Welcome Guest ( Log In | Register )

6 Pages < 1 2 3 4 5 > » Bottom

Outline · [ Standard ] · Linear+

Investment [CONNECTIVITY] KVMRT 2 SG BULOH-PUTRAJAYA LINE, And also news about Circle Line

views
     
TSaccetera
post Oct 8 2013, 10:46 PM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


This is the same as Ho Chin Soon one.... and since Dec 2012.
TSaccetera
post Oct 10 2013, 12:34 AM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


QUOTE(zahirnya @ Oct 9 2013, 02:53 PM)
anyone knows what happen in front of Casa Indah? are they building a monsoon drainage or underpass towards Giza?
*
Yes...
TSaccetera
post Nov 20 2013, 12:39 AM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


As we all know from the beginning of this thread, the ending part is break to 2 branches.

Some quarters felt that MRT2 will have to be extended from Serdang branch line and head towards a proposed site in Cyberjaya.
TSaccetera
post Nov 20 2013, 08:47 PM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


If you add all the stations on our Rail Map, you'll get few hundred stations as well.

That is if you consider KTM as an urban rail transport.


TSaccetera
post Nov 21 2013, 08:35 PM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


QUOTE(skcJVN @ Nov 21 2013, 11:58 AM)
Resume ' TALK ' only .. Talk talk talk cock lor !
*
This project needs to TALK MORE. Involving alot of money and both countries politics.
TSaccetera
post Mar 11 2014, 11:02 PM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


Reposting tangent88

This is SSP route (as of July 2013)

user posted image
TSaccetera
post Mar 13 2014, 02:13 PM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


user posted image
https://www.facebook.com/MRTMalaysia
TSaccetera
post Mar 13 2014, 04:12 PM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


QUOTE(ace77 @ Mar 13 2014, 02:34 PM)
This is very strange as it stop for not connecting KLIA track which will link to KLIA. I dont think this will be the final coz the cost of not linking to KLIA is too much to risk... Especially with KLIA2>> Surely this cannot be miss
*
KLIA and KLIA2 is already connected to an Airport Rail called ERL.

There shouldn't be duplicating route. In future, the KTM in Nilai will connect the southern part to KLIA.

This post has been edited by accetera: Mar 13 2014, 04:12 PM
TSaccetera
post Mar 13 2014, 11:26 PM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


My hope is Putrajaya Monorai tweaked into extension for this MRT. Secondly, the Serdang branch should go all the way to Equine Park and finally reaching Limkokwing Cyberjaya.
TSaccetera
post Mar 17 2014, 10:24 AM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


MRT Sg Buloh - Kajang Line trains.
https://www.facebook.com/groups/115179435202482/

THE REPLICA ::: At this minute, MRT Corp is officially unveiling "The Guiding Light" - Malaysia's first MRT train at KL Sentral. The train is designed based on the Siemens Inspiro series with "The Guiding Light" theme chosen for Malaysia. It was reported that the interior of the train is designed by BMW DesignWorks.

user posted image
https://www.facebook.com/MRTMalaysia

This post has been edited by accetera: Mar 17 2014, 10:24 AM
TSaccetera
post Mar 18 2014, 09:31 AM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


QUOTE(Rockman.EXE @ Mar 18 2014, 02:04 AM)
DISAPPOINTING that MRT Corp. didn't announce the 2nd Line...... sad.gif

But anyway, this train looks luxury~~~ thumbup.gif  rclxms.gif
*
https://www.facebook.com/groups/115179435202482/


FLASH NEWS ::: Introducing MRT Sg Buloh-Serdang-Putrajaya (SSP) Line as Klang Valley's MRT Line 2.

Below is an indication of the alignment and proposed stations. It is not yet made official via public display and announcement, and in addition, PTLM expects a few more stations will add onto this list below.

1. Sungai Buloh (interchange KTM and MRT 1)
2. Damansara Damai
3. Sri Damansara
4. Bandar Menjalara
5. Kepong Sentral (interchange KTM)
6. Metro Prima
7. Kepong Utara
8. Jinjang
9. Batu
10. Batu Kentonmen
11. Sentul (interchange MRT Circle and possible interchange KTM)
12. Jalan Ipoh
13. General Hospital
14. Kampung Baru (interchange KJ-LRT)
15. KLCC (interchange KJ-LRT)
16. Pasar Rakyat/Tun Razak Exchange (interchange MRT 1)
17. Kampung Pandan
18. Pandan Jaya (interchange AP-LRT)
19. Pandan Indah
20. Taman Muda (interchange MRT Circle)
21. Bukit Permai
22. Taman Segar
23. Plaza Phoenix (interchange MRT 1)
24. Alam Damai
25. Damai Perdana
26. The Mines
27. Serdang (interchange KTM)
28. Sri Serdang (possible future extension)
29. UPM
30. Precinct 14 Putrajaya (possible future extension)

TSaccetera
post Mar 18 2014, 12:09 PM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


My take on possible loop extension

Sri Serdang - Equine Park - Putra Permai - Limkokwing - Putrajaya Sentral

Sri Serdang - UPM - IOI City Mall - Precinct 14 Putrajaya - Putrajaya Sentral
TSaccetera
post Apr 9 2014, 01:56 PM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


QUOTE(Antiexunited @ Apr 8 2014, 11:27 PM)
Taman muda station interchange with circle line.that mean in future taman muda got two mrt line .?
*
Yes
TSaccetera
post Apr 28 2014, 11:20 PM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


Cyberjaya may get a LRT
TSaccetera
post May 18 2014, 08:50 PM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


Sidetopic:

MRT Circle Line is looking to integrate with Universiti LRT (linked to KL Gateway) after stopping at Angakasapuri (possible integration with LRT/KTM/Monorail at KL Eco City) and Pantai Dalam (interchange KTM and linked to Pantai Sentral Park).
TSaccetera
post May 21 2014, 11:25 PM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


QUOTE(Dry Pillow @ May 21 2014, 06:04 PM)
feel sorry for people in the west side. Shah Alam-Klang area looks like out of the radar for now. No lines whatsoever
*
LRT 3 (2014 Approval Stage)
http://www.thestar.com.my/Business/Busines...al-to-start-job
TSaccetera
post May 22 2014, 10:06 AM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


BU - Aman Suria - Kelana Centre Point - Glenmarie - Batu Tiga - Shah Alam Stadium - ICity - Klang Bus Station - Klang Hospital - AEON Bukit Tinggi
TSaccetera
post May 22 2014, 10:09 AM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


QUOTE(gsw8895 @ May 22 2014, 10:07 AM)
probably the immediate beneficiary is setia alam...not supprised also, SP setia and SIME DARBY have huge project there...
earlier on i also curious will they go to the other side of shah alam klang where not much GLC have interest there, only the alam impian by sime.
the rest are ioi/gamuda/etc...
*
Setia Alam has no market because the final part is mainly industrial.

The southern side serves Shah Alam City - Stadium - UITM, typically the main focal point of Shah Alam.

The biggest lobby guy is I-City now.

This post has been edited by accetera: May 22 2014, 10:11 AM
TSaccetera
post May 22 2014, 10:18 AM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


QUOTE(felixmask @ May 22 2014, 10:17 AM)
hi accetera

Im confuse..is LRT 3 = MRT 2 (Sg Buloh - Putrajaya)
*
Don't confuse lah.

LRT is LRT. We plan to have 3 lines by 2020.

MRT is MRT. We plan to have 3 lines by 2025.
TSaccetera
post Sep 4 2014, 04:22 PM

Ambassador of ChatHouz AI
********
All Stars
10,777 posts

Joined: Sep 2009


MRT 2 has got some updates.

6 Pages < 1 2 3 4 5 > » Top
 

Change to:
| Lo-Fi Version
1.3177sec    0.51    7 queries    GZIP Disabled
Time is now: 11th December 2025 - 07:43 PM