Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

> Ultimate Sg Buloh-Kajang MRT construction thread

views
     
davkong
post Jan 9 2014, 02:19 PM

reConnect
******
Senior Member
1,766 posts

Joined: Jan 2003
From: Malaysia


Happening now at Pasar Rakyat station.... the world's firdt variable density TbM breakthrough
user posted image

davkong
post Jan 9 2014, 03:51 PM

reConnect
******
Senior Member
1,766 posts

Joined: Jan 2003
From: Malaysia


user posted image
davkong
post Jan 9 2014, 04:23 PM

reConnect
******
Senior Member
1,766 posts

Joined: Jan 2003
From: Malaysia


QUOTE(pobox @ Jan 9 2014, 03:59 PM)
Good job MRTCorp.

Means the drilling from maluri to pasar rakyat is done?
*
This TBM started mining from Cochrane. There are another two which are mining in the opposite direction towards Maluri, yet to break through. So Cochrane to Pasar Rakyat completed for both tunnels, in fact the lower shaft TBM has already mined through underneath Pasar Rakyat and broke through Inai, but no ceremony for that one.
davkong
post Jan 10 2014, 09:14 AM

reConnect
******
Senior Member
1,766 posts

Joined: Jan 2003
From: Malaysia


QUOTE(jonc88 @ Jan 10 2014, 12:03 AM)
Yup, posted some photos of that one on the previous page. So not bad really, they're done with 3 tunnels so far.

KL Sentral - Semantan Portal (NB)
Pasar Rakyat - Cochrane (SB)
Cochrane - Pasar Rakyat (NB)

Where NB = NorthBound and SB = SouthBound.

Other tunnels underway:
Semantan Portal - KL Sentral (SB) = Semantan 2
Inai - Pudu (NB or SB?) = Inai 2
Cochrane - Maluri (SB) = Maluri 2
Cochrane - Maluri (NB) = Maluri 1
*
Yup...Semantan 2 expected to break through KL Sentral sometime end of this month.

Bump Topic Add ReplyOptions New Topic
 

Change to:
| Lo-Fi Version
0.0289sec    1.15    7 queries    GZIP Disabled
Time is now: 22nd December 2025 - 09:48 AM