QUOTE(BEANCOUNTER @ Dec 28 2018, 08:16 AM)
link pedestrian bridges from pav to Klcc is 1km. anything is possible.
but will developer willing to foot the bill and do it is different story.
Guess is just "feel good term" used to promote.
Link bridge nicer to hear compare to covered walkway.
Just like Kenwingston Avenue at Sg Besi, all using the term "direct link" to MRT station to sell. But in actual fact is nothing but just a propose bridge to cross the main road to the opposite side. From there onwards, still is a long walk unshelthered + uphill to the future MRT2 station.
QUOTE(LTG @ Dec 28 2018, 08:30 AM)
cover walk path is fine for me

i heavy mrt monthly pass user
At a cheaper PSF pricing got other projects along the MRT line, all closer to the MRT station, realistically better scoring in term of walkable distance. Rather than hoping for a 400 meter covered walkway here:
1. Aster Residence (real direct link to MRT station)
2. Parkland Residence, B11 (real direct link to MRT station)
3. Netizen, (located next to MRT park and ride facility)
Just suggestion since you are a heavy MRT user.
This post has been edited by AskarPerang: Dec 28 2018, 09:02 AM