that tunnel boring machine, is it same like used in SMART tunnel? look like this tunnel very small compare to SMART tunnel..
Ultimate Sg Buloh-Kajang MRT construction thread
Ultimate Sg Buloh-Kajang MRT construction thread
|
|
Dec 25 2013, 07:14 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,422 posts Joined: Jan 2003 From: 192.168.0.100 |
that tunnel boring machine, is it same like used in SMART tunnel? look like this tunnel very small compare to SMART tunnel..
|
|
|
Dec 26 2013, 01:23 AM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,831 posts Joined: Dec 2009 |
+1
|
|
|
Dec 26 2013, 10:25 PM
|
![]() ![]() ![]()
Junior Member
449 posts Joined: Jul 2009 From: Soyuz Sovetskikh Sotsialisticheskikh Respublik |
quick Q, what happens to these TBMs after completion of project? jual balik or simpan for MRT2/3? What happened to Smart tunnel's TBM?
|
|
|
Dec 31 2013, 11:15 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
TTDI (31/12/2013)
![]() ![]() ![]() |
|
|
Dec 31 2013, 11:28 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Seksyen 16 (31/12/ 2013)
![]() ![]() ![]() ![]() ![]() ![]() |
|
|
Dec 31 2013, 11:31 AM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,340 posts Joined: Dec 2005 From: here |
wa... this station very high leh...
in city centre, how big is the underground station? will there be any underground shopping? plenty of exit linked to different places? like Sg or Jp. |
|
|
Dec 31 2013, 11:37 AM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,661 posts Joined: Jan 2003 |
not only this infact the stations in midah and taman pertama also as high and huge..wonder how many shops will they provide inside
|
|
|
Dec 31 2013, 11:43 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(menmissed @ Dec 31 2013, 11:31 AM) wa... this station very high leh... There is no underground shopping. However, Bukit Bintang MRT station will have at least 4 exits.in city centre, how big is the underground station? will there be any underground shopping? plenty of exit linked to different places? like Sg or Jp. |
|
|
Dec 31 2013, 06:06 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,831 posts Joined: Dec 2009 |
Well, now already end of Year 2013
But still no news for MRT 2 and MRT 3 *As per predicted... |
|
|
Jan 1 2014, 02:47 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
https://www.facebook.com/mrtunderground?fref=ts
QUOTE Aerial view showing current position of COCHRANE (COC) 1 & COCHRANE (COC) 2: COC 1 (@CH7+117.75) has mined 1260.44m (895/1035 rings - 86.5%). The TBM has mined 222.6m into the Pasar Rakyat Station box and will arrive at Inai Lower Shaft before the end of this week for cutterhead repair / maintenance which should take about just over a week. COC 2 (@CH7+369.69) has mined 975.86m (692/742 rings - 93.2%). The TBM has successfully crossed under the SMART Motorway and Jalan Tun Razak without incident. The TBM has just stopped for once more for maintenance before mining through the last stretch before the breakthrough at Pasar Rakyat Station. The TBM will break into the station box on the 9th of January 2014. ![]() ![]() |
|
|
Jan 5 2014, 08:26 PM
|
![]()
Newbie
0 posts Joined: Oct 2012 |
Believe that this is Cochrane 1 that has broken through to Inai shaft.
![]() https://fbcdn-sphotos-f-a.akamaihd.net/hpho...418734024_n.jpg ![]() https://fbcdn-sphotos-c-a.akamaihd.net/hpho...198746123_n.jpg This post has been edited by jonc88: Jan 5 2014, 08:28 PM |
|
|
Jan 5 2014, 09:32 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
TTDI (3/1/2013)
![]() SB launch gantry at Seksyen 16 station site (4/1/2013) ![]() |
|
|
Jan 5 2014, 10:25 PM
|
![]()
Newbie
0 posts Joined: Oct 2012 |
Good to see phase 1 finally having some progress! Cannot imagine how PBD will look once they get the gantries up there too. Whoo!
|
|
|
Jan 5 2014, 11:04 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Jan 6 2014, 05:38 PM
|
![]()
Newbie
2 posts Joined: Feb 2010 |
|
|
|
Jan 6 2014, 05:59 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Jan 7 2014, 10:47 PM
|
![]()
Newbie
0 posts Joined: Oct 2012 |
QUOTE(Kampung2005 @ Jan 5 2014, 11:04 PM) I have to say progress is getting faster. Damansara area, piers can be seen in TTDI, 1 Utama and coming soon Surian area. Good to hear. I also heard from my friend that Cochrane 2 is ready to breakthrough to Pasar Rakyat. Waiting for some VVIPs to attend though. This one will break directly into Pasar Rakyat station box instead of tunneling through as they have already excavated to the required depth. |
|
|
Jan 9 2014, 02:19 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,766 posts Joined: Jan 2003 From: Malaysia |
Happening now at Pasar Rakyat station.... the world's firdt variable density TbM breakthrough
![]() |
|
|
Jan 9 2014, 03:51 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,766 posts Joined: Jan 2003 From: Malaysia |
![]() |
|
|
Jan 9 2014, 03:59 PM
|
![]() ![]() ![]() ![]()
Junior Member
551 posts Joined: May 2013 |
QUOTE(davkong @ Jan 9 2014, 02:19 PM) » Click to show Spoiler - click again to hide... « Means the drilling from maluri to pasar rakyat is done? |
| Bump Topic Add ReplyOptions New Topic |
| Change to: | 0.0311sec
0.46
6 queries
GZIP Disabled
Time is now: 20th December 2025 - 08:43 AM |