Outline ·
[ Standard ] ·
Linear+
Investment SUNWAY VELOCITY TWO @ JALAN PEEL, Sunway JV CRSC Prop Former Lemon Tree
|
DesRed
|
Sep 14 2023, 11:24 PM
|
|
QUOTE(DrPitchard @ Sep 10 2023, 10:26 PM) Phase 1 VP liao. » Click to show Spoiler - click again to hide... « VP date is on 25th August, to be exact. I'm one of the buyers of that phase (Block B) and got my keys early this week. Block A VP'ed earlier in the month. Great workmanship and had no defects when I inspected my unit. The placement of the A/C units for all rooms is really close to the ceiling, tho, which makes it challenging to put up a plaster ceiling/gypsum board. Units in Block A are more flexible as they are bare and only come with water heater tank and a/c points. As for that link bridge connecting it to Sunway Velocity Mall, it is still not complete yet (hopefully it will be soon), so if you do need to go there, you'll have to walk outside and cross the road. I recall seeing a lift lobby under construction in the mall's P2 carpark level which connects directly to this bridge a while back so that you don't have to go through the mall to go back to this project after its opening hours. This will probably be the only way for the time being until Phase 2 is completed so that you can use its bridge to connect back to the latter if you're exiting from the Cochrane MRT station. This post has been edited by DesRed: Sep 14 2023, 11:37 PM
|
|
|
|
|
|
butthead76
|
Sep 15 2023, 08:32 AM
|
|
QUOTE(DesRed @ Sep 14 2023, 11:24 PM) VP date is on 25th August, to be exact. I'm one of the buyers of that phase (Block B) and got my keys early this week. Block A VP'ed earlier in the month. Great workmanship and had no defects when I inspected my unit. The placement of the A/C units for all rooms is really close to the ceiling, tho, which makes it challenging to put up a plaster ceiling/gypsum board. Units in Block A are more flexible as they are bare and only come with water heater tank and a/c points. As for that link bridge connecting it to Sunway Velocity Mall, it is still not complete yet (hopefully it will be soon), so if you do need to go there, you'll have to walk outside and cross the road. I recall seeing a lift lobby under construction in the mall's P2 carpark level which connects directly to this bridge a while back so that you don't have to go through the mall to go back to this project after its opening hours. This will probably be the only way for the time being until Phase 2 is completed so that you can use its bridge to connect back to the latter if you're exiting from the Cochrane MRT station. what is the rear bridge for? connect to the new development by Sunway too? Think like 1k units too. Already full speed on construction.
|
|
|
|
|
|
DesRed
|
Sep 15 2023, 02:34 PM
|
|
QUOTE(butthead76 @ Sep 15 2023, 08:32 AM) what is the rear bridge for? connect to the new development by Sunway too? Think like 1k units too. Already full speed on construction. Yes. That project is called Sunway Velocity 3 as I was told by the Sunway staff assigned to me for the key handover. Either way, the view facing towards KL city will eventually be blocked as there's still that empty plot adjacent to it which was once filled with squatter houses.
|
|
|
|
|
|
DesRed
|
Nov 12 2023, 01:19 AM
|
|
As an update, the link bridge connecting Sunway Velocity Mall to SV2 Phase 1 is completed and now accessible. I just managed to use it this Wednesday to reach the Maluri MRT station. No need to walk across Jln Peel to reach the mall anymore (tbh, it's not a busy road, but cars drive pretty fast around there). This post has been edited by DesRed: Nov 12 2023, 01:20 AM
|
|
|
|
|
|
butthead76
|
Nov 12 2023, 06:52 AM
|
|
QUOTE(DesRed @ Nov 12 2023, 01:19 AM) As an update, the link bridge connecting Sunway Velocity Mall to SV2 Phase 1 is completed and now accessible. I just managed to use it this Wednesday to reach the Maluri MRT station. No need to walk across Jln Peel to reach the mall anymore (tbh, it's not a busy road, but cars drive pretty fast around there).  How long takes to walk to maluri station thru the mall?
|
|
|
|
|
|
DesRed
|
Nov 19 2023, 12:57 AM
|
|
QUOTE(butthead76 @ Nov 12 2023, 06:52 AM) How long takes to walk to maluri station thru the mall? 4 - 5 mins if I'm not mistaken, and this is from the Tower B 2nd floor lift lobby. If you're staying in Tower A, it'll be slightly shorter. But since the walkway connects to the 2nd floor of the mall, you still need to take an escalator/lift down to the 1st floor where the walkway to the Maluri station is located in the centre court or the Cochrane station further away at the opposite end towards the Vanity Hall/Nanjing Street direction. Do be aware that the walkway opens from 9am - 11pm. If you happen to be there before/after those hours, you'll need to flag the guard stationed there to open the door to the mall manually.
|
|
|
|
|
|
darren_yuri
|
Nov 20 2023, 03:29 PM
|
|
Would love to see more owners thoughts on the workmanship of the project.
|
|
|
|
|
|
kevinx86
|
Dec 25 2023, 10:50 PM
|
Getting Started

|
Any tower c/d owner group here?
|
|
|
|
|
|
butthead76
|
Dec 26 2023, 07:31 AM
|
|
Yesterday went pass, many shops open, impressive and attractive.
|
|
|
|
|
|
macbookpro88
|
Dec 27 2023, 05:56 PM
|
Getting Started

|
Anyone knows if there are any units left ? and how much psf ?
|
|
|
|
|
|
AskarPerang
|
Jan 11 2024, 01:23 AM
|
|
|
|
|
|
|
|
phinoex
|
Jun 11 2024, 06:02 PM
|
New Member
|
Any Tower D owner whatsapp group here? Interested to join if there is one.
|
|
|
|
|
|
lankor
|
Oct 28 2024, 07:02 PM
|
New Member
|
I am an owner in Tower D as well. If there is an owner whatsapp group, would like to join
|
|
|
|
|
|
skathemuzzi
|
Dec 27 2024, 11:44 PM
|
Getting Started

|
QUOTE(lankor @ Oct 28 2024, 07:02 PM) I am an owner in Tower D as well. If there is an owner whatsapp group, would like to join  Hi. Just went to visit the unit today. I'm seriously thinking of buying one to stay there. Hows your experience so far?
|
|
|
|
|
|
lankor
|
Dec 29 2024, 12:52 PM
|
New Member
|
QUOTE(skathemuzzi @ Dec 27 2024, 11:44 PM) Hi. Just went to visit the unit today. I'm seriously thinking of buying one to stay there. Hows your experience so far? I had not received the keys yet. Not sure how is the facility and interior. I think most likely it will be in January I will receive the keys. Hopefully it will display quality workmanship considering developer is Sunway itself.
|
|
|
|
|
|
skathemuzzi
|
Dec 29 2024, 08:56 PM
|
Getting Started

|
QUOTE(lankor @ Dec 29 2024, 12:52 PM) I had not received the keys yet. Not sure how is the facility and interior. I think most likely it will be in January I will receive the keys. Hopefully it will display quality workmanship considering developer is Sunway itself. Nice. I bought mine sub-sale, just made payment for booking fee yesterday. you in sunway velocity 1 or 2? Im in SV2 Block C
|
|
|
|
|
|
chongmelvin2238
|
Dec 29 2024, 09:38 PM
|
|
QUOTE(skathemuzzi @ Dec 29 2024, 08:56 PM) Nice. I bought mine sub-sale, just made payment for booking fee yesterday. you in sunway velocity 1 or 2? Im in SV2 Block C PM .
|
|
|
|
|
|
C31
|
Mar 8 2025, 11:25 AM
|
Getting Started

|
Any owner whataps group for block D? I just got my key last week
|
|
|
|
|
|
butthead76
|
Mar 9 2025, 07:35 AM
|
|
QUOTE(C31 @ Mar 8 2025, 11:25 AM) Any owner whataps group for block D? I just got my key last week just took on friday. disappointing, lots of minor defects. overall design is good. too many facilities. likely need 50cents psf fees in future.
|
|
|
|
|
|
skathemuzzi
|
Mar 10 2025, 08:34 PM
|
Getting Started

|
QUOTE(C31 @ Mar 8 2025, 11:25 AM) Any owner whataps group for block D? I just got my key last week Im in Block C? Does that count?
|
|
|
|
|