QUOTE(vin_ann @ Dec 3 2013, 02:58 PM)
A map detailing total underground work will be made shortly.
Ultimate Sg Buloh-Kajang MRT construction thread
Ultimate Sg Buloh-Kajang MRT construction thread
|
|
Dec 3 2013, 03:00 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Dec 3 2013, 05:18 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
TBM progress update (won't be 100% accurate as it is based on periodic update by MRT Corp)
![]() SMT1 (Semantan 1) = covered 1264 m from Semantan portal, towards KL Sentral (as of 2nd December 2013) SMT2 (Semantan 2) = covered 943 m from Semantan portal, towards KL Sentral (as of 2nd December 2013) Inai 2 = covered first ring, towards Bukit Bintang Sentral station (as of 29th November 2013) COC1 (Cochrane 1) = covered 900 m from Cochrane station site (as of 16th November 2013) COC2 (Cochrane 2) = covered 600 m from Cochrane station site, towards Pasar Rakyat station (as of 16th November 2013) MAL 1 (Maluri 1) = covered 163 m from Cochrane station site, towards Maluri (as of 16th November 2013) MAL 2 (Maluri 2) = covered 38 m from Cochrane station site, towards Maluri (as of 16th November 2013) This post has been edited by Kampung2005: Dec 3 2013, 08:02 PM |
|
|
Dec 3 2013, 07:35 PM
|
![]()
Newbie
0 posts Joined: Oct 2012 |
I think the TBM update slightly off.. COC1 and COC2 launched from Cochrane itself, so the red and green lines should be from Cochrane station?
|
|
|
Dec 3 2013, 07:38 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Dec 3 2013, 07:47 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Map fixed.
|
|
|
Dec 3 2013, 09:13 PM
|
![]()
Junior Member
15 posts Joined: Nov 2013 |
when mrt completed? crazy jams along cheras leisuremall....wtf la
|
|
|
Dec 3 2013, 09:18 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Dec 4 2013, 09:13 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
10,912 posts Joined: Feb 2006 |
QUOTE(Kampung2005 @ Dec 3 2013, 05:18 PM) TBM progress update (won't be 100% accurate as it is based on periodic update by MRT Corp) ![]() SMT1 (Semantan 1) = covered 1264 m from Semantan portal, towards KL Sentral (as of 2nd December 2013) SMT2 (Semantan 2) = covered 943 m from Semantan portal, towards KL Sentral (as of 2nd December 2013) Inai 2 = covered first ring, towards Bukit Bintang Sentral station (as of 29th November 2013) COC1 (Cochrane 1) = covered 900 m from Cochrane station site (as of 16th November 2013) COC2 (Cochrane 2) = covered 600 m from Cochrane station site, towards Pasar Rakyat station (as of 16th November 2013) MAL 1 (Maluri 1) = covered 163 m from Cochrane station site, towards Maluri (as of 16th November 2013) MAL 2 (Maluri 2) = covered 38 m from Cochrane station site, towards Maluri (as of 16th November 2013) btw, kampung, how's LRT extension? i thinks we have forgets about LRT construction! |
|
|
Dec 4 2013, 12:08 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Kajang area (4/12/2013)
![]() ![]() ![]() ![]() |
|
|
Dec 4 2013, 07:28 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Batu 11 to Batu 9 Cheras (4/12/2013)
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
|
Dec 4 2013, 07:36 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Jalan Cheras, Kuala Lumpur (4/12/2013)
![]() ![]() SB launch girder near Tesco ![]() ![]() ![]() ![]() |
|
|
Dec 9 2013, 04:38 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
https://www.facebook.com/photo.php?fbid=581...&type=1&theater
Preparatory works at KL Sentral station for breakthrough of Semantan 1 (coming from Semantan portal) which is expected before Christmas. ![]() |
|
|
Dec 9 2013, 04:46 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Latest TBM progress update (won't be 100% accurate as it is based on periodic update by MRT Corp)
![]() SMT1 (Semantan 1) = covered 1264 m from Semantan portal, towards KL Sentral (as of 2nd December 2013) SMT2 (Semantan 2) = covered 943 m from Semantan portal, towards KL Sentral (as of 2nd December 2013) Inai 2 = covered first ring, towards Bukit Bintang Sentral station (as of 29th November 2013) COC1 (Cochrane 1) = now in Pasar Rakyat station site (as of 9th December 2013) COC2 (Cochrane 2) = now just outside of Royal Selangor Golf Club, towards Pasar Rakyat station (as of 9th December 2013) MAL 1 (Maluri 1) = covered 163 m from Cochrane station site, towards Maluri (as of 16th November 2013) MAL 2 (Maluri 2) = covered 38 m from Cochrane station site, towards Maluri (as of 16th November 2013) |
|
|
Dec 9 2013, 04:48 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
https://www.facebook.com/photo.php?fbid=660...&type=1&theater MRT guideway special span across Jalan Sungai Buloh-Subang completed. ![]() |
|
|
Dec 9 2013, 04:54 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Photos taken by sapphire blue (SSC)
Along Cheras-Kajang Highway 8-12-2013 ![]() Uploaded with ImageShack.us ![]() Uploaded with ImageShack.us ![]() Uploaded with ImageShack.us ![]() Uploaded with ImageShack.us ![]() Uploaded with ImageShack.us ![]() Uploaded with ImageShack.us ![]() Uploaded with ImageShack.us |
|
|
Dec 12 2013, 10:54 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Photos taken by dengilo (10/12/2013)
TV3 area ![]() ![]() |
|
|
Dec 12 2013, 10:56 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
Merdeka station (photos by MRT Corp)
![]() ![]() |
|
|
Dec 14 2013, 03:06 AM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,831 posts Joined: Dec 2009 |
+1
|
|
|
Dec 15 2013, 11:49 PM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
https://www.facebook.com/MRTMalaysia?fref=ts
QUOTE The Pasar Rakyat MRT Station Box taking shape with a base level of 45 metres. This station will be the deepest of the seven underground stations. ![]() |
|
|
Dec 17 2013, 12:45 AM
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
https://www.facebook.com/photo.php?fbid=585...&type=1&theater
QUOTE Work going on at Pasar Seni station. ![]() |
| Bump Topic Add ReplyOptions New Topic |
| Change to: | 0.0348sec
0.98
6 queries
GZIP Disabled
Time is now: 19th December 2025 - 05:38 PM |