Hi Daren,
Plse PM me. I need some ID for my living. Thanks
Extension, Wet Works and ID, Discussion for Wet Works and ID works
Extension, Wet Works and ID, Discussion for Wet Works and ID works
|
|
Jun 10 2020, 02:16 PM
Return to original view | Post
#1
|
![]() ![]()
Junior Member
72 posts Joined: Feb 2008 |
Hi Daren,
Plse PM me. I need some ID for my living. Thanks |
|
|
Aug 23 2020, 12:31 PM
Return to original view | Post
#2
|
![]() ![]()
Junior Member
72 posts Joined: Feb 2008 |
QUOTE(Darenloh @ Aug 23 2020, 09:08 AM) -Re-tile 3 bathroom with waterproofing and change the sanitary wares estimated 12-15 days Hi,-Tiling the porch and backyard depends on the size. estimated 8-10 days - change door, adding plug point with hack and plaster back, repair leaking estimated 7-10 days - repaint House estimated 7-10 days - window grille depend on the manufacturer workload Re-tile 3 bathroom will takes 12-15 days?? I guess if 1 bathroom will take shorter days, right? My bathroom took 16 days for the waterproofing and retiling. hacking only 1 day. I plan to retiling my downstairs bathroom. |
|
|
Aug 23 2020, 10:14 PM
Return to original view | Post
#3
|
![]() ![]()
Junior Member
72 posts Joined: Feb 2008 |
QUOTE(Darenloh @ Aug 23 2020, 04:31 PM) Hi Merci, My bathroom size is 8' x 6'x10'.using normal tile : 2' x 1' for wall and 1' x 1' for floor.The duration of retiling depends on the size, height and the complexity. I'm using standard bathroom size with 4' x 8' x 5'(H) bathroom without bathtub and shower screen as reference. Let me breakdown the job scope with 2 workers per bathroom and using 2' x 1' tiles. - 1 day for hacking and floor screed (for condo it may take up to 2 days cuz need to discard the debris to loading bay) - 1 and half day to do wall tiling and another half day for waterproofing - 1 day to do floor tiles - 1 day to do installation of sanitary wares For your bathroom it takes 16 days to complete 1 bathroom? what's the size of the bathroom and what's size of tiles u using? I've seen some people using hexagon tiles 😁 I'm so stressed that time 'coz have to take leave alternate with my spouse. |
| Change to: | 0.0299sec
1.26
7 queries
GZIP Disabled
Time is now: 27th November 2025 - 09:18 AM |