During joint inspection with developer upon VP must we submit the defect report on that day itself or can I tell the technician I will submit after a much thorough inspection by me.
mustang
post Jun 23 2015, 09:21 PM

#mUsTaNg.corp#
******
Senior Member
1,748 posts

Joined: Jan 2003
From: Pearl Of the Orient

QUOTE(honkkydorry @ Jun 22 2015, 11:15 PM)
During joint inspection with developer upon VP must we submit the defect report on that day itself or can I tell the technician I will submit after a much thorough inspection by me.
*
You can submit at a later date. Just make sure it is within the DLP period as stated in your agreement.
honkkydorry
post Jun 23 2015, 10:46 PM

On my way
****
Senior Member
671 posts

Joined: May 2012


QUOTE(mustang @ Jun 23 2015, 09:21 PM)
You can submit at a later date. Just make sure it is within the DLP period as stated in your agreement.
*
Thanks. Actually why need to have joint inspection...
mustang
post Jun 28 2015, 01:54 PM

#mUsTaNg.corp#
******
Senior Member
1,748 posts

Joined: Jan 2003
From: Pearl Of the Orient

QUOTE(honkkydorry @ Jun 23 2015, 10:46 PM)
Thanks. Actually why need to have joint inspection...
*
In my personal opinion, the joint inspection is to enable the owners to have a view on the standard fittings in the house. They wont be able to have a thorough session with you to find out potential defects which is why you will need to do it and submit the list to them
rajsingh
post Jul 2 2015, 01:44 PM

New Member
*
Junior Member
9 posts

Joined: Apr 2015
The practical way to give you, the customer, control over defect rectification is for you to set a limit on the amount of work we can perform without your express permission.
Aylina
post Jul 10 2015, 11:43 AM

New Member
*
Junior Member
6 posts

Joined: Apr 2009
Dear all,
is this kind of poor workmanship consider defect?



Attached thumbnail(s)
Attached Image Attached Image
pillay
post Jul 15 2015, 01:23 PM

New Member
*
Junior Member
12 posts

Joined: May 2009


Hi guys..this thread was very useful, thanks a lot.
I got a question, does low water pressure (on 1st floor toilets) falls under defect rectification job? Thanks in advance.
Nation of Sensation
post Jul 16 2015, 10:22 AM

On my way
****
Senior Member
554 posts

Joined: Nov 2006
From: 127.0.0.1
QUOTE(pillay @ Jul 15 2015, 01:23 PM)
Hi guys..this thread was very useful, thanks a lot.
I got a question, does low water pressure (on 1st floor toilets) falls under defect rectification job? Thanks in advance.
*
This is a subjective matter.

Most of the times they will put the blame on SYABAS and will ask you to install a water pump to boost the pressure.
enriquelee
post Jul 16 2015, 11:39 AM

Don't ask for more, ask for COKE
********
All Stars
10,507 posts

Joined: Jan 2003
From: Atlanta

QUOTE(pillay @ Jul 15 2015, 01:23 PM)
Hi guys..this thread was very useful, thanks a lot.
I got a question, does low water pressure (on 1st floor toilets) falls under defect rectification job? Thanks in advance.
*
Low pressure after the tank can blame the developer.
adiwarna
post Jul 31 2015, 12:41 PM

Look at all my stars!!
*******
Senior Member
2,669 posts

Joined: Jun 2009
any company/personnel provide service for defect checking?

how much the rate for single storey house in klang valley?
roger roger
post Aug 7 2015, 12:32 PM

On my way
****
Senior Member
560 posts

Joined: Oct 2011


QUOTE(adiwarna @ Jul 31 2015, 12:41 PM)
any company/personnel provide service for defect checking?

how much the rate for single storey house in klang valley?
*
PM-ed, thanks
IReallyNeed Answers
post Aug 7 2015, 04:39 PM

Krazeybender
*****
Senior Member
913 posts

Joined: Jan 2008
From: Cheras


QUOTE(roger roger @ Aug 7 2015, 12:32 PM)
PM-ed, thanks
*
Appreciate if you can PM me too.

1800sf condo
2556RL
post Aug 11 2015, 03:26 PM

New Member
*
Junior Member
20 posts

Joined: Jun 2008


Hi there.

Just to ask around the forumners here if there is a new policy by TNB that requires owners of new condominiums/apartments to get a guarantor in order for TNB to install the electricity meter?

I had received a sms from developer for my condo that they needed my guarantor's details to submit to TNB for installing electricity meter. I called the developer office to check if the sms was really from them and they confirmed it was and they told me this is a new policy from TNB but I am quite skeptical about this.
honkkydorry
post Aug 12 2015, 01:08 PM

On my way
****
Senior Member
671 posts

Joined: May 2012


Need some advice from fellow experienced forummers. I have submitted my defects list to developer and they have started doing the rectification works but there was no activity for the past one week. From the list I submitted, most of the minor defects have been rectified but the major ones (doors and ceilings) have not been recifitied. When I called, I was told I am in the queue list. I am into the 3rd week from the date I submitted the list.

If there is still no activity resuming by the end of the 4th week, can I still write to the developer and tell them I will get my contractor to rectify the rest of the defects and billed to the developer?
SUScute_miao
post Aug 18 2015, 03:13 PM

Look at MY STARS!!!!!!!!!
******
Senior Member
1,438 posts

Joined: Dec 2011



Hi friends,

Developer called me tht my keys are ready to be collected. Few questions i would like to ask...

1. He will be giving me the defect form. If got any defect, by how long they need to fix it?

2. When do i need to change the tnb n water bills name? As far as i concern, its still under developer.

3. I asked the developer to add the grill at the bck door n wants the colour same like the frnt grill. I went to check n noticed its slightly different. According to them, they use the same colour coating, bt i see its slightly different colour.

Pls advise
zzzhhhzzz
post Aug 29 2015, 01:01 PM

Regular
******
Senior Member
1,652 posts

Joined: Apr 2012
QUOTE(roger roger @ Aug 7 2015, 12:32 PM)
PM-ed, thanks
*
Hi mind to PM me your charges ?
shinchan^^
post Sep 3 2015, 08:51 AM

K66
*********
All Stars
21,256 posts

Joined: Jan 2003
From: Pekopon


QUOTE(cute_miao @ Aug 18 2015, 03:13 PM)
Hi friends,

Developer called me tht my keys are ready to be collected. Few questions i would like to ask...

1. He will be giving me the defect form. If got any defect, by how long they need to fix it?

2. When do i need to change the tnb n water bills name? As far as i concern, its still under developer.

3. I asked the developer to add the grill at the bck door n wants the colour same like the frnt grill. I went to check n noticed its slightly different. According to them, they use the same colour coating, bt i see its slightly different colour.

Pls advise
*
chase them everyweek and then and eventually got it all fix laugh.gif
jernailrai
post Sep 18 2015, 10:18 PM

New Member
*
Junior Member
14 posts

Joined: Jan 2009


I would like to get a quotation for house inspection. Pleas

This post has been edited by jernailrai: Jul 11 2021, 10:56 PM
enriquelee
post Oct 25 2015, 01:04 PM

Don't ask for more, ask for COKE
********
All Stars
10,507 posts

Joined: Jan 2003
From: Atlanta

QUOTE(jernailrai @ Sep 18 2015, 10:18 PM)
I would like to get a quotation for house inspection. Please PM or msg me at 0122070111.

House type : Double Storey Semi D
Land Area : 35 x 71
Built Up Area : 2500 sq. ft.
Location : Teluk Panglima Garang
*
Which state is this?
justusfrantz
post Oct 26 2015, 12:20 PM

New Member
*
Junior Member
11 posts

Joined: Nov 2006


Good afternoon to all, a few questions from a first home owner here :

1. May i know upon handing over of keys to us (owner) and we submit the defects list, do we also let them have a set of keys as they need to enter to rectify the defects?

2. If there are no water supply yet (no meter installed), how do we do water ponding test in the toilets?

3. Does anyone check on the electrical wirings as well (megger, continuity)?

4. How do we prevent our fixtures (tap, sink, switches etc) from being stolen since no grilled installed or do we call for grill installation right away and lock our units?

btw, its a double story house. non g&g

Appreciate the advices. smile.gif

48 Pages « < 24 25 26 27 28 > » Top
 

Change to:
| Lo-Fi Version
0.0367sec    0.21    6 queries    GZIP Disabled
Time is now: 29th March 2024 - 06:46 PM