 23 2020, 10:14 PM
|
![]() ![]()
Junior Member
72 posts Joined: Feb 2008 |
QUOTE(Darenloh @ Aug 23 2020, 04:31 PM) Hi Merci, My bathroom size is 8' x 6'x10'.using normal tile : 2' x 1' for wall and 1' x 1' for floor.The duration of retiling depends on the size, height and the complexity. I'm using standard bathroom size with 4' x 8' x 5'(H) bathroom without bathtub and shower screen as reference. Let me breakdown the job scope with 2 workers per bathroom and using 2' x 1' tiles. - 1 day for hacking and floor screed (for condo it may take up to 2 days cuz need to discard the debris to loading bay) - 1 and half day to do wall tiling and another half day for waterproofing - 1 day to do floor tiles - 1 day to do installation of sanitary wares For your bathroom it takes 16 days to complete 1 bathroom? what's the size of the bathroom and what's size of tiles u using? I've seen some people using hexagon tiles 😁 I'm so stressed that time 'coz have to take leave alternate with my spouse. |
|
|
Aug 24 2020, 11:17 AM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(merci @ Aug 23 2020, 10:14 PM) My bathroom size is 8' x 6'x10'.using normal tile : 2' x 1' for wall and 1' x 1' for floor. You liaise with contractor or workers? u need to check the site twice a week. it can be after your work or lunch time.I'm so stressed that time 'coz have to take leave alternate with my spouse. |
|
|
Aug 24 2020, 01:53 PM
Show posts by this member only | IPv6 | Post
#196
|
![]() ![]()
Junior Member
61 posts Joined: Dec 2009 |
|
|
|
Aug 26 2020, 10:00 AM
|
![]()
Newbie
2 posts Joined: Sep 2010 |
I would like to have quotation for renovation of a 3 storeys plus kitchen extension n widen car porch, thank you Daren
|
|
|
Aug 26 2020, 11:46 AM
|
![]()
Newbie
5 posts Joined: Aug 2005 |
Hi Daren,
Please PM your contact. Location at Setia Alam |
|
|
Aug 28 2020, 01:59 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Aug 28 2020, 02:00 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Aug 28 2020, 02:00 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Aug 31 2020, 10:09 PM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
908 posts Joined: Jan 2005 From: USJ |
Hi Darren,
Very nice work, like to know the rough quotation for following work 2-storey renovation 1-modernize car porch modernize (tile + extend enterance + gate) 2-Extend behind kitchen and 1st floor, I think 24 * 10. 3.Relocation of toilets. 4-Repaint whole house. Location USJ can PM me the rough quotation? |
|
|
Aug 31 2020, 11:30 PM
|
![]() ![]() ![]()
Junior Member
409 posts Joined: Apr 2019 |
how much for retaining wall?
|
|
|
Sep 1 2020, 10:11 AM
Show posts by this member only | IPv6 | Post
#204
|
![]() ![]()
Junior Member
79 posts Joined: Sep 2020 |
Hi Darren,
Thumbs up to your nice renovation works. Hi! I'm looking for ID designer and contractor to renovate 20' x 65' double storey (4 bedrooms + 3 bathrooms) which is 20+ years. - car porch extension with pillar removal + balcony on top of car porch (similar to your Post #65) - master bedroom bathroom extension (approximately 2' to align with mater bedroom window) - main gate pillar relocation - whole house rewiring - whole house piping with new water tank - roof replacement - whole house painting - car porch tiling - ground floor tiling - upper floor tiling - 3 washrooms tiling - relocate ground floor bathroom (approximate 4' x 5') - full kitchen cabinet - bedroom & living room cabinet Please PM me contacts and rough quotation for the above. Thanks in advance! https://pictr.com/images/2020/09/01/7zLRXq.md.jpg |
|
|
Sep 4 2020, 02:47 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(wos @ Aug 31 2020, 10:09 PM) Hi Darren, Thanks for the compliment.. pls check your inbox 😁Very nice work, like to know the rough quotation for following work 2-storey renovation 1-modernize car porch modernize (tile + extend enterance + gate) 2-Extend behind kitchen and 1st floor, I think 24 * 10. 3.Relocation of toilets. 4-Repaint whole house. Location USJ can PM me the rough quotation? |
|
|
Sep 4 2020, 02:47 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Sep 4 2020, 02:48 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(BTKee @ Sep 1 2020, 10:11 AM) Hi Darren, Thanks for the compliment.. pls check your inbox 😁Thumbs up to your nice renovation works. Hi! I'm looking for ID designer and contractor to renovate 20' x 65' double storey (4 bedrooms + 3 bathrooms) which is 20+ years. - car porch extension with pillar removal + balcony on top of car porch (similar to your Post #65) - master bedroom bathroom extension (approximately 2' to align with mater bedroom window) - main gate pillar relocation - whole house rewiring - whole house piping with new water tank - roof replacement - whole house painting - car porch tiling - ground floor tiling - upper floor tiling - 3 washrooms tiling - relocate ground floor bathroom (approximate 4' x 5') - full kitchen cabinet - bedroom & living room cabinet Please PM me contacts and rough quotation for the above. Thanks in advance! <a href='https://pictr.com/images/2020/09/01/7zLRXq.md.jpg' target='_blank'>https://pictr.com/images/2020/09/01/7zLRXq.md.jpg </a> |
|
|
Sep 7 2020, 02:29 PM
Show posts by this member only | IPv6 | Post
#208
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
Project @ Jinjang, Kepong
Client requirement: To enhance facade of the house with budget cost. Job descriptions: -Repaint exterior ceiling, wall, grille and gate using Jotashield and nippon 9000 gloss finish -Repair existing wall -Hack existing 1' x 1' floor tiles @ car porch (est. 10' x 28') -Install new 2' x 1' floor tiles @ car porch (est. 30' x 28') -To do RC driveway using BRC A8 (est. 14' x 5') -To repair existing water pipe @ car porch Total Budget: Rm8,000 ![]() ![]() |
|
|
Sep 9 2020, 09:00 PM
|
![]() ![]()
Junior Member
107 posts Joined: Oct 2012 |
HI Daren,
Need quotation for semi D renovation: (30 years old property) 1. Whole house makeover, with side and front extension of 10 feet and 5 feet respectively 2. Wiring and electrical works (including security wirings) 3. tiling for porch, ground floor, bath room 4. add one bathroom upstairs and another downstairs 5. removal of a large pond at the garden 6. Painting, installing new sanitary products 7. Plaster ceilings 8. Change of front facade 9. new windows, door etc 10. SPC flooring upstairs Land size is 67x85 Location: USJ |
|
|
Sep 11 2020, 01:01 PM
Show posts by this member only | IPv6 | Post
#210
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(Coolken @ Sep 9 2020, 09:00 PM) HI Daren, Sorry for the late response. Pls check your inbox. Thanks Need quotation for semi D renovation: (30 years old property) 1. Whole house makeover, with side and front extension of 10 feet and 5 feet respectively 2. Wiring and electrical works (including security wirings) 3. tiling for porch, ground floor, bath room 4. add one bathroom upstairs and another downstairs 5. removal of a large pond at the garden 6. Painting, installing new sanitary products 7. Plaster ceilings 8. Change of front facade 9. new windows, door etc 10. SPC flooring upstairs Land size is 67x85 Location: USJ |
|
|
Sep 12 2020, 08:35 AM
|
![]()
Newbie
4 posts Joined: Sep 2017 |
Hi Daren,
30yo end lot property is good condition, still in the phase of budgeting. Can u please quote me on: 1. car porch (re-cement) 2. side yard (replace cement with soil) 3. Kitchen tiling roughly 1300sqft land size prop Thank you |
|
|
Sep 15 2020, 12:03 PM
Show posts by this member only | IPv6 | Post
#212
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Sep 17 2020, 02:19 PM
Show posts by this member only | IPv6 | Post
#213
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Sep 19 2020, 10:34 PM
|
![]()
Junior Member
8 posts Joined: May 2011 |
Hi Daren, please PM me your contact. Thanks
|
|
|
Sep 19 2020, 10:50 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
6,017 posts Joined: Sep 2011 |
pm contact
|
|
|
Sep 21 2020, 01:11 AM
Show posts by this member only | IPv6 | Post
#216
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Sep 21 2020, 01:12 AM
Show posts by this member only | IPv6 | Post
#217
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Sep 21 2020, 01:46 PM
|
![]()
Newbie
4 posts Joined: Jul 2016 |
Hi can PM me price for:
1. Kitchen cabinet and table top 2. Wiring & electric - air con cable hide inside wall 3. Full house grill include backdoor gate 4. Lighting & Fan installation |
|
|
Sep 21 2020, 10:53 PM
Show posts by this member only | IPv6 | Post
#219
|
![]() ![]()
Junior Member
207 posts Joined: Jul 2006 |
Hi. Do u do reno work for shoplot?
|
|
|
Sep 23 2020, 11:45 AM
|
![]()
Junior Member
28 posts Joined: Aug 2007 |
Afternoon Mr Darren, im actually looking for contractor that focus on wet works, hacking and painting. May i get your contact to discuss further.
Thank You. |
|
|
Sep 24 2020, 02:05 PM
Show posts by this member only | IPv6 | Post
#221
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Sep 24 2020, 02:05 PM
Show posts by this member only | IPv6 | Post
#222
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Sep 24 2020, 02:06 PM
Show posts by this member only | IPv6 | Post
#223
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Sep 28 2020, 01:19 PM
Show posts by this member only | IPv6 | Post
#224
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
Late update for Jinjang project
|
|
|
Sep 28 2020, 04:17 PM
|
![]() ![]() ![]()
Junior Member
347 posts Joined: Aug 2006 From: Kuala Lumpur |
Hi do you do minor work for bathroom and kitchen?
|
|
|
Oct 3 2020, 02:06 PM
Show posts by this member only | IPv6 | Post
#226
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Oct 3 2020, 09:39 PM
|
![]()
Junior Member
23 posts Joined: Mar 2020 |
Hi, do you do repair for water leakage in walls?
|
|
|
Oct 5 2020, 11:04 AM
|
![]() ![]()
Junior Member
190 posts Joined: Aug 2010 |
if i want to extend my kitchen only maybe around 8ft. Is it necessary to apply permit?
|
|
|
Oct 6 2020, 03:36 PM
Show posts by this member only | IPv6 | Post
#229
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Oct 6 2020, 03:44 PM
Show posts by this member only | IPv6 | Post
#230
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(wkc @ Oct 5 2020, 11:04 AM) Any renovation that involve extension need to apply permit.. After the renovation is done then apply for CCC. With CCC your house value will be higher. This is for future when u wanna sell or flip the property. |
|
|
Oct 7 2020, 10:42 AM
|
![]() ![]()
Junior Member
190 posts Joined: Aug 2010 |
|
|
|
Oct 7 2020, 02:03 PM
|
![]()
Probation
1 posts Joined: Oct 2020 |
Hi Darren,
I would like to extend my kitchen 18' x 5' and relocate existing bathroom. Pls pm me |
|
|
Oct 7 2020, 02:05 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Oct 7 2020, 02:06 PM
Show posts by this member only | IPv6 | Post
#234
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Oct 7 2020, 02:13 PM
Show posts by this member only | IPv6 | Post
#235
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Oct 7 2020, 06:11 PM
Show posts by this member only | IPv6 | Post
#236
|
![]() ![]() ![]() ![]() ![]()
Junior Member
723 posts Joined: Jul 2008 |
|
|
|
Oct 8 2020, 01:54 PM
Show posts by this member only | IPv6 | Post
#237
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Oct 8 2020, 02:31 PM
Show posts by this member only | IPv6 | Post
#238
|
![]() ![]() ![]() ![]() ![]()
Junior Member
723 posts Joined: Jul 2008 |
|
|
|
Oct 9 2020, 04:24 PM
Show posts by this member only | IPv6 | Post
#239
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Oct 9 2020, 04:25 PM
Show posts by this member only | IPv6 | Post
#240
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Oct 9 2020, 09:53 PM
|
![]()
Junior Member
15 posts Joined: Sep 2007 |
hello, do you have in-house
carpentry team too? or there’s sub-cons under you that provide the services? I’m looking for contractor to renovate my new apartment (tmn oug area) that cover following: -Wall hacking, floor leveling and tiling -Plumbing modification -Plaster ceiling -Carpentry includes shoes cabinet, book shelf, kitchen cabinet, etc (probably the biggest scope) -Electrical (addition plug point, lighting & fan installation Mind to share your contact so we could discuss and understand your services? |
|
|
Oct 11 2020, 11:49 PM
Show posts by this member only | IPv6 | Post
#242
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(jordanyk @ Oct 9 2020, 09:53 PM) hello, do you have in-house I've pm u my contact number ☺️carpentry team too? or there’s sub-cons under you that provide the services? I’m looking for contractor to renovate my new apartment (tmn oug area) that cover following: -Wall hacking, floor leveling and tiling -Plumbing modification -Plaster ceiling -Carpentry includes shoes cabinet, book shelf, kitchen cabinet, etc (probably the biggest scope) -Electrical (addition plug point, lighting & fan installation Mind to share your contact so we could discuss and understand your services? |
|
|
Oct 12 2020, 04:14 PM
Show posts by this member only | IPv6 | Post
#243
|
![]() ![]() ![]()
Junior Member
365 posts Joined: Mar 2010 |
Hi Darren, I am looking to extend the back of my 2-storey terrace house. May I get a quote from you? Please text me at 0122125108. Thanks!
|
|
|
Oct 13 2020, 05:44 PM
|
![]()
Probation
16 posts Joined: Aug 2019 |
TS,
Need minor renovation for my new house (expected to get key by end of the year). Need some close up of door and window, about 20 new plug point, 1 new pipe line, 1 partition (with gypsum board) and interior painting. Your company accept these minor reno? |
|
|
Oct 13 2020, 11:34 PM
|
![]() ![]()
Junior Member
249 posts Joined: Apr 2006 From: K.L |
Park for muji concept
|
|
|
Oct 15 2020, 03:52 PM
Show posts by this member only | IPv6 | Post
#246
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Oct 15 2020, 03:53 PM
Show posts by this member only | IPv6 | Post
#247
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(wilsonwwws @ Oct 13 2020, 05:44 PM) TS, Yes.. I'll pm u my number for further discuss Need minor renovation for my new house (expected to get key by end of the year). Need some close up of door and window, about 20 new plug point, 1 new pipe line, 1 partition (with gypsum board) and interior painting. Your company accept these minor reno? |
|
|
Oct 15 2020, 03:54 PM
Show posts by this member only | IPv6 | Post
#248
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Oct 15 2020, 08:00 PM
Show posts by this member only | IPv6 | Post
#249
|
![]() ![]() ![]() ![]() ![]()
Junior Member
723 posts Joined: Jul 2008 |
|
|
|
Oct 16 2020, 02:32 PM
Show posts by this member only | IPv6 | Post
#250
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Oct 16 2020, 03:04 PM
Show posts by this member only | IPv6 | Post
#251
|
![]() ![]() ![]() ![]() ![]()
Junior Member
723 posts Joined: Jul 2008 |
|
|
|
Oct 17 2020, 08:54 PM
Show posts by this member only | IPv6 | Post
#252
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Oct 19 2020, 12:42 AM
Show posts by this member only | IPv6 | Post
#253
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
MUJI in Japanese, translates as “no-brand quality goods.” It's low-cost but using high-quality products. Furthermore, it creates functional space with uncomplicated design and color. MUJI uses natural materials and neutral colors to make it look harmonious and neat.
Living Area: ![]() Dining Area: ![]() Master Bedroom: ![]() |
|
|
Oct 19 2020, 12:46 AM
Show posts by this member only | IPv6 | Post
#254
|
![]() ![]() ![]() ![]() ![]()
Junior Member
723 posts Joined: Jul 2008 |
QUOTE(Darenloh @ Oct 19 2020, 12:42 AM) MUJI in Japanese, translates as “no-brand quality goods.” It's low-cost but using high-quality products. Furthermore, it creates functional space with uncomplicated design and color. MUJI uses natural materials and neutral colors to make it look harmonious and neat. I don't think it will still be low cost in Malaysia. Unless the timber is sourced locally. |
|
|
Oct 19 2020, 09:16 AM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
934 posts Joined: Mar 2009 |
i always thought that muji concept is expensive? all those timber finshing and furniture will be very expensive.
|
|
|
Oct 19 2020, 10:05 AM
Show posts by this member only | IPv6 | Post
#256
|
![]() ![]() ![]() ![]() ![]()
Junior Member
723 posts Joined: Jul 2008 |
QUOTE(Agent 45 @ Oct 19 2020, 09:16 AM) i always thought that muji concept is expensive? all those timber finshing and furniture will be very expensive. In Japan where it originates from, it's cheap and affordable brand. There's plenty of timber there. Well maintained and regulated timber industry for local consumption.So if people wants to replicate just the concept and sources local timber, it may be more affordable than importing Japan's timber from Japan. |
|
|
Oct 31 2020, 05:25 PM
Show posts by this member only | IPv6 | Post
#257
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(zemega @ Oct 19 2020, 10:05 AM) In Japan where it originates from, it's cheap and affordable brand. There's plenty of timber there. Well maintained and regulated timber industry for local consumption. Well said! Furthermore, timber is the low cost to do furniture compare to aluminum and glass. In the future, it can refurbish by applying new paint or shellac/lacquer. Besides that, you can DIY some furniture without any special and expensive tools. Using timber as furniture also has its disadvantage. The biggest enemy of timber is termite. So please be aware when using timber in wet places. So if people wants to replicate just the concept and sources local timber, it may be more affordable than importing Japan's timber from Japan. |
|
|
Oct 31 2020, 05:52 PM
Show posts by this member only | IPv6 | Post
#258
|
![]() ![]()
Junior Member
54 posts Joined: Feb 2015 |
QUOTE(Darenloh @ Oct 31 2020, 05:25 PM) Well said! Furthermore, timber is the low cost to do furniture compare to aluminum and glass. In the future, it can refurbish by applying new paint or shellac/lacquer. Besides that, you can DIY some furniture without any special and expensive tools. Using timber as furniture also has its disadvantage. The biggest enemy of timber is termite. So please be aware when using timber in wet places. Hi Daren. Sorry missed your mail last time. Was very busy and don't have time to reply you. So is Muji style cheap in Malaysia? |
|
|
Oct 31 2020, 06:49 PM
Show posts by this member only | IPv6 | Post
#259
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(kermit21 @ Oct 31 2020, 05:52 PM) Hi Daren. Hi there,Sorry missed your mail last time. Was very busy and don't have time to reply you. So is Muji style cheap in Malaysia? It's ok bro First of all, I did not say Muji style is cheap.. Every style and concept has its own characteristic. The cost depends on the client's budget and what can the designer do it for their client. I have a client that bought IKEA stuff that costs only Rm59 if not mistaken and apply it to the concept (attachment below). As long as you can match it to the concept everything will look nice. You can have an eclectic style by using low-cost material and minimalist with expensive material. Cost budgeting really depends on yourself. ![]() |
|
|
Nov 2 2020, 09:19 AM
Show posts by this member only | IPv6 | Post
#260
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
New update 😁 zemega liked this post
|
|
|
Nov 3 2020, 04:54 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,856 posts Joined: Dec 2008 From: In The HELL FIRE |
i am looking for contractor to give advice and demolish the wall in my apartment .
|
|
|
Nov 12 2020, 08:54 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Dec 23 2020, 04:17 PM
Show posts by this member only | IPv6 | Post
#263
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
Hi guys, long time didn't update my topic here. Here's some update of Bathroom reno
|
|
|
Jan 1 2021, 10:35 PM
Show posts by this member only | IPv6 | Post
#264
|
![]()
Newbie
5 posts Joined: Mar 2012 |
Hi, enquiring for extension and refurbishment of a 25yo 22x75 house. Kindly pm
|
|
|
Jan 4 2021, 01:05 AM
Show posts by this member only | IPv6 | Post
#265
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(mlc @ Jan 1 2021, 10:35 PM) Pm done 😁👍🏼 Brainy_Panda liked this post
|
|
|
Jan 5 2021, 10:40 AM
Show posts by this member only | IPv6 | Post
#266
|
![]() ![]() ![]() ![]()
Junior Member
500 posts Joined: Aug 2014 |
QUOTE(Darenloh @ Oct 8 2018, 01:25 PM) Hi guys, pls leave a comment regrading Extension and ID. Here are some photos of on-going project :thumbsup: . From bare unit to fully extend with ID works Can pm me your cost of breakdown? Recently I will going to renovate an old house in subang area. Hope u can give me some info about your cost n everything |
|
|
Jan 5 2021, 01:51 PM
Show posts by this member only | IPv6 | Post
#267
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jan 7 2021, 12:23 PM
Show posts by this member only | IPv6 | Post
#268
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jan 7 2021, 12:25 PM
Show posts by this member only | IPv6 | Post
#269
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jan 7 2021, 12:26 PM
Show posts by this member only | IPv6 | Post
#270
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jan 15 2021, 04:33 PM
Show posts by this member only | IPv6 | Post
#271
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jan 24 2021, 03:31 PM
|
![]() ![]()
Junior Member
57 posts Joined: Jul 2012 |
Hi, Daren. Kindly PM your contact details and rough estimation of costings to renovate a 25+ year old double story terrace house. Thank you
|
|
|
Jan 25 2021, 07:57 PM
Show posts by this member only | IPv6 | Post
#273
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jan 26 2021, 11:39 AM
|
![]() ![]() ![]() ![]()
Junior Member
560 posts Joined: Nov 2013 |
looking for extension and wall demolition contact for Johor bahru nusajaya area house.
|
|
|
Jan 29 2021, 12:40 PM
Show posts by this member only | IPv6 | Post
#275
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Feb 8 2021, 05:48 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,325 posts Joined: Jan 2007 From: Selangor |
hi, i'm actually surveying the cost to renovate my double storey house. I'm thinking to extend my master bedroom by another 6x22 ft, extending my corner house by another 12x43ft (2 floors) and the kitchen 6x22ft. There will be quite some wet work to be done in this renovation. Roughly how much should be expected?
|
|
|
Feb 8 2021, 08:28 PM
Show posts by this member only | IPv6 | Post
#277
|
![]() ![]()
Junior Member
101 posts Joined: Oct 2012 |
Hi DarenLoh , im surveying to budget for my future renovation.
May I know what is the rough estimate for this type of renovation ? 1) Changing exterior from the one below to something like the picture of your 1st post, wanted to have french window from top to bottom House size is 24x75 2) widening car porch pillar to park more car 3) extending master bedroom at 1st floor to family area 4) change out new roofing ![]() This post has been edited by MUFTW: Feb 8 2021, 08:29 PM |
|
|
Feb 15 2021, 06:18 PM
Show posts by this member only | IPv6 | Post
#278
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(coldfission @ Feb 8 2021, 05:48 PM) hi, i'm actually surveying the cost to renovate my double storey house. I'm thinking to extend my master bedroom by another 6x22 ft, extending my corner house by another 12x43ft (2 floors) and the kitchen 6x22ft. There will be quite some wet work to be done in this renovation. Roughly how much should be expected? Hi, your total est extension is 1300 sqft and it cost roughly around 200k 😁 |
|
|
Feb 15 2021, 06:22 PM
Show posts by this member only | IPv6 | Post
#279
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(MUFTW @ Feb 8 2021, 08:28 PM) Hi DarenLoh , im surveying to budget for my future renovation. Hi, the est cost for item 1-4 is around Rm60k 😁May I know what is the rough estimate for this type of renovation ? 1) Changing exterior from the one below to something like the picture of your 1st post, wanted to have french window from top to bottom House size is 24x75 2) widening car porch pillar to park more car 3) extending master bedroom at 1st floor to family area 4) change out new roofing ![]() |
|
|
Feb 22 2021, 12:54 PM
Show posts by this member only | IPv6 | Post
#280
|
![]() ![]()
Junior Member
101 posts Joined: Oct 2012 |
|
|
|
Feb 24 2021, 01:49 PM
Show posts by this member only | IPv6 | Post
#281
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(MUFTW @ Feb 22 2021, 12:54 PM) Item 1 - Rm45k+-Item 2 & 3 - RM5k - Rm7k (for item 2 I believe is to build bricks wall and ceiling and the price is depend on the area of extension) Item 4 - Rm8k - Rm10k to change monier roof tiles *The above pricing is just estimation only* |
|
|
Feb 27 2021, 10:15 PM
|
![]()
Junior Member
20 posts Joined: Nov 2012 |
Hi. May I request a high level quotation for the extension of backyard with estimated size of 500sq ft into a dining + wet kitchen + bedroom + small room?
|
|
|
Mar 2 2021, 10:16 PM
Show posts by this member only | IPv6 | Post
#283
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Mar 4 2021, 01:05 PM
Show posts by this member only | IPv6 | Post
#284
|
![]()
Junior Member
13 posts Joined: Jul 2007 |
Hi, can you please pm your contact, would request to get some quote on kitchen extension
|
|
|
Mar 5 2021, 01:08 AM
|
![]()
Junior Member
48 posts Joined: Mar 2008 |
Hi, Daren. Kindly PM your contact details and rough estimation of costings to renovate a 30+ year old double story terrace house in Subang Jaya. Thank you!
|
|
|
Mar 6 2021, 09:31 AM
Show posts by this member only | IPv6 | Post
#286
|
![]() ![]() ![]() ![]() ![]()
Junior Member
803 posts Joined: Aug 2019 |
Hi all. I wasn’t aware that extensions need to apply for permit until I started to do more research as this is my first home. As I was seeing a lot reno company fb, so they actually take permits or do without it. So many house going through reno now. So majlis perbandaran would have gotten so many applications ryt. What is the fee if wana submit for hall extension in the porch? Tqvm.
|
|
|
Mar 7 2021, 08:35 PM
Show posts by this member only | IPv6 | Post
#287
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Mar 7 2021, 08:36 PM
Show posts by this member only | IPv6 | Post
#288
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Mar 7 2021, 08:54 PM
Show posts by this member only | IPv6 | Post
#289
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(soulred777 @ Mar 6 2021, 09:31 AM) Hi all. I wasn’t aware that extensions need to apply for permit until I started to do more research as this is my first home. As I was seeing a lot reno company fb, so they actually take permits or do without it. So many house going through reno now. So majlis perbandaran would have gotten so many applications ryt. What is the fee if wana submit for hall extension in the porch? Tqvm. Hi there, every renovation that involves structure building need to do submission to the local council. Every local council have different charges and requirements. You can appoint a runner to do the submission for you or you can go to the local council office to do it by yourself if you wanna save some cost 😁 soulred777 liked this post
|
|
|
Mar 7 2021, 09:40 PM
Show posts by this member only | IPv6 | Post
#290
|
![]() ![]() ![]() ![]() ![]()
Junior Member
803 posts Joined: Aug 2019 |
QUOTE(Darenloh @ Mar 7 2021, 08:54 PM) Hi there, every renovation that involves structure building need to do submission to the local council. Every local council have different charges and requirements. You can appoint a runner to do the submission for you or you can go to the local council office to do it by yourself if you wanna save some cost 😁 Tq bro ✌️ |
|
|
Mar 10 2021, 12:03 AM
|
![]()
Probation
4 posts Joined: Mar 2021 |
Hi can PM me your contact. Would like to get quotation for kitchen extension
|
|
|
Mar 10 2021, 03:45 PM
Show posts by this member only | IPv6 | Post
#292
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Mar 10 2021, 03:46 PM
Show posts by this member only | IPv6 | Post
#293
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Mar 10 2021, 08:22 PM
Show posts by this member only | IPv6 | Post
#294
|
![]() ![]() ![]() ![]() ![]()
Senior Member
720 posts Joined: Sep 2009 |
Hey Daren,
I’m planning to extend my kitchen 22x10, wondering if I extend as well 2nd floor bedroom to follow kitchen another 10ft.. how much roughly the cost would be? |
|
|
Mar 11 2021, 11:47 AM
|
![]()
Junior Member
42 posts Joined: Mar 2010 |
Hi can PM me your contact. Would like to get quotation for old single storey toilet/bathroom renovation.
|
|
|
Mar 12 2021, 01:44 PM
Show posts by this member only | IPv6 | Post
#296
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Mar 12 2021, 01:44 PM
Show posts by this member only | IPv6 | Post
#297
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Mar 13 2021, 01:31 PM
Show posts by this member only | IPv6 | Post
#298
|
![]() ![]()
Junior Member
63 posts Joined: Sep 2010 |
Hi, can pm ur contact? Would like to ask for quotation
|
|
|
Mar 15 2021, 10:15 PM
Show posts by this member only | IPv6 | Post
#299
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Mar 18 2021, 09:41 PM
Show posts by this member only | IPv6 | Post
#300
|
![]()
Probation
6 posts Joined: Feb 2021 |
Hi Daren, please can you help to provide your contact? Thanks.
|
|
|
Mar 22 2021, 12:46 AM
Show posts by this member only | IPv6 | Post
#301
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Mar 22 2021, 12:49 AM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,714 posts Joined: Aug 2005 From: Taman Pekaka, Sg. Dua, Gelugor, Penang |
Hi darren, can you take up unfinished job by runaway contractor? Pls pm me
|
|
|
Mar 22 2021, 03:31 PM
Show posts by this member only | IPv6 | Post
#303
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Mar 22 2021, 10:33 PM
|
![]() ![]()
Junior Member
164 posts Joined: Jan 2003 From: Klang |
Hi, please pm your contact. Easier to send pictures.
|
|
|
Mar 22 2021, 10:42 PM
Show posts by this member only | IPv6 | Post
#305
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,546 posts Joined: Jun 2009 From: Selangor / Sarawak / New York |
Anyone can recommend wet work and general workers in Kuching, Sarawak?
|
|
|
Mar 29 2021, 01:31 AM
Show posts by this member only | IPv6 | Post
#306
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Mar 29 2021, 01:32 AM
Show posts by this member only | IPv6 | Post
#307
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Apr 8 2021, 04:38 PM
Show posts by this member only | IPv6 | Post
#308
|
![]() ![]()
Junior Member
101 posts Joined: Oct 2012 |
anyone got any good main con for wetwork/civil work to recommend in puchong area ?
|
|
|
Apr 9 2021, 02:53 PM
|
![]() ![]()
Junior Member
235 posts Joined: Sep 2008 |
Hi Daren, i would like to do some minor renovation for my 20x70 double storey house in Setia Alam. Do you mind to split the quotation for me?
1. Cabinet installation at (a) Shoe Cabinet @ Car pouch (b) Cabinet @ main door entrance © Cabinet @ Dining area (d) Kitchen Cabinet @ Kitchen © C-Shape Wardrobe / Cabinet @ 1st floor family area 2. Extension for 5 feet at Kitchen to the back, might need to relocate the toilet. Might also consider to hack the Ground Floor Room Wall to maximize the Kitchen size. 3. Car pouch - relocate the pillar (currently only can park one car) & change the gate. Pls pm me, Thanks Daren |
|
|
Apr 9 2021, 07:13 PM
Show posts by this member only | IPv6 | Post
#310
|
![]() ![]() ![]()
Junior Member
475 posts Joined: Mar 2008 |
Hi daren, can you pls pm me your contact
|
|
|
Apr 11 2021, 10:14 PM
Show posts by this member only | IPv6 | Post
#311
|
![]()
Junior Member
23 posts Joined: Apr 2007 |
hi daren , may i know any max height to extend a brick fence ? do we need to apply permit ? and do you accept job for extend height of brick fence and hacking ? thx
|
|
|
Apr 12 2021, 06:25 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Apr 12 2021, 06:28 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(jonathansshui @ Apr 9 2021, 02:53 PM) Hi Daren, i would like to do some minor renovation for my 20x70 double storey house in Setia Alam. Do you mind to split the quotation for me? Pls check your inbox 1. Cabinet installation at (a) Shoe Cabinet @ Car pouch (b) Cabinet @ main door entrance © Cabinet @ Dining area (d) Kitchen Cabinet @ Kitchen © C-Shape Wardrobe / Cabinet @ 1st floor family area 2. Extension for 5 feet at Kitchen to the back, might need to relocate the toilet. Might also consider to hack the Ground Floor Room Wall to maximize the Kitchen size. 3. Car pouch - relocate the pillar (currently only can park one car) & change the gate. Pls pm me, Thanks Daren |
|
|
Apr 12 2021, 06:29 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Apr 12 2021, 06:31 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Apr 12 2021, 07:02 PM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
885 posts Joined: May 2008 From: i donno LOL |
sorry wrong thread
This post has been edited by soket: Apr 12 2021, 07:03 PM |
|
|
May 21 2021, 06:54 PM
Show posts by this member only | IPv6 | Post
#317
|
![]()
Junior Member
23 posts Joined: Jul 2006 |
Pm me for contact. Need recommendations in wet works and extension
|
|
|
May 22 2021, 09:09 AM
Show posts by this member only | IPv6 | Post
#318
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,546 posts Joined: Jun 2009 From: Selangor / Sarawak / New York |
Wow amazing works..
How much was the total cost of renovation excluding carpentry? |
|
|
May 25 2021, 12:01 PM
Show posts by this member only | IPv6 | Post
#319
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
May 25 2021, 12:01 PM
Show posts by this member only | IPv6 | Post
#320
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
May 25 2021, 12:16 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,546 posts Joined: Jun 2009 From: Selangor / Sarawak / New York |
|
|
|
May 26 2021, 04:29 PM
Show posts by this member only | IPv6 | Post
#322
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(Michaelbyz23 @ May 25 2021, 12:16 PM) For wet work and extension it cost around 150k 😁 Michaelbyz23 liked this post
|
|
|
Jun 2 2021, 12:20 PM
|
![]()
Junior Member
48 posts Joined: Feb 2017 |
Hi Daren, can pm me your contact? Would like to get quote for kitchen cabinet, wardrobe etc.. thanks
|
|
|
Jun 6 2021, 02:16 PM
Show posts by this member only | IPv6 | Post
#324
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jun 6 2021, 03:05 PM
Show posts by this member only | IPv6 | Post
#325
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
Hi guys, Here's some update of my project. Another satisfied client from lyn. Thanks to mikhail for the support. ![]() (Before) Facade: ![]() (After) Facade: ![]() ![]() Michaelbyz23 liked this post
|
|
|
Jun 6 2021, 03:05 PM
Show posts by this member only | IPv6 | Post
#326
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jun 6 2021, 03:07 PM
Show posts by this member only | IPv6 | Post
#327
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jun 6 2021, 03:07 PM
Show posts by this member only | IPv6 | Post
#328
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
Michaelbyz23 liked this post
|
|
|
Jun 6 2021, 03:08 PM
Show posts by this member only | IPv6 | Post
#329
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
Michaelbyz23 liked this post
|
|
|
Jun 6 2021, 03:08 PM
Show posts by this member only | IPv6 | Post
#330
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
Michaelbyz23 liked this post
|
|
|
Jun 6 2021, 03:42 PM
|
![]() ![]() ![]()
Junior Member
495 posts Joined: Sep 2007 |
Hi Darren, please do PM me your contact. Thank you.
|
|
|
Jun 8 2021, 01:40 PM
Show posts by this member only | IPv6 | Post
#332
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jun 8 2021, 01:54 PM
Show posts by this member only | IPv6 | Post
#333
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,546 posts Joined: Jun 2009 From: Selangor / Sarawak / New York |
Very nice work done to fellow lyn! Darenloh liked this post
|
|
|
Jun 10 2021, 02:38 PM
Show posts by this member only | IPv6 | Post
#334
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jun 20 2021, 07:33 PM
Show posts by this member only | IPv6 | Post
#335
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jun 20 2021, 07:34 PM
Show posts by this member only | IPv6 | Post
#336
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Aug 13 2021, 04:54 PM
Show posts by this member only | IPv6 | Post
#337
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
Some of the rendering during MCO MCO 1.0: Morning view ![]() MCO 2.0: Afternoon sun ![]() MCO 3.0: Night view ![]() Which rendering u guys prefer? Headsup! liked this post
|
|
|
Sep 10 2021, 05:17 PM
|
![]() ![]()
Junior Member
180 posts Joined: May 2020 |
|
|
|
Sep 11 2021, 05:14 PM
|
![]() ![]()
Junior Member
68 posts Joined: May 2012 |
need to do a partition wall and door to separate kitchen and dining/ living hall, size is 10ft height and 8 ft width, anyone know usually is how much per sq cost?
|
|
|
Sep 11 2021, 08:54 PM
Show posts by this member only | IPv6 | Post
#340
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
14,511 posts Joined: Sep 2017 |
QUOTE(brothercheong @ Sep 11 2021, 05:14 PM) need to do a partition wall and door to separate kitchen and dining/ living hall, size is 10ft height and 8 ft width, anyone know usually is how much per sq cost? Normally is an agreed lump sum for small job. It also depends on the material you preferred ....bricks, wood, glass or mix and match.A complete solid wall without allowance for some natural lighting will make the place dark and warm PSF pricing is normally for big jobs. Darenloh and brothercheong liked this post
|
|
|
Sep 11 2021, 09:12 PM
Show posts by this member only | IPv6 | Post
#341
|
![]() ![]()
Junior Member
151 posts Joined: Nov 2005 |
Keen to touch up my sub sale bungalow, extend balcony and new cabinets and kitchen top. Can pm ur company details?
|
|
|
Sep 11 2021, 11:13 PM
|
![]() ![]()
Junior Member
68 posts Joined: May 2012 |
QUOTE(mini orchard @ Sep 11 2021, 08:54 PM) Normally is an agreed lump sum for small job. It also depends on the material you preferred ....bricks, wood, glass or mix and match. thanks insightful thoughts, initially wanted to do aluminium and glass partition but suddenly aluminium price go up and everything doubled cost... so thinking to make dry wall using gypsum board like plaster ceiling those for top and bottom and middle only glassA complete solid wall without allowance for some natural lighting will make the place dark and warm PSF pricing is normally for big jobs. Darenloh liked this post
|
|
|
Sep 13 2021, 12:42 AM
Show posts by this member only | IPv6 | Post
#343
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Sep 13 2021, 12:43 AM
Show posts by this member only | IPv6 | Post
#344
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Sep 13 2021, 12:44 AM
Show posts by this member only | IPv6 | Post
#345
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Sep 21 2021, 09:49 PM
|
![]()
Newbie
5 posts Joined: Mar 2012 |
Pls quote kitchen extension for 22x75 house, kitchen cabinets, wardrobes, plumbing, wiring and roofing for 20 ++house. Thanks
|
|
|
Sep 27 2021, 12:43 AM
Show posts by this member only | IPv6 | Post
#347
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(mlc @ Sep 21 2021, 09:49 PM) Pls quote kitchen extension for 22x75 house, kitchen cabinets, wardrobes, plumbing, wiring and roofing for 20 ++house. Thanks Pm done. Pls check ya 😁 Headsup! liked this post
|
|
|
Oct 8 2021, 03:03 PM
|
![]() ![]()
Junior Member
180 posts Joined: May 2020 |
|
|
|
Oct 8 2021, 05:09 PM
Show posts by this member only | IPv6 | Post
#349
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,714 posts Joined: Aug 2005 From: Taman Pekaka, Sg. Dua, Gelugor, Penang |
I'm here to write a review for this contractor (Daren). Before I appoint him I have another contractor that was doing renovation for my house but the contractor the quality is not so good and runaway. So I decided to search for some contractors in this forum and I've found Daren. He is friendly, quality of work is good and price is reasonable but in terms of time he will take a bit longer to complete. As we know, no one is perfect. Although there are some delays due to MCO but he managed to get all the approval from MITI and CIDB to resume back the work immediately. I will recommend him to those who wanna do renovation. Thanks to him and all his team for the hard work. Great guy, very friendly and can kawtim. Wish him all the best 👍 Darenloh liked this post
|
|
|
Oct 11 2021, 01:13 AM
Show posts by this member only | IPv6 | Post
#350
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Oct 11 2021, 01:18 AM
Show posts by this member only | IPv6 | Post
#351
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(nabelon @ Oct 8 2021, 05:09 PM) I'm here to write a review for this contractor (Daren). Before I appoint him I have another contractor that was doing renovation for my house but the contractor the quality is not so good and runaway. So I decided to search for some contractors in this forum and I've found Daren. He is friendly, quality of work is good and price is reasonable but in terms of time he will take a bit longer to complete. As we know, no one is perfect. Although there are some delays due to MCO but he managed to get all the approval from MITI and CIDB to resume back the work immediately. I will recommend him to those who wanna do renovation. Thanks to him and all his team for the hard work. Thank you for giving me the opportunity to serve you. Wishing you all the best too and thanks again for the support and patience. 😁👍Great guy, very friendly and can kawtim. Wish him all the best 👍 |
|
|
Oct 14 2021, 11:34 AM
|
![]() ![]()
Junior Member
81 posts Joined: Sep 2021 |
Hi sifus, for extension of more than 500 sqf, have to submit new DO to municipal, which will take 4-6 months, and then BP, another 2-3 months.. I wonder is there any more clear cut ways of doing this? Please advise
|
|
|
Oct 14 2021, 10:22 PM
Show posts by this member only | IPv6 | Post
#353
|
![]() ![]() ![]() ![]() ![]()
Junior Member
832 posts Joined: Jul 2016 |
Guys. I wanna ask. Is there such thing as Sirim concrete beam or Sirim concrete piling? I was given option to go with Sirim one which is 2x the price or non Sirim half the price.
|
|
|
Oct 18 2021, 01:22 AM
|
![]()
Junior Member
30 posts Joined: Sep 2008 |
Can pm your company contact? I’m mid of looking for contractor for new house extension
|
|
|
Oct 21 2021, 07:21 PM
Show posts by this member only | IPv6 | Post
#355
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(Chris_Inch @ Oct 14 2021, 11:34 AM) Hi sifus, for extension of more than 500 sqf, have to submit new DO to municipal, which will take 4-6 months, and then BP, another 2-3 months.. I wonder is there any more clear cut ways of doing this? Please advise Hi Chris, for submission of more than 500sf the deposit is slightly higher. Basically, it takes around 1-2 months and depend on how fast your architecture and engineer to draw the plan. If u do the submission on behalf of your client then u should know what to do first. If your client appoint a runner then u get the contact of the runner and provide what he needs. Here is my two cents 😁 |
|
|
Oct 21 2021, 07:28 PM
Show posts by this member only | IPv6 | Post
#356
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(JasonTheGreat @ Oct 14 2021, 10:22 PM) Guys. I wanna ask. Is there such thing as Sirim concrete beam or Sirim concrete piling? I was given option to go with Sirim one which is 2x the price or non Sirim half the price. Precast beam mostly use on commercial, roads and bridges. I think your contractor quoted u using BS rebar. BS is with sirim and jkr specs. |
|
|
Oct 21 2021, 07:29 PM
Show posts by this member only | IPv6 | Post
#357
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Oct 21 2021, 07:35 PM
Show posts by this member only | IPv6 | Post
#358
|
![]() ![]() ![]() ![]() ![]()
Junior Member
832 posts Joined: Jul 2016 |
|
|
|
Oct 21 2021, 07:47 PM
Show posts by this member only | IPv6 | Post
#359
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Oct 25 2021, 06:49 PM
|
![]() ![]()
Junior Member
289 posts Joined: Oct 2007 From: KL |
Hi Daren, do you do small jobs like concrete kitchen cabinets for condo unit?
This post has been edited by Lil'Maine: Oct 27 2021, 12:13 PM |
|
|
Oct 25 2021, 11:54 PM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
919 posts Joined: May 2005 |
|
|
|
Oct 26 2021, 07:56 AM
Show posts by this member only | IPv6 | Post
#362
|
![]()
Newbie
13 posts Joined: Jul 2013 |
Anyone experiencing somethin like , it's a new project and once u get the key, there's still alot of bangla/indon/ workers around that area doin some final touch up, doin defects etc etc... Then hire them to do the hackin and extension stuff?! Or not even hackin... just building up the wall at the yard areas and door..... is it safe?!
This post has been edited by cwleon82: Oct 26 2021, 07:58 AM |
|
|
Oct 28 2021, 12:11 AM
|
![]() ![]() ![]()
Junior Member
498 posts Joined: Mar 2005 |
QUOTE(Darenloh @ Jun 6 2021, 03:05 PM) Hi guys, Here's some update of my project. Another satisfied client from lyn. Thanks to mikhail for the support. Darren, How much is the cost of the renovation for this house?![]() (Before) Facade: ![]() (After) Facade: ![]() ![]() i'm planning to get a house on USJ and wana do the same |
|
|
Oct 31 2021, 03:51 PM
Show posts by this member only | IPv6 | Post
#364
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Oct 31 2021, 03:53 PM
Show posts by this member only | IPv6 | Post
#365
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Oct 31 2021, 03:57 PM
Show posts by this member only | IPv6 | Post
#366
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(cwleon82 @ Oct 26 2021, 07:56 AM) Anyone experiencing somethin like , it's a new project and once u get the key, there's still alot of bangla/indon/ workers around that area doin some final touch up, doin defects etc etc... Then hire them to do the hackin and extension stuff?! Or not even hackin... just building up the wall at the yard areas and door..... is it safe?! In my opinion, u can hire them if the works are repair or 1-2 days work. Renovation and extension better look for a licensed local contractor to do it. |
|
|
Oct 31 2021, 04:06 PM
Show posts by this member only | IPv6 | Post
#367
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Oct 31 2021, 05:16 PM
|
![]() ![]()
Junior Member
163 posts Joined: Nov 2008 |
Hihi, can ask whether if we want to do a patio in the side, is it considered as the extension and need to apply permit?
Mainly, is do cement layout in the ground then followed by awning/ |
|
|
Oct 31 2021, 07:09 PM
Show posts by this member only | IPv6 | Post
#369
|
![]() ![]()
Junior Member
151 posts Joined: Nov 2005 |
Hi
Mine is a sub sale bungalow 2700sqf. Need to remove a powder room, replace kitchen cabinets and walk-in wardrobe. And whole house painting plus touch up. Selayang area. Pls pm ur contact. |
|
|
Nov 2 2021, 10:28 AM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,754 posts Joined: May 2011 |
|
|
|
Nov 2 2021, 12:06 PM
Show posts by this member only | IPv6 | Post
#371
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
14,511 posts Joined: Sep 2017 |
|
|
|
Nov 3 2021, 10:31 PM
Show posts by this member only | IPv6 | Post
#372
|
![]()
Probation
16 posts Joined: Sep 2021 |
Hi, want to ask how do interior designer charge just for plan design and 3D drawing in Klang valley area? Let's say for a 4500+ sq house
|
|
|
Nov 4 2021, 10:17 PM
Show posts by this member only | IPv6 | Post
#373
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
13,773 posts Joined: Jan 2006 From: stress & confuse world |
can pm me your contact?
i am looking around to reno my new condo that will be completed in 6 months |
|
|
Nov 4 2021, 10:22 PM
|
![]() ![]()
Junior Member
204 posts Joined: Oct 2008 From: Subang Jaya |
PM me your contact please?
|
|
|
Nov 7 2021, 03:44 PM
|
![]()
Newbie
39 posts Joined: Jul 2014 |
Hi. Can send me your contact number.
Thanks |
|
|
Nov 7 2021, 04:56 PM
|
![]() ![]() ![]() ![]()
Junior Member
559 posts Joined: May 2006 From: 1,234 |
Hi, please send contact or a link to your portfolio ? thanks
|
|
|
Nov 15 2021, 05:57 PM
Show posts by this member only | IPv6 | Post
#377
|
![]()
Junior Member
7 posts Joined: Nov 2021 |
Can PM your contact please? I need to built an outdoor concrete table top at my house. Thanks
|
|
|
Nov 15 2021, 07:20 PM
|
![]()
Junior Member
45 posts Joined: May 2007 |
hi can pls pm ur contact, planning to do cabinet carpentry, electric work, painting, bathroom wet works,
|
|
|
Nov 15 2021, 08:34 PM
|
![]()
Newbie
39 posts Joined: Jul 2014 |
Hi. Can send me your contact number. Thanks
|
|
|
Nov 21 2021, 03:23 PM
Show posts by this member only | IPv6 | Post
#380
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Nov 21 2021, 03:24 PM
Show posts by this member only | IPv6 | Post
#381
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Nov 21 2021, 03:34 PM
Show posts by this member only | IPv6 | Post
#382
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(Leisman @ Nov 3 2021, 10:31 PM) Hi, want to ask how do interior designer charge just for plan design and 3D drawing in Klang valley area? Let's say for a 4500+ sq house Hi, there are 3 types of charge (or more) for 3D design. First is charge by per sqft, secondly is the lump-sum charge, third is per view charge. If u need a kitchen area only then u can choose per view. For a condo, u may choose the lump-sum charge. Your designer will let u know which to choose and what's the things that included. |
|
|
Nov 21 2021, 03:35 PM
Show posts by this member only | IPv6 | Post
#383
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Nov 21 2021, 03:36 PM
Show posts by this member only | IPv6 | Post
#384
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Nov 21 2021, 03:37 PM
Show posts by this member only | IPv6 | Post
#385
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Nov 21 2021, 03:39 PM
Show posts by this member only | IPv6 | Post
#386
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Nov 21 2021, 03:40 PM
Show posts by this member only | IPv6 | Post
#387
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Feb 20 2022, 06:58 AM
|
![]()
Junior Member
10 posts Joined: Dec 2014 |
Hi. Can send me your contact number.
Thanks |
|
|
Feb 23 2022, 02:04 PM
|
![]()
Probation
30 posts Joined: Nov 2020 |
Hi,
Can you PM your contact and price for extend kitchen 20frx10ft? |
|
|
Feb 28 2022, 04:45 PM
|
![]()
Junior Member
6 posts Joined: Dec 2009 |
Hi,
I'm surveying for cost to renovate my basic house of 18x60. Please PM contact and FB page if any. Thank you. |
|
|
Mar 5 2022, 12:52 PM
|
![]()
Probation
1 posts Joined: Mar 2022 |
QUOTE(Darenloh @ Oct 8 2018, 01:25 PM) Hi guys, pls leave a comment regrading Extension and ID. Here are some photos of on-going project :thumbsup: . From bare unit to fully extend with ID works Hi could u pm ur contact |
|
|
Mar 9 2022, 03:10 PM
Show posts by this member only | IPv6 | Post
#392
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Mar 9 2022, 03:10 PM
Show posts by this member only | IPv6 | Post
#393
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Mar 9 2022, 03:11 PM
Show posts by this member only | IPv6 | Post
#394
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Mar 9 2022, 03:11 PM
Show posts by this member only | IPv6 | Post
#395
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Mar 9 2022, 03:16 PM
Show posts by this member only | IPv6 | Post
#396
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
Hi everyone,
Currently, our company can't take any new renovation project due to project overload and shortage of manpower. We will be back to taking new renovation project in June 2022 but our ID services are available. Sorry for the inconvenience and thanks for the support. 😁👍🏼 |
|
|
Mar 11 2022, 04:25 PM
|
![]() ![]() ![]()
Junior Member
348 posts Joined: Sep 2006 |
hi, please pm contact. looking for ID to look at a few design for our house
|
|
|
Mar 14 2022, 06:35 PM
Show posts by this member only | IPv6 | Post
#398
|
![]()
Junior Member
11 posts Joined: Feb 2010 |
Hi. Can pm me contact. Looking for ID n light renovation work for a new unit I have. Around 1500sq. Thanks.
|
|
|
Mar 14 2022, 10:43 PM
Show posts by this member only | IPv6 | Post
#399
|
![]() ![]()
Junior Member
54 posts Joined: Feb 2022 |
Hi I'm looking at renovating a new 2500sq ft semi d in puncak alam, kindly pm for details, thanks
|
|
|
Mar 23 2022, 01:21 PM
Show posts by this member only | IPv6 | Post
#400
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Mar 23 2022, 01:22 PM
Show posts by this member only | IPv6 | Post
#401
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Mar 23 2022, 01:22 PM
Show posts by this member only | IPv6 | Post
#402
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Mar 23 2022, 03:41 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,630 posts Joined: Jul 2005 |
Hi, can pm me contact as well.
|
|
|
Mar 24 2022, 02:24 PM
Show posts by this member only | IPv6 | Post
#404
|
![]()
Junior Member
39 posts Joined: May 2005 |
PM.looking to reno my 3 storey house.
|
|
|
Mar 24 2022, 09:16 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,457 posts Joined: Jul 2009 |
Hi Daren, please send me contact too thanks ya
|
|
|
Mar 24 2022, 10:39 PM
Show posts by this member only | IPv6 | Post
#406
|
![]() ![]() ![]() ![]() ![]()
Senior Member
700 posts Joined: Nov 2009 |
Hi Darren, do you guys do kitchen cabinets also?
|
|
|
Mar 25 2022, 01:27 PM
Show posts by this member only | IPv6 | Post
#407
|
![]() ![]()
Junior Member
53 posts Joined: Feb 2008 |
Please Pm contact and portfolio if any..thanks ya
|
|
|
Mar 26 2022, 12:57 PM
Show posts by this member only | IPv6 | Post
#408
|
![]() ![]()
Junior Member
111 posts Joined: May 2010 |
Hi. I need Reno works from June onwards? Can give quotation?
|
|
|
Apr 21 2022, 10:12 PM
Show posts by this member only | IPv6 | Post
#409
|
![]()
Junior Member
14 posts Joined: Aug 2011 |
Hi i'm looking to reno my house
1) Knock down two walls ( one around 11 ft, the other around 18ft) 2) Extend kitchen 22ft x 5 ft PM me |
|
|
May 7 2022, 01:43 AM
Show posts by this member only | IPv6 | Post
#410
|
![]()
Junior Member
28 posts Joined: Jan 2014 |
Hi Darren
Please PM your contact your contact and company details would like to do extension kitchen and house side. |
|
|
May 13 2022, 08:45 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,118 posts Joined: Jan 2003 From: SA.KD.SA.KD |
PM contact Darren.
|
|
|
May 18 2022, 04:52 PM
Show posts by this member only | IPv6 | Post
#412
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,754 posts Joined: May 2011 |
How do you rectify this scenario:
Semi-d house , renovated the downstairs guest room (with attached bathroom) , till the back end , with only 2 windows that is connected to wet kitchen . Problem is , there is lingering smell in the room that won't go away , and the problem is worse , when there is kitchen trash that is not cleared immediately. |
|
|
May 18 2022, 07:55 PM
|
![]() ![]() ![]() ![]() ![]()
Junior Member
723 posts Joined: Jul 2008 |
QUOTE(drbone @ May 18 2022, 04:52 PM) How do you rectify this scenario: You have a stagnant air problem. If you smoke or burn something there, you can see the smoke would not go anywhere.Semi-d house , renovated the downstairs guest room (with attached bathroom) , till the back end , with only 2 windows that is connected to wet kitchen . Problem is , there is lingering smell in the room that won't go away , and the problem is worse , when there is kitchen trash that is not cleared immediately. You need to add ventilation. Actively or passively. |
|
|
May 19 2022, 10:26 AM
Show posts by this member only | IPv6 | Post
#414
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,754 posts Joined: May 2011 |
|
|
|
Jun 26 2022, 02:03 PM
Show posts by this member only | IPv6 | Post
#415
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
Hi everyone, sorry for being offline for 3 months. I am back to accepting new Reno projects from July onwards. Will reply to everyone ASAP. Thanks for the support 😄
|
|
|
Jun 26 2022, 02:15 PM
Show posts by this member only | IPv6 | Post
#416
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jun 27 2022, 03:23 PM
|
![]()
Probation
4 posts Joined: May 2022 |
Hi Darenloh,
Can I know how much it is going to costs (roughly) for extension? Area is about 200sf (20fx10f). Ceiling height should be around 9f |
|
|
Jun 30 2022, 11:30 PM
Show posts by this member only | IPv6 | Post
#418
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jul 1 2022, 07:26 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,714 posts Joined: Jan 2003 |
Hi, not sure if this is the right place to ask. assuming my porch, i want to knock down the centre pillar and extend it to the side to widen it. How do I make sure the middle part is strong enough? Currently my contractor ask engineer to estimate and looks like i need to build extra 2 pillars at the back area of the whole car porch area it seems....
Attached thumbnail(s) |
|
|
Jul 1 2022, 09:30 PM
Show posts by this member only | IPv6 | Post
#420
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
Hi, first of all, what roof u gonna do after widening it? if it's a slab then u need to rebuild the entire structure.
|
|
|
Jul 1 2022, 11:02 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
12,410 posts Joined: Jan 2008 From: KL - Cardiff - Subang - Sydney |
Hi do you provide reno service for condo in KL area? Pm me if you do
|
|
|
Jul 2 2022, 01:19 PM
Show posts by this member only | IPv6 | Post
#422
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jul 7 2022, 05:16 PM
|
![]()
Newbie
2 posts Joined: Dec 2008 |
do you do car pourch extension at Klang ?
|
|
|
Jul 8 2022, 11:01 AM
|
![]() ![]()
Junior Member
173 posts Joined: Jan 2003 |
|
|
|
Jul 12 2022, 01:11 PM
Show posts by this member only | IPv6 | Post
#425
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jul 12 2022, 01:12 PM
Show posts by this member only | IPv6 | Post
#426
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Aug 3 2022, 10:54 PM
Show posts by this member only | IPv6 | Post
#427
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Aug 17 2022, 06:09 PM
|
![]() ![]()
Junior Member
151 posts Joined: Jun 2007 |
hi Daren,
roughly how much cost for doing corner lot extension 35ft x 10 ft? thanks This post has been edited by zgerm: Aug 17 2022, 06:13 PM |
|
|
Aug 20 2022, 12:57 AM
|
![]()
Junior Member
20 posts Joined: Sep 2011 |
hi, i am interested at car porch relaying with new gate and auto gate, toilet makeover and have a piece of wall that i have no idea what i want to do with it. mind sharing and pm me ur contact?
|
|
|
Aug 20 2022, 09:39 PM
Show posts by this member only | IPv6 | Post
#430
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Aug 20 2022, 09:39 PM
Show posts by this member only | IPv6 | Post
#431
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Aug 20 2022, 10:10 PM
Show posts by this member only | IPv6 | Post
#432
|
![]() ![]()
Junior Member
100 posts Joined: Nov 2018 |
Hi Daren, please send me contact n company profile too thanks you
|
|
|
Aug 28 2022, 10:58 AM
|
![]()
Junior Member
16 posts Joined: Jun 2008 |
Hi Daren ,
Please do send me ur company profile and contact as well. Thanks. |
|
|
Sep 2 2022, 10:50 AM
Show posts by this member only | IPv6 | Post
#434
|
![]() ![]()
Junior Member
284 posts Joined: Jan 2003 From: Kuala Lumpur |
Hi Darren,
Send me a pm on your contacts. Looking for someone for extension works, toilets, floor tiling works, painting, etc...... |
|
|
Sep 4 2022, 11:18 AM
|
![]()
Probation
13 posts Joined: Jun 2020 |
Hi Darren,
Please PM me your contact as I’m looking for ID and renovation service. Thanks |
|
|
Sep 25 2022, 09:47 PM
Show posts by this member only | IPv6 | Post
#436
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Sep 25 2022, 09:47 PM
Show posts by this member only | IPv6 | Post
#437
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Sep 25 2022, 09:48 PM
Show posts by this member only | IPv6 | Post
#438
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Sep 25 2022, 09:48 PM
Show posts by this member only | IPv6 | Post
#439
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Sep 25 2022, 10:32 PM
Show posts by this member only | IPv6 | Post
#440
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Sep 25 2022, 10:52 PM
Show posts by this member only | IPv6 | Post
#441
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Sep 27 2022, 12:55 PM
|
![]()
Newbie
6 posts Joined: Mar 2016 |
Do you do plaster ceiling and carpenter work for Condo? Please pm me your contact if you do so in Cheras area. Thx u
|
|
|
Sep 27 2022, 03:04 PM
|
![]()
Newbie
6 posts Joined: Mar 2016 |
QUOTE(Darenloh @ Jul 20 2020, 01:59 PM) Wangsa condo renovation... How much will this cost now? planning to do up my new condo in cheras 900+ sqft. Thx u.Job scope: -Plaster ceiling -Painting -Wall hacking -Wall repairing -Kitchen storage cabinet -Wardrobe for Master bedroom and Bedroom 1 -M&E -Installation of lights and fans |
|
|
Sep 29 2022, 09:55 AM
Show posts by this member only | IPv6 | Post
#444
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Sep 29 2022, 09:56 AM
Show posts by this member only | IPv6 | Post
#445
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Oct 17 2022, 04:41 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Oct 24 2022, 11:19 PM
Show posts by this member only | IPv6 | Post
#447
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Oct 25 2022, 11:05 AM
|
![]()
Newbie
7 posts Joined: Nov 2015 |
QUOTE(Darenloh @ Sep 25 2022, 10:52 PM) Before Backyard: Can I know the approximately price for the renovation of the backyard? Thanks![]() After Backyard: ![]() ![]() Before Ground floor bedroom: ![]() After Ground floor bedroom: ![]() Before Living and Dining: ![]() After Living and Dining: ![]() ![]() Before Upper floor bathroom: ![]() After Upper floor bathroom: ![]() |
|
|
Oct 26 2022, 11:06 PM
Show posts by this member only | IPv6 | Post
#449
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Oct 30 2022, 09:54 PM
Show posts by this member only | IPv6 | Post
#450
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jan 3 2023, 12:29 AM
Show posts by this member only | IPv6 | Post
#451
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jan 16 2023, 01:09 AM
Show posts by this member only | IPv6 | Post
#452
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jan 16 2023, 11:10 PM
Show posts by this member only | IPv6 | Post
#453
|
![]() ![]() ![]() ![]()
Senior Member
563 posts Joined: Apr 2005 |
How much if i want to extend ground floor 13feet to the side for corner house and length is 30 feet?
|
|
|
Jan 17 2023, 10:08 PM
Show posts by this member only | IPv6 | Post
#454
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jan 18 2023, 08:03 PM
|
![]()
Probation
2 posts Joined: Jan 2023 |
Can I know the approximately price for the re-doing tile, wall plaster, electrical and water point for double storey landed at bukit antarabangsa?
|
|
|
Jan 27 2023, 01:02 AM
Show posts by this member only | IPv6 | Post
#456
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jan 31 2023, 02:45 PM
|
![]()
Newbie
3 posts Joined: Feb 2017 |
pm for contact no. . tq
This post has been edited by jasmineapk99: Jan 31 2023, 02:48 PM |
|
|
Jan 31 2023, 09:52 PM
Show posts by this member only | IPv6 | Post
#458
|
![]() ![]() ![]() ![]() ![]()
Senior Member
908 posts Joined: Jan 2005 From: USJ |
Hi bro, like to know
Approximately price for house extension 24 * 14 for ground floor + 1st floor) + tile redo tiles area (24 * 28) roughly. And do we need approval with local municipal council? need to engage with architect for the extension? thanks |
|
|
Feb 2 2023, 12:17 PM
Show posts by this member only | IPv6 | Post
#459
|
![]() ![]()
Junior Member
241 posts Joined: Oct 2021 |
Hi those are some.nice.pictures. wonderinf if you do the following:
- re-paint wall - Vinyl flooring or any other suitable material - Demolish wall and install door - Kitchen reno full, with hood and hob. Kitchen island with sink (wet works needed) - Bathroom reno Apartment 860 sqft in cheras. This post has been edited by CoolStoryWriter: Feb 2 2023, 12:20 PM |
|
|
Feb 2 2023, 10:10 PM
Show posts by this member only | IPv6 | Post
#460
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Feb 2 2023, 10:15 PM
Show posts by this member only | IPv6 | Post
#461
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(wos @ Jan 31 2023, 09:52 PM) Hi bro, like to know Hi bro, the price i have pmed u. yes u need to submit the approval to local council. u need to engage architect and engineer if involve 2 storey slab extension. Approximately price for house extension 24 * 14 for ground floor + 1st floor) + tile redo tiles area (24 * 28) roughly. And do we need approval with local municipal council? need to engage with architect for the extension? thanks |
|
|
Feb 2 2023, 10:19 PM
Show posts by this member only | IPv6 | Post
#462
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(CoolStoryWriter @ Feb 2 2023, 12:17 PM) Hi those are some.nice.pictures. wonderinf if you do the following: I've pmed u my contact number for further discussion. Pls check - re-paint wall - Vinyl flooring or any other suitable material - Demolish wall and install door - Kitchen reno full, with hood and hob. Kitchen island with sink (wet works needed) - Bathroom reno Apartment 860 sqft in cheras. |
|
|
Feb 3 2023, 05:11 PM
|
![]()
Probation
2 posts Joined: Feb 2021 |
Contact plz.
|
|
|
Feb 4 2023, 11:55 PM
Show posts by this member only | IPv6 | Post
#464
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Feb 5 2023, 06:33 PM
Show posts by this member only | IPv6 | Post
#465
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,264 posts Joined: Feb 2006 From: KL, Malaysia |
Hi I have new house vp soon. Double storey. Looking for renovation work involving design and build.
Work involved ID - living hall, kitchen master room Back extension This post has been edited by jasperng: Feb 5 2023, 06:35 PM |
|
|
Feb 6 2023, 04:34 PM
Show posts by this member only | IPv6 | Post
#466
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Feb 6 2023, 09:01 PM
|
![]()
Probation
2 posts Joined: Jan 2023 |
|
|
|
Feb 11 2023, 11:26 PM
Show posts by this member only | IPv6 | Post
#468
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Feb 13 2023, 03:22 PM
|
![]() ![]()
Junior Member
206 posts Joined: Apr 2012 |
Hello, would like to get a quote for renovation, 2 storey terrace:
20x70 1. Extention of front gate. 2. Installation of electrical point for auto gate system. 3. Outdoor tiling (to raise the floor a bit, rain water cannot go out because road higher than tiles) 4. Whole house need re-tile. Stairs and floor 1 parquets removal. 5. 3 bathroom - remodal (tile, pipes, new sink, new toilet). 6. Add additional electrical points , rough estimation 20 units. 7. Checking on electrical wires. 8. Ceiling need some patchwork. |
|
|
Feb 15 2023, 08:52 PM
Show posts by this member only | IPv6 | Post
#470
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,805 posts Joined: Oct 2010 |
Hi pls pm contact for some extension, plaster ceiling, electrical works or let me know what service provided ya.
|
|
|
Feb 15 2023, 11:17 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(AppleTwist @ Feb 13 2023, 03:22 PM) Hello, would like to get a quote for renovation, 2 storey terrace: I've pm you. Pls check 20x70 1. Extention of front gate. 2. Installation of electrical point for auto gate system. 3. Outdoor tiling (to raise the floor a bit, rain water cannot go out because road higher than tiles) 4. Whole house need re-tile. Stairs and floor 1 parquets removal. 5. 3 bathroom - remodal (tile, pipes, new sink, new toilet). 6. Add additional electrical points , rough estimation 20 units. 7. Checking on electrical wires. 8. Ceiling need some patchwork. |
|
|
Feb 15 2023, 11:19 PM
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Feb 17 2023, 04:53 PM
|
![]() ![]() ![]()
Junior Member
356 posts Joined: Oct 2011 |
pm, u contractor ka
|
|
|
Feb 19 2023, 12:52 PM
Show posts by this member only | IPv6 | Post
#474
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Mar 5 2023, 02:41 PM
Show posts by this member only | IPv6 | Post
#475
|
![]() ![]()
Junior Member
97 posts Joined: Jan 2005 |
|
|
|
Mar 13 2023, 01:25 PM
|
![]()
Junior Member
47 posts Joined: Aug 2008 |
Hello bosses,
I am looking to buy a subsale property. Just wondering if I can get a rough quotation for below work.. a) re-wiring whole house b) change plumbing of whole house+ change design to new toilet c) others still not too sure what i want (for further discussion) Its an old piece of house 3 stories around 1100sqft total. 3 rooms + 2 bathroom Sorry if this is no proper thread to ask 🙏 and thank you |
|
|
Mar 14 2023, 07:44 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,760 posts Joined: Oct 2005 |
Hi Boss, PM me your contact.. I am looking to renovation my 24x70 house very soon.
Need kitchen extension, kitchen cabinets, electrical wiring & lighting etc.. |
|
|
Mar 20 2023, 10:36 AM
|
![]() ![]()
Junior Member
57 posts Joined: Feb 2022 |
Hi i would like to know the price for double storey house build up-1399sqft land-1800sqft 20x70 extension and renovation.
1st floor: Back 7ft extend kitchen extend hall knock down the room move it to the all the back relocate toilet compact size 4ft width 9ft length to the back 2nd floor : Extend 2 rooms to the back same as the kitchen redesign toilet to compact size 4ft width 9ft length Balcony with minimal glass extend till to the front gate. 20x20 if possible Please give price separately for 1st floor and 2nd floor Thank you |
|
|
Mar 20 2023, 06:39 PM
|
![]() ![]() ![]()
Junior Member
300 posts Joined: Jan 2003 From: Petaling Jaya |
Hi there,
Am planning to buy a subsale property, 22x75 at Subang area. So far am thinking below is needed. Perhaps more when finally getting the house. 3 phase wiring Piping redone with pump Extension front & back Kitchen redone Roof for porch Lighting Additional water tank Ceiling check & upgrade Please PM for quote/advise/etc. Thank you. |
|
|
Mar 22 2023, 01:36 PM
Show posts by this member only | IPv6 | Post
#480
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Mar 22 2023, 01:37 PM
Show posts by this member only | IPv6 | Post
#481
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(akutaksempurna @ Mar 13 2023, 01:25 PM) Hello bosses, Pm-ed pls check 😁I am looking to buy a subsale property. Just wondering if I can get a rough quotation for below work.. a) re-wiring whole house b) change plumbing of whole house+ change design to new toilet c) others still not too sure what i want (for further discussion) Its an old piece of house 3 stories around 1100sqft total. 3 rooms + 2 bathroom Sorry if this is no proper thread to ask 🙏 and thank you |
|
|
Mar 22 2023, 01:38 PM
Show posts by this member only | IPv6 | Post
#482
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Mar 22 2023, 01:40 PM
Show posts by this member only | IPv6 | Post
#483
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(D1D @ Mar 20 2023, 10:36 AM) Hi i would like to know the price for double storey house build up-1399sqft land-1800sqft 20x70 extension and renovation. I've pm u my number pls send the details to me 😁1st floor: Back 7ft extend kitchen extend hall knock down the room move it to the all the back relocate toilet compact size 4ft width 9ft length to the back 2nd floor : Extend 2 rooms to the back same as the kitchen redesign toilet to compact size 4ft width 9ft length Balcony with minimal glass extend till to the front gate. 20x20 if possible Please give price separately for 1st floor and 2nd floor Thank you |
|
|
Mar 22 2023, 01:41 PM
Show posts by this member only | IPv6 | Post
#484
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(sbd18 @ Mar 20 2023, 06:39 PM) Hi there, Pm-ed pls check 😁Am planning to buy a subsale property, 22x75 at Subang area. So far am thinking below is needed. Perhaps more when finally getting the house. 3 phase wiring Piping redone with pump Extension front & back Kitchen redone Roof for porch Lighting Additional water tank Ceiling check & upgrade Please PM for quote/advise/etc. Thank you. |
|
|
Apr 7 2023, 11:14 AM
Show posts by this member only | IPv6 | Post
#485
|
![]()
Junior Member
32 posts Joined: Nov 2014 |
Hi,
Just got a newly completed double storey terrace in Elmina. Looking to do the following: Plaster ceiling Lighting & fan installation Feature wall Sliding door between wet and dry kitchen Toilet shelf Shower divider Want to get your quotation. PM me if you need more details. TQ |
|
|
Apr 26 2023, 11:47 AM
Show posts by this member only | IPv6 | Post
#486
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(ClickityQuack @ Apr 7 2023, 11:14 AM) Hi, Pm done 😁Just got a newly completed double storey terrace in Elmina. Looking to do the following: Plaster ceiling Lighting & fan installation Feature wall Sliding door between wet and dry kitchen Toilet shelf Shower divider Want to get your quotation. PM me if you need more details. TQ |
|
|
May 15 2023, 12:32 AM
Show posts by this member only | IPv6 | Post
#487
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
Latest update on project @ Jalan BPP thinkgoodpositive liked this post
|
|
|
May 21 2023, 07:26 PM
|
![]()
Probation
13 posts Joined: Sep 2022 |
Im from KL area. looking for a rough quote as follows:-
1. to erect a car porch. The porch is currently empty and I wish to erect a 25 x 20 car porch. 2. to extend the back room to the balcony. The owner, who owns an architect firm, told me that the column and foundation are all done up. As such, I can just extend the room to the current balcony. There is already opening in the back room which accesses to the balcony. I want to extend a further 10 x 10. ![]() ![]() |
|
|
May 22 2023, 12:46 AM
Show posts by this member only | IPv6 | Post
#489
|
![]()
Junior Member
21 posts Joined: Dec 2012 |
pm contact
|
|
|
May 22 2023, 10:07 AM
Show posts by this member only | IPv6 | Post
#490
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
QUOTE(yyphang88 @ May 21 2023, 07:26 PM) Im from KL area. looking for a rough quote as follows:- Pm done 😁1. to erect a car porch. The porch is currently empty and I wish to erect a 25 x 20 car porch. 2. to extend the back room to the balcony. The owner, who owns an architect firm, told me that the column and foundation are all done up. As such, I can just extend the room to the current balcony. There is already opening in the back room which accesses to the balcony. I want to extend a further 10 x 10. ![]() ![]() |
|
|
May 22 2023, 10:08 AM
Show posts by this member only | IPv6 | Post
#491
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
May 28 2023, 11:40 PM
Show posts by this member only | IPv6 | Post
#492
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
May 29 2023, 10:18 PM
Show posts by this member only | IPv6 | Post
#493
|
![]() ![]() ![]() ![]()
Junior Member
501 posts Joined: Nov 2008 From: PJ |
Looking for the 20x5 back extension double story wet work. Please pm me. Thanks.
|
|
|
May 29 2023, 10:30 PM
|
![]() ![]() ![]() ![]()
Senior Member
651 posts Joined: Jan 2003 |
hi all - looking to get some renovation done on a unit
it's an old unit, and i want to do some basic works on it - lay floor with vinyl - remove existing cornices,built in shelves - fix new doors for shelves - possibly renovate 2 bathrooms - painting |
|
|
May 31 2023, 12:36 PM
Show posts by this member only | IPv6 | Post
#495
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
May 31 2023, 12:37 PM
Show posts by this member only | IPv6 | Post
#496
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jun 6 2023, 09:33 PM
Show posts by this member only | IPv6 | Post
#497
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
|
|
|
Jun 17 2023, 08:57 PM
Show posts by this member only | IPv6 | Post
#498
|
![]() ![]() ![]()
Junior Member
451 posts Joined: Apr 2016 |
Interior Design for landed property..
|
|
|
Jun 26 2023, 10:32 AM
|
![]() ![]()
Junior Member
196 posts Joined: Sep 2015 |
hi, for living room plaster ceiling (flat/plain type), is the normal plaster board or Gypsum board (9mm) which one is better/suitable?
For downlights, magnetic track lights, LED strip lights mainly. |
|
|
Jun 28 2023, 02:32 PM
Show posts by this member only | IPv6 | Post
#500
|
![]() ![]() ![]()
Junior Member
330 posts Joined: Jan 2013 |
Hi, im planning to install 2 Led strip light in my livingroom (plaster ceiling), they quoted me Rm1000. Is tis price normal?
|
| Change to: | 0.6135sec
0.24
6 queries
GZIP Disabled
Time is now: 26th November 2025 - 03:32 AM |