QUOTE(robert82 @ Jan 27 2015, 04:31 PM)
It is definitely going to be a problem.
Just the question is:
Do they thought about it and if yes, what is the mitigation plan?
Working hours?
Do they collect residents feedback.
Can't run away from it, as the whole area is being developed over the years and we are the initial lab rat.
Just a matter of moving in, see how it goes and start to feedback to them to reduce the inconvenience.
Sand, dust and all is expected, noise is expected, heck I even wonder how are the trucks going in and out of the housing area (pass by the guard house) and the frequent in and out will damage roads, etc or not…
We shall see upon moving in and then talk to them.
One thing for sure, I think they have similar issue with Setia Alam/Eco Park and definitely it is part of the approval permit to consider all this before they are allowed to start work on any additional buildings etc.
For Presint 1, they will be a dedicated pathway for the lorry to move in/out at the back of waterway and no need to go through the guard house.. Just the question is:
Do they thought about it and if yes, what is the mitigation plan?
Working hours?
Do they collect residents feedback.
Can't run away from it, as the whole area is being developed over the years and we are the initial lab rat.
Just a matter of moving in, see how it goes and start to feedback to them to reduce the inconvenience.
Sand, dust and all is expected, noise is expected, heck I even wonder how are the trucks going in and out of the housing area (pass by the guard house) and the frequent in and out will damage roads, etc or not…
We shall see upon moving in and then talk to them.
One thing for sure, I think they have similar issue with Setia Alam/Eco Park and definitely it is part of the approval permit to consider all this before they are allowed to start work on any additional buildings etc.
For presint 2, majority of house units are not open for sale yet, so should be no problem.
For presint 3, the problematic part would be on the new SemiD unit that near to Tralas, maybe lorry will go through the guard house, not very sure though...
Anyhow, I think noise (piling, lorry moving) and dust is unavoidable..
Anyhow, do we feel the noise and dust in the welcome center since there are so much construction in the surrounding...
Jan 28 2015, 12:17 PM

Quote
0.0321sec
0.49
6 queries
GZIP Disabled