> Ultimate Sg Buloh-Kajang MRT construction thread

views
     
davkong
post Jan 9 2014, 04:23 PM

reConnect
******
Senior Member
1,766 posts

Joined: Jan 2003
From: Malaysia


QUOTE(pobox @ Jan 9 2014, 03:59 PM)
Good job MRTCorp.

Means the drilling from maluri to pasar rakyat is done?
*
This TBM started mining from Cochrane. There are another two which are mining in the opposite direction towards Maluri, yet to break through. So Cochrane to Pasar Rakyat completed for both tunnels, in fact the lower shaft TBM has already mined through underneath Pasar Rakyat and broke through Inai, but no ceremony for that one.
jonc88
post Jan 10 2014, 12:03 AM

New Member
*
Newbie
0 posts

Joined: Oct 2012


QUOTE(davkong @ Jan 9 2014, 04:23 PM)
This TBM started mining from Cochrane. There are another two which are mining in the opposite direction towards Maluri, yet to break through. So Cochrane to Pasar Rakyat completed for both tunnels, in fact the lower shaft TBM has already mined through underneath Pasar Rakyat and broke through Inai, but no ceremony for that one.
*
Yup, posted some photos of that one on the previous page. So not bad really, they're done with 3 tunnels so far.

KL Sentral - Semantan Portal (NB)
Pasar Rakyat - Cochrane (SB)
Cochrane - Pasar Rakyat (NB)

Where NB = NorthBound and SB = SouthBound.

Other tunnels underway:
Semantan Portal - KL Sentral (SB) = Semantan 2
Inai - Pudu (NB or SB?) = Inai 2
Cochrane - Maluri (SB) = Maluri 2
Cochrane - Maluri (NB) = Maluri 1
davkong
post Jan 10 2014, 09:14 AM

reConnect
******
Senior Member
1,766 posts

Joined: Jan 2003
From: Malaysia


QUOTE(jonc88 @ Jan 10 2014, 12:03 AM)
Yup, posted some photos of that one on the previous page. So not bad really, they're done with 3 tunnels so far.

KL Sentral - Semantan Portal (NB)
Pasar Rakyat - Cochrane (SB)
Cochrane - Pasar Rakyat (NB)

Where NB = NorthBound and SB = SouthBound.

Other tunnels underway:
Semantan Portal - KL Sentral (SB) = Semantan 2
Inai - Pudu (NB or SB?) = Inai 2
Cochrane - Maluri (SB) = Maluri 2
Cochrane - Maluri (NB) = Maluri 1
*
Yup...Semantan 2 expected to break through KL Sentral sometime end of this month.
TSKampung2005
post Jan 11 2014, 01:49 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
Overall completion : 33%

Tunneling works : 50%
lilzany
post Jan 11 2014, 04:11 PM

Regular
******
Senior Member
1,479 posts

Joined: Mar 2005
From: Kuala Lumpur
user posted image

From the looks of here, that means the predicted out was on the spot. This is some solid engineering calculations.
vin_ann
post Jan 11 2014, 06:56 PM

10k Club
********
All Stars
10,912 posts

Joined: Feb 2006
QUOTE(lilzany @ Jan 11 2014, 04:11 PM)
user posted image

From the looks of here, that means the predicted out was on the spot. This is some solid engineering calculations.
*
rclxms.gif rclxms.gif
TSKampung2005
post Jan 13 2014, 11:23 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
Kajang (13/1/2014)

user posted image

user posted image

user posted image
whyliddat
post Jan 14 2014, 11:48 PM

New Member
*
Junior Member
4 posts

Joined: Dec 2013


Hi I'm very vey late tot his thread, but I was wondering why didn't they go for a subway approach instead? Is it just because it's too expensive?
TSKampung2005
post Jan 14 2014, 11:50 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(whyliddat @ Jan 14 2014, 11:48 PM)
Hi I'm very vey late tot his thread, but I was wondering why didn't they go for a subway approach instead? Is it just because it's too expensive?
*
Too expensive and unnecessary.

Even inside KL city, they went for underground as it is actually more cost effective to do underground in KL city than elevated.
spacelion
post Jan 14 2014, 11:51 PM

Ada Liu
******
Senior Member
1,692 posts

Joined: Mar 2009
From: Probation?
hopefully delayed a bit

bcos schedule a bit tight for our side as well >.<
whyliddat
post Jan 15 2014, 12:33 AM

New Member
*
Junior Member
4 posts

Joined: Dec 2013


QUOTE(Kampung2005 @ Jan 14 2014, 11:50 PM)
Too expensive and unnecessary.

Even inside KL city, they went for underground as it is actually more cost effective to do underground in KL city than elevated.
*
However everytime i drive along the sprint to KL i kind of wish it was, at least up till semantan. The elevated tracks seems jarring with the landscape, especially maarof side. I might have to eat my words a fe years from now but it looks so messy.

Ranting. But seriously urgh.......
TSKampung2005
post Jan 15 2014, 12:34 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(whyliddat @ Jan 15 2014, 12:33 AM)
However everytime i drive along the sprint to KL i kind of wish it was, at least up till semantan. The elevated tracks seems jarring with the landscape, especially maarof side. I might have to eat my words a fe years from now but it looks so messy.

Ranting. But seriously urgh.......
*
Messy as it may be, it is approved by local authority and complies with rules.

Even land acquisition alone costs upwards of RM 1 billion.
TSKampung2005
post Jan 15 2014, 11:33 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
15/1/2014

Seksyen 16

user posted image

Pusat Bandar Damansara

user posted image
cnvery
post Jan 16 2014, 02:04 AM

Regular
******
Senior Member
1,831 posts

Joined: Dec 2009

+1
TSKampung2005
post Jan 17 2014, 01:56 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
https://www.facebook.com/photo.php?fbid=601...&type=1&theater

Successful breakthrough of Semantan 2 at KL Sentral today at 4.30pm.

user posted image
user posted image
TSKampung2005
post Jan 20 2014, 08:05 AM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
Photos by sapphire blue

Bukit Dukung

user posted image

user posted image

user posted image

Batu 9 Cheras

user posted image

user posted image

user posted image
SUSAxeFire
post Jan 21 2014, 10:44 PM

Casual
***
Junior Member
368 posts

Joined: Oct 2012
From: Penang
user posted image
toda_erika_II
post Jan 21 2014, 10:47 PM

rawr~~
****
Senior Member
540 posts

Joined: Mar 2008
Kampung, the other 2 lines wont start before this one completed?
TSKampung2005
post Jan 21 2014, 10:50 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(toda_erika_II @ Jan 21 2014, 10:47 PM)
Kampung, the other 2 lines wont start before this one completed?
*
No idea about that. After all, financing one line isn't easy.
SUSJyunkai
post Jan 21 2014, 10:53 PM

Getting Started
**
Junior Member
176 posts

Joined: Apr 2013


hey kampung, once the MRT line finishes, how long would it take to go from one end to another?

This post has been edited by Jyunkai: Jan 21 2014, 10:54 PM