Signed SPA today, some sharing:
1. Only units on level 2 for block J, H and E are recalled
2. The re-designed mall contains air-con covered mall and non aircon street mall ( I like this concept a lot)
3. cineplex located in between tower H and E, above the 2-level shopping mall
4. 48 months contruction period is calculated from the date of signing SPA, not building plan approval date.
5. Liability period is 24 months after VP
6. still pending whether convert Tower N to hotel
7. the fund drawdown is upon "Completion" but not "commencement" of stages, it is a very good news for those who go for non-DIBS,
the 2nd 10% will be drawdown upon the completion of the fundamental and the 3rd 15% is the COMPLETION upon the structure construction of your parcel,
means 2nd 10% should be somewhere end of next year and 3rd 15% even somewhere in year 2015 coz they need to complete the mall first...very good...
Thanks for sharing1. Only units on level 2 for block J, H and E are recalled
2. The re-designed mall contains air-con covered mall and non aircon street mall ( I like this concept a lot)
3. cineplex located in between tower H and E, above the 2-level shopping mall
4. 48 months contruction period is calculated from the date of signing SPA, not building plan approval date.
5. Liability period is 24 months after VP
6. still pending whether convert Tower N to hotel
7. the fund drawdown is upon "Completion" but not "commencement" of stages, it is a very good news for those who go for non-DIBS,
the 2nd 10% will be drawdown upon the completion of the fundamental and the 3rd 15% is the COMPLETION upon the structure construction of your parcel,
means 2nd 10% should be somewhere end of next year and 3rd 15% even somewhere in year 2015 coz they need to complete the mall first...very good...