https://www.facebook.com/photo.php?fbid=586...&type=1&theater

QUOTE
Aerial view showing current location of TBMs Maluri 1 and Maluri 2 which were launched from Cochrane towards Maluri. Maluri 1 has done 426m while Maluri 2 has mined 175m.
user posted image
TSKampung2005
post Dec 18 2013, 06:52 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
TBM progress update (won't be 100% accurate as it is based on periodic update by MRT Corp)

user posted image

SMT1 (Semantan 1) = covered 1264 m from Semantan portal, towards KL Sentral (as of 2nd December 2013)
SMT2 (Semantan 2) = covered 943 m from Semantan portal, towards KL Sentral (as of 2nd December 2013)
Inai 2 = covered first ring, towards Bukit Bintang Sentral station (as of 29th November 2013)
COC1 (Cochrane 1) = covered 900 m from Cochrane station site (as of 16th November 2013)
COC2 (Cochrane 2) = covered 600 m from Cochrane station site, towards Pasar Rakyat station (as of 16th November 2013)
MAL 1 (Maluri 1) = covered 426 m from Cochrane station site, towards Maluri (as of 18th December 2013)
MAL 2 (Maluri 2) = covered 175 m from Cochrane station site, towards Maluri (as of 18th December 2013)
weiheng
post Dec 18 2013, 07:15 PM

I'm Lovin' it
******
Senior Member
1,513 posts

Joined: Jan 2003

when is the 2nd line suppose to announce?
TSKampung2005
post Dec 18 2013, 07:33 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(weiheng @ Dec 18 2013, 07:15 PM)
when is the 2nd line suppose to announce?
*
Not known for now smile.gif
TSKampung2005
post Dec 18 2013, 07:40 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
18/12/2013

1 Utama

user posted image

user posted image

user posted image

Persiaran Surian

user posted image

user posted image
Quattho
post Dec 22 2013, 07:32 PM

New Member
*
Newbie
0 posts

Joined: Dec 2013
MRT website is very informative! Good work from the developer. It got almost everything that u need; project updates, information about tenders, even reports on special events ex: protest on MRT at Bus Stand Klang last year.

Check it out!

http://www.mymrt.com.my/

LRT extension and BRT sunway should learn something from here.
Flaming_lion
post Dec 22 2013, 07:42 PM

An Innocent Lion
****
Senior Member
649 posts

Joined: Aug 2010
I do get a sense that they may very well finish ahead of time?
TSKampung2005
post Dec 22 2013, 07:45 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(Flaming_lion @ Dec 22 2013, 07:42 PM)
I do get a sense that they may very well finish ahead of time?
*
Ahead of time, I don't know, however tunneling wise, a major milestone will be achieved soon smile.gif

Very soon, Semantan 1 tunnel boring machine will reach KL Sentral station box biggrin.gif

user posted image

In the northern part of the line, more piers can be seen around Kota Damansara now.
Flaming_lion
post Dec 22 2013, 07:46 PM

An Innocent Lion
****
Senior Member
649 posts

Joined: Aug 2010
QUOTE(Kampung2005 @ Dec 22 2013, 07:45 PM)
Ahead of time, I don't know, however tunneling wise, a major milestone will be achieved soon smile.gif

Very soon, Semantan 1 tunnel boring machine will reach KL Sentral station box biggrin.gif

user posted image

In the northern part of the line, more piers can be seen around Kota Damansara now.
*
Can't wait for it to finish. Its been long overdue. Hopefully it will ease the jam and the over-reliance on LRT & Monorail in the long run.
TSKampung2005
post Dec 22 2013, 07:48 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(Flaming_lion @ Dec 22 2013, 07:46 PM)
Can't wait for it to finish. Its been long overdue. Hopefully it will ease the jam and the over-reliance on LRT & Monorail in the long run.
*
Not just it relieves over-reliance on LRT and monorail, ultimately this line will serve areas where there is no rail at all (i.e Damansara).

The beautiful thing about this line is that there might be some extra services which do not serve the whole line. That means frequency can be varied between different parts of the line.

Some MRT stations may have 3 tracks.
Flaming_lion
post Dec 22 2013, 07:50 PM

An Innocent Lion
****
Senior Member
649 posts

Joined: Aug 2010
QUOTE(Kampung2005 @ Dec 22 2013, 07:48 PM)
Not just it relieves over-reliance on LRT and monorail, ultimately this line will serve areas where there is no rail at all (i.e Damansara).

The beautiful thing about this line is that there might be some extra services which do not serve the whole line. That means frequency can be varied between different parts of the line.

Some MRT stations may have 3 tracks.
*
Woah... 3 tracks? As in functioning like a commuter or maybe an express line?
TSKampung2005
post Dec 22 2013, 07:57 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(Flaming_lion @ Dec 22 2013, 07:50 PM)
Woah... 3 tracks? As in functioning like a commuter or maybe an express line?
*
No, it is like this.

Case 1: Singapore North-South Line

The whole line is from Jurong East (NS 1) to Marina Bay (NS 27).

In Ang Mo Kio station (NS 16), they have 3 tracks, such as this...

user posted image

The extra track, they used it to launch more frequent 'Lunch Time Xpress' during lunch hours from Ang Mo Kio to Marina Bay.
Flaming_lion
post Dec 22 2013, 08:26 PM

An Innocent Lion
****
Senior Member
649 posts

Joined: Aug 2010
QUOTE(Kampung2005 @ Dec 22 2013, 07:57 PM)
No, it is like this.

Case 1: Singapore North-South Line

The whole line is from Jurong East (NS 1) to Marina Bay (NS 27).

In Ang Mo Kio station (NS 16), they have 3 tracks, such as this...

user posted image

The extra track, they used it to launch more frequent 'Lunch Time Xpress' during lunch hours from Ang Mo Kio to Marina Bay.
*
Oh... That.... That would be very useful.
Quattho
post Dec 22 2013, 09:49 PM

New Member
*
Newbie
0 posts

Joined: Dec 2013
Anybody check this vid already? MRT Bukit Bintang station got underground connection to Pavilion, Starhill and Fahrenheit88. Woohooo!



namh
post Dec 22 2013, 10:46 PM

Just a passerby
******
Senior Member
1,422 posts

Joined: Jan 2003
From: 192.168.0.100



QUOTE(Quattho @ Dec 22 2013, 09:49 PM)
Anybody check this vid already? MRT Bukit Bintang station got underground connection to Pavilion, Starhill and Fahrenheit88. Woohooo!


*
I help you fix this cool2.gif
TSKampung2005
post Dec 23 2013, 02:05 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
TTDI ( 23/12/ 2013)

user posted image

user posted image

user posted image
TSKampung2005
post Dec 24 2013, 10:21 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
First tunnel boring machine breakthrough of the project, in KL Sentral station site

Photos by MRT Corp

https://www.facebook.com/MRTMalaysia?fref=ts

Construction for the Klang Valley MRT Sungai Buloh-Kajang Line marked an important milestone today, as the first of nine Tunnel Boring Machines (TBM) named Semantan 1, made a breakthrough at the underground KL Sentral Station worksite. This would be the first breakthrough for the MRT Project.

The machine involved is the Earth Pressure Balance TBM, which was launched at the Semantan North Portal on 13 June 2013. The breakthrough follows an excavation of about 1.4km, boring a 6m diameter tunnel for trains that will head north towards Sungai Buloh.

The machine will now undergo maintenance works at the KL Sentral Station worksite before being re-launched for tunnelling through to Pasar Seni worksite next year.

A total of nine TBMs are going to be used to construct the tunnel for the 9.5km underground alignment of the Sungai Buloh-Kajang MRT Line, with 7 underground stations. They comprise of four Earth Pressure Balance TBMs which will be used for the Kenny Hills geological formation, and five Variable Density TBMs for the Kuala Lumpur Limestone geological formation. The underground works contractor is MMC Gamuda KVMRT (T) Sdn Bhd.

Currently, there are seven TBMs which are operational for the MRT Project and are at various stages of tunnelling. They are monitored by personnel who are stationed directly above where the TBMs excavate.

The first TBM was launch by YAB Dato’ Sri Mohd Najib Tun Abdul Razak at the Cochrane Launch Shaft on 30 May 2013, indicating the start of excavation works.

user posted image

user posted image

user posted image

user posted image

user posted image
TSKampung2005
post Dec 25 2013, 01:25 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
Seksyen 16 station (23/12/2013)

user posted image

user posted image

Pusat Bandar Damansara (24/12/2013)

user posted image

user posted image

SUSFindingGamerWife
post Dec 25 2013, 01:28 PM

Getting Started
**
Junior Member
51 posts

Joined: Dec 2013
omg. wall pecah to photoshop ke? the tunnel boring machine rosak?
TSKampung2005
post Dec 25 2013, 01:31 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(FindingGamerWife @ Dec 25 2013, 01:28 PM)
omg. wall pecah to photoshop ke? the tunnel boring machine rosak?
*
It is not rosak. It means tunneling work has reached to this distance smile.gif